Loading...
HomeMy WebLinkAbout20080950 Ver 1_401 Application_200806080 8- 0 9 5 0 N• :'W E•; BURDETTE LAND CONSULTING, INC. 10212 Creedmoor Road - Raleigh, North Carolina 27615 Telephone (919) 841-9977-Fax (919) 841-9909 S LETTER OF TRANSMITTAL To: Mr. Jamie Shern Date: June 9, 2008 US Army Corps of Engineers Project #: 7147 3331 Heritage Trade Dr, Ste 27587 RE: TT & E Metal & Iron Wake Forest, North Carolina 27587 Works, Inc. We are sending the following items attached to this transmittal: Copies Date Description 1 6/9/08 PCN Application Remarks: P A, I D W- r, p 2008 DENR - WATER QUAUTY WETLANDS AND STORMWATER BRANCH Signed: Jennifer Burdette c: Ian McMillan-NCDWQ (5 copies + SW Management & $240 check) Ronnie Thompson - TT&E Iron & Metal Works 08-0950- Office Use Only: Form Version March 05 USACE Action ID No. DWQ No. (it any particular item is not applicable to ttus project, please enter "Not Applicable" or "N/A".) 1. Processing AdN PAID Mk __ 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ® Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 39 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information JUN 1 0 LO;? Name: T T & E Metal and Iron Works Inc. Mailing Address: Contact: Ronnie Thompson WETLANDSANO STORMWATFR RRANGH 508 N. Garner Road Garner, North Carolina 27529 Telephone Number: (919) 772-5041 Fax Number: (919) 772-8790 E-mail Address: ronniethompson@TTandE.com 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Jennifer A. Burdette Company Affiliation:_ Burdette Land Consulting Inc. Mailing Address: 10212 Creedmoor Road Raleigh North Carolina 27615 Telephone Number: (919) 841-9977 Fax Number: (919) 841-9909 E-mail Address:-JBurdetteBLC @ bellsouth. net Updated 11/1/2005 Page 1 of 9 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site, plan must include a scale and north arrow. The specific footprints of all buildings, impav bs surfaces, or other facilities must be included. If possible, the maps and plans should incluW'tht appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: TT & E Facility Expansion 2. T.I.P. Project Number or State Project Number (NCDOT Only): NA 3. Property Identification Number (Tax PIN): 1711-17-1540, 1711-18-1238, 1711-171716, & 1711-17-3847 4. Location County: Wake Nearest Town: Garner Subdivision name (include phase/lot number): Directions to site (include road numbers/names, landmarks, etc.): From Raleigh, take Interstate 440 Beltline to Ext 299 at Hammond Road and go south. From Hammond Road turn left on Tryon Road then turn right onto Garner Road. The site is located on the west side of W Garner Road approximately V2 mile south of Tryon Road's intersection with W Garner Road. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35.7220769 ON 78.6249717 °W 6. Property size (acres): 20 7. Name of nearest receiving body of water: UT to Big Branch 8. River Basin: Neuse (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Approximately one-half of the site contains pine forest Updated 11/1/2005 Page 2 of 9 while the existing metal recycling facility occupies the other half. Figure 1 depicts the location of the property on the US Geological Survey (USGS) Garner and Lake Wheeler NC 7.5-minute quadrangle topographic map. Figure 2 shows the location of the site on the applicable Wake County Soil Survey map. 10. Describe the overall project in detail, including the type of equipment to be used: The project involves the expansion of the existing metal recycling facility through construction of shredder on property adjacent to the existing f_acility. The proposed shredder facility is separated from the existing facility by a perennial stream channel The project includes construction of road across the stream channel to provide critical interconnection between the new shredder and the existing facilitv. Please refer to the attached Surface Water and Wetland Impact Map (Figure 3) and Insets (1-3) for the details of road crossing impact Heavy equipment typically used for road construction and grading will be used to complete the project. 11. Explain the purpose of the proposed work: The purpose of the project is to construct the proposed shredder and to route vehicles carrying recycling materials to the appropriate area of the facility and allow much needed stacking space especially for heavy weekend traffic IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. On July 24, 2007, Burdette Land Consulting Inc. (BLC) conducted an on-site meeting with Chad Coburn of NCDWQ to confirm that Feature B located on the existing facility property and shown on the Wake Soil Survey Map (Figure 2) is not subject to the riparian buffer rules. Mr. Coburn's letter is attached (NBRRO# 07-153) This March BLC conducted a delineation of the surface waters and wetlands present on the existing property and the adjacent property to the north. Because a marginal wetland area was identified on the property, a request for a desk review including wetland data forms and photographs of the area was submitted to Jamie Shern of the USACE on May 12 2008 This marginal wetland area lacked hvdric soils. On June 3 2008, Lauren Witherspoon conducted an on-site review of the stream and wetlands present on the existing facility and expansion area to the north Ms Witherspoon determined the both Features B and C are not subject to the riparian buffer rules and verified the boundary of the isolated wetland present on the site We have assumed the marginal area mentioned above is a nonjurisdictional area for this PCN application based on the absence of hvdric soils. Updated 11/1/2005 Page 3 of 9 V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. This PCN application covers the all phases of the project; therefore, future permit requests are not anticipated for this project. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The proposed impacts consist of a road crossing of a stream channel and removal of a small isolated wetland to construct a wet detention basin. Please refer to Figure 3 (USACE - 3A & 3B) for the entire project and Insets A & B for the details of each impact. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Type of Wetland Located within Distance to Area of Site Number Type of Impact (e.g., forested, marsh, 100-year Hoodplain Nearest Stream Impact (acres) (indicate on map) herbaceous, bog, etc.) ( es/no) (linear feet) NA Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: 0.5 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Updated 11/1/2005 Page 4 of 9 Stream Impact Perennial Average Impact Area of Number Stream Name Type of Impact Intermittent? Stream Width Length Impact (indicate on ma) Before Impact (linear feet) (acres) 1 UT to Big Branch culvert/rip-rap perennial 5 138 0.016 Total Stream Impact (by length and acreage) 138 0.016 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Name Wat Type of Waterbody Area of Site Number (if applicable) ) Type of Impact (lake, pond, estuary, sound, bay, Impact (indicate on ma) ocean, etc.) (acres) NA Total Open Water Impact (acres) 6. List the cumulative impact to all Waters of the U.S. resulting from the proiect: Stream Impact (acres): 0.016 Wetland Impact (acres): 0 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0.016 Total Stream Impact (linear feet): 138 7. Isolated Waters Do any isolated waters exist on the property? ® Yes ? No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. A small isolated wetland (<0.010 acre) is present in the area of proposed detention pond #2. The applicant proposes remove 0.006 acre of this isolated wetland to construct the pond 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ® uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): See attached SW Plan Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): See attached SW Plan Current land use in the vicinity of the pond: See attached SW Plan Size of watershed draining to pond: See above Expected pond surface area: See above Updated 11/112005 Page 5 of 9 VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Impacts to the only jurisdictional wetland on the property were avoided. The location shape and most importantly size of the isolated wetland present on the property made it impractical to avoid. The perennial stream channel could not be avoided as it bisects the site. The proposed road/driveway crossing is necessary to interconnect the two facilities. This interconnection is required to provide a flow through system, which will also accommodate stacking of vehicular traffic entering the facility. The alignment was designed to cross the channel perpendicularly to minimize the length of stream channel affected. The impact will be further minimized by burying the culvert one foot to allow for aquatic life passage. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina (see DWQ website for most current version.). 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) Updated 11/1/2005 Page 6 of 9 of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. The applicant avoided impacts to wetlands where possible and minimized the stream channel impact that is unavoidable to the maximum extent practicable as described above A 50-foot-wide riparian buffer will be maintained around the stream channel present within the facility in accordance with Neuse River Riparian Buffer Rules and will serve as a permanent vegetative buffer to the stream channels. Because the applicant minimized the project impacts to the maximum extent practicable, proposes less than 150 linear feet of stream channel impact, less than 0.10 acre of isolated wetland impact and no jurisdictional wetland impacts, BLC believes that compensatory mitigation should not be required for the Nationwide Permit or Water Quality Certification. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://www.nceep.net/pages/inlieureplace.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): NA Amount of buffer mitigation requested (square feet): NA Amount of Riparian wetland mitigation requested (acres): NA Amount of Non-riparian wetland mitigation requested (acres): NA Amount of Coastal wetland mitigation requested (acres): NA IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ? No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? Updated 11/1/2005 Page 7 of 9 X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ® No ? 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 6,825 3 (2 for Catawba) NA 2 4,158 1.5 NA Total 10,983 NA * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. The proposed driveway crossing of a buffered stream channel involves less than 150 linear feet of stream channel and 1/3 acre of riparian buffer. Therefore, BLC does not believe that buffer mitigation is required. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The existing facility has impervious surface area i_n_ excess of 24%. An old barn is the onlv impervious surface area currently present on the adjacent property to the north. . The project engineer Keith Roberts PE prepared a stormwater management plan that has been approved by the Town of Garner. A copy of the Town's approval letter and the approved plan including an excutive summary, stormwater calculations and plan view are attached A level spreader is proposed at the outlet of Detention Pond #2 to Updated 11/1/2005 Page 8 of 9 comply with the diffuse flow requirement of the Neuse River Riparian Buffer Rules The BMP supplemental and I & M sheets for this level spreader are also attached The stormwater management plan and Neuse River riparian buffer around the stream channel are anticipated to protect surface waters and wetlands downstream from the property. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater generated from the proposed project will be disposed of through the Town of Garner sewer system. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: The proposed infrastructure serves only the proposed commercial expansion Therefore the project is not anticipated to result in additional development XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). if an authorization letter from the applicant is provided.) Updated 11/1/2005 Page 9 of 9 • Mnntiawn' - -? Mempnal park p J- - - `.i r ? 1! 1 ethltcal C),nryrew,-- Ry. YC ? J !rr l C 9TAT11E 9l }f OO L R PM ?° ?,1 'i ?l,BLIND AND 47 F >'; s? i .? ? ?( ??V C'/ ?? 319 _ ?? 1 ( a Sewage Z i ,»a1+ ? ..... ? ? i i' v? ter. )t \, 16 ? • ? ' ? ? ? ? ? _"' L 1? . Cloverdwe N? A ?? - ?? 1' ?,? 'Cloverdale ";l 1- ? ?- ' ? 0111 41 I ,r /? - 1?/ 1 , •?.. 111 1 }?( /? _.i"r •i --Theater;: Water Tank 3* " 7 LI-i b i 344 er. n r • ? ? i i .• Estates . ; t 36 `; ' t?r' 1 + ' .)i : % ???? .^i c 1"`111 i`?. ,_ } j. ` ' a• - 1 , ? Garne r 4 `., • ; ? ......... .? Fo e' •? • ' / r i f / r . . ht mho Hei • : , _` s r jz . : : 31 j 1 Trader ., Pine Park; GRAPHIC SCALE USGS LOCATION MAP N 2000' • V = ' TT&E METAL AND IRON WORKS, INC. 2000 o zooo RONNIE AND SCOTT THOMPSON GARNER, WAKE COUNTY, NC ''•?N•''• • DATE: 4-21-08 USGS 7.5' TOPO QUAD: GARNER & LAKE E'' BURDETTE LAND CONSULTING, INC. .