HomeMy WebLinkAbout20130918 Ver 8_Oct Inspection_20161028Wetland Inspection Report
Project Num: 20130918 Version: 8
Project Name: NCDOT- Greensboro Eastern L�
County: Guilford
Location: NCDOT- Greensboro Eastern Loop (U-2525 B& C)
Latitude: +36° 07'
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 10/27/2016
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: � Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
� Permit (401 WQC)
Inspection Summary:
Title:
❑ Not Compliant
Status: Issued
Project Type: New Road/Highway
Region: Winston-Salem
Longitude: -79° 42' 43"
Phone:
Phone: 336-776-9703
Removal of temp crossing/causeway is proceeding as planned. BMPs are in place to minimize downstream
sedimentation.
page: 1
Site Number: 20130918
Inspection Date: 10/27/2016
Owner: Thorpe, Gregory
Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑
Are the culverts and/or filled areas installed properly? �❑❑❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑
Comment: This visit was to check on the proqress of causewav/temp crossinq removal at Site 37. Half the stream
was isolated while crews beqan to remove pipinq and riprap on one side. A turbiditv curtain was installed
downstream. Dirtv water was qumped to an adiacent skimmer basin. Once concern is that the skimmer
basin has limited storaqe space and mav slow proqress. A determination will be make later in the week if
additional storaqe is needed.
page: 2