Loading...
HomeMy WebLinkAbout20130918 Ver 8_Oct Inspection_20161028Wetland Inspection Report Project Num: 20130918 Version: 8 Project Name: NCDOT- Greensboro Eastern L� County: Guilford Location: NCDOT- Greensboro Eastern Loop (U-2525 B& C) Latitude: +36° 07' SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 10/27/2016 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Title: ❑ Not Compliant Status: Issued Project Type: New Road/Highway Region: Winston-Salem Longitude: -79° 42' 43" Phone: Phone: 336-776-9703 Removal of temp crossing/causeway is proceeding as planned. BMPs are in place to minimize downstream sedimentation. page: 1 Site Number: 20130918 Inspection Date: 10/27/2016 Owner: Thorpe, Gregory Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑ Are the culverts and/or filled areas installed properly? �❑❑❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑ Comment: This visit was to check on the proqress of causewav/temp crossinq removal at Site 37. Half the stream was isolated while crews beqan to remove pipinq and riprap on one side. A turbiditv curtain was installed downstream. Dirtv water was qumped to an adiacent skimmer basin. Once concern is that the skimmer basin has limited storaqe space and mav slow proqress. A determination will be make later in the week if additional storaqe is needed. page: 2