Loading...
HomeMy WebLinkAbout20190211_U-5875 PJD Verification Meeting Minutes 20161104_20161104Cele6mting 15 Years � � � I E N G I N E E R I H G & L O N S T R ll L 7 I 0 N November 4, 2016 Memorandum to: Betty Ann Caldwell, PE NCDOT Division 2 Project Engineer 105 Pactolus Hwy Greenville, NC 27835 From: Susan Westberry, AICP, PWS, CPESC Senior Planner/Project Manager, SEPI Engineering Re: Preliminary ]urisdictional Determination Verification Meeting for U-5875, Allen Road Widening in Greenville, Pitt County A preliminary jurisdictional determination verification meeting was held on November 3, 2016, at 10:00 am at the project site in Greenville. The following people were in attendance: Betty Ann Caldwell Jay Johnson Tom Steffens Garcy Ward Chris Dustin Susan Westberry NCDOT - Division 2 NCDOT - Division 2 USACE Washington Regulatory NCDEQ - Division of Water Resources SEPI SEPI The purpose of the meeting was to field verify stream and wetland features delineated and classified by SEPI staff in the field on August 24, 2016. Meeting attendees met at the Speedway gas station at the south end of the project. Field verifications began at the south end of the project at Stream SA and Pond PA and moved to the north through the project area. Results of the verifications are as follows and summarized in the table below: • Stream SA will remain intermittent for the purposes of DWR, but did score higher than the original rating. • Pond PA is not jurisdictional. The pond has no connection and is a stormwater feature. • Stream SB from the origin to the area of rip-rap/pipe outlet should be changed from ephemeral to intermittent. • Stream SB from the area of rip-rap/pipe outlet to the confluence with Greens Mill Run should be changed from intermittent to perennial. 5030 IVew Centre Drive � Suite B � Wrlmingtvn, NC � 28403 � Phone: 9f 0.523.57I5 � Fax: 9I0.523.5716 � seprengineering.com � �[ SEPlengineers SEPI • Stream SC, above the confluence with Stream SB should be changed from intermittent to perennial. • Stream SC/Greens Mill Run mainstem remains perennial. • The small potential wetland feature adjacent to Stream SC (not mapped in package) was determined not jurisdictional - no change. • Stream SD will be changed from intermittent to perennial. • Tributary SF will remain ephemeral but will be labeled on figures as a linear stormwater conveyance. • Wetland feature WA is not jurisdictional. Remove from package. * 0 0 '� � � � c ;� � = o � �y d 0 � .N u f0 � 1° � � (Jf U Uf U = ? � � N N � d W d c c a., �� •� . . � �7 U 3 �i O O o�C a�' � c�C � o�C Stream SA 21 I 26.5 I No JS - Non Mit Pond SA - Buffer - Not Jurisdictional Req Stream SB - E - I No JS - Non Mit (culvert outlet/origin to pipe/rip- rap) Stream SB 25.5 I - P Yes JS - Non Mit (pipe/rip-rap to confl. w/SC) Stream SC 22.5 I 30.5 P Yes JS - Non Mit (top) Stream SC 34 P - - Yes ]S - Mit (Greens Mill Run) Stream SD 22.5 I 30.5 P Yes JS - Non Mit Stream SE 30 P - - Yes JS - Mit Tributary SF - E - - No No Wetland WA - Juris. - Non - No Juris. Wetland WB - Juris. - Juris. - Jurisdictional * E- epnemerai, i- intermittent, P- Perenniai 2 SEPI Action Items• • SEPI and NCDOT will prepare a State Environmental Assessment for the project. • SEPI will revise mapping to fix labeling issues with Greens Mill Run. Greens Mill Run is stream feature SC. Stream Feature SE is currently labeled as Greens Mill Run on the figures. • SEPI will revise the LiDAR mapping to include an elevation scale. • SEPI will produce a revised PJD package and NRTR for the project. • USACE will permit the project as two separate NWP 14 with two study areas (200 feet square) to avoid inclusion of the historic property located on Allen Road. • NWP 14(1) will include Stream SA. • NWP 14(2) will include Streams SC (Greens Mill Run) and SE. 3