Loading...
HomeMy WebLinkAbout20061900 Ver 1_More Info Letter_20061229~QF WATFgQ Michael F. Easley, Governor `Q G William G. Ross Jr, Secretary ~ rte.. North Carolina Department of Environment and Natural Resources ~ ~ 0 .~. Alan W. Klimek, P.E. Director Division of Water Quality December 29, 2006 DWQ EXP No. 06-1900 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Pearl Creek Partners Attn: Mr. William Hardin 5201 William & Mary Drive Raleigh, NC 27614 Subject Property: Pearl Creek Subdivision REQUEST FOR MORE INFORMATION-EXPRESS REVIEW PROGRAM Dear Mr. Hardin: On December 27, 2006, the Division of Water Quality (the "Division") received your PCN application for the above-referenced project. The DWQ has determined that this information is incomplete. Please provide the additional information requested below in order to continue review of your project and to prevent denial of your application as required by 15A NCAC 2H .0506: Operation and Maintenance Manual: a) The Operation & Maintenance manual for the wet detention ponds and for dry detention basins refers multiple times to the fertilization of vegetation. Fertilization of BMPs in Nutrient Sensitive Waters is carefully controlled. DWQ will allow aone-time application during establishment and another application if an area must be replanted and/or reseeded. The one-time application of fertilizer should be the minimum amount required for success. Please provide a revised O&M manual reflecting compliance with the above statements. 2. Stub Road: a) The street located along Lots 64-66 (Pearl Road Extension) cannot be permitted as designed (i.e. no logical terminus). Please resubmit your plans showing the road terminating into a cul-de-sac. If the City of Raleigh requires this road to be stubbed with the intention of completing the road, a quantitative cumulative impact analysis will be required. Please note that NCDWQ reserves the right to address additional stormwater-related issues for this project within the next 10 days. There was no mention of a stormwater management plan review on the initial interest form received on December 7, 2006 and stormwater review staff availability is very limited during the holiday season. Please respond within five (5) days (in acknowledgement of the holiday season vacation difficulties, the days have been extended from 3 days to 5 days) of the date of this letter by sending five (5} copies of the above information in writing. 401 Oversight I Express Review Permitting Unit 1650 Mai Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Ralegh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-6893 ! Internet: httg~!/h2o enr state nc us/ncwetlands Na" Caro na ~turn~y An Equal OpportunitylAffinnative Action Empbyer - 50% Recycled110% Post Consumer Paper Pearl Creek Page 2 of 2 December 29, 2006 This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please contact Lia Myott at (919) 733-9205 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, Cyndi Karoly, 401 Oversight/Express Review Permitting Unit CBIUIem cc: USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office File Copy Central Files Debbie Edwards, S&EC, 11010 Raven Ridge Road, Suite 120, Raleigh, NC 27614 Filename: 06! 900PearlCreek(Wake)EXP+hold