HomeMy WebLinkAbout20190211_PJD package_20160920
Strickland, Bev
From:Susan Westberry <SWestberry@sepiengineering.com>
Sent:Tuesday, September 20, 2016 9:40 AM
To:Ward, Garcy
Cc:Christopher Dustin
Subject:U-5875 Allen Road Widening PJD Package
Attachments:U-5875_Allen Road_PJD Packet_20160906.pdf
Good morning Garcy
Please find attached the PJD package for the proposed U-5875 project. The project involves the widening of Allen Road
to 4 lanes with a divided median and sidewalks or a multi-use path (to be determined). The package was sent to Tom
Steffens using their file transfer system due to the large file size.
Please let myself or Chris Dustin (cc’d) know if you have any questions or would like to make a visit to the project area.
We will include you on any future correspondence with Tom Steffens.
Thank you
Susan
Susan Westberry, AICP, PWS, CPESC, LSSIT
Senior Environmental Planner
SEPI Engineering & Construction
5030 New Centre Drive, Suite B | Wilmington, NC 28403
Direct: 910.550.3257 | Cell: 910.524.9404 | sepiengineering.com
Connect with us: LinkedIn | Twitter | Facebook
Confidentiality Notice: This message is intended only for the designated recipient(s). It may contain confidential or proprietary information and may be subject to the
attorney-client privilege or other confidentiality protections. If you are not a designated recipient, you may not review, copy or distribute this message. If you receive
this in error, please notify the sender by reply e-mail and delete this message. Thank you.
1