Loading...
HomeMy WebLinkAbout20080928 Ver 1_Individual_20080606UNITED STATES MARINE CORPS PAYMENT MARINE CORPS BASE SEC EIS' L. iJ PSC Box 20004 CAMP LEJEUNE, NORTH CAROLINA 28542.0004 IN REPLY REFER TO: 5090.11.2 BEMD Ju% o 2 Boa From: Commanding Officer, Marine Corps Base, Camp Lejeune To: Commanding Officer, United States Army Corps of Engineers, Wilmington District 69 Darlington Avenue, Wilmington, NC 28403 Subj: APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT FOR PHASE ONE MODERNIZATION OF K-2 RANGES (P-1135) OF MARINE CORPS BASE (MCB), CAMP LEJEUNE, NORTH CAROLINA Encl: (1) Application for Department of the Army Permit for Phase One Modernization of K-2 Ranges in the Verona Loop Training Area 1. The enclosure is submitted for approval of the proposed Phase One Modernization of K-2 Ranges (P-1135) in the Verona Loop Training Area on Marine Corps Base Camp Lejeune, North Carolina. 2. Camp Lejeune proposes to mechanically clear, cut, and fill 12.32 acres of Section 404 wetlands, and 141.5 linear feet of intermittent stream to complete the project described in the permit application. 39.74 acres of Section 404 wetlands will be temporarily impacted during removal of unexploded ordinance. 3. The point of contact for this project is Mr. Martin Korenek, Environmental Conservation Branch, Environment and Installations Department, at telephone (910) 451-5063 or email martin.korenek@usmc.mi1. �W�fflowf-R-3 Sincerely, JUN 6 2008 �� DENR - WATER WAUTY WETLANDS AND STORMWATER BRANCH 0 R. TOWNSON Director, Environmental Management By direction of the Commanding Officer Copy to: NCDENR, DWQ, 401 Section, 7 copies with application fee NCDENR, DCM APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT Privacy Act Statement Authority: 33 USC 401, Section 10: 1413, Section 404. Principal Purpose: These laws require permits authorizing activities in, or affecting, navigable waters of the United States, the discharge of dredged or fill material into waters of the United States, and the transportation of dredged material for the purpose of dumping it into ocean waters. Routing Uses: Information provided on this form will be used in evaluating this application for a permit. Disclosure; Disclosure of requested information is voluntary. If information is not provided however, the permit application cannot be processed nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPL. COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME 8. AUTHORIZED AGENTS NAME AND TITLE (an agent is not Marine Corps Base Camp Lejeune required) N/A c/o Mr. Carl Baker 6. APPLICANT'S ADDRESS 9. AGENT'S ADDRESS Marine Corps Base Camp Lejeune Deputy Public Works Officer N/A Public Works Division 1005,Michael Road Camp Lejeune, NC 28542 7. APPLICANT'S PHONE NOS. W/AREA CODE 10. AGENT'S PHONE NO. W/AREA CODE a. Business (910) 451-2213 N/A b. Fax 11 autno entali FURE STATEMENT OF AUTHORIZATION it Group, Inc. to act in my behalf as my agent in the processing of this application and to furnish, upon request, of this permit application. DATE NAME, LOCATION AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE - Modernization of K-2 Ranges; Phase One 13. NAME OF WATERBODY, IF KNOWN (if applicable) Tributaries of New River 15. LOCATION OF PROJECT Onslow North Carolina COUNTY STATE 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN 14. PROJECT STREET ADDRESS (if applicable) MCB Camp Lejeune Jacksonville, NC .)E di: 'vvAi ER (�JAW Y WETLANDS AND STORMWATER BRANCH 17. DIRECTIONS TO THE SITE From Wilmington, take Hwy 17 N into Onslow County. Turn right at gate into Camp Lejeune. Site is located off of Rhodes Point Road (see vicinitv map). �A" 18. NATURE OF ACTIVITY (Description of project, include all features) - i ., , Aruction of four ranges: 50 Lane BZO Range (P-1), M16 Static Range (P-2), M249 SAW Range t. .lice Range (P-4). In addition, support facilities for these ranges will be constructed. 12.32 acres of 404 wetianas dna 141.5 linear feet of intermittent stream will be permanently impacted. In addition, 39.74 acres of 404 wetlands will be temporarily impacted during an inspection for UXO (See Project Narrative). 