Loading...
HomeMy WebLinkAboutNCG120047 DMR SW (6) Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG120000 Date submitted 7/29/2016 CERTIFICATE OF COVERAGE NO. NC�G 2 ' ,'74 SAMPLE COLLECTION YEAR 2016 FACILITY NAME Haywood County—White Oak Landfill SAMPLE PERIOD ❑Jan-June ❑July-Dec COUNTY Haywood or ® Monthly'. June (month) PERSON COLLECTING SAMPLES DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Lab Cert.# RECEIVED ❑Zero-flow ❑Water Supply EISA Comments on sample collection or analysis: SDO-2 and SDO-3 are ®Other Class C currently in the Tier Two sampling phase of General Permit AUG U 3 X016 NCG120000. According to the site manager, no discharge occurred at CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE a SDO-2 and SDO-3 during June 2016. DWR SECTION Part A: Stormwater Benchmarks and Monitoring Results ® No discharge this period?' Outfall No. Date Sample 24-hour rainfall Collected) amount, Chemical Oxygen Demand Fecal Coliform Total Suspended Solids (mo/dd/yr) Inches Yg p Benchmarks===> - - 120 mg/L 1000 count per 100 mL 100 mg/L or 50 mg/L4 1 Monthly sample^g(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit text,Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example,do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non- numerical format. When results are below the applicable limits,they must be reported in the format,"<XX mg/L",where XX is the numerical value of the detection limit, reporting limit,etc. in mg/L. Conversely,where fecal coliform results exceed the dilution upper limit, report the result as">XX". Permit Date: 11/1/2012-10/31/2017 SWU-248, last revised 10/25/2012 Page 1 of 2 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging> 55 gal of new oil per month. ❑ No discharge this period?' Outfall No. Date Sample 24-hour rainfall Collected'. amount, Non-polar O&G/TPH by (mo/dd/yr) Inches3 EPA 1664(SGT-HEM) Total Suspended Solids pH Benchmarks===> _ - 15 mg/L 100 mg/L or 50 mg/1.4 6.0—9.0 SU Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for&athering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties fo, submitting false information,including the possibility of fines and imprisonment for knowing violations." .00- 04, ‘21 (Signature of Permittee) (Date) Permit Date:11/1/2012-10/31/2017 SWU-248, last revised 10/25/2012 Page 2 of 2 July 29, 2016 S A N T E K NCDEQ TALT Central Files A® Division of Water Quality 1617 Mail Service Center WasteServices Raleigh,North Carolina 27699-1617 650 25th Street,N.W.,Suite 100 Cleveland,Tennessee 37311 (423)303-7101 Re: Tier Two Monitoring (SDO-2 and SDO-3) Email:mail@santekenviro corn Haywood County (White Oak) Landfill Internet wwwsantekenwrocorn NPDES Permit Number: N PMOO To Whom It May Concern: In accordance with the Tier Two monitoring requirements located in Part II(B) of General NPDES Permit(NCG120000),please find enclosed one original and one copy of June 2016 discharge monitoring reports (DMR) for stormwater discharge outfalls (SDO-2 and SDO-3). SDO-2 and SDO-3 became subject to the Tier Two monitoring requirements following two consecutive Total Suspended Solids (TSS) detections above the benchmark value (100 mg/L)which occurred on June 30, 2015 and November 2, 2015. Therefore, SDO-2 and SDO-3 are in the process of being monitored monthly for all of the stormwater parameters until three consecutive monthly sampling results are below the benchmark values. According to the site manager, no discharge occurred at SDO-2 and SDO-3 during the month of June 2016. The site will attempt to collect a monthly sample during the next discharge producing rain event. If you have any questions or comments,please feel free to call at(423) 303-7101. Sincerely, Robert Hudson Environmental Compliance Coordinator Enclosure cc: David Francis, Solid Waste/Tax Administrator, Haywood County Ira Dove, County Manager, Haywood County Matt Dillard, Executive V.P. of Operations, Santek Cheryl Dunson, Executive V.P. of Marketing, Santek Ron Vail, P.E., V.P. of Engineering, Santek John Preston, Site Manager, Santek