•w DRAWN BY: TMB WHEELER 10212 Creedmoor Road - Raleigh, North Carolina 27615 CHK'D BY: JAB Telephone (919) 841-9977- Fax (919) 841-9909 S PROJECT #: 7147 FIGURE #: l • • GRAPHIC SCALE WAKE COUNTY SOIL SURVEY MAP N 1" = 1320' 1320' 0 1320' TT&E METAL AND IRON WORKS INC. RONNIE AND SCOTT THOMPSON GARNER, WAKE COUNTY, NC ' DATE: 4-21-08 SIIEET(S):69 'v?? E?i BURDETTE LAND CONSULTING, INC. DRAWN BY: JBB CBK'D BY: JAB 10212 Creedmoor Road - Raleigh, North Carolina 27615 . S Telephone (919) 841-9977-Fax (919) 841-9909 PROJECT #: 7147 FIGURE #: 2 Q= O U) Q Z IU) W ~ p w W::) U) 0 U W W U) Q z m H Q F- W U QOM>LL QQ=Q Q CO z CL Z CL LL 0- 2 o< U U.) W JOUm ??~o- Qp pc) pm pZ?WZ p zZZ F-< F-Z (0ZQz? U)ZW?w ZM 1 1- w W iE=a j2p>p Qw Oc! O F- ?UQF-w ?UC4ct W 2? ? J I I I I I J in ri Q Z'S Z a ohm 1°m V U a o N v \ ?? f 1 ? ? O ?? ' rr ?'?r l ? l 1 [ „_ J T U U a W Z O N m Z p p d ° ° M Z N II Z U) U_ u' g of F- o W ?k F- O? mm gWZ w Qu U) 0 CL F- W 3: 2 ?pw00 LL - U0 ?pm?<w QUQCx?a w N ? W:)I _ w> U CL Z D F- U w O F- W_ :5 z p zz C/) Z d ) m a- < < U) ? C) Un U Z Z m O W> Z p a 0 O? Zm - z QQJgwzmow Q H 00C Q U ?ui U<IZc) QF- LL w"WW 2° t¢-Iw_- O (wj02 W F- U) ?wozo>ww(/)nW W w==rz F-ZOwwwa=p0 QH OF- F- mw cn¢F-QOCn?F-cn? z[o]o z ? N 04 u 0d ?N LL W I CID 00 g H U Z C7 n \ is a$o ? b 01 h 0 i a? L 1 ZUO m^ ? O 7 Qnm z ?00 0 j? o, U C' I r^ {CI z a wo w o ?, 0 1~ 4) x W N ? A N O 1 ?w i z v? a wg P ?e 3 \?- J 'a "w W F \\\ O 4 Y/ 00 w z w I N SH Z2 yV\\ d ! ?? ° .? z lit CD us < N N m O J I Y " a v v ??a i A-- ??'; nc -- leg p \ JIM i - -S16-- \ t?" \ J r ..6?E" i, 106.75' xv O _ d 41?N r NT W C? ? C7 N U ona!o MCC ? W Ct?? 2 0 V n N W N C7^tD? ? O'ZmN X w ]E o q 3 ?Q to ° w 4' W ?O co u- vi Z pa z U a ? g? 4 o 7 ? ? 2 ? lzt M1 ; ? :3 ?wF- ? Wpu cn co U- jQZm CO U U ?w g ? wp ~jW?vj W U) ' w zz 3 P? F ? Q JZ?W W <o >U JQWZ Q d d HWLL =a a 0 ? MWap ?- m p w - zpmit A g cxi a w z - z a R U- 0-UZ) Wm H = m a Z I- - -? F- U) O~0 N Q cn U) pcna U -a 0 W z W O J W °' O U) W p I-mw_f- w U W ma - < LV JO c>wcn=) (nzzw <z cn Z Z Zp - Qp co 0 Uwv? zz w z w z o o a2 O pzw?cn C7g g g N N ZfnV cn ? ° Co cnVazozplp? < o0 nzv)w WF=OCL CA a z Q =?=a z-3ww wH o F- m co Owl ?_>>D ?? ?? F==w ( z?zwUWZ) mIX w z? ocZ=pw?~ H W .j -?c)ai- - Of I z z Z C??cnW W LL w wwww W?z ' =w~tw-°i O<P-0 v < 00 <MM tovo<Ww w wv g w zo v U U viW w==>-z O?Hmw w o > -zOwwwa=00 W<--<OW: -W!2 I I Z N U Q _ _?? 3 1 \ ?3? Oaa ° W zw °om Z- W (11E) N 117'24' W \ .- - i; 208.01 TAL ! om "--` ` 106.25 \ - ? 10 a 72. 0.377 ---- w J \ 9 17? ?\ W `\ \ \ \ Cf) (\. \ N M. W ` a ?` ? motaaa Z?, aond ro C? QXNm ON m O , \\ \ \ y N N , % ` \ Q C11 C) / JmN 'IT 00 U G C3 C6 R U z I' N {? J ' \ (L, b I I ? ` 1 \ '/ \ 1 I \ k\ \ \ W Q1 WW O? Q 0 b \ \ 2 W o , ?? \ \ V n \? a? ?R a?,.,,, ?\ \ \ \ t ? - \ VI N Q \ " \ ¢ N > m ` IL W . Lu . . m nmoz \ L Y m^ N \ \ 1 \ o yr- Viz J \ ° -C !? \ o n_ (f+ \ \? ??lll J -7 \ i 1 ' ?\ \\ zci y o m tr m 00 WI) z W ?a C) ? J Q ti I \ O /f zici f WY ° a Zogg CL m Z \ Vm R 1 ` 0 'l O 04 N om C\4 O O j rn w ? i qW ? ? ? C 1 N slllNl_ / ? v ? a m aK° Q fqp cc) r l ( l ?. / / J i? , i , a ? ? i ( U O N i / ---"------ -- Lr) N / t O Lrs r7 / , 'J LL LL 0) U) ?V?ZO / i J i M to Co r L Q h (/,) l W II II - _J W U ? ? ? Z W W ?-- i Q Z Z -/% O°° i I -Z g,,•? z LLJ CL 4-f i v6 o ?® Lo LLJ Lo z? O ff ' r ? NJ ? J i ? O? O ? Q O Qc r°`' ? ?.?go 0 CL 40'.09 Z?? CL i 32?" tp? / Q / / m 64 L F• HD 2 v? O O Q) Q) X it ',II o Q ?N Zug v) ?ZO I W O L-Li 30» RCP E ® 0.5% O ,k 8 Mocn ?AUa V) H z ? ? E~ Q o Ea"'?3U ?6W Q WSW W U d z fy C7 H . *0 rq CY .• 00 N ? O U? z? z w A CW ' ?r x? W o? W W ?x Q > W W u? Q U) O i Lv F- . o /) Wes( / X ..? . / w 'Z U),. Q lJ % 3 . Lo 2 OO Q) o I a i Zi = II a T 0 0 Cl) 00 k +k ? N 0 m w V Mo L) M cn z u a Lv z -Q W ~ Q :?i C) Q' LLJ O w O O, Z I10 Lie II cc N IIII U ? N ?II OQQ1 ?" LO N O ' OC U) Z) 0 ? j ? Ur Zp kk » p Lo Co ti? z UL lw W °zo HHvx!// LC- 0 Lo CO 6i (3 L.Li (o Cl) Lci ,ce / / ?? W k Q- / i ? ? CL -j O W ?/Y ' ?I? W *0 10 ?,. ?? ,? ;. III III / / '= ?. 'II /f II. ? ? II III `: ??4 III-_.. -' I 00 G) I- I Q? LLJ W LL (n LL D D W m zry Ln ry rA H U d U ? z z?z o v? W H H fy ? d W ? U d C7 z H? a N CD G 0 00 z ta00 U z A °? z C, 0z rx rn W o rn .d a W u? ch N O w. :z m; IL J U Na U `'0 =u 0.r c? 0 III tV£% '"? II ti ?? / / ? I x? i III ? _ - -- III II 0 ? t.C4 / c (M, DATUM EM 305.00 O M NOTE: CROSS-SECTION DETAILS PROVIDED BY DEVELOPMENT CONSULTING SERVICES N O N ? co O O N N N O ? tl= CROSS-SECTION DETAIL TT&E IRON & METALS GARNER, WAKE COUNTY, NC DATE: 6-3-08 SCALE: AS NOTED W EBURDETTE LAND CONSULTING., INC. DRAWN BY: TMB CHKDBY: JAB 10212 Creedmoor Road - Raleigh North Carolina 27615 PROJECT #: 7147 S? Telephone (919) 841-9977-Fax (919) 841-9909 FIGURE: 4 10+00 11+00 12+00 ?F W ATFR Michael F. Easley, Governor Q William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources 7 r Coleen H. Sullins, Director l Division of Water Quality .: = July 31, 2007 Mrs. Jennifer Burdette Burdette Land Consulting, Inc. 308-D West Millbrook Road, Suite 200 Raleigh NC 27609 NBRRO 07-153 County: Wake BASIN: Neuse X Tar-Pamlico (15A NCAC 2B.0233) (15A NCAC 2B .0259) Complaint NOV Buffer Determination X Incident # Appeal Call Project Name: TT & E Metal andiron Works, Inc. Location/Directions: Site consists of a parcel off of West Garner Road, Garner, NC. There are two streams on the soils map, one that transects property line east to west in the northern part of the property (A), and another that runs adjacent to West Garner Road (B). Subject Stream: UT to Big Branch Creek Date of Determination: 07/24/07 Feature Start Buffer End Buffer Stream Appeal Located Located on GPS Points (if provided) Form Call on Soil USGS Survey Topographic A Subject X B Not Subject X Explanation: The feature(s) listed above has or have been located on the Soil Survey of Wake County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Quality. While Stream `B' is not subject to the Neuse Riparian Buffer Rules, it is possible that it is part of a linear wetland. This on-site determination shall expire five (S) years from the date of this letter. Landowners or affectedparties that dispute a determination made by the DWQ or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing clo Cyndi Karoly , DWQ Wetands/401 Unit, 2321 Crabtree Blvd., Raleigh, NC 27604-2260. Individuals that dispute a determination by the DWQ or Delegated Local Authority that "exempts" a surface water from the buffer rule may ask for an ad judicatory hearing. You must One act within 60 days of the date that you receive this letter. Applicants are hereby notified that the 60-day statutory NorthCarolina appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of NatUrall'if North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791-4200 Customer Service Internet: h2o.enr.state.nc.us 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 571-4718 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper 7/31/2007 Page 2 of 2 this decision. DWQ recommends that the applicant conduct this notification in order to be certain that third party appeals are made in a timely manner. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This determination is final and binding unless you ask for a hearing within 60 days. The (owner/future owners) should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 4041401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Quality (Central Office) at (919)-733-1786, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-876-8441. Respectfully, da gw? Chad Coburn Environmental Specialist CC: RRO/SWP Files Central Files DWQ Wetlands and Stormwater Branch NorthCarolina Naturally North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Intemet: h2o.enr.state.nc.us 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer Service FAX (919) 571-4718 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper + # p MIP r ` j . \ `V " 1 4f y] ?? )/? ?+?•,r/ t l ? ?a 5I J `" V { 1 "'. 'ct (/ ? ?. "..1 I ?`\ f / "^_' ? ((4i=--?- ,? {° k? '' `;' x `` 1 } ( } 5 '.. f ULlCA/iF1?! ?." f ? F 1F. } , l ?Y? L `,? „^ ? I _I /? `??,' ?` /-?+??C.?1 ?11{?4 ?Mri.% ' ` `= 4 "-' ' N f - , ` ? ? 'i ' ' , 1 t? . , ti. r , ; , TF?. $(`. 1Z• ti .M`• -.t ?,Y r ?? ¦ t J - c .11 , -. .\1, , ;i r - , ; 71 , - ?,', , .? a,' J ? ? ! q ?,µ1t ? ?? \?\ /•r ) ?; ; ?` \ j f E l /r' f?` - ?? p , i V . I^ 4 . ;lt •.i.-? ?., r/?rl1T ,/+ t Ilt f?{ ti 1? , l^, ?:.?. f t i 11 ff. i ° 1 ? -.. i F ? 'low or te, , ??` l ^ r"? ,4?F , F 1 J,rY '` a • ?' 1 ``J?2',r? ~J -; v f ?'? f r + ?• ? ? r ? k? ?^-?rrye?tar ? . ? ?s?? v, t ?I (? ,,? • 1--? ? 7 i.'? f l ?i? ?1 ? ? f ??`; 1 J i e , ?t • .. ? l y{ k: ' ti • ( ? ` , , ? . a, k y ? i 11 ? ?.., ?tC,r? R :•.? .L,,• ?f. 4 •?, n t. _ R y 1 1 . ?Rf'.:: 1K .?k ?, •J .^? 1? ` ? - ??" j I !L?? 1. !: rj? ?R ,j 1:.:/ '1?.. 9C, ,. a w r ? -Jam'-''... _•r 1 v1 '??:` ;?1 : t?,, J, '`,,1 ..- f I... i ?i ? ?? .? ? 31 Cr, { `,x'^_; ? ? !_.??? I ? , J ? ?? _ ;.,,,/ /I ? I ?' 1 ? { hi '1?. (r 111 1 r , , rr F ?? 1` f i .? - ?e1^1 ??Y,' ?_ Y i xf - ?1 U }'1'[?'V a1 -3-? 4 !?" 1 + '1' [ d 1'.- Z ? ? { ? s Jt/ . t j ?? J l ?? 1 1 ? lf f? 1 ? T ?'? f J .r ?.^? [Y l?. {,j lJ.l 'V?'' 3?J 1 II l} `r 1 }-' f"' J E ? ? ! + P..?' ? I I 1 ? , 1 1 1 Rl ? ' ti Y , ., `1 { , ? ? ?? ^'? `' ??{ `` ?? ? t??F\.? , I \ s ?`•\. ?F lf r ? ,. .? A Lll @@ x tx- ?j I ?, A 4'v. J p ?.f I 4 t' 4/ / ? t? R S i J 1 'i I^ ? 44 T (/ -r . ?.?L? ? ?? ?? t`, ? .--^?r 1 ?j_ - ?'.71? 1 Il..\!\? ?"y. '. 156 i '_a 4iCw° f 1 L " t ?I I I ' % '1 r ? t ?, ?? t M`ati' ?. ?' ? '` ? ? U ' / k r , , S t • :; , S ' ? J ?? 1 f ? ? 9 j T [ _ ?`- „? H `? 4 li ? , ? f i „?. ? ? r f f ? ?, F? ` i,,,+?•?y ii?,'?)r?" i ? •. h1?. k V ?,.?,,,i. !? t i t-"z ? it j A'? ?? S ? '4 "It ? ? I ? _ ? ._ ? sr t v?'!??. ?,` ? r J? l ? ` y'' ;/,/, /' 1\!. "'? ^, 7{7?;`,. I I s' ? 'w• I r "x?•"'., ?r ,i~ rt ti /_i „ : •" u i, +?' ?t `? ? ` ' '?'.?? fr.'s'7 i ?i''Q 4 ?t i` I \ '`y `, ?'?wr ?(4'\ %"c- 1ij5u. `,. +1 ,? J K P ' '? y '? ?l t? j a I ?N" j ` f p i71=?`+ ' % ( v %' f?? ? M .J ygrA .{ vi .` \ ! !'-•.?f + JI ! ( n •a`'asu<? ?, 1 N ,,. . 4 ? ! j ? j ? i? • `?, ^? ? ?. + hY p F 'K t '}. 1. ¦7 ??° fi ?l + ?fL 1.0 rrer V f? ''y l I 1? + r/j VmBi}t l? 3 l - .t ?T Y ti tt ~! ? ? ?+ ? f ?s s._r - :? f ??. )? t1 ri ? r ? --? ? • ? , nor,! ,.!.. H l " _, // '/ , ._ ? ..•Y "•} `.( I? ?"??.F.?=^` A.•,/ ..: ?Y",.-,R?- / l`r+l \.{[1tJ) f-' fI i'j'- / "iY" •,??. .G j n ? ?1, ti • Y \` f ` ? ? i 1 , 1 ?yj ?''?`? 1. E 1.?. ?.1 I FQ,<Y 1 .?'" i /` S jSU J1 r A ? t F 1 I 1 ? 3r ? -^ 17" f ? "i{^ t!V[d 4+1 } r? ? 3 ? I 7 _%'^ , Q . ? a?. f , , ? p l i'? V k .:i{?? ! 4 ? f ? -,? GRAPHIC SCALE USGS LOCATION MAP N V = 2000' • ' TT&E METAL AND IRON WORKS, INC. 2000 0 2000 RONNM AND SCOTT THOMPSON GARNER, WAKE COUNTY, NC N. DATE: 7-16-07 USGS 7.5' TOPO QUAD: GARNER & LAKE BURDETTE LAND CONSULTING, INC- DRAWN BY: TAM WHEELER E 308D W Millbrook Road, Suite 200 -Raleigh, North Carolina 27609 CIII{'D BY: JAB Telephone (919) 841-9977- Fax (919) 841-9909 S PROJECT #: 7147 FIGURE #: 1 . I.,a..mm..,,?a..«?.,o,..?,?.. ._...?..=..„,n:,...ww....,..?..w??...........?.l?.aa-u.?:,:..?-_?v..?...:,...-c...._?w-u?,w....?,._. ,.,W-?_?...::.....?b-3..,,<...c?w .?mm..?_?a... .,i?:.e ,.,w...t....z..?.?:u..- ....?.,..?.,. .. .., M_?.....:... C(L N)B 00 07- IS3 GRAPHIC SCALE WAKE COUNTY SOIL SURVEY MAP N 1320' 1" = 0 1320' 1320' TT&E METAL AND IRON WORKS INC. RONNIE AND SCOTT THOMPSON GARNER, WAKE COUNTY, NC '• N•''• DATE: 7-16-07 SHEET(S):69 w E =3 BURDETTE LAND CONSULTING, INC. DRAWN BY: JBB CHKD BY: JAB 308-D W Millbrook Road, Suite 200 -Raleigh, North Carolina 27609 3 Telephone (919) 841-9977-Fax (919) 841-9909 PROJECT #: 7147 FIGURE #: 2 A S vb1C?? (? ' ilat S?b?Cc? OF W ATF9 Michael F. Easley, Governor C1? QG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources r Coleen H. Sullins, Director Division of Water Quality Burdette Land Consulting, Inc. Attn: Jennifer Burdette 10212 Creedmoor Road Raleigh, NC 27615 TT&E Metal and Iron Works NBRR0#08-111 Wake County BASIN: Neuse River Buffer Determination X June 3, 2008 Tar-Pamlico Buffer Determination (15A NCAC 2B .0233) Project Name (15A NCAC 2B.0259) Location/Directions: located north of the intersection of Yeargan Road and Garner Road, tract is located between Garner Road and Railroad Tracks Subject Stream: UT to Big Branch Date of Determination: 6/3/08 Feature(s) Not Subject Subject Start @ Stop@ Stream Form Pts. Soil Survey USGS Topo A X Throughout X B X X C X X D X X Note: Verified isolated wetland boundary on the property. Explanation: The feature(s) listed above has or have been located on the Soil Survey of Wake County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Quality. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c/o Cyndi Karoly , DWQ Wetlands/401 Unit, 2321 Crabtree Blvd., Raleigh, NC 27604-2260. Individuals that dispute a determination by the DWQ or Delegated Local Authority that "exempts" a surface water from the buffer rule may ask for an ad judicatory hearing. You must act within 60 days of the date that you receive this letter. Applicants are hereby notified that the 60-day statutory appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of this decision. DWQ recommends that the applicant North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Internet: h2o.enr.state.ne.us 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer Service FAX (919) 571-4718 1-877-623-6748 Noe Carolina Naturally An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper 6/3/08 Page 2 of 2 conduct this notification in order to be certain that third party appeals are made in a timely manner. