Loading...
HomeMy WebLinkAbout20050732 Ver 36_Stormwater Approval_20161028 CI A I NII C, R.0 R Y S. )A Y /I N41\1 I-R NII AN October 28, 20161 DWR # 05-073206 Chatham County Mr. Lee Bowman —Sr. Project Manager NNP Briar Chapel, LLC 16 Windy Knoll Circle Chapel Hill, North Carolina 27516 Subject: APPROVAL OF STORMWATER MANAGEMENT PLAN Briar Chapel —SD West Phase 2 Dear Mr. Mumford: The Division of Water Resources (Division) recently reviewed' the proposed stormwater management plain (SMP) for the subject project as, required by 4011 Water Quality Certification approval' issued by the Division on January 11, 2008. Submittal of the SMP satisfies Condition, No. 10 of the 401 Certification letter and is subject to the requiiremenits below,, The Division approves the SMP consisting of two wet detention basins (#26 and #27) and all' associated stormwater conveyances, inlet and outlet structures, and grad'i'ng and drainage patterns depicted on design drawings dated September 30, 2016 and sealed by Gareth Avant, PE, which are incorporated by reference and are enforceable by the Division. The following conditions also apply t15A NCAC 02H .0506(b)(5)]: The maximum allowable drainage area for the pond #26 shall be 19.76 acres and the maximum, allowable built-upon area within that drainage area shall be 516,468 square feet. The maximum allowable drainage area for the pond #27 shall be 6.55 acres and' the maximum allowable built-upon area within that drainage area shall be 199,703 square feet. Any changes to these maximum areas shall require the applicant to submit and' receive approval for a revised stormwater management plan by the Division. [15A NCAC 02Hl .0506(b)(5)] The footprint of all stormwater management devices as well as an additional 10-foot wide area on, all sides of the devices shall be located in either: public rights-of-way; cleclicated common areas; or recorded easement areas, The final plaits for the project showing all such rights-of-way, common areas and easement areas shall be in accordance with the approved plans, [15A NCAC 02HI .0506(b)(5)] SIMe afNorlh Cambria ! Uvironmel1W Qirlafil3l I water Resources 401&Brifier llcrmiWng 1617 Mail service Cenrer � Ralcigh,North Carii 2 7699-1617 9 11 9 707 63001 DWR#05-0732v36 SNIP Approval Page 2 of 2 The approved SMP shall be constructed and operational before any permanent building or other structure is occupied at the site. (15A NCAC 02H .0506(b)(5)] The SMP may not be modified without prior written authorization from the Division. (15A NCAC Q2H .0506(b)(5)] Maintenance activities for the wet detention basins #26 and #27 shall be performed in accordance with the inotarized O&M agreements signed by Lee Bowman (Sr, Project Manager) on September 29, 2016. The O&M agreement shall transfer with the sale of the land or transfer of ownership/responsibility for the BMP facility. The Division shall be notified promptly of every transfer. [15A NCAC 02H .0506(b)(5)] The appllicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at http://Portal.ncdenr.org/web/wq/swp/ws/40lZcertsandperm,it,sZapplyjform, ). [15A NCAC 02H .0506(b)(5)] Please contact Cory Larsen, PE at 919-807-6379 or cory.larsen@ncdenr.gov if you have any questions or concerns. Sincerely, C-1 Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: DR 401 & Buffer Permitting Branch File Gareth Avant, PE—McKim & Creed! (1730 Varsity Drive, Raleigh NC 27606) DWR RRO Filename: 20050732v36_SMP—ApprovaII61028.d'ocx