HomeMy WebLinkAbout20061900 Ver 1_More Info Letter_20061229~QF WATFgQ Michael F. Easley, Governor
`Q G William G. Ross Jr, Secretary
~ rte.. North Carolina Department of Environment and Natural Resources
~ ~
0 .~. Alan W. Klimek, P.E. Director
Division of Water Quality
December 29, 2006
DWQ EXP No. 06-1900
Wake County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Pearl Creek Partners
Attn: Mr. William Hardin
5201 William & Mary Drive
Raleigh, NC 27614
Subject Property: Pearl Creek Subdivision
REQUEST FOR MORE INFORMATION-EXPRESS REVIEW PROGRAM
Dear Mr. Hardin:
On December 27, 2006, the Division of Water Quality (the "Division") received your PCN application for
the above-referenced project. The DWQ has determined that this information is incomplete. Please
provide the additional information requested below in order to continue review of your project and to
prevent denial of your application as required by 15A NCAC 2H .0506:
Operation and Maintenance Manual:
a) The Operation & Maintenance manual for the wet detention ponds and for dry detention
basins refers multiple times to the fertilization of vegetation. Fertilization of BMPs in
Nutrient Sensitive Waters is carefully controlled. DWQ will allow aone-time application
during establishment and another application if an area must be replanted and/or reseeded.
The one-time application of fertilizer should be the minimum amount required for success.
Please provide a revised O&M manual reflecting compliance with the above statements.
2. Stub Road:
a) The street located along Lots 64-66 (Pearl Road Extension) cannot be permitted as
designed (i.e. no logical terminus). Please resubmit your plans showing the road
terminating into a cul-de-sac. If the City of Raleigh requires this road to be stubbed
with the intention of completing the road, a quantitative cumulative impact analysis
will be required.
Please note that NCDWQ reserves the right to address additional stormwater-related issues for this
project within the next 10 days. There was no mention of a stormwater management plan review on the
initial interest form received on December 7, 2006 and stormwater review staff availability is very limited
during the holiday season.
Please respond within five (5) days (in acknowledgement of the holiday season vacation difficulties, the
days have been extended from 3 days to 5 days) of the date of this letter by sending five (5} copies of the
above information in writing.
401 Oversight I Express Review Permitting Unit
1650 Mai Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Ralegh, North Carolina 27604
Phone: 919-733-17861 FAX 919-733-6893 ! Internet: httg~!/h2o enr state nc us/ncwetlands
Na" Caro na
~turn~y
An Equal OpportunitylAffinnative Action Empbyer - 50% Recycled110% Post Consumer Paper
Pearl Creek
Page 2 of 2
December 29, 2006
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
authorized (at this time) by the DWQ.
Please contact Lia Myott at (919) 733-9205 if you have any questions regarding or would like to set up a
meeting to discuss this matter.
Sincerely,
Cyndi Karoly,
401 Oversight/Express Review Permitting Unit
CBIUIem
cc: USACE Raleigh Regulatory Field Office
DWQ Raleigh Regional Office
File Copy
Central Files
Debbie Edwards, S&EC, 11010 Raven Ridge Road, Suite 120, Raleigh, NC 27614
Filename: 06! 900PearlCreek(Wake)EXP+hold