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This determination is final and binding unless you ask for a hearing within 60 days. The owner/future owners should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Quality (Central Office) at (919)-733-1786, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-876-8441. Respectfully, Lauren C. Witherspoon Environmental Senior Specialist CC: Wetlands/ Stormwater Branch, 2321 Crabtree Blvd, Suite 250, Raleigh, NC 27604 RRO/SWP File Copy Central Files Nose Carolina Na&ra!!y North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Internet: h2o.enr.state.nc.us 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 7914200 Customer Service FAX (919) 571-4718 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper r, " A ? RD AZ4D 1 *. 4 -•4 2y p 4l % v } 1 i % V t: iiiYYYYII ' '" 11 y\lf I - xr Sl .-- l? ..+, r,g h..- ., I W S I? ( _\ w 1 `? - { ti ,? ?'. lJ'.?YCr /r'' 1 ,• 2'r f? + II ^'-?.. "; - ? ? i ! v? I ? t.?. . is ???I ? ?a - ? ? ?WOIA! anal r '* " ? ,v ? ? ti. ?•+ewV-«r,,..y,i? ? "??r i?j; t ' ftli vl ?i?i T. ??' x•. i I x ,?? a t* ? ? [r 5. ? f`?+-.-? ? ? 71. ?, A vii r F nCfl - ii •? O3ri !I ? r . ? i '` ? , iTl ? f ft L`w" I_.. t?I? r??>?'• fl tii r ?}. `{ r ' ?///? , i , 3G i t r 1 I t9t ? , i • I )?` yU ? 'F [ A{ ?c. ? r.??., J rt3 -. 791 t r . f h ? , ,.. 1 1 ? ??? n ? ?'• "h F• ? ` C ' ?#i'?i"' `'? ?Ls? '1 , y ? !--^ ? it : rj ?` ? \ t ? J ?? k• ? ? { ` ,. r ?y.?', t.[ 1? 4 4 i ? '..? `? ?'.•r„pi "' C +?i f• y If ?` {? 15 4? f?4 ifs :I ?r 1 Ar.?f 'F+ t ?' ?_I ? ?? 1 ` i '' !f ?."4 , { 3. .i t L,??? f ? .?? ??, 1 `? •,a ?16 q f ?? 4 r jy ,? ? FI???Y L? =1 ?. ?! I r F 1 »•c,? ? } ? h ]}, .,,j ? 1 ?.,? !V r .1 ; .7'et? MM ,[III" l vyi \? r?4'i4• 1`.'F! ? i?4'y'?(] ? ? F 1 ?;( ? '•?, ? {) Syr J y + ??? +?( 1 ? ±\7 {?...? ` ` ,{,, ?. • ,?;.. ??q. •.? 31 q?" , 4- } ? F r A .&-.?#.e? 1 ?• 13 ""7' 4, 4^ ?^• xx 'a'.#„ t. y !t' ?,. r 'I, ,?l,n f rr ± w 'k , 3 a i 1 77+ i ?" ? ? ? ? ? - g' /f t,'J ti it 7r ,? y y '" ?Y . d r[? d j ' ???? tl, l' rf / j`I r ?'' •+?+. ?. i ?.,• ??ti? #x ? ?? 1.?`"?:/, j ?'J?t?'?' .?..?le? ? ? k1a 14, , ?+- yCj?3t ? •-as.w.-?,?+?f`? '.°"i*"tY T7 M`d 'i" * yN 1 } S \k .1{ ?? ''' 1 "° I? I y? ?3?'66 n r ?,.. + 4 n:._..;r'?' ?u# 1 V 't? i b f SS}27"?W .'? Y A4 • .[i 5' •? ? { a\+• I.• ??... S Vr / i ?, S t ? ? I + y ?f ? +T t- ,' ? }! ? 1?^-'1 I `i ?? t , 4i-s . 7 1 r J ?, T ? ' } M1 ? f f I •. ?-.I'_ 4f. ?""?'r. 'a?? t•`1?55`?I .?? C I • ) GRAPHIC SCALE USGS LOCATION MAP N 1" = 2000' ' ' TT&E METAL AND IRON WORKS NC. 2000 0 2000 , i 1 RONNIE AND SCOTT THOMPSON ? GARNER, WAKE COUNTY, NC DATE: 4-21-08 USGS 7.5' TOPO QUAD: • LAKE WH E 1 BURDETTE LAND CONSULTING, INC. w E DRAWN BY: TMB E LER 10212 Creedmoor Road - Raleigh, North Carolina 27615 T l h CHK'D BY: JAB e ep one (919) 841-9977- Fax (919) 841-9909 S PROJECT #: 7147 FIGURE #: 1 GRAPHIC SCALE 1" = 1320' WARE COUNTY SOIL SURVEY MAP ? 1320' 0 1320' TT&.E METAL AND IRON WORKS INC. R©NNIE AND SCOTT THOMPSON ?I GARNER, WAKE COUNTY, NC DATE: 4-21-08 SHEET(S):69 +W E : BURDETTE LAND CONSULTING INC. DRAWN BY: JBB CHK'D BY: JAB 10212 Creedmoor Road - Raleigh, North Carolina 27615 Telephone (919) 841-9977- Fax (919) 841-9909 PROJECT 11: 7147 FIGURE #: 2 S 0 CIT- ROA1 I I ?'o -N P1 0 Al. t I C) Z03; 4111 T-? IW CO C) T z.- ji CD c t g 1 oo .01 cf) N, N, Z6 RZ ----------- N", r V1 ---------- > m m z zm C, I,- 'o 'm 12 m2 q-uzxzx -2 , 0 m ?a En M 5srna - C) =1 c) ? > x > m w Z>25m> H = m m m 0 m 3>0 -m, W> ->11 > z m > - > 0 0 m TH 'o z z m CI) G) > C,- z c: z ?Iz. Z. m, M> > 0 E - x > - Z Z Ln m Z , m z , E: z 0 > 0 M m, Z> 0 0 0,0 Z 0 cn > co OM 2 m u) I z U) cf) o 1> m (D cz wx* m 0 m M;,, 6 -.1, C: m -o ?7- Z -? - z -i m C, z , , ; o 0 m z m ?5 > M c p m 5 ?21 , 0 s m) : M?- , (n Z > X C) W z :?moo --Iom - R: > > x --i i c z ,,,o 0, 0 M 8 m ?u U82 5-1 m > Km ; , > 9 0 --m > C) > ? c, z 0 , K -, M C? m 8 mo G) 0 (1) m m > V5 7 o > > z o z , -m, x M 1- < G) M -1 m m -< 0 'D m m >, m a: (n m c > a z -< --I b z o > Cl) m m 0 m 0 m m -4 z z c m ;u m m m < u) m M > I x Deceived 05 08 2008 13:02 0 05-08-08:12:55PM: .N `.w BURDETT?E LAND CONSULTING, INC. 10212 Creedmoor Road - Raleigh, North Carolina 27615 Telephone (919) 841-9977 - Fax (919) 841-9909 AGENT AUTHORIZATION FORM US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 To Whom It May Concern: North Carolina Division of Water Quality Central Office Mail Service Center 1650 Raleigh, North Carolina 27699 By signing below, the current property owner gives representatives of Burdette Land Consulting, Inc. permission to act as their authorized agent for jurisdictional and isolated waters and riparian buffer determinations, delineation, and permitting for the subject project. This authorization includes permission to enter the site to conduct site meetings with US Army Corps of Engineers and NC Division of Water Quality personnel, as necessary. Project Name: T T & E Expansion BLC Project #: 7147 Current Property Owner or Easement Holder: Name: T T & E Metal and Iron Works Inc. (include contact person if a corporation, partnership, or government) Mailing Address: 508 N. Garner Road Garner North Carolina 27529 Telephone: (919) 772-5041 Fax: 04- c-t (-4 n)?-72-q (9o % %dc 9s9-7v2 -8-7 90 fbv< 'RPVL? (a, ?-"tiie A - T\ov"P.50'? - pnz?i)e'+ Signature Print Name (include title, if appropriate) # 1 ! 1 5-2-0-19 Date a? AV- ?_ NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This fort must be completely fitted out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! Project name TT&E Iron & Metal Contact name Development Consulting Services, Inc. (Matt Collins) Phone number 919-3290051 Date May 8, 2008 :. Drainage area number Detention Pond #2 .11?ilillillimillimlmi MIN-, -, For Level Spreaders Receiving Flow From a BMP Type of BMP Extended Dry Detention Pond Drawdown flow from the BMP 6.68 cis For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area ftz Do not compete this section of the worksheet. Impervious surface area fe Do not complete this section of the worksheet. Percent impervious % Do not complete this section of the worksheet. Rational C Coefficient Do not complete this section of the worksheet. Peak flow from the 1 in/hr storm CIS Do not complete this section of the worksheet. Time of concentration min Rainfall intensity, l0 yr storm in/hr Do not complete this section of the worksheet. Peak flow from the 10-yr storm cfs Do not complete this section of the worksheet. Where Does the Level Spreader Discharge? To a grassed bioretention cell? N (Y or N) To a mulched bioretention cell? N (Y or N) To a wetland? N (Y or N) To a filter strip or riparian buffet? Y (Y or N) Please complete filter strip characterization below. Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass 0.00 It Width of dense ground cover ..50.00 ft Width of wooded vegetation 0.00. ft Total width 50.00: ft Elevation at downslope base of level lip 325.00... fmsl Elevation at top of bank of the receiving water 322.00 ; fmsl Slope (from level lip to to top of bank) 6.00 % oK Are any draws present? N (Y or N) OK Level Spreader Design Forebay surface area 0.00 :: sq ft No forebay is needed. Feet of level lip needed per cfs 13 ftlcis Answer 'Y' to one of the following: Length based on the 1 in/hr storm? N (Y or N) Length based on the 10-yr storm? N .. .: (Y or N) Length based on the BMP discharge rate? Y . (Y or N) Design flow 6.68. efs Is a bypass device provided? N (Y or N) A bypass device must be provided. Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Paris I. and 11. Design Summary, page 1 of 2 Length of the level lip 87.00. ` it avnl.UE! Are level spreaders in series? N (Y or N) Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M 8 W y Peak velocity in the channel during the 10-yr storm Channel lining material . (Y or N) Do not complete this section of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. Cfs Do not complete this section of the worksheet Do not complete this section of the worksheet Y t t i------------ --------------? M M B Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and ll. Design Summary, page 2 of 2 Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials y? Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement '94 2. Plan details (1' = 30' or larger) for the level spreader showing: - Forebay (if applicable), - High flow bypass system, - One foot topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate build-out. 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), - level lip, - Upslope channel, and - Downslope filter fabric. 4. A date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. ,?LEfL ? .? 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. / ? 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (00) agreement. A&& 8. A copy of the deed restrictions (if required). Form SW441-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of i .i TT&E IRON & METAL STORM DRAINAGE DESIGN Inlet DA EDA C I (in/hr) Q (cfs) Pipe Length Size 1 0.5 0.50 0.85 8.5 3.6 18" 108' 2 57.5 57.50 - - 137.6* 60" 64' 3 0.38 0.38 0.85 8.5 2.7 18" 100' *Q for Inlet #2 determined using Map of Hydrologic Contours DISSIPATOR PAD DESIGN Outlet @ Q (cfs) Pipe Size Slope Vel (fps) Dissipator D50 1 3.6 18 in. 3.0% 8.0 4.5'x6'x18" 6" 2 137.6* 60 in. 0.5% 9.5 15'x40'x24" 13" 3 2.7 18 in. 2.1% 6.9 4.5'x6'x18" 6" POND 1 7.0 30 in. 0.5% 3.9 7.5'x15'x18" 6" POND 2 11.5 36 in. 0.5% 5.8 9'x18'x18" 6" LEVEL SPREADER CHANNEL/ UNDERDRAIN - SIZED FOR SITE SOIL CONDITIONS - DRAIN INTO BYPASS SWALE 3" LAYER OF #57 STONE FLOW PATH 3 ft WIDE STRIP OF FILTER FABRIC --,,APPROPRIATELY SIZED CONCRETE FOOTER LEVEL SPREADER DETAIL - SECTION VIEW BUFFER '•3" LAYER OF FROM • #57 STONE WATERSHED FOREBAY l am rn m 1 151011 5 l 1 um cm z REINFORCED ?n CHANNEL UNDERDRAIN - SIZED FOR SITE SOIL CONDITIONS - DRAIN INTO BYPASS SWALE LEVEL SPREADER U LEVEL SPREADER DETAIL - PLAN VIEW 1. Insure the site is stabilized and confirm with the Enviromental Engineer, DENR 791-4200. 2. Install level spreaders as shown on the approved plan. Clear only as necessary to install these devices. Seed any disturbed areas as a result to the installation of the level spreader. 3. Ensure level spreader is constructed at 0% slope. 4. Insure under drain has been installed and outlet free of debris. NOTE: LEVELSPREADER DETAILS PROVIDED BY DEVELOPMENT CONSULTING SERVICES LEVEL SPREADER DETAIL TT&E IRON & METALS GARNER, WAKE COUNTY, NC • • N • • • DATE: 6-3-08 SCALE: AS NOTED W e BiU"ETTE LAND CONSULTING, INC. DRAWN BY: TMB CHIMBY: JAB 10212 Creedmoor Road - Raleigh North Carolina 27615 PROJECT #: 7147 FIGURE: 5 S Telephone (919) 841-9977- Fax (919) 841-9909 '• ...?...:........ ?.I ,..,-.....,...,.?, ,..., .... >...•... .. a.?.v.,?., ..,...?_.,.,.....,ti .......:.........,a.,...LL.w.,:..1?...v.:.?._....--?. ?..:.o...._-??.__.. ?..m,-..,.:.. ,. .?.aaa,1 ?«. ? ?...:...:G,w ?.o.,?...o....?, .i.,.?:.. ?.. .•... >.o...r.? ?,..w.... ... ,__?.,, . CC 4 iA PAO 0-7- (S3 GRAPHIC SCALE 1" = 1320' 1320' 0 1320' Nw BURDETTE LAND CONSULTING, INC. 308-D W Millbrook Road, Suite 200 -Raleigh, North Carolina 27609 3 Telephone (919) 841-9977-Fax (919) 841-9909 DATE: 7-16-07 DRAWN BY: JBB PROJECT #: 7147 N SHEET(S):69 CHKD BY: JAB FIGURE #: 2 WAKE COUNTY SOIL, SURVEY MAP TT&E METAL AND IRON WORKS INC. RONNIE AND SCOTT THOMPSON GARNER, WAKE COUNTY, NC N 5 bJ ???r f? - i'lo t S; b C cj- TT & E Iron & Metal Works, Inc. Garner, Wake County, NC Vegetation downslope of proposed level spreader for Detention Pond #2 Permit Number: (to be provided by DWQ) Drainage Area Number: Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How l will remediate the problem: The entire filter strip Trash/debris is present. Remove the trash/debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clo ed. of an sediment off-site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 BMP element: Potential problem: How I will remediate the problem: The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off-site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo a of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable). approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: -rE',.rs;??[ `,O" '* Z.Print name: rrt? t ?? r N Title: f r . d Address: ( 525 W- qrs. 2 d • ?ar•?er /v.(- 27Sz5 -7 ? Z Signature:.;, Date: 22 -? Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. r'\E M MC- V , a Notary Public for the State of County of?p6S l' N , do hereby certify that personally appeared before me this A)-- day of UDg , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, y + s &0 ?Uwg Ilftlt SEAL My commission expires ?o2 / &d a Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 Re Cived 06 09 2008 10;00 ,JUN-09-2008 10:03 From: Town of 1 O5r orri(:e 8o)c 446 • (-.arr Phone 919-772-4688; June 5, 2008 Tony M_ T•Le 'Landscape Archite 5011 Soutkpaxk Drive, Suite 20 Durham, NC 27713 RE: 1529 W. Garner Rd, Dear Mr. ate: Ar i s meeting on June 2 approved the above-rcferenced listed c)n the attached permit. the approval date. If you have any questions DeparCment! at the Town Hall (7' To:9198419909 jarner )1111 C.arolum 11529 9'19-6624874 SP-08-02-M P.1"3 08, the Garner Board of Aldei-men plan application with the conditions its permit is valid for two years from lease feel. free to call Lhe Planning 1688) . Sinc;ex'ely?? Judy Bass Town Clerk cc Brad IBass Jenny Saldi Sand' 'real Debby Coiuie 1 ly -Jones Fran Powell Jenn fcr Sjarrdema, Wake. Tim Wilkins, BellSoUch C_q cations Enclozure Received 06 09 2008 10:00 JUN-09-2008 10:03 From: To:9198419909 I I TO L N OF GARNER CP- P-08-02-M CONDI m AL USE PERMIT P. 213 w APPLICAN T Tony M. Tate Lan 501 'I Southpark Dr Durham, NC 2771 k a v e pe Architecture Suite 200 LOCATIO 1529 W. Garner k' a I' d l USE Addition Metal S ; el, DATE 1SS I+ O June 2, 2008 1. COMPLETENESS OF APPLTCA71ION The a plication is complete. IT. COMPLIANCE WITH ORDIN I REQUIREMENTS The'plication complies with alll pp icable requirements of the Unified Development Ordinance. Ill. GRANTING THE APPLICATI The a plication is granted, subject he following conditions: 1) The applicant shall complete t ie development strictly in accordance with the plans submitted to and app ov d by this Board, a copy of which is filed in the Town Hall. Any deviation. ?fi )m, or changes in these plans must be pointed out specifically to the admini. at or in writing and specific written approval obtained as provided Jai the tfnified!. ?e elopinent Ordinance. 2) if any of the conditions aff a hereto or any part thereof shall be held invalid or void, then this permit shall be void and of no effect. 3) All applicable permit apps vas shall be obtained by the applicant. 1V. SPECIFIC TO THE PROJECT 1. Documentation of approval from NCDEHNR for crossing the Neuse River Buffer shall be required prior to is u nce of a building permit. 2. Construction drawing apps v I shall be required, prior to issuance of a building permit, to replace the sew r line, running under the new drive, with ductile iron from manhole to manhole: 3. In the event the proposed1 o lights create off site glare, as determined by the Town of Gamer, the Appli n shall be responsible for modifying light fixtures to eliminate the problem- 4. If it is determined, by the Tuv of Garner, that the noise level exceed the maximums stated in the U ifi d Development Ordinance, the Applicant shall be responsible for installing m 1a ures to reduce the sound to acceptable levels. i. 1 5. Documentation of an apps' ve air quality permit from the State shall be submitted prior to release F the building permit. 6. Prior to issuance of a build li?permit, a plat shall be recorded combining the four lots into one. 1 of 2 Re jkved 06 09 2008 10:00 .JUN-09-2008 10:03 From: 7. 8 Road improvements shall to the standards of the Tc road widening, curb and c The Town of Garner shall 11 street lights are needed on responsible for installation To:9198419909 P.3r3 ade along the frontage of the property according Garner Unified Development Ordinance including construction and sidewalks. with Progress Energy to determine if additional Garner Road; the Town of Garner will be ose street lights as the project develops- 2 of 2 DEVELOPMENT CONSULTING SERVICES, INC. 1401 Aversboro Road, Suite 206 Garner, North Carolina 27529 Ph. (919) 329-0051 Friday, April 18, 2008 Frank Powell, Town Engineer Town Of Garner P.O. Box 446 Garner, North Carolina 27529 Reference: TT&E Iron & Metal Storm Drainage Design The project is located on a parcel that is approximately 20.17 acres in size. At present the tract consists of an existing metal recycling center on the western portion of the tract and mostly wooded on the eastern portion of the tract. There is a stream that runs through the middle of site which is protected by a Neuse Riparian Buffer. The proposed use for this site will be the addition of a new metal shredder along with additional parking, traffic circulation area. Access to the site will be located at the current entrance and two new entrances area also proposed. There will be a new access located at the western portion of the site and at the eastern portion of the site. All three accesses will be located on West Garner Road. It is estimated that at build out the site will have an impervious area of approximately 49.2%. Due to the location of the site, control of the 1, 25 and 100 year storm events will be required. Nitrogen reduction will also be required. Since the site is divided by a stream, we are proposing two detention ponds on either side of the stream to meet the stormwater requirements for this site. There will be approximately 10.75 acres of off-site area draining to Pond #2. Since including this off-site area would cause Pond #2 to extremely large, Pond #2 has been designed for only the on-site drainage area (5.05 acres). However, we have sized the emergency spillway for the entire 15.8 acres draining to the pond. Due to the existing and proposed site layout, over half of the site area will note drain to a BMP. A majority of the drainage area we are not able to treat or control comes from the existing site where it is not feasible to do so. Although the drainage areas for the ponds is less than the total site area, the post-development peak flow for the entire site is less than the pre-development peak flow. The following table lists the peak flows for pre and post development conditions for the 1, 25 and 100 year storm events for Pond #1: 1 YEAR 25 YEAR 100 YEAR STORM STORM STORM PRE-DEVELOPMENT 4.19 cfs 6.18 cfs 7.28 cfs POST-DEVELOPMENT (WITHOUT DETENTION) 12.87 cfs 19.00 cfs 22.35 cfs POST-DEVELOPMENT (WITH DETENTION) 3.73 cfs 5.49 cfs I 7.03 cfs _J The following table lists the peak flows for pre and post development conditions for the 1, 25 and 100 year storm events for Pond #2: The following table lists the peak flows for pre and post development conditions for the 1, 25 and 100 year storm events for the entire site (SEE ATTACHED CALCULATIONS): In summary, it is proposed that the site will meet stormwater requirements by using two detention ponds to reduce the nitrogen loading rate and control the 1, 25 and 100 year storm events. Thank you for your consideration in this matter. If you need additional information or have questions please feel free to contact us. Developm nsultin Services, Inc. Matt Collins, EI s'y 0 028728 w? o 1 1N EQ:•'?''tyi . 011111111 Keith Roberts, P.E. TT&E IRON & METAL OVERALL SITE STORM DRAINAGE E AREA: ST. IMP AREA: _ =5'fi5 A = 128.0°I° OP. IMP. AREA: :.__:W .....:, .......49.8% 1'Q05°AC RUNOFF COEFFICIENT (C) Cpre= 14.5 AC x 0.25 + 5.65 AC x 1.0 = 0.46 20.17 AC Cpost= 10.1 AC x 0.25 + 10.05 AC x 1.0 = 0.62 20.17 AC STORM DATA STORM EVENT INTENSITY I ) PRECIPITATION DEPTH { P ) 1 YEAR 5.76 in/hr 2.1" 25 YEAR 8.50 in/hr 4.3" 100 YEAR 10.00 in/hr 1 YEAR STORM 25 YEAR STORM 100 YEAR STORM Qpre=CIA= 0.46 x 5.76 x 20.17 = 53.45 cfs Qpost=CIA= 0.62 x 5.76 x 20.17 = 72.46 cfs Qpre=CIA= 0.46 x 8.5 x 20.17 = 78.88 cfs Qpost=CIA= 0.62 x 8.5 x 20.17 = 106.93 cfs Qpre=CIA= 0.46 x 10.0 x 20.17 = 92.80 cfs Qpost=CIA= 0.62 x 10.0 x 20.17 = 125.80 cfs POND 1 DRAINAGE AREA: 2.9 AC Q POST W/ DETENTION Q1 3.73 cfs Q25 5.49 cfs Q100 7.03 cfs POND 2 DRAINAGE AREA: 5.1 AC Q POST W/ DETENTION Q1 5.06 cfs Q25 6.88 cfs Q100 11.50 cfs AREA NOT DRAINING TO POND DRAINAGE AREA: 12.2 AC IMPERVIOUS AREA: 4.2 AC Cpost 0.51 Q1 35.87 cfs Q25 52.93 cfs Q100 62.27 cfs TOTAL, SITE POST DEVELOPMENT RUNOFF =Qpost w/ detention for Pond #1 + Qpost w/ detention for Pond #2 + Qpost Not draining to ponds Q l 44.66 cfs Q26 65.30 cfs Q100 80.80 cfs STORMWATER CALCULATIONS TT&E IRON & METAL GARNER, NORTH CAROLINA SUBMITTED BY: DEVELOPMENT CONSULTING SERVICES, INC. 1401 AVERSBORO ROAD, SUITE 206 GARNER, NC 27529 (919) 625-0411 EAR y z 0 023726 lob r Glee R ?. Nitrogen Control Plan - November 2007 Method 2: Commerical/Industrial/Residential Sites with Known Imervious Area Project Name: TT&E IRON & METAL Date: 411/2008 Applicant: Development Consulting Services Telephone: (919) 329-0051 Part I. Riparian Buffers Does site contain riparian buffers? [ ] No [x] Yes (show buffers on Plan [ ] Exempt (show basis) Part II. Nitrogen Calculation Item Proposed Site Information j Area (acres) 1 Total Pro ect Acreage 20.17 2 Total Proposed Impervious Area 9.92 3 Existing Impervious area (prior to 3/9/01 5.65 4 New Im ervious area Item 2 - Item 3 4.27 5 L Permanently protected undisturbed open sace 5.27 6 Permanently protected managed open space 4.98 I PRE-DEVELOPMENT NITR OGEN LOADING TYPE OF LANDCOVER AREA (acres) TN EXPORT COEFFICIENT (lbs/ac/ ) TN EXPORT FROM USE Ibs/yr) Existing Forest Land 11.94 1.7 20.30 Existing Pasture 4.4 0.00 Existing residential 7.5 0.00 Existing cropland 13.6 0.00 Existing commercial/industrial 8.23 13.0 106.99 TOTAL 20.17 127.29 N ITROGEN LOADING RATE* (Ibs/ac/yr) 6.31 Nitrogen Loading Rate (Ibs/ac/yr) = Total TN export from use (lbs/yr)/Total Area (acres) POST-DEVELOPMENT LOADING BEFORE B MPs AND/OR OFFSET PAYMENTS TYPE OF LANDCOVER AREA TN EXPORT COEFFICIENT TN EXPORT FROM acres Obs/ac/yr) USE Ibs/ r Permanently protected undisturbed open space (forest, unmown meadow, wetlands buffers Item 5 5.27 0.6 3.16 Permanentely protected managed open space (grass, landscaping, etc.) (Item 6) 4.98 1.2 5.98 Impervious surfaces (roads, parking lots, driveways, roofs, paved storage areas, etc. Item 4 4.27 21.2 90.52 TOTAL -14. 99.66 tem Item 8 Nitrogen Loading Rate (Ibs/ac/yr) (Equals Item 8 = Item 7) 6.86 BMP Type TN Removal Rate % Check which apply Wet Pond 25 Stonnwater Wetland 40 Sand Filter 35 Bioretention 35 Grass Swale 20 Vegetated Filter Strip w/ Level Spreader 20 50' Restored or Additional Riparian Buffer w/ Level Spreader 30 Dry Detention 10 X Post-Development Loading after BMPs and/or Offset Payments Item Description Nitrogen Loading Rate lbs/ac/ r 9 Nitrogen load after BMPs show separately in detail 4 10 Nitrogen load offset b payments Item 9 - 3.6 Z, T6 Amount of Offset (Pounds of Nitrogen) [Item 10 s (Item 1- Item 3)] Z..-4 ("a' 1'7 - = tir s3 - 11.9 = z9.6s « 114 t45 7?a *To Calculate the Amount of the Nitrogen Offset Payment Required to Be Paid to the NC EEP Use The Following Formula: F--,c I q yl4/? Amount of Offset Payment [Pounds of Nitrogen x $28.35} 30 years ] *S'" 2ao -3o Sv?µ,rra? Part 111.. Control of Peak Stormwater Flow Calculated Pre-development Peak Flow (1-year) 5-3.3 I Calculated Post-development Peak Flow without Controls (1-year) 7Z..4-6 Calculated Post-development Peak Flow with Controls (1-year) Calculations and details showing control of nitrogen and peak stormwater runoff control must be included. Part IV: Watershed Development Permit 1. Total project acreage (in Lake Benson Watershed) 2. Total proposed impervious surface (in Lake Benson Watershed) 3. Existing impervious surface (in Lake Benson Watershed) 4. Equivalent project acreage (Item 1 - Item 3) 5. New impervious surface (Item 2 - Item 3) 6. Percent impervious [(Item 5 - Item 4) x 100] * Limited to impervious surface existing before 7/1/93 I, the undersigned, certify that to the best of my knowledge that the above information is correct (af4sett . SEAL = p 023728 a ?':cNG1NE??•'•??co To be filled in by staff 0 Project Exempt: Explain Project Watershed Protection Requirements 0 Project Located in Lake Benson Conservation District - LBCD (Critical Area) Standards Apply ? Project Located Outside LBCD - On-site treatment required. ? Minor Variance Requested (WRB) Approved (date): Disapproved (date): 0 Major Variance Requested (EMC) Approved (date): Disapproved (date): Recommended by WRB (circle one): YES NO Comments (use additional sheet if necessary) Approved by Watershed Administrator: (sign) Date: W U? Z DO I- OV LL °` CEO 0 0 0 0o (D00 ? N P M O Lf) O M N LOM m O v to w Z? w Lu O z z P LL U co " O co C) O M Q n ?.? + cM O O fn Uj O C:i N CO Q 0- Z U w LL Z O O Z o z U' z Q U_ N a U- ? Co O V U Q co O co O N O N O N O N W 07 0 o .= ? N N tz 0- < 4 Z Z Q i w N .N h N O 00 O co N ? - Z Q m O O O O C O O sf) V-: f - C. w a- 0 U t0 O V co m O w vi N N F' O Cl. Q O 4) Q) O p CL w .0 a) 'D N O -0 O O v 3 ?o g E E LL a) 0 a) 0) O O 2 U ` F-- L- GL C 't t ) N w N O O 0) O I E E E L m N Q N a (D a ? E0 TT&E [RON & METAL STORMWATER DETENTION POND DESIGN POND # 1 DRAINAGE AREA: 2:9'IsAG rf ?= EXIST. IMP AREA: PROP. IMP. AREA: _ =5 ? ` 01AC = :'_=? 69.1 /o RUNOFF COEFFICIENT (C) Cpre= 2.91 AC x 0.25 + 0.00 AC x 1.0 = 0.25 2.91 AC Cpost= 0.90 AC x 0.25 + 2.41 AC x 1.0 = 0.77 2.91 AC 1 YEAR STORM Qpre=CIA= 0.25 x 5.76 x 2.91 = 4.19 cfs Qpost-CIA= 0.77 x 5.76 x 2.91 = 12.87 cfs 25 YEAR STORM Qpre=CIA=. 