HomeMy WebLinkAboutNCG120047 DMR SW (7) July 29, 2016
SANTE KYrANCDEQ g
Division of Water Quality RECEIVED
,® Central Files AuG 0 3 2016
WasteServices 1617 Mail Service Center
Raleigh,North Carolina 27699-1617 CENTRAL FILES
650 25th Street,N W,Suite 100 ®WR SECTION
Cleveland,Tennessee 37311
(423)303-7101 Re: Discharge Monitoring Reports (DMR's)— 1St Semi-Annual Event 2016
Emaimail@sancorn Haywood County (White Oak) Landfill
Internet www santekenviro corn
NPDES Permit Number: PN0,04f
To Whom It May Concern:
In accordance with Part III(E)(1) of General NPDES Permit(NCG120000),
please find enclosed one original and one copy of the storm water discharge
monitoring reports (DMR's) for the Haywood County(White Oak) Landfill.
According to the site manager, no discharge occurred during the first semi-
annual monitoring period of 2016 due to drought conditions and increased
sediment pond capacity after sediment was removed.
If you have any questions or comments,please feel free to call at(423) 303-
7101.
Sincerely,
•
Robert Hudson
Environmental Compliance Coordinator
Enclosure
cc: Jonathan Stepp, Environmental Specialist,NCDENR
David Francis, Solid Waste/Tax Administrator, Haywood County
Ira Dove, County Manager, Haywood County
Matt Dillard, Executive V.P. of Operations, Santek
Ron Vail, P.E., V.P. of Engineering, Santek
John Preston, Facility Manager, Santek
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG120000
Date submitted 7/29/2016
CERTIFICATE OF COVERAGE NOA _ Iate' SAMPLE COLLECTION YEAR 2016
FACILITY NAME Haywood County—White Oak Landfill SAMPLE PERIOD ®Jan-June ❑July-Dec
COUNTY Haywood or ❑ Monthly' (month)
PERSON COLLECTING SAMPLES DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY Lab Cert.# ❑Zero-flow ❑Water Supply ESA
Comments on sample collection or analysis:According to the site ®Other Class C
manager, no discharge occurred during the 1St semi-annual monitoring
period of 2016 due to drought conditions and increased sediment pond PLEASE REMEMBER TO SIGN ON THE REVERSE 4
capacity after sediment was removed.
RECEIVED
Part A: Stormwater Benchmarks and Monitoring Results I��G � 2016
��� IX No discharge this period?2
CENT 5��`f1�N
Outfall No. Date Sample 24-hour rainfall DWg
Collected' amount, Chemical Ox en Demand Fecal Coliform Total Suspended Solids
(mo/dd/yr) Inches
Yg p
Benchmarks===> _ - 120 mg/L 1000 count per 100 mL 100 mg/L or 50 mg/1.4
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit text,Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Note: Results must be reported in numerical format. For example,do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non-
numerical format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the
detection limit, reporting limit,etc. in mg/L. Conversely,where fecal coliform results exceed the dilution upper limit, report the result as">XX".
Permit Date: 11/1/2012-10/31/2017 SWU-248,last revised 10/25/2012
Page 1 of 2
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
n No discharge this period?2
Outfall No. Date Sample 24-hour rainfall
Collected' amount, Non-polar O&G/TPH by Total Suspended Solids pH
(mo/dd/yr) Inches3 EPA 1664(SGT-HEM)
Benchmarks===> - - 15 mg/L 100 mg/L or 50 mg/L° 6.0—9.0 SU
Footnotes from Part A also apply to this Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES LINO
IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period
in the case of"No Discharge"reports)to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I
am aware that there are significant penalties fQr submitting false information,including the possibility of fines and imprisonment for knowing violations."
/� // . 7- (57.---/
(Signature of Permittee) (Date)
Permit Date: 11/1/2012-10/31/2017 SWU-248, last revised 10/25/2012
Page 2 of 2