Loading...
HomeMy WebLinkAbout20190211_PJD package_20160920 Strickland, Bev From:Susan Westberry <SWestberry@sepiengineering.com> Sent:Tuesday, September 20, 2016 9:40 AM To:Ward, Garcy Cc:Christopher Dustin Subject:U-5875 Allen Road Widening PJD Package Attachments:U-5875_Allen Road_PJD Packet_20160906.pdf Good morning Garcy Please find attached the PJD package for the proposed U-5875 project. The project involves the widening of Allen Road to 4 lanes with a divided median and sidewalks or a multi-use path (to be determined). The package was sent to Tom Steffens using their file transfer system due to the large file size. Please let myself or Chris Dustin (cc’d) know if you have any questions or would like to make a visit to the project area. We will include you on any future correspondence with Tom Steffens. Thank you Susan Susan Westberry, AICP, PWS, CPESC, LSSIT Senior Environmental Planner SEPI Engineering & Construction 5030 New Centre Drive, Suite B | Wilmington, NC 28403 Direct: 910.550.3257 | Cell: 910.524.9404 | sepiengineering.com Connect with us: LinkedIn | Twitter | Facebook Confidentiality Notice: This message is intended only for the designated recipient(s). It may contain confidential or proprietary information and may be subject to the attorney-client privilege or other confidentiality protections. If you are not a designated recipient, you may not review, copy or distribute this message. If you receive this in error, please notify the sender by reply e-mail and delete this message. Thank you. 1