0.25 x 8.5 x 2.91 = 6.18 cfs Qpost=CIA= 0.77 x 8.5 x 2.91 = 19.00 cfs 100 YEAR STORM Qpre=CIA= 0.25 x 10.0 x 2.91 = 7.28 cfs Qpost=CIA= 0.77 x 10.0 x 2.91 = 22.35 cfs STORM DATA STORM EVENT INTENSITY( I? PRECIPITATION DEPTH { P 1 YEAR 5.76 in/hr 2.1" 25 YEAR 8.50 in/hr 4.3" 100 YEAR 10.04 in/hr 5.8" DETERMINE SOIL STORAGE CN= 98 x ;U69 + 55 x 61 x `0 6z = 86 S = 100 CN -10 = 85 1000 -10 = 1.68" .63 RUNOFF DEPTH * (P-0.2 *S)2 (Q*) Q _ (P+0.8*S) Q* 12 in/ft x DA x 43560 SF/AC TIME TO PEAK (Tp) Tp= 1.39 x Qpost 1 YEAR STORM Q* = 2.1 - 0.2 x 1.7)112 = 0 90 in (2.1 + . . 0.8 x 1.68) 0.90 in. x 2.91 AC x 43560 SF/AC Tp= 12 in/ft = 8.9 min. 1.39 x 12.87 cfs ? PEAK 12.87 cfs @ 8.9 min. 25 YEAR STORM Q* _ (4.3 - 0.2 . x 1.7 )^2 2 78 in (4.3 + . . 0.8 x 1.68) 2.78 in. 12 in/ft x 2.91 AC x 43560 SF/AC Tp_ 1.39 x 19.00 cfs = 18.5 min. ? PEAK 19.00 cfs @ 18.5 min. 100 YEAR STORM * _ Q (5.8 - 0.2 x 1.7 )^2 4.13 in (5.8 + . 0.8 x 1.68) 4.13 in. x 2.91 AC x 43560 SF/AC Tp_ 12 inlft = 23.4 min. 1.39 x 22.35 cfs ? PEAK 22.35 cfs @ 23.4 min. ESTIMATE POND SIZE Vpond = (Qpost-Qpre) x Tp + 40% Vpon d ={ 22.35 - 7.28) x 23.4 min. + 40% Vpond_= 29,661 CF EMERGENCY SPILLWAY (SIZE FOR 100 YEAR STORM) Q100=CIA= 0.77 x 10.0 x 2.91 = 22.35 cfs WEIR EQUATION: Q=Cw*L*H^312 Cw= 3.0 Q= 22.35 cfs H= 1.00 Q _ 22.35 cfs _ L_ Cw*H"3/2 3.0 x JA 3/2 7.5, USE IO' EMERGENCY SPILLWAY TO CARRY 100 YEAR STORM SIZE ORIFICE Q100=CAd2GH Q100 = 7.28 cfs C = 0.93 G = 32.2 ft/s H = 3.0' A= Q100 = 7.28 cfs = 0.56 S.F. C42GH 0.93 2732.273 A=Pi*r2 r = 0.56 S.F. _ 0.4' 3.14 USE 9.6" DIAMETER ORIFICE (MAXIMUM) Pond Report Hydraflow Hydrographs by Intel€solve Monday, Mar 31 2008, 4:11 PM Pond No. 1 - TT&E - POND 1 Pond Data Pond storage is based on known contour areas. Average end area m ethod used. Stage / Storage Table Stage (ft) ' Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 322.75 01 0 0 0.25 323.00 548 69 69 1.25 324.00 3,739 2,144 2 212 2.25 325.00 4,688 4,214 , . 6 426 3.25 326.00 5,725 5,207 , 11 632 4.25 327.00 6,831 6,278 , 17,910 Culvert 1 Orifice Structures Weir Structures [A] [BI [C] [D] [A] [6] [c] [D] Rise (in) = 30.00 12.00 0.00 0.00 Crest Len (ft) = 16.00 0.00 0.00 0.00 Span (in) = 30.00 12.00 0.00 0.00 Crest El. (ft) = 326.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 322.50 322.75 0.00 0.00 Weir Type = Riser - Length (ft) = 100.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 0.50 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = n/a Yes No No Exfiltration = 0.000 in/hr (Contour) Ta ilwater Elev. = 0.00 It Note: CulverUOriflce outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions Stage (ft) 5.00 4.00 Stage (ft) 5.00 4.00 3.00 Stage / Storage 2.00 1.00 0.00 0 Z,uUU Storage 4,000 6,000 0.00 8;000 10,000 12,000 14,000 16,000 18,000 Storage (cuft) Hydrograph Plot r Hydraflow Hydrographs by Intefisoive Monday, Mar 31 2008, 4:9 PM Hyd. No. 4 TT&E - POND 1 Hydrograph type = Reservoir Peak discharge = 3.73 cfs Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 3 Max. Elevation = 324.23 ft Reservoir name = TT&E - POND 1 Max. Storage = 3,194 cuft Storage Indication method used.. Q (cfs) 10.00 8.00 6.00 4.00 2.00 Hydrograph Volume = 6,852 cult TT&E - POND 1 Hyd. No..4 --1 Yr Q (cfs) 10.00 8.00 6.00 4.00 2.00 0.00 0.00 0 10 20 30 40 50 60 70 Hyd No. 4 Hyd No. 3 Req. Stor = 3,194 cult Time (min) 1.... .11 1..1. 1_1 ,..1 1..1_1 A ......... .......... ....,........_...__... .. ... ,.. ............... .. ......, ... .,... ... .. ..... .1 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 Manual 0.00 1 0 0 - ---- ----- MALCOM METHOD 2 Reservoir 0.00 1 0 0 1 0.00 0 <no description> 3 Rational 8.16 1 9 7,050 -- - ---- TT&E - POND 1 4 Reservoir 3.73 1 19 6,852 3 324.23 3,194 TT&E - POND 1 TT&El.gpw Return Period: 1 Year Monday, Mar 31 2008, 4:10 PM Hydrallow Hydrographs by Intelisolve Hydrograph Report 2 Hydraflow Hydrographs by Intelisolve Hyd. No. 4 TT&E - POND 1 Hydrograph type = Reservoir Storm frequency = I yrs Inflow hyd. No. = 3 Max. Elevation = 324.23 ft Monday, Mar 31 2008, 4:10 PM Peak discharge = 3.73 cfs Time interval = 1 min Reservoir name = TT&E - POND 1 Max. Storage = 3,194 cuft Storage Indication method used. Outflow hydrograph volume = 6,852 cult Hydrograph Dis charge Table (Printed values -I%ofOp.) Time Inflow Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D EXfII Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1 0.91 322.84 0.44 0.04 ----- 0 04 2 1.81 323.01 0.45 0.30 . 0 30 3 2.72 323.07 0.49 0.42 . 0 42 4 3.63 323.14 0.64 0.62 . 0 62 5 4.53 323.23 0.94 0.91 . 0 91 6 5.44 323.34 1.31 1.29 . -- _____ 1.29 7 6.35 323.47 1.76 1.74 -- ---- -- ___ ___ w- _W 1.74 8 7.25 323.60 2.33 2.24 2.24 9 8.16 << 323.75 2.72 2.68 2.68 10 7.73 323.89 3.03 3.02 3.02 11 7.30 324.01 3.33 3.29 3.29 12 6.87 324.06 3.42 3.40 ---- ---- --_- -?- _?_ _?_ -_ __ 3.40 13 6.44 324.10 3.50 3.50 ----- ---- ----- ---- _-_ _-_ __..__ 3.50 14 6.01 324.14 3.57 3.57 ----- _-_ __..__ 3.57 15 5.58 324.17 3.63 3.63 --- ---- ---- 3.63 16 5.15 324.20 3.68 3.68 ----- ---- ---- -__ _? __w _____ 3.68 17 4.72 324.22 3.71 3.71 ----- --- 3.71 18 4.29 324.23 3.73 3.73 3.73 19 3.87 324.23 << 3.73 3.73 3.73 << 20 3.44 324.23 3.73 3.73 ----- 3.73 21 3.01 324.22 3.72 3.72 ----- ---- ---- -__ -_-- ?__ w_ 3.72 22 2.58 324.21 3.70 3.70 ----- ----- ---- ----- ----- ----- --- 3.70 23 2.15 324.19 3.67 3.67 ---- ----- ---- ---- ----- ----- ---- 3.67 24 1.72 324.17 3.62 3:62 ---- ---- ---- --- ----- ----- ---- 3.62 25 1.29 324.14 3.56 3.56 3.56 26 0.86 324.10 3.49 3.49 3.49 27 0.43 324.06 3.43 3.41 3.41 28 0.00 324.02 3.35 3.31 3.31 29 0.00 323.95 3.17 3.15 3.15 30 0.00 323.86 2.98 2.95 ----- ----- ---- -.--- ----- ---- --- 2.95 31 0.00 323.78 2.82 2.76 ---- ---- ---- ---- ---- --- ----- 2.76 32 0.00 323.71 2.61 2.58 ----- ---- ---- ---- ---- ----- ---- 2.58 33 0.00 323.64 2.43 2.36 ----- 2.36 34 0.00 323.57 2.21 2.15 ----- ---- ---- ---- --- -- -- --- 2.15 35 0.00 323.52 1.95 1.94 _W_ 1.94 36 0.00 323.47 1.76 1.74 ---- ---- ----- ---- ___ __w ___ 1.74 37 0.00 323.42 1.62 1.57 1.57 38 0.00 323.38 1.46 1.41 1.41 Continues on next page... 3 TI'&E - POND 1 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C Civ D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 39 0.00 323.34 1.30 1.28 ---- ----- -__ __- __ _ _? ___ 1.28 40 0.00 323.31 1.15 1.15 ---- ---- ---- -- ---- ----- -- 1.15 41 0.00 323.28 1.06 1.05 1.05 42 0.00 323.25 0.97 0.95 ---- ----- --- ?__ M_ M_ ?__ 0.95 43 0.00 323.22 0.90 0.86 _____ 0.86 44 0.00 323.20 0.83 0.79 ---- ----- 0.79 45 0.00 323.18 0.76 0.72 ---- ----- ---- ----- _-__ _W_ ___-- 0.72 46 0.00 323.16 0.70 0.67 0.67 47 0.00 323.14 0.64 0.62 ---- --- ----- ____ --__ 0.62 48 0.00 323.12 0.59 0.57 ----- ---- ---- ---- ----- ---- --- - 0.57 49 0.00 323.11 0.54 0.52 ----- ----- ----- ---- ---- ---- ----- 0.52 50 0.00 323.09 0.51 0.49 -- ---- -- ----- - ----- ----- 0.49 51 0.00 323.08 0.50 0.45 ---- ---- --- ----- ----- ----- ----- 0.45 52 0.00 323.07 0.49 0.43 --- --- -__ -__ 0.43 53 0.00 323.06 0.48 0.40 ---- -__ 0.40 54 0.00 323.05 0.47 0.37 ----- 0.37 55 0.00 323.04 0.46 0.35 ----- ----- ---_ ___ ?_ -- ----- 0.35 56 0.00 323.03 0.46 0.33 ---- - --- -- ---- ---- ---- 0.33 57 0.00 323.02 0.45 0.31 0.31 58 0.00 323.01 0.44 0.29 ----- ---- ----- ----- --- ----- ----- 0.29 59 0.00 323.00 0.44 0.27 ----- ---- ---- ---- ---- ---- ---- 0.27 60 0.00 322.96 0.44 0.20 ---- ----- --- ---- -- - ---- ---- 0.20 61 0.00 322.93 0.44 0.14 ---- ----- ---- ---- ----- ---- ----- 0.14 62 0.00 322.90 0.44 0.10 ----- --- ---- ____ -? ___ ____ 0.10 63 0.00 322.88 0.44 0.08 0.08 64 0.00 322.87 0.44 0.06 -- ---- ---- ____ _ _ _w -__ 0.06 65 0.00 322.85 0.44 0.05 --- ---- ---- ----- ---- ---- ---- 0.05 66 0.00 322.84 0.44 0.04 --- --- -- ---_ _? ___ ____ 0.04 ... End Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Mar 31 2008, 4:8 PM Hyd. No. 4 TT&E - POND 1 Hydrograph type = Reservoir Peak discharge = 5.49 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 3 Max. Elevation = 325 54 ft Reservoir name = TT&E -POND 1 . Max. Storage = 9,228 cuft Storage Indication method used. TT&E - POND 1 Q (cfs) Hyd. No. 4 -- 25 Yr 12.00 10.00 8.00 6.00 4.00 2.00 0.00 Hydrograph Volume = 21,472 cuft ------ ---- --- i? --- E i ? 1 i E ----- ----------- ------ _--- ---------- ----------- -- -- -- ------------ ._. . .?.. ! l f 3 t _.... _i_ !; I i 11 _.. - ----- ..-----._.._.. ._._._._._............. - E {l Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 10 20 30 40 50 60 70 80 90 100 110 120 Time (min) Hyd No. 4 Hyd No. 3 ® Req. Stor = 9,228 cult Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 Manual 0.00 1 0 0 - - ------ ------ MALCOM METHOD 2 Reservoir 0.00 1 0 0 1 0.00 0 <no description> 3 Rational 11.93 1 19 21,760 --- ----- ---- TT&E - POND 1 4 Reservoir 5.49 1 41 21,472 3 325.54 9,228 TT&E - POND 1 [TT&E1.9PW Return Period: 25 Year Monday, Mar 31 2008, 4:08 PM Hydraflow Hydrographs by intelisolve Hydrograph Report 2. Hydraflow Hydrographs by Intelisolve Monday, Mar 31 2008, 4:8 PM Hyd. No. 4 TT&E - POND 1 Hydrograph type = Reservoir Peak discharge = 5.49 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 3 Reservoir name = TT&E - POND 1 Max. Elevation = 325.54 ft Max. Storage = 9,228 cult Storage Indicatlon method used. Outflow hydrograph volume = 21,472 tuft Hydrograph Di scharge Table (Printed values >= 1% of Op.) Time Inflow Elevation Clv A Clv B Clv C CIv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2 1.26 322.99 0.44 0.25 ---- ----_ ---- --- ----- _-? _? 0 25 3 1.88 323.03 0.46 0.35 . -_- _-__ 0 35 4 2.51 323.08 0.50 0.46 . 0 46 5 3.14 323.15 0.67 0.64 ---- --- ----- . --- ---- ---- ----- 0 64 6 3.77 323.22 0.91 0.87 ---- ----- ---- . -?- -?- _-_ ----- 0 87 7 4.40 323.31 1.17 1.17 . 1 17 8 5.02 323.40 1.57 1.51 ----- ----- ---- . -- - -- -? -- 1 51 9 5.65 323.51 1.90 1.90 . 1 90 10 6.28 323.61 2.37 2.29 ----- --- ---- . ---- ----- ----- ----- 2.29 11 6.91 323.73 2.68 2.63 2.63 12 7.53 323.85 2.97 2.94 --- ----- ----- ---- --- ---- ----- 2.94 13 8.16 323.99 3.28 3.25 ---- ---- --- ----- ----- ----- --- 3.25 14 8.79 324.07 3.43 3.42 ----- ----- -_-- -?- -- _ _W_ __- 3.42 15 9.42 324.15 3.58 3.58 --- --- ----- --- ---- ----- ----- 3.58 16 10.05 324.23 3.73 3.73 ---- ---- ----- -- ____ -? _? 3.73 17 10.67 324.33 3.88 3.88 3.88 18 11.30 324.43 4.04 4.04 -_-- -- ---- 4.04 19 11.93 << 324.53 4.22 4.20 ----- ----- ----- ---- ----- ---- ---- 4.20 20 11.64 324.64 4.41 4.35 ----- --- ----- ----- _?_ _?_ _?_ 4.35 21 11.35 324.74 4.54 4.49 4.49 22 11.06 324.84 4.62 4.62 ----- --- ---- ---- --- ----- ---- 4.62 23 10.77 324.92 4.76 4.74 4.74 24 10.48 325.01 4.91 4.84 --- --- ----- 4.84 25 10.18 325.07 5.04 4.92 4.92 26 9.89 325.13 5.10 4.99 4.99 27 9.60 325.18 5.10 5.07 ----- ----- ----- ---- ----- ---- -- - 5.07 28 9.31 325.23 5.16 5.13 5.13 29 9.02 325.28 5.25 5.19 ----- --- -_--- 5.19 30 8.73 325.32 5.31 5.23 ----- ----- --- ---- ----- ---- ----- 5.23 31 8.44 325.36 5.32 5.28 5.28 32 8.15 325.39 5.33 5.32 ----- ---- ---- ----- _? ____ __-_ 5.32 33 7.86 325.42 5.37 5.36 5.36 34 7.57 325.45 5.42 5.39 ----- -- ---- 5.39 35 7.27 325.47 5.46 5.42 --- ----- ----- ----- ---- --- ---- 5.42 36 6.98 325.49 5.49 5.44 5.44 37 6.69 325.51 5.51 5.46 -- ---- --- ----- -- ____ _? 5.46 38 6.40 325.52 5.52 5.48 ----- ----- ---- -_-_- -- _ -?- _--- 5.48 39 6.11 325.53 5.52 5.49 5.49 Continues on next page... 3 TUE-POND 1 Hydrograph Discharge Table Time Inflow Elevation CIv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs Cfs cfs cfs cfs cfs 40 5.82 325.54 5.52 5.49 5 49 41 5.53 325.54 << 5.53 5.49 . 5 49 << 42 5.24 325.54 5.52 5.49 . 5 49 43 4.95 325.53 5.52 5.49 ----- --- ----- --- . 5.49 44 4.66 325.52 5.52 5.48 ---- ---- --- _ -?- - _- -___ ___-- 5.48 45 4.36 325.51 5.51 5.47 ----- 5.47 46 4.07 325.50 5.50 5.45 ---- ---- -- 5.45 47 3.78 325.48 5.47 5.43 --- --- ----- ?__ ?- ___ -__ 5.43 48 3.49 325.46 5.44 5.41 5.41 49 3.20 325.44 5.40 5.38 5.38 50 2.91 325.41 5.35 5.34 ---- ----- ---- ----- ----- ---- ----- 5.34 51 2.62 325.38 5.33 5.31 ----- 5.31 52 2.33 325.35 5.31 5.27 ---- --- ----- ---- ---- ---- --- 5.27 53 2.04 325.31 5.30 5.23 5.23 54 1.75 325.28 5.25 5.18 5.18 55 1.45 325.23 5.17 5.14 -- -_- ----- -_- ?_ ?__ ___- 5.14 56 1.16 325.19 5.10 5.08 --- ----- ---- --- ----- ----- --- 5.08 57 0.87 325.14 5.10 5.02 ----- ---- --- ---- --- ---- ----- 5.02 58 0.58 325.10 5.09 4.95 --- ----- ---- ---- ---- ----- ---- 4.95 59 0.29 325.04 4.99 4.89 ----- ----- ---- ---- ---- --- ----- 4.89 60 0.00 324.99 4.88 4.82 4.82 61 0.00 324.92 4.75 4.74 ---- -- ----- --- ---- ----- ----- 4.74 62 0.00 324.85 4.64 4.64 -_- -_- 4.64 63 0.00 324.79 4.56 4.55 4.55 64 0.00 324.72 4.53 4.46 ----- ---- ----- -_- ____ ____ ?__ 4.46 65 0.00 324.66 4.45 4.38 4.38 66 0.00 324.60 4.33 4.29 4.29 67 0.00 324.54 4.22 4.21 ----- ----- ----- ----- _____ _-_ -..__ 4.21 68 0.00 324.48 4.12 4.12 --- ----- ---- _-_ _? ___ _____ 4.12 69 0.00 324.42 4.03 4.03 4.03 70 0.00 324.36 3.94 3.94 3.94 71 0.00 324.31 3.85 3.85 ----- - -- ----- ----- 3.85 72 0.00 324.25 3.77 3.77 3.77 73 0.00 324.20 3.68 3.68 ---- ----- ---- ----- ----- --- ----- 3.68 74 0.00 324.15 3.58 3.58 ----- ----- ----- ----- --- _?- ___-- 3.58 75 0.00 324.10 3.48 3.48 ----- 3.48 76 0.00 324.05 3.40 3.38 ----- --- ----- -_ __? _w_ _?