November 4, 2016
Memorandum to: Betty Ann Caldwell, PE
NCDOT Division 2 Project Engineer
105 Pactolus Hwy
Greenville, NC 27835
From:
Susan Westberry, AICP, PWS, CPESC
Senior Planner/Project Manager, SEPI Engineering
Re: Preliminary ]urisdictional Determination Verification Meeting
for U-5875, Allen Road Widening in Greenville, Pitt County
A preliminary jurisdictional determination verification meeting was held on
November 3, 2016, at 10:00 am at the project site in Greenville. The following
people were in attendance:
Betty Ann Caldwell
Jay Johnson
Tom Steffens
Garcy Ward
Chris Dustin
Susan Westberry
NCDOT - Division 2
NCDOT - Division 2
USACE Washington Regulatory
NCDEQ - Division of Water Resources
SEPI
SEPI
The purpose of the meeting was to field verify stream and wetland features
delineated and classified by SEPI staff in the field on August 24, 2016. Meeting
attendees met at the Speedway gas station at the south end of the project. Field
verifications began at the south end of the project at Stream SA and Pond PA and
moved to the north through the project area.
Results of the verifications are as follows and summarized in the table below:
• Stream SA will remain intermittent for the purposes of DWR, but did score
higher than the original rating.
• Pond PA is not jurisdictional. The pond has no connection and is a
stormwater feature.
• Stream SB from the origin to the area of rip-rap/pipe outlet should be
changed from ephemeral to intermittent.
• Stream SB from the area of rip-rap/pipe outlet to the confluence with
Greens Mill Run should be changed from intermittent to perennial.
5030 IVew Centre Drive � Suite B � Wrlmingtvn, NC � 28403 � Phone: 9f 0.523.57I5 �
Fax: 9I0.523.5716 � seprengineering.com � �[ SEPlengineers
SEPI
• Stream SC, above the confluence with Stream SB should be changed from
intermittent to perennial.
• Stream SC/Greens Mill Run mainstem remains perennial.
• The small potential wetland feature adjacent to Stream SC (not mapped in
package) was determined not jurisdictional - no change.
• Stream SD will be changed from intermittent to perennial.
• Tributary SF will remain ephemeral but will be labeled on figures as a linear
stormwater conveyance.
• Wetland feature WA is not jurisdictional. Remove from package.
*
0 0
'� �
� � c
;� � = o
� �y d 0
�
.N
u f0 � 1° � �
(Jf U Uf U =
? � � N N � d W d
c c
a., �� •� . . � �7 U 3
�i O O o�C a�' � c�C � o�C
Stream SA 21 I 26.5 I No JS - Non Mit
Pond SA - Buffer - Not Jurisdictional
Req
Stream SB - E - I No JS - Non Mit
(culvert
outlet/origin
to pipe/rip-
rap)
Stream SB 25.5 I - P Yes JS - Non Mit
(pipe/rip-rap
to confl.
w/SC)
Stream SC 22.5 I 30.5 P Yes JS - Non Mit
(top)
Stream SC 34 P - - Yes ]S - Mit
(Greens Mill
Run)
Stream SD 22.5 I 30.5 P Yes JS - Non Mit
Stream SE 30 P - - Yes JS - Mit
Tributary SF - E - - No No
Wetland WA - Juris. - Non - No
Juris.
Wetland WB - Juris. - Juris. - Jurisdictional
* E- epnemerai, i- intermittent, P- Perenniai
2
SEPI
Action Items•
• SEPI and NCDOT will prepare a State Environmental Assessment for the
project.
• SEPI will revise mapping to fix labeling issues with Greens Mill Run. Greens
Mill Run is stream feature SC. Stream Feature SE is currently labeled as
Greens Mill Run on the figures.
• SEPI will revise the LiDAR mapping to include an elevation scale.
• SEPI will produce a revised PJD package and NRTR for the project.
• USACE will permit the project as two separate NWP 14 with two study areas
(200 feet square) to avoid inclusion of the historic property located on Allen
Road.
• NWP 14(1) will include Stream SA.
• NWP 14(2) will include Streams SC (Greens Mill Run) and SE.
3