_ 3.38 77 0.00 324.00 3.32 3.28 3.28 78 0.00 323.91 3.09 3.08 ----- --- --- ---- ----- - ----- 3.08 79 0.00 323.83 2.93 2.88 2.88 80 0.00 323.75 2.74 2.69 2.69 81 0.00 323.68 2.54 2.50 ----- ---- ---- --- --- ---- ----- 2.50 82 0.00 323.61 2.37 2.29 ----- -w _____ 2.29 83 0.00 323.55 2.12 2.07 __-_ -_- 2.07 34 0.00 323.50 1.87 1.87 1.87 35 0.00 323.45 1.71 1.68 --- -? ---__ ----- ----- ---- --- 1.68 36 0.00 323.40 1.57 1.51 ----- --- ---- ---- ----- -- -- ---- 1.51 37 0.00 323.36 1.40 1.36 ---- ---- ---- ---- ----- ----- ----- 1.36 38 0.00 323.33 1.24 1.23 ----- 1.23 39 0.00 323.29 1.11 1.11 1.11 30 0.00 323.26 1.03 1.01 1.01 Continues on next page... TT&E - POND 1 Hydrograph Discharge Table Time (min) Inflow cfs Elevation ft Civ A Civ B Civ C Civ D Wr A Wr B Wr C Wr D Exfil Outflow Cfs cfs cfs Cfs cfs cfs Cfs Cfs cfs cfs 91 0.00 323.24 0.95 0 92 92 0.00 323.21 0.87 . 0 83 0.92 93 0.00 323.19 0.81 . -___- -__- ___.._ 0 76 0.83 94 0.00 323.17 0.74 . 0 70 ---- ----- 0.76 95 0.00 323.15 0.68 . ----- _w __ __ _ 0 65 ----- ----- - ?? 0.70 96 0.00 323.13 0 62 . ---_ -__ ?_ ?_ 0 60 0.65 97 0.00 323.12 . 0 57 . 0 55 0.60 98 0.00 323.10 . 0.52 . 0 51 --- ----- 0.55 99 0.00 323.09 0 50 . --- ----- --_- __w _ 0 47 ---- ---- 0.51 100 0.00 323.08 . 0.49 . _-- _ _M ?__ _w _w 0 44 0.47 101 0.00 323.06 0.48 . _-_ ___ 0 42 -- ----- 0.44 102 0.00 323.05 0.48 . ?_ ___ ___ ___ w 0.39 0:42 0 39 103 0.00 323.04 0.47 0.36 ----- ----- -____ . 0 36 104 0.00 323.03 0.46 0.34 . 0 34 105 0.00 323.02 0.45 0.32 . 0 32 106 0.00 323.01 0.45 0.30 . 0 30 107 0.00 323.01 0.44 0.28 ---- ---- ---_ __ _ __? ___ _? . 0 28 108 0.00 322.99 0.44 0.25 . 0 25 109 0.00 322.95 0.44 0.17 --__- ----- _-_ . 0 17 110 0.00 322.92 0.44 0.12 ----- ----- __-_- _-_ _W_ _W_ __..- . 0 12 111 0.00 322.89 0.44 0.09 . 0 09 112 0.00 322.87 0.44 0.07 ----- ----- _? -- - ----- . 0 07 113 0.00 322.86 0.44 0.06 . 0.06 ... End r 4. Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Mar 31 2008.4:7 PM Hyd. No. 4 TT&E - POND 1 Hydrograph type = Reservoir Peak discharge = 7.03 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 3 Max. Elevation = 326.06 ft Reservoir name = TT&E - POND 1 Max. Storage = 12,024 cuft Storage Indication method used. Hydrograph Volume = 29,069 cuft TT&E - POND 1 Q (cfs) Hyd. Na. 4--100 Yr Q (cfs) 140 . 0 12.00 10.00 8.00 6.00 4.00 2.00 0.00 14.00 12.00 10.00 8.00 ' 6.00 4.00 2.00 0 00 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Hyd No. 4 Hyd No. 3 ® Req. Stor = 12,024 cuft Time (min) Hydrograph Summary Report Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cult) (ft) (cult) 1 Manual 0.00 1 0 0 - --- - ---- MALCOM METHOD 2 Reservoir 0.00 1 0 0 1 281.00 0 <no description> 3 Rational 13.27 1 23 29,310 -- --- ----- TT&E - POND 1 4 Reservoir 7.03 1 47 29,069 3 326.06 12,024 TT&E - POND 1 TT&E1.gpw Return Period: 100 Year Monday, Mar 31 2008, 4:07 PM Hydraflow Hydrographs by Intelisolve 1. Hydrograph Report Hydraflow Hydrographs by Intelisolve Monday, Mar 31 2008,4:7 PM Hyd. No. 4 TT&E - POND 1 Hydrograph type = Reservoir Peak discharge. = 7.03 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 3 Reservoir name = TT&E - POND 1 Max. Elevation = 326.06 ft Max. Storage = 12,024 cult Storage Indication method used. Outflow hydrograph volume = 29,069 cult Hydrograph Discharge Table (printed values- 1% of Op.) Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2 1.15 322.97 0.44 0.21 ----- ----- ----- ---- ----- ----- ----- 0.21 3 1.73 323.03 0.46 0.33 ---- ----- 0 33 4 2.31 323.08 0.49 0.44 --- ---- ----- . -- ?__ __- ___ 0.44 5 2.89 323.13 0.62 0.60 0 60 6 3.46 323.20 0.84 0.80 . 0.80 7 4.04 323.28 1.08 1.07 _____ ----- 1.07 8 4.62 323.37 1.42 1.3$ ----- ---- ---- ---- ----- ---- ----- 1.38 9 5.19 323.46 1.75 1.73 1 73 10 5.77 323.56 2.16 2.10 ----- . 2.10 11 6.35 323.67 2.51 2.46 2.46 12 6.93 323.78 2.82 2.76 ----- ---- ----- 2.76 13 7.50 323.90 3.05 3.05 ----- 3.05 14 8.08 324.02 3.35 3.31 ---- ---- ---._ _W_ __-_ _-_ ____ 3.31 15 8.66 324.09 3.46 3.46 3.46 16 9.23 324.16 3.61 3.61 ---- ---- ----- __- ___ __? __ _ 3.61 17 9.81 324.25 3.76 3.76 -_- -_- 3.76 18 10.39 324.34 3.90 3.90 -_- -_- 3.90 19 10.97 324.43 4.05 4.05 4.05 20 11.54 324.53 4.22 4.20 -_- -_- 4.20 21 12.12 324.64 4.41 4.35 ---- - ----- ---- --- ----- ----- 4.35 22 12.70 324.75 4.54 4.50 _-- _-_ _-- 4.50 23 13.27 << 324.87 4.67 4.67 _____ 4.67 24 13.01 324.99 4.89 4.83 -- ---- ---- ----- --- ----- ----- 4.83 25 12.74 325.09 5.07 4.94 --- ---- --- -__ 4.94 26 12.48 325.17 5.10 5.06 __- -_- -_- -_- 5.06 27 12.21 325.26 5.21 5.16 5.16 28 11.95 325.34 5.31 5.25 5.25 29 11.68 325.41 5.35 .5.35 ----- ----- --- ---- ---- ----- ----- 5.35 30 11.42 325.48 5.47 5.43 ---- ---- ---- --- ---- ----- ---- 5.43 31 11.15 325.55 5.53 5.51 ----- --- ----- -- - ----- ----- ----- 5.51 32 10.88 325.61 5.58 5.58 5.58 33 10.62 325.67 5.67 5.65 5.65 34 10.35 325.73 5.77 5.71 ----- ---- ----- --- - __-- _M_ __M 5.71 35 10.09 325.78 5.88 5.77 ---- ----- 5.77 36 9.82 325.83 5.93 5.82 5.82 37 9.56 325.87 5.93 5.87 ---- --- 5.87 38 9.29 325.91 5.95 5.92 -- _____ 5 92 39 9.03 325.95 6.03 5.96 . 5.96 2 Continues on next page... TT&E - POND 1 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Exfii outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 40 8.76 325.98 6.11 5 99 41 8.50 326.01 6.31 . 6.00 --- ---- 0 17 5.99 42 8.23 326.03 6.62 5.99 . ----- ----- 0.50 -=--- 6.17 ----- ----- -? 6 49 43 7.96 326.04 6.85 5.99 ----- ----- 0.74 ---- . ----- --- - 6 73 44 7.70 326.05 7.01 5.98 --- --- 0.90 . 6 89 45 7.43 326.06 7.11 5.98 --- ---- 1.01 --- . --- --- ---- 6 99 46 7.17 326.06 7.15 5.98 ---- ---- 1.05 . 7 03 47 6.90 326.06 << 7.15 5.98 ----- -- 1.05 . 7 03 << ? 48 6.64 326.06 7.11 5.98 ---- ----- 1.01 ----- . ---- ---- - - 6 99 49 6.37 326.06 7.04 5.98 ---- ----- 0.94 ---- . ----- ----- ---- 6 92 50 6.11 326.05 6.95 5.98 ---- -- 0.84 . 82 6 51 5.84 326.04 6.82 5.99 ---- -- 0.71 . 6 70 52 5.58 326.03 6.68 5.99 ---- --- 0.56 ---- . ----- -?-- --- 6 56 53 5.31 326.02 6.52 6.00 --- ----- 0.40 . 6 39 54 5.04 326.01 6.35 6.00 0.22 ----- . ----- ----- ---- 6 22 55 4.78 326.00 6.16 6.01 ---- --- 0.02 -- . ----- ----- ----- 6 03 56 4.51 325.99 6.11 5.99 ----- . 5 99 57 4.25 325.97 6.07 5.97 . 5 97 58 3.98 325.95 6.03 5.95 . --.-.- ---..- 5 95 59 3.72 325.92 5.97 5.93 ----- -- ----- _-- . __-- _-__ _w_ 5 93 60 3.45 325.90 5.93 5.90 --- ----- ---- - . --- -w ----_ 5 90 61 3.19 325.87 5.93 5.87 . 5.87 62 2.92 325.83 5.93 5.83 5 83 63 2.65 325.80 5.92 5.78 . 5 78 64 2.39 325.76 5.84 5.75 ---- ----- ---- _____ . ?_ _ _____ 5.75 65 2.12 325.72 5.76 5.71 --- ----- ---- -__ -__ w_ ___ 5 71 66 1.86 325.68 5.68 5.66 ---- --- _---- -- . ___ ?__ _ _- 5.66 67 1.59 325.63 5.61 5.60 5.60 68 1.33 325.59 5.55 5.54 ----- ---- --- ---- ----- --- ----- 5.54 69 1.06 325.54 5.52 5.49 5.49 70 0.80 325.48 5.48 5.43 ---- ---- ----- ----- ----- ----- ----- 5.43 71 0.53 325.43 5.38 5.37 ----- 5.37 72 0.27 325.37 5.32 5.30 --- ----- ---- ---- --- ----- --- 5.30 73 0.00 325.31 5.30 5.23 5.23 74 0.00 325.25 5.21 5.16 ---- ----- ----- --- ?_ - _ ___ 5.16 75 0.00 325.19 5.10 5.09 5.09 76 0.00 325.14 5.10 5.01 ___ --_ 5.01 77 0.00 325.08 5.06 4.93 -- --- ---- ---- ?- _ - ?_ 4.93 78 0.00 325.02 4.95 4.86 ---- ---__ ----- -_ ____ ?_ w- 4.86 79 0.00 324.96 4.82 4.79 ---- --- ---- -- ----- - --- ----- 4.79 80 0.00 324.89 4.70 4.70 ____ ___ 4.70 81 0.00 324.83 4.60 4.60 ____ --- 4.60 82 0.00 324.76 4.55 4.51 4.51 83 0.00 324.70 4.51 4.43 4.43 84 0.00 324.63 4.40 4.34 --- --- --- --- -- ?__ ?__ 4.34 85 0.00 324.57 4.29 4.26 4.26 86 0.00 324.51 4.18 4.18 4.18 87 0.00 324.45 4.09 4.09 4.09 88 0.00 324.40 4.00 4.00 ---- ---- ----- --- _ _w_ ____ ____ 4.00 89 0.00 324.34 3.91 3.91 3.91 90 0.00 324.29 3.82 3.82 ----- ----- ----- --_ _ __? --_ ___ 3.82 3. Continues on next page... TUE - POND 1 Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Civ C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) as ft cfs cfs cfs cfs cfs cfs cfs cfs cfs Cfs 91 0.00 324.23 3.73 3 73 ----- ---- _ 92 0.00 324.18 3.64 . -_ ?? - __ ?_ __ 3 64 ---- ---- 3.73 93 0.00 324.13 3.54 . _--- _w_ -_ __ ____ ..... 3 54 3.64 94 0.00 324.08 3.45 . 3 44 -- ---- 3.54 95 0.00 324.03 3 37 . _-- --_ -__ ___ -w 3 34 ----- ----- 3.44 96 0.00 323.97 . 3 23 . ____ ?_ -r_- -_- _ 3 20 ---_ ---- 3.34 97 0.00 323.88 . 3.02 . -?_ -___ -_-_ ----- 3 00 3.20 98 0.00 323.80 2.87 . 2 80 -- ----- 3.00 99 0.00 323.72 2.66 . _- ----- ----- 2 62 ----- --- 2.80 100 0.00 323.65 2 47 . -w ----- 2 41 --- --_ 2.62 101 0.00 323.59 . 2.28 . 2.20 2.41 2 20 102 0.00 323.53 2.01 1.99 ---- ----- _-- -? _-___ ___ __ . 1 99 103 0.00 323.48 1.80 1.79 ---- ---- . 1 79 104 0.00 323.43 1.65 1.61 . 1 61 105 0.00 323.39 1.50 1.45 . 1 45 106 0.00 323.35 1.34 1.31 . 1 31 107 0.00 323.31 1.19 1.18 --- ----_ ---_ ?_ -- ___- -___ . 1 18 108 0.00 323.28 1.08 1.07 ----- ----- ---- --- ----- ---- ----- . 1 07 109 0.00 323.25 0.99 0.97 . 0 97 110 0.00 323.23 0.92 0.88 ---- ----- ----- ----- ---- ---- ----- . 0 88 111 0.00 323.20 0.85 0.80 . 0 80 112 0.00 323.18 0.78 0.74 ---- ----- --- ---- ---- __- _? . 0 74 113 0.00 323.16 0.71 0.68 . 0 68 114 0.00 323.14 0.65 0.63 ----- ---- -?- -?- _?- _?_ _____ . 0 63 115 0.00 323.13 0.60 0.58 ---- ---- . 0 58 116 0.00 323.11 0.55 0.53 . 0 53 117 0.00 323.10 0.51 0.49 -- ---- -__-- -- __-_ ___ -? . 0 49 118 0.00 323.08 0.50 0.46 . 0 46 119 0.00 323.07 0.40 0.43 ----- . 43 0 120 0.00 323.06 0.48 0.41 ----- ----- ----- ----- ___-_ _-_- _w_ . 0 41 121 0.00 323.05 0.47 0.38 . 0 38 122 0.00 323.04 0.46 0.36 . 0 36 123 0.00 323.03 0.46 0.33 --- ----- _? _ __ -__ ----- . 0 33 124 0.00 323.02 0.45 0.31 . 0 31 125 0.00 323.01 0.44 0.29 . 0 29 126 0.00 323.00 0.44 0.27 ---- ----- ---_ _-__ ?__ ?__ ___ . 0 27 127 0.00 322.97 0.44 0.21 ----- --- ____ ____ w_ __- -_-- . 0 21 128 0.00 322.94 0.44 0.15 . 0 15 129 0.00 322.91 0.44 0.11 ---- ----- -w_ -_-- _-__ -___ - ?__ . 0 11 130 0.00 322.89 0.44 0.08 . 0.08 ..End 4 TT&E IRON & METAL STORMWATER DETENTION POND DESIGN POND # 2 DRAINAGE AREA: a 05AC:_ la= EXIST. IMP AREA: Q_00'AC 0.0% PROP. IMP. AREA: _ 3 81 X1C__ 75.4% RUNOFF COEFFICIENT (C) Cpre= 5.05 AC x 0.25 + 0.00 AC x 1.0 = 0.25 5.05 AC Cpost= 1.24 AC x 0.25 + 3.81 AC x 1.0 = 0.82 5.05 AC STORM DATA STORM EVENT INTENSITY( I) ( PRECIPITATION DEPTH (P) 1 YEAR 5.76 in/hr 2.1" 25 YEAR 8.50 in/hr 4.31- 100 YEAR 10.00 in/hr 5.8" 1 YEAR STORM 25 YEAR STORM 100 YEAR STORM Qpre=CIA= 0.25 x 5.76 x 5.05 = 7.27 cfs Qpost=CIA= 0.82 x 5.76 x 5.05 = 23.73 cfs Qpre=CIA= 0.25 x 8.5 x 5.05 = 10.73 cfs Qpost=CIA= 0.82 x 8.5 x 5.05 = 35.02 cfs Qpre=CIA= 0.25 x 10.0 x 5.05 = 12.63 cfs Qpost=CIA= 0.82 x 10.0 x 5.05 = 41.20 cfs DETERMINE SOIL STORAGE CN= 98 x 55 x t0 '! 0 + 61 x Q 1'51= 88 S 100 -10 = 88 0 5 -10 = 1.34" RUNOFF DEPTH Q* _ (P-0.2*S)2 (Q*) (P+0.8*S) Q* 12 in/ft x DA x 43560 SF/AC TIME TO PEAK (Tp) Tp= 1.39 x Qpost 1 YEAR STORM Q* = (2.1 - 0.2- x 1.3 )^2 = 1 06 in (2.1 + . . 0.8 x 1.34) 1.06 in. x 5.05 AC x 43560 SF/AC Tp= 12 in/ft = 9.8 min. 1.39 x 23.73 cfs ? PEAK 23.73 cfs @ 9.8 min. 25 YEAR STORM * _ Q (4.3 - 0.2 x 1.3 )"2 3 01 in (4.3 + . . 0.8 x 1.34) 3.01 in. 12 in/ft x 5.05 AC x 43560 SF/AC _ Tp 1.39 x 35.02 cfs 18.9 min. ? PEAK. 35.02 cfs @ 18.9 min. 100 YEAR STORM * = Q (5.8 - 0.2 x 1.3 )A2 4Q in = 4 (5.8 + . . 0.8 x 1.34) 4.40 in. 1 2 in/ft x 5.05 AC x 43560 SF/AC Tp_ 1.39 x 41.20 cfs = 23.5 min. ? PEAK 41.20 cfs @ 23.5 min. ESTIMATE POND SIZE Vpond = (Qpost-Qpre) x Tp + 40% Vpond =( 41.20 - 12.63) x 23.5 min. + 40% Vpond = 56,365 CF EMERGENCY SPILLWAY (SIZE FOR 100 YEAR STORM) Q100=CIA= 0.75 x 10.0 x 15.78 = 118.35 cfs WEIR EQUATION: Q=Cw*L*H"312 Cw= 3.0 Q= 118.35 cfs H= 1.00 L= . Q _ 118.35 cfs = 39.5, Cw*H^3/2 ^ 3.0 x 1^3/2 o' (w) USE EMERGENCY SPILLWAY TO CARRY 100 YEAR STORM SIZE ORIFICE Q100=CAd2GH Q100 = 12.63 cfs C = 0.93 G = 32.2 fVs H = 3.0' Q100 12.63 cfs A-_ C42GH 0.93 4 2*32.2*3 = 0.98 S. F. A=Pi*rz r d 0.98 S.F. = 0.6' 3.14 USE )y.4" DIAMETER ORIFICE (MAXIMUM) Pond Report Hydraflow Hydrographs by Intelisolve Thursday, Mar 27 2008, 12:6 PM Pond No. 1 - TT&E - POND 2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 325.50 01 0' 0 0.50 326.00 1,706 427 427 1.50 327.00 3,525 2,616 3 042 2.50 328.00 5,974 4,750 , 7 792 3.50 329.00 9,054 7,514 , 15 306 4.50 330.00 12,766 10,910 , 26 216 5.50 331.00 17,107 14,937 , 41,152 Culvert I Orifice Structures [A] [B] [C] [D] Rise (in) = 36.00 12.00 0.00 0.00 Span (in) = 36.00 12.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 325.25 325.50 0.00 0.00 Length (ft) = 46.00 0.00 0.00 0.00 Slope (%) = 0.50 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = nla Yes No No Weir Structures [A] [B] [C] [o] Crest Len (ft) = 20.00 0.00 0.00 0.00 Crest El. (ft) = 330.00 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type = Riser -- --.. Multi-Stage = Yes No No No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifioe outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Stage (ft) 6.00- 5.00 4.00 3.00 2.00- 1.00 0.00 Stage I Storage Stage (ft) ------ --- 6.00 5.00 --- --------- ................. 4.00 ......................... . .......................... ---------- -- -- _...-------- ---------------- -- 3.00 ------------ 2.00 --------- ----- ._._..... . 1.00 0 00 0 4,000 8,000 12,000 16,000 20,000 24,000 28,000 32,000 36,000 40,000 44,000 Storage Storage (cult) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 TT&E - POND 2 Hydrograph'type = Reservoir Storm frequency = 1 yrs Inflow hyd. No. = 3 Reservoir name = TT&E -POND 2 Storage Indication method used. Q (cfs) 15.00 12.00 9.00 6.00 3.00 0.00 1 -W ' 0 10 Hyd No. 4 TT&E - POND 2 Hyd. No. 4 --1 Yr Thursday, Mar 27 2008, 12:0 PM Peak discharge = 5.06 cfs Time interval = 1 min Max. Elevation = 327.96 ft Max. Storage = 7,597 cult Hydrograph Volume = 13,788 cult 20 30 40 50 60 70 Hyd No. 3 ® Req. Stor = 7,597 cuft 80 Q (cfs) 15.00 12.00 9.00 6.00 3.00 -J- 0.00 90 Time (min) Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 Manual 0.00 1 0 0 ---- ---- --- MALCOM METHOD 2 Reservoir 0.00 1 0 0 1 0.00 0 <no description> 3 Rational 14.37 1 10 13,791 --- ---- - ---- TT&E - POND 2 4 Reservoir 5.06 1 24 13,788 3 327.96 7,597 TT&E - POND 2 TT&E2.gpw Return Period: 1 Year Thursday, Mar 27 2008, 12:00 PM Hydraflow Hydrographs by Intelisolve Hydrograph Report s Hydraflow Hydrographs by Intelisolve Thursday, Mar 27 2008, 12:0 PM Hyd. No. 4 TT&E - POND 2 Hydrograph type = Reservoir Peak discharge = 5.06 cfs Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 3 Reservoir name = TT&E -POND 2 Max. Elevation = 327.96 ft Max. Storage = 7,597 cuft Storage Indication method used. Outflow hydrograph volume = 13,788 cult Hydrograph Dis charge Table (Printed values >= 1% of Op.) Time Inflow Elevation CIv A Civ B Civ C Civ D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2 2.87 325.70 0.51 0.17 0 17 3 4.31 325.92 0.72 0.69 . ----- 0 69 4 5.75 326.07 1.20 1.19 . 1 19 5 7.18 326.18 1.69 1.62 . 1 62 6 8.62 326.32 2.22 2.13 . 2 13 7 10.06 326.48 2.73 2.62 . ----- ---- ---- ----- ---- ----- ---- 2 62 8 11.49 326.66 3.15 3.08 . 3 08 9 12.93 326.87 3.61 3.52 . ----- --- --- 3 52 10 14.37 << 327.05 3.90 3.85 . _____ 3 85 11 13.71 327.18 4.11 4.03 . --- ____ 4 03 12 13.06 327.30 4.31 4.19 . 4 19 13 12.41 327.40 4.48 4.33 . 4 33 14 11.75 327.50 4.49 4.48 . __-_ -__ 4 48 15 11.10 327.59 4.64 4.60 . ----- --- --- ---- --- --- ---- 4 60 16 10.45 327.67 4.77 4.69 . 4 69 17 9.80 327.73 4.89 4.77 . ----- ---- ---_ __? _ -_ ?__ ___ 4 77 18 9.14 327.79 5.00 4.84 . 4 84 19 8.49 327.84 5.01 4.91 . --- --- 4 91 20 7.84 327.88 5.01 4.97 . 4 97 21 7.18 327.92 5.04 5.01 . ---- --- 5 01 22 6.53 327.94 5.08 5.04 . ----- -- ----- - -- ---- ----- --- 5 04 23 5.88 327.95 5.11 5.05 . ---- --- ----- ---- --- ---- ---- 5 05 24 5.22 327.96 << 5.12 5.06 . 5 06 << 25 4.57 327.96 5.11 5.06 . ---- ---- ---- ----- --- 5.06 26 3.92 327.95 5.09 5.05 5.05 27 3.27 327.93 5.06 5.03 5 03 28 2.61 327.90 5.01 5.00 . ----- ---- ---- ---- ----- ' ----- ---- 5 00 29 1.96 327.87 5.01 4.95 . --- --- ---- ----- --- - --- --- 4 95 30 1.31 327.83 5.01 4.89 . -- --- ----- ---- ----- -_-- ----- 4 89 31 0.65 327.78 4.97 4.82 . ---- ---- ----- - --- ---- --- ----- 4 82 32 0.00 327.72 4.87 4.76 . 4 76 33 0.00 327.66 4.76 4.69 . 4 69 34 0.00 327:60 4.66 4.62 . 4 62 35 0.00 327.55 4.56 4.54 . 4 54 36 0.00 327.49 4.48 4.46 . _-- 4 46 37 0:00 327.43 4.48 4.38 . ---- ----- _? __-- _w ___ ----- 4 38 38 0.00 327.38 4.44 4.30 . 4 30 39 0.00 327.32 4.35 4.23 . ----- ---- ----- -- _____ __- --_- 4.23 Continues on next page... TT&E - POND 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D ExfII Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 40 0.00 327.27 4.26 4.16 4 16 41 0.00 327.22 4.18 4.08 . 4 08 42 0.00 327.17 4.09 4.01 . 4 01 43 0.00 327.12 4.01 3.94 . 3 94 44 0.00 327.07 3.93 3.87 . 3 87 45 0.00 327.02 3.85 3.80 ---- ----- --- . 3 80 46 0.00 326.95 3.74 3.68 . 3 68 47 0.00 326.87 3.61 3.52 . 3 52 48 0.00 326.79 3.47 3.36 . 3 36 49 0.00 326.71 3.24 3.19 ----- ---- ---- --- --- ----- ----- . 3 19 50 0.00 326.64 3.12 3.03 ----- ---- _-_ _-_ _-_ _w_ ____ . 3 03 51 0.00 326.57 2.99 2.86 . 86 2 52 0.00 326.51 2.81 2.70 . 2 70 53 0.00 326.45 2.65 2.54 --- -- -- _ --. _? ___- _____ . 2 54 54 0.00 326.39 2.49 2.39 . 2 39 55 0.00 326.34 2.29 2.20 . 2.20 56 0.00 326.29 2.11 2.02 ---- --- 2.02 57 0.00 326.25 1.94 1.86 1.86 58 0.00 326.21 1.79 1.71 1.71 59 0.00 326.17 1.63 1.57 --- --- ..--- ----- 1.57 60 0.00 326.13 1.47 1.44 ----- --- ----- ---- ---- ----- ---- 1.44 61 0.00 326.10 1.33 1.31 ----- 1.31 62 0.00 326.07 1.23 1.21 1.21 63 0.00 326.05 1.13 1.12 ---- --- ----- ----- ---- ----- ---- 1.12 64 0.00 326.02 1.04 1.04 ----- ---- ----- ____ ___ _____ ?_ 1.04 65 0.00 326.00 0.96 0.96 -M- ---- --- _- -__ __-_ _-_ 0.96 66 0.00 325.94 0.78 0.76 0.76 67 0.00 325.89 0.64 0.62 0.62 68 0.00 325.85 0.51 0.50 ---- - ----- --- ____ ?- -- 0.50 69 0.00 325.82 0.51 0.42 0.42 70 0.00 325.79 0.51 0.35 ----- ----- ----- --- --- --- -- -- 0.35 71 0.00 325.77 0.51 0.30 0.30 72 0.00 325.75 0.51 0.26 ---- ----- ----- - ---- ----- ---- 0.26 73 0.00 325.73 0.51 0.23 -- ---- ----- ----- ----- ----- ----- 0.23 74 0.00 325.72 0.51 0.21 0.21 75 0.00 325.70 0.51 0.18 _-_ _-_ 0.18 76 0.00 325.69 0.51 0.16 0.16 77 0.00 325.68 0.51 0.15 0.15 78 0.00 325.67 0.51 0.13 --- --- ---- ---- ---- ---- ---- 0.13 79 0.00 325.66 0.51 0.12 ---- ----- ----- --- ---- ---- ----- 0.12 80 0.00 325.65 0.51 0.10 0.10 81 0.00 325.65 0.51 0.10 --- ---- ---- ---- -- ----- ---- 0.10 82 0.00 325.64 0.51 0.09 0.09 83 0.00 325.63 0.51 0.08 --- ---- --- ----- ---- --- ----- 0.08 84 0.00 325.63 0.51 0.08 0.08 85 0.00 325.62 0.51 0.07 ----- --- --- ---- ---- -- ----- 0.07 86 0.00 325.62 0.51 0.06 0.06 87 0.00 325.61 0.51 0.06 ----- ---- ---- ----- 0.06 88 0.00 325.61 0.51 0.06 0.06 89 0.00 325.61 0.51 0.05 ---- ----- --- ----- --- --- --- 0.05 ... End Hydrograph Plot HydraFlow Hydrographs by Intelisolve Hyd. No. 4 TT&E - POND 2 Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 3 Reservoir name = TT&E -POND 2 Thursday, Mar 27 2008, 12:2 PM Peak discharge = 6.88 cfs Time interval = 1 min Max. Elevation = 329.69 ft Max. Storage = 22,847 cult Storage Indication method used. Hydrograph Volume = 39,682 cult Q (cfs) TT&E - POND 2 Hyd. No. 4 -- 25 Yr Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0 20 40 60 80 100 120 140 160 Hyd No. 4 Hyd No. 3 ® Req. Stor = 22,847 cuft Time (min) Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (ch) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 Manual 0.00 1 0 0 - ------ ------ MALCOM METHOD 2 Reservoir 0.00 1 0 0 1 0.00 0 <no description> 3 Rational 22.05 1 19 40,215 - ------ ----- TT&E - POND 2 4 Reservoir 6.88 1 47 39,682 3 329.69 22,847 TT&E - POND 2 TT&E2.gpw Return Period: 25 Year Thursday, Mar 27 2008, 12:07 PM 1. Hydraflow Hydrographs by Intelisolve Hydrograph Report Hydraflow Hydrographs by Intellsolve Thursday, Mar 27 2008,12:7 PM Hyd. No. 4 TT&E - POND 2 Hydrograph type = Reservoir Peak discharge = 6.88 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 3 Reservoir name = TT&E -POND 2 Max. Elevation = 329.69 ft Max. Storage = 22,847 cuft Storage Indication method used. Outflow hydrograph volume = 39,682 cult Hydrograph Discharge Table (Printed values -1%ofOp.) Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EXfiI Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2 2.32 325.66 0.51 0.11 ----- ----- --- --- _?_ ____ _W_ 0.11 3 3.48 325.84 0.51 0.48 ----- ---- ----- --_ _ -_ _W_ _?_ 0.48 4 4.64 326.02 1.05 1.05 ----- ---- ----- ---- ----- ----- ---- 1.05 5 5.80 326.12 1.39 1.36 ---- ----- ---- ---- ---- -- -- ----- 1.36 6 6.96 326.23 1.86 1.78 1.78 7 8.12 326.35 2.34 2.24 2.24 8 9.28 326.50 2.77 2.67 ----- ----- -- ----- ----- - __ _-? 2.67 9 10.44 326.66 3.14 3.06 ---- ---- 3.06 10 11.60 326.84 3.56 3.45 3.45 11 12.76 327.02 3.85 3.79 3.79 12 13.92 327.14 4.04 3.97 3.97 13 15.09 327.27 4.26 4.15 ----- ---- ----- ____ _?_ _ - w- 4.15 14 16.25 327.41 4.48 4.35 ---- --- --- --- ---- ----- ---- 4.35 15 17.41 327.57 4.60 4.57 ----- --- -- ---- ----- ----- ---- 4.57 16 18.57 327.74 4.90 4.78 ----- ---- --- __-_ _?_ __ _ _____ 4.78 17 19.73 327.92 5.04 5.02 5.02 18 20.89 328.07 5.32 5.18 5.18 19 22.05 << 328.20 5.37 5.35 ---- ----- ----- ---- ---- ---- - --- 5.35 20 21.51 328.33 5.56 5.48 --- --_- -- ---- --- __? _?_ 5.48 21 20.97 328.45 5.66 5.63 --- ----- ---- - ---- ----- ----- 5.63 22 20.43 328.57 5.89 5.75 -- --- ---- --_- -_- 5.75 23 19.90 328.69 5.94 5.89 --- ----- --- -- -- --- ----- 5.89 24 19.36 328.80 6.13 5.99 ----- ---- --- ---- - __ _____ _? 5.99 25 18.82 328.90 6.14 6.12 6.12 26 18.28 329:00 6.32 6.20 ----- ---- --- - ---- ----- ---- ----- 6.20 27 17.75 329.07 6.32 6.28 ---- ----- _--- _--- ?_ __- ___- 6.28 28 17.21 329.13 6.38 6.34 ---- ----- ---- ----- ----- --- ---- 6.34 29 16.67 329.19 6.49 6.39 6.39 30 16.13 329.24 6.52 6.45 ----- ----- ----- --__ ?__ _ _- ___ 6.45 31 15.59 329.29 6.52 6.51 6.51 32 15.06 329.34 6.60 6.55 6.55 33 14.52 329.39 6.69 6.59 ----- 6.59 34 13.98 329.43 6.72 6.63 ---- ----- ---- --_._ _?_ _-__ __- 6.63 35 13.44 329.47 6.72 6.67 ---- ---- ----- ---- ----- ---- ---- 6.67 36 12.91 329.50 6.72 6.71 _ 6 71 37 12.37 329.53 6.79 6.73 ----- . ----- ---- ----- ---- ---- - -- 6 73 38 11.83 329.56 6.85 6.76 . ----- 6 76 39 11.29. 329.59 6.90 6.78 -- . ---- ---- ----- _-_-- _____ _-?- 6.78 2 Continues on next page... ME - POND 2 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 40 10.75 329.61 6.92 6.80 6 80 41 10.22 329.63 6.92 6.82 ---- -- w_ . 6 82 42 9.68 329.65 6.92 6.84 ---- ---- ---- --- . ----- --- ---- 6 84 43 9.14 329.67 6.92 6.86 --- ----- -_ -_ - . _- ?_ ___ _?_ 6 86 44 8.60 329.68 6.92 6.87 ---- ---- -- _- . 6 87 45 8.07 329.68 6.92 6.88 . 6 88 46 7.53 329.69 6.92 6.88 ----- --------- . ?__ ____ -? 6 88 47 6.99 329.69 << 6.92 6.88 . 6 88 << 48 6.45 329.69 6.92 6.88 ---- ----- ---- _____ . w_ ___ ____ 6 88 49 5.92 329.69 6.92 6.88 . 6 88 50 5.38 329.68 6.92 6.87 . 6 87 51 4.84 329.67 6.92 6.86 ----- -- --- --- . ----- ---- ----- 6 86 52 4.30 329.66 6.92 6.85 ----- --- ----- __? . ____ ___ ____ 6 85 53 3.76 329.64 6.92 6.83 . 6 83 54 3.23 329.62 6.92 6.81 ---- --- ---.- . 6 81 55 2.69 329.60 6.92 6.79 . 6 79 56 2.15 329.58 6.88 6.77 . 6.77 57 1.61 329.55 6.82 6.75 6 75 58 1.08 329.52 6.76 6.72 ---- ----- ---- _w- . _? 6 72 59 0.54 329.49 6.72 6.70 ---- -- ---- ----- . ----- 6 70 60 0.00 329.45 6.72 6.66 . 6.66 61 0.00 329.42 6.72 6.62 ----- ----- ---- --- --- ----- - --- 6.62 62 0.00 329.38 6.68 6.58 --- --- -- ---- ----- ---- ---- 6.58 63 0.00 329.35 6.61 6.55 -- - _____ 6.55 64 0.00 329.31 6.54 6.52 6.52 65 0.00 329.27 6.52 6.49 --- --- -- --- --- -- ----- 6.49 66 0.00 329.24 6.52 6.45 6.45 67 0.00 329.20 6.52 6.41 ----- ---- ---_ ___ ___ ?_ ____ 6.41 68 0.00 329.17 6.46 6.38 --- ----- w__ M__ ?_ ___ ___ 6.38 69 0.00 329.13 6.39 6.35 ---- ---- --- --- ---- -- --- 6.35 70 0.00 329.10 6.32 6.31 -- --- ----- ---- ---- ---- ----- 6.31 71 0.00 329.06 6.32 6.28 --- ----- ----- ---- ---- ----- ----- 6.28 72 0.00 329.03 6.32 6.24 ---- --- ---- ----- ---- ----- ---- 6.24 73 0.00 328.99 6.31 6.20 ---- ----- ---- ---- ----- ----- ----- 6.20- 74 0.00 328.94 6.21 6.15 _--- ___ ___ ---- 6.15 75 0.00 328.89 6.13 6.11 ---- --- ----- -- --- -- -- ---- 6.11 76 0.00 328.85 6.13 6.05 ----- --- ---- ---- --- ----- ---- 6.05 77 0.00 328.80 6.13 5.99 --- ---- ---- 5.99 78 0.00 328.75 6.03 5.95 5.95 79 0.00 328.70 5.94 5.90 ---- ----- ---- -- ____ ?_ _____ 5.90 80 0.00 328.66 5.94 5.85 ---- ---- -- --- --- ---- - -- 5.85 81 0.00 328.61 5.94 5.79 5.79 82 0.00 328.56 5.87 5.74 ---- ---- --- ---- ---- -- - --- 5.74 83 0.00 328.52 5.78 5.70 ---- ---- ---- ---- --- ----- ----- 5.70 84 0.00 328.47 5.70 5.65 5.65 85 0.00 328.43 5.61 5.59 5.59 86 0.00 328.38 5.56 5.54 5.54 87 0.00 328.34 5.56 5.49 --- ---- ----- ----- ?__ ___ ___ 5.49 88 0.00 328.30 5.55 5.45 ---- ---- ----- ---- ----- ----- ----- 5.45 89 0.00 328.25 5.47 5.40 ---- ----- ---- ---- ----- ----- ----- 5.40 90 0.00 328.21 5.39 5.36 ---- --- --- -- ----- ---- --- 5.36 3. Continues on next page... 4 ME - POND 2 Hydrograph Discharge Table Time Inflow Elevation Civ A Civ B Civ C Civ D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 91 0.00 328.17 5.37 5.30 5 30 92 0.00 328.12 5.37 5.25 . 5 25 93 0.00 328.08 5.34 5.20 ---- ---- __w ___ __ _ __..__ --- . 5 20 94 0.00 328.04 5.27 5.15 . 5 15 95 0.00 328.00 5.19 5.11 _____ . 5 11 96 0.00 327.94 5.07 5.04 . 5 04 97 0.00 327.87 5.01 4.96 ----- ---- ----- ---- . 4 96 98 0.00 327.81 5.01 4.87 --- ---- ----- ----- --- ---- ---- . 4 87 99 0.00 327.75 4.92 4.79 --- ----- . 4 79 100 0.00 327.69 4.81 4.72 . 4 72 101 0:00 327.63 4.71 4.65 . 4 65 102 0.00 327.57 4.61 4.58 . 4 58 103 0.00 327.51 4.51 4.50 . 4 50 104 0.00 327.46 4.48 4.42 . 4 42 105 0.00 327.40 4.48 4.33 . 4 33 106 0.00 327.35 4.40 4.26 . 4 26 107 0.00 327.30 4.31 4.19 _w_ . 4 19 108 0.00 327.24 4.22 4.12 ----- ----- --? ___ _ _ __ __ _M_ . 4 12 109 0.00 327.19 4.13 4.05 _____ . 4 05 110 0.00 327.14 4.05 3.97 ----- - -- -- -__ ?__ _____ -? . 3 97 111 0.00 327.09 3.97 3.90 ----- ----- ---- ___ _w_ w_ ____ . 3 90 112 0.00 327.04 3.89 3.83 ---- ----- _---- ----- -? _ __ -__ . 3 83 113 0.00 326.99 3.80 3.75 -- ---- ----- ----- ----- ---- ---- . 3 75 114 0.00 326.91 3.67 3.60 _____ . 3 60 115 0.00 326.83 3.54 3.43 ----- . 3 43 116 0.00 326.75 3.35 3.27 . 3 27 117 0.00 326.68 3.17 3.11 ----- . 3 11 118 0.00 326.61 3.07 2.94 ----- ---- --- --- . 2.94 119 0.00 326.54 2.89 2.78 ---- ----- ---- -__ -_-- ___ ?- 2.78 120 0.00 326.48 2.72 2.62 2.62 121 0.00 326.42 2.56 2.47 2.47 122 0.00 326.37 2.38 2.29 ----- ---- ---- __? _____ _....__ ___.._ 2 29 123 0.00 326.32 2.19 2.11 . 2 11 124 0.00 326.27 2.02 1.94 ---- ----- ---_ ___ ?_ ?_ _ __ . 1 94 125 0.00 326.23 1.86 1.78 ---- -__ . 1 78 126 0.00 326.19 1.70 1.64 --- ---- ----- ----- ---- - -- ---- . 1 64 127 0.00 326.15 1.54 1.50 . 1 50 128 0.00 326.12 1.40 1.37 --- ---- --_- -__ . 37 1 129 0.00 326.09 1.28 1.26 --- __- . 1.26 130 0.00 326.06 1.18 1.17 ----- ----- -__ _ _ ?_ ____ _? 1 17 131 0.00 326.03 1.09 1.08 . 1.08 132 0.00 326.01 1.00 1.00 ---- --- --- ?- W_ ____ -___ 1.00 133 0.00 325.97 0.86 0.85 0.85 134 0.00 325.91 0.71 0.68 0.68 135 0.00 325.87 0.57 0.56 ---- -- -- -- -__ ?_ ___ ____ 0 56 136 0.00 325.83 0.51 0.46 ---- --- ----- ---- --- -- ----- . 0 46 137 0.00 325.80 0.51 0.38 --- ---- ----- --- _-_ -_- . 0 38 138 0.00 325.78 0.51 0.33 ----- ----- ___-- _? ___-_ -?- ___-- . . 0 33 139 0.00 325.76 0.51 0.28 ---- ---- _ _ _? __-- ----- ----- . 0 28 140 0.00 325.74 0.51 0.25 ---- ---- ---- ----- . 0 25 141 0.00 325.72 0.51 0.22 ----- --- ---- ---- ---- ---_.. ----- . 0.22 Continues on next page... TT&E - FOND 2 Hydrograph Discharge Table Time Inflow Elevation Civ A Civ B CIv C Civ D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 142 0.00 325.71 0.51 0.19 ----- ---- ----- 0 19 143 0.00 325.70 0.51 0.17 . 0 17 144 0.00 325.68 0.51 0.15 . 0 15 145 0.00 325.67 0.51 0.14 ---- ----- ---- . -?- -?_ __? _M_ 0 14 146 0.00 325.67 0:51 0.12 . 0 12 147 0.00 325.66 0.51 0.11 ---- ----- ----- . ----- --- ---- ----- 0 11 148 0.00 325.65 0.51 0.10 ---- ---- --- . ----- ----- --- ----- 0 10 149 0.00 325.64 0.51 0.09 . 0.09 150 0.00 325.64 0.51 0.08 0.08 151 0.00 325.63 0.51 0.08 ----- ----- 0 08 152 0.00 325.63 0.51 0.07 . 0.07 5. ... End Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Mar 27 2008, 12:3 PM Hyd. No. 4 TT&E - POND 2 Hydrograph type = -Reservoir Peak discharge = 11.50 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 3 Max. Elevation = 330.17 ft Reservoir name = TT&E -POND 2 Max. Storage = 28,701 cuft Storage Indication method used. Hydrograph Volume = 54,841 cult TT&E - POND 2 Q (cfs) Hyd. No. 4 --100 Yr Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0 20 40 60 80 100 120 140 160 180 Hyd No. 4 Hyd No. 3 ® Req. Star = 28,701 cuff Time (min) Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Manual 0100 1 0 0 - ------ ----- MALCOM METHOD 2 Reservoir 0.00 1 0 0 1 281.00 0 <no description> 3 Rational 24.05 1 24 55,422 ---- ---- ----- TT&E - POND 2 4 Reservoir 11.50 1 51 54,841 3 330.17 28,701 TT&E - POND 2 TT&E2.gpw Return Period: 100 Year Thursday, Mar 27 2008, 12:04 PM 1. Hydraflow Hydrographs by Intelisolve Hydrograph Report Hydraflow Hydrographs by lntelisolve Thursday, Mar 27 2008, 12:4 PM Hyd. No. 4 TT&E - POND 2 Hydrograph type = Reservoir Peak discharge = 11.50 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 3 Reservoir name = TT&E -POND 2 Max. Elevation = 330.17 ft Max. Storage = 28,701 cult Storage Indication method used. Outflow hydrograph volume = 54,841 cuR Hydrograph Discharge Table ( Printed values >= I% of Op.) Time Inflow Elevation Clv A Civ B CIv C CIv D Wr A Wr a Wr C Wr D EXfII Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3 3.01 325.80 0.51 0.37 ---- ---- ---- ----- ----- ----- ----- 0.37 4 4.01 326.00 0.96 0.96 0.96 5 5.01 326.08 1.24 1.23 ----- ---- ----- ----- -- ----- ---- 1.23 6 6.01 326.17 1.64 1.58 ---- ----- ---- ---_ _?_ ____ ----- 1.58 7 7.02 326.28 2.06 1.98 1.98 8 8.02 326.40 2.52 2.42 -- --- ---- ---- ----- ---- ---- 2.42 9 9.02. 326.54 2.89 2.77 ---- --- ----_ _---- - --- ?_-- _-- 2.77 10 10.02 326.69 3.19 3.14 3.14 11 11.03 326.85 3.59 3.49 _---- - --- -___ ?? ?_ ?_ --- 3.49 12 12.03 327.02 3.85 3.80 ----- ---- ---- ----- -- ----- --- 3.80 13 13.03 327.1,3 4.03 3.96 3.96 14 14.03 327.25 4.23 4.12 ----- ---- ---- __? ___ _?_ _?_ 4.12 15 15.03 327.38 4.45 4.30 --- ---- 4.30 16 16.04 327.52 4.52 4.51 ----- 4.51 17 17.04 327.67 4.78 4.70 --- --- ----- ----- --- ---- ----- 4.70 18 18.04 327.83 5.01 4.90 ----- ---- ----- --- -__ 4.90 19 19.04 328.00 5.19 5.11 --- ---_- ---- ---- ---- ---- ----- 5.11 20 20.05 328.12 5.37 5.24 ---- ----- 5.24 21 21.05 328.24 5.44 5.39 --- ----- ---- ----- ----- --- ---- 5.39 22 22.05 328.37 5.56 5.52 --- ---- 5.52 23 23.05 328.50 5.75 5.68 5.68 24 24.05 << 328.64 5.94 5.83 5.83 25 23.59 328.79 6.11 5.98 5.98 26 23.13 328.93 6.18 6.14 6.14 27 22.67 329.04 6.32 6.25 --- ----- 6.25 28 22.20 329.13 6.38 6.34 6.34 29 21.74 329.21 6.52 6.42 ___ --_ 6.42 30 21.28 329.30 6.52 6.51 --- ----- ----- 6.51 31 20.82 329.38 6.67 6.58 6.58 32 20.35 329.45 6.72 6.66 ----- ----- -____ 6.66 33 19.89 329.53 6.78 6.73 6.73 34 19.43 329.60 6.92 6.79 6.79 35 18.97 329.67 6.92 6.86 6.86 36 18.50 329.73 6.98 6.92 --_-- ----- ----- -__- -?_ -__ _ __-- 6.92 37 18.04 329.79 7.11 6.97 6 97 38 17.58 329.85 7.12 7.03 . 7.03 39 17.12 329.91 7.14 7.08 ---- ---- --__ ---_ ?_ _ _ __-- 7.08 40 16.65 329.96 7.25 7.12 7.12 2 Continues on next page... Ti'&E - POND 2 Hydrograph Discharge Table Time (min) Inflow cfs Elevation ft Civ A Civ B Clv C Civ D Wr A Wr B Wr C Wr D EXfil Outflow cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 41 16.19 330.01 7.53 7.14 ----- --- 0 23 ---- 42 15.73 330.04 8.15 7.10 . ---- --- ----- 0 93 7.37 43 15.27 330.07 8.69 7.07 , ---- --- 1 53 -- 8.03 44 14.80 330.10 9.16 7.04 . ---- -- - --- ----- 2 08 8.60 45 14.34 330.12 9.85 6.98 . ----- ----- 2 81 9.10 46 13.88 330.13 10.43 6.93 . - _? ----- ----- 3 43 ---- 9.79 47 13.42 330.15 10.88 6.90 . ---- --- -- ----- 3 91 10.37 48 12.95 330.16 11.19 6.87 . ---- ----- 4 25 ----_ - ?- 10.80 49 12.49 330.16 11.41 6.85 . ----- - - 4,48 11.12 11 33 50 12.03 330.17 11.53 6.84 -- -- 4.61 ---- ---- ----- - --- . 11 45 51 11.56 330.17 << 11.58 6.84 4.66 . 11 50 << 52 11.10 330.17 11.56 6.84 4.64 . 11 48 53 10.64 330.16 11.48 6.84 ----- ---- 4.55 ---- --- ----- ----- . 11 40 54 10.18 330.16 11.34 6.86 4.41 . 11 27 55 9.71 330.15 11.17 6.87 4.22 ---- ---- ----- --- . 11 09 56 9.25 330.15 10.95 6.89 ---- ---- 3.99 ----- --- ---- ---- . 10 88 57 8.79 330.14 10.70 6.91 ---- --- 3,72 . 10 63 58 8.33 330.13 10.42 6.94 ---- ---- 3.42 ----- ---- ----- ----- . 10 36 59 7.86 330.13 10.12 6.96 ---- -- 3.09 . 10 06 60 7.40 330.12 9.79 6.99 2.74 ----- --- ---- ---- . 9 73 61 6.94 330.11 9.45 7.02 ---- ----- 2,37 . 9 39 62 6.48 330.10 9.14 7.04 2,04 . 9 08 63 6.01 330.09 8.94 7.06 -- ----- 1.81 ---- ---- --- -- . 8 86 64 5.55 330.07 8.71 7.07 --- ---- 1.56 ---- ---- ----- ----- . 8 63 65 5.09 330.06 8.47 7.08 --- -- 1.29 ----- ----- __? _? . 8 37 66 4.63 330.05 8.22 7.10 ----- ---- 1.00 . 8 10 67 4.16 330.03 7.95 7.11 ----- ----- 0.70 --- - -- -- _ __? . 7 82 68 3.70 330.02 7.67 7.13 ----- --- 0.38 . 7 52 69 3.24 330.00 7.37 7.15 ----- ----- 0.06 . 7 20 70 2.78 329.98 7.28 7.14 ----- --- --_ -?-- _ - _-_ __w , 7 14 71 2.31 329.96 7.23 7.12 ---- ---- ---- --- --- ----- -- . 7 12 72 1.85 329.93 7.18 7.10 . 7.10 73 1.39 329.90 7.12 7.07 7 07 74 0.93 329.87 7.12 7.04 -- ---- -- . 7 04 75 0.46 329.83 7.12 7.00 ---- ---- ---- ---- ---- ---- ---- . 7.00 76 0.00 329.79 7.11 6.97 6 97 77 0.00 329.76 7.03 6.94 --- ---- -_- ---_ -? _ - _?_ . 6.94 78 0.00 329.72 6.95 6.91 ----- --- ----- ?- -__ __w _____ 6 91 79 0.00 329.68 6.92 6.87 . 6.87 80 0.00 329.64 6.92 6.83 ----- ----- ----- ----- ---- ---- ---- 6.83 81 0.00 329.60 6.92 6.79 ----- ---- _---- ---_ __- - __ _W 6.79 82 0.00 329.57 6.85. 6.76 ---- ---- ----- ---- W- ?_ ____ 6.76 83 0.00 329.53 6.78 6.73 6.73 84 0.00 329.49 6.72 6.70 6.70 85 0.00 329.46 6.72 6.66 ---- ---- ----- ---- ----- ----- ----- 6.66 86 0.00 329.42 6.72 6.62 --- ----- _-_ -?_ _?- _-__ ___ _ 6.62 87 0.00 329.38 6.69 6.58 6.58 88 0.00 329.35 6.61 6.55 --- ----- -- _-_ -_ _ _?_ _?_ 6 55 89 0.00 329.31 6.54 6.52 ---- ---- -- -- ---- ___ - ?_ _w_ . 6 52 90 0.00 329.28 6.52 6.49 . 6.49 91 0.00 329.24 6.52 6.45 -_- -_- -? 6.45 Continues on next page... 7 ME - POND 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cis 92 0.00 329.20 6.52 6.41 41 6 93 0.00 329.17 6.46 6.38 -- - ----- . 6 38 94 0.00 329.13 6.39 6.35 ---- ----- ----- ----- --- --- . 35 6 95 0.00 329.10 6.32 6.32 ---- ----- ----- _____ . 6 32 96 0.00 329.06 6.32 6.28 ----- _w_ . 6 28 97 0.00 329.03 6.32 6.24 . 6 24 98 0.00 328.99 6.31 6.20 ----- ----- --- ___ __? ____ _-__ . 6 20 99 0.00 328.95 6.22 6.15 . 6.15 100 0.00 328.90. 6.13 6.11 ___ __-_ 6 11 101 0.00 328.85 6.13 6.05 . 6 05 102 0.00 328.80 6.13 5.99 ----- . 5 99 103 0.00 328.75 6.04 5.95 --- ---- ----- --- ----- ----- --- . 5.95 104 0.00 328.70 5.95 5.91 ---- ----- --- --- --- --- 5 91 105 0.00 328.66 5.94 5.85 _-_ _-_ . 5 85 106 0.00 328.61 5.94 5.79 . 5 79 107 0.00 328.57 5.87 5.75 . 5 75 108 0.00 328.52 5.78 5.70 __- _-_ _____ . 5 70 109 0.00 328.47 5.70 5.65 __ ____ . 5.65 110 0.00 328.43 5.61 5.60 ---- ---- ----- ----- ---- - --- ----- 5 60 111 0.00 328.38 5.56 5.54 . 5 54 112 0.00 328.34 5.56 5.50 --- ---- ---- _-__ __ _ ___ ?_ . 5 50 113 0.00 328.30 5.55 5.45 . 5 45 114 0.00 328.25 5.47 5.41 ---- ___ -__ - _-_- -?- _-_ . 5.41 115 0.00 328.21 5.39 5.36 ---- --- --- 5.36 116 0.00 328.17 5.37 5.31 5 31 117 0.00 328.13 5.37 5.25 --- ---- . 5 25 118 0.00 328.08 5.35 5.20 . 5.20 119 0.00 328.04 5.27 5.15 --- -- ---- -- ___ _? ____ 5.15 120 0.00 328.00 5.19 5.11 ----- ---- ----- __ _ _ w_ -___ 5.11 121 0.00 327.94 5.08 5.04 ----- --_ ----- --- ?__ ___ ___ 5.04 122 0.00 327.88 5.01 4.96 4.96 123 0.00 327.81 5.01 4.87 4.87 124 0.00 327.75 4.93 4.80 4.80 125 0.00 327.69 4.82 4.72 --- ----- ---- _-- _W_ _-__ -_-- 4.72 126 0.00 327.63 4.71 4.65 4.65 127 0.00 327.57 4.61 4.58 4.58 128 0.00 327.52 4.51 4.51 4.51 129 0.00 327.46 4.48 4.42 4.42 130 0.00 327.41 4.48 4.34 -__ ___ 4.34 131 0.00 327.35 4.40- 4.26 -- ---- ----- ___ ___ _ _ _W 4.26 132 0.00 327.30 4.31 4.19 4.19 133 0.00 327.25 4.22 4.12 4.12 134 0.00 327.19 4.14 4.05 ---- --- ---- ---- _____ 4.05 135 0.00 327.14 4.05 3.9$ ----- ----- --- ----- --- ---- ---- 3.98 136 0.00 327.09 3.97 3.91 --- ----- --- ---- ---- ---_ ----- 3.91 137 0.00 327.04 3.89 3.83 ---- --- 3.83 138 0.00 326.99 3.81 3.76 3 76 139 0.00 326.91 3.68 3.60 . 3.60 140 0.00 326.83 3.55 3.44 3 44 141 0.00 326.75 3.36 3.28 ---- ----- . 3.28 142 0.00 326.68 3.17 3.11 3.11 4 Continues on next page... ME - POND 2 Hydrograph Discharge Table Time Inflow Elevation Civ A Civ B Clv C Civ D Wr A Wr B Wr C Wr D Exfll Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 143 0.00 326.61 3.07 2.95 ----- ----- ----- ----- --- ---- -- 2 95 144 0.00 326.54 2.90 2.78 ----- ---- ----- ___-- _-__ _w_ _ ___ . 2 78 145 0.00 326.48 2.73 2.62 . 2 62 146 0.00 326.42 2.57 2.47 . 2 47 147 0.00 326.37 2.39 2.30 . 2 30 148 0.00 326.32 2.20 2.11 . 2 11 149 0.00 326.27 2.03 1.94 ---- ----- ----- ----- ----- --- --- . 1 94 150 0.00 326.23 1.87 1.79 --- ---- ---- ---- ----- --_-- --- . 1 79 151 0.00 326.19 1.71 1.64 --- . 1 64 152 0.00 326.15 1.55 1.50 ---- ---- _- _? ___- _w __-_ . 1 50 153 0.00 326.12 1.40 1.38 ----- ---- W__ W- ----- -__ --_ . 1 38 154 0.00 326.09 1.28 1.26 ----- . 1 26 155 0.00 326.06 1.18 1.17 ----- --_-- ----- ----- -_- ?- . __ . 1 17 156 0.00 326.04 1.09 1.08 . 1.08 157 0.00 326.01 1.00 1.00 1.00 158 0.00 325.97 0.87 0.86 _-_ _a_ 0.86 159 0.00 325.91 0.71 0.69 ---- ---- ----- -__ _ _W_ __? _ _____ 0.69 160 0.00 325.87 0.58 0.56 ---- --- ---- --- - --- ---- -- -- 0.56 161 0.00 325.84 0.51 0.46 ---- ---- ---- ----- ---- --- ---- 0.46 162 0.00 325.81 0.51 0.39 0.39 163 0.00 325.78 0.51 0.33 -- - ----- -- ----- ----- ----- 0.33 164 0.00 325.76 0.51 0.28 ----- ---- - _-_-- __- ?- ___ 0.28 165 0.00 325.74 0.51 0.25 0.25 166 0.00 325.72 0.51 0.22 --- ----- --- - ----- ---- ---- ----- 0.22 167 0.00 325.71 0.51 0.19 0.19 168 0.00 325.70 0.51 . 0.17 ----- ---- ----- -- ---- ---- --- - 0.17 169 0.00 325.68 0.51 0.15 ---- ----- ---- ---- ----- -? _?_ 0.15 170 0.00 325.67 0.51 0.14 ---- ----- --- -_- _--- _ _ -? 0.14 171 0.00 325.67 0.51 0.12 0.12 S ...End TT&E IRON & METAL STORM DRAINAGE DESIGN Inlet DA EDA C I (in/hr) Q (cfs) Pipe Length Size 1 0.5 0.50 0.85 8.5 3.6 18" 108' 2 57.5 57.50 - - 137.6" 60" 64' 3 0.38 0.38 0.85 8.5 2.7 18" 100' *Q for Inlet #2 determined using Map of Hydrologic Contours (See attached charts) DISSIPATOR PAD D Outlet @ Q (cfs) Pipe Size Slope 1 3.6 18 in. 3.0% 2 137.6* 60 in. 0.5% 3 2.7 18 in. 2.1% POND 1 7.0 30 in. 0.5% POND 2 11.5 36 in. 0.5% 8.0 4.5'x6'x18" 6" 9.5 16'x40'x24" 13" 6.9 4.5'x6'xl8" 6" 3.9 7.5'x15'xl 8" 6" 5.8 9'x18'x18" 6" APPENDIX C SHEET 1 OF 8 kl* 1-3 Z O 0 N V V Z Q ?? Z rk WQO U) 0 CHART C 200.1 A APPENDIX C SHEET 3 OF 8 t x1,91,rl pL GIVgN HYDROL061C CONTOUR 5.0 SMRR L? ARER fU L &j5IN,?55 ANSWER 0 W=39 x14 - 54.(o aF5 QQ = 4A GFS Z 644Fs ,7 ? 137 b c.?s Qaa v ? -?. O o5 m LxJ Lai ?' >w W U'l ?dR Y5DEVE RORaWJ, 1 ,2, 000 /,000 Boo 600 400 200 $O vi 20 t-I ?o 8 ? W 4 2 I %5 /000 6 00 ? 400 -? 200 t 100 54 V) 40 4.; 30 cizz 20 Z to czi FRCTORS FOR FREQCIENCIES Q 5 CURVE VALUE X .75 it n Q 23 a tt x 1.35 •8 i?50 it tt x i:/W (2/00 it tt x RUNOFF FROM UR 6RN RR-0,95 NORM CAROLINA SVrH HIGHWRY COM115510N URN, 1 7.9 C 200.3 CHART C 200.3