19. PROJECT PURPOSE (Describe the reason or purpose of the project) - To transform these ranges into state-of-the-art, interactive training facilities that could be used to readily meet Infantry Training and Readiness Manual requirements (See Project Narrative). USE BLOCKS 20-22 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. REASON(S) FOR DISCHARGE To realign ranges and construct roads on which to access ranges and support facilities. 21. TYPE(S) OF MATERIAL BEING DISCHARGED AND THE AMOUNT OF EACH TYPE IN CUBIC YARDS — Clean, compacted sub -grade soil materials, clean ABC aggregate, pavement etc all above street reinforced concrete culverts at map specified locations. See map for area in each location. 22. SURFACE AREA IN ACRES OF WETLANDS OR OTHER WATERS FILLED 12.32 acres of 404 wetlands and 141.5 linear feet of intermittent stream will be permanently impacted. In addition, 39.74 acres of 404 wetlands will be temporarily impacted during an inspection for UXO (See Project Narrative). _ 23. IS ANY PORTION OF THE WORK ALREADY COMPLETE? no IF YES, DESCRIBE THE COMPLETED WORK Ranges currently exist within site. Proposed project will modernize and realign ranges. 24. ADDRESSES OF ADJOINING PROPERTY OWNERS, LESSEES, Etc., WHOSE PROPERTY ADJOINS THE WATERBODY N/A Property is confined entirely within Camp Lejeune 25. LIST OTHER CERTIFICATIONS OR APPROVALS/DENIALS RECEIVED FROM OTHER FEDERAL, STATE, OR LOCAL AGENCIES FOR WORK DESCRIBED IN THIS APPLICATION N/A AGENCY TYPE APPROVAL` IDENTIFICATION NUMBER DATE APPLIED DATE APPROVED DATE DENIED 26. Application is hereby made for a permit or permits to authorize the work described in this application. I certify that the information in his application is complete and accurate. I further certify that I possess the authority to undertake the work described I r n or am ac ,4g as the duly authorized agent of the applicant. SIGNATURE OF APPLICANT DATE 18. U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations o r makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. PROJECT NARRATIVE Phase One Modernization of K-2 Ranges United States Marine Corps Camp Lejeune Onslow County, NC May 2008 INTRODUCTION The United States Marine Corps (USMC) proposes to modernize the K-2 ranges at Marine Corps Base Camp Lejeune (MCBCL), North Carolina. The 23 existing ranges are inadequate and outdated. The objective is to transform these ranges into state-of-the-art, interactive training facilities that could be used to readily meet Infantry Training and Readiness Manual (Marine Corps Order 3501.34) requirements. Modernization of the K-2 Ranges would be accomplished in two phases. This Individual Permit application applies only to Phase One of this project. Phase One involves the construction of four ranges: 50 Lane BZO Range (P-1), M16 Static Range (P-2), M249 SAW Range (P-3), and M203 Training Practice Range (P-4). In addition, support facilities for these ranges will be constructed. Total proposed permanent impacts for Phase One are 12.32 acres of 404 wetlands and 141.5 linear feet of intermittent stream. In addition, 39.74 acres of 404 wetlands will be temporarily impacted during an inspection for unexploded ordnance (UXO). The entire project area is located within the White Oak River Basin and is 470 acres in size. Please note that much of the information from this Project Narrative comes from the Environmental Assessment prepared for this project in March of 2005. This EA received a Finding of No Significant Impact. PURPOSE AND NEED Modernization of the K-2 ranges is needed because the existing design of the ranges no longer meets the demand for modern warfare, using present-day warfare methods. Current technology is available for use on modernized ranges that would optimize training, reduce cost, and save time, and would also minimize logistical support and provide very high accuracy ratings during qualifications training. The proposed modernization is required for several reasons: to meet training requirements, to provide automated target systems, to upgrade the road network, and to realign the surface danger zones (SDZs) in order to minimize their footprint over areas of the New River. Currently, while certain ranges are in use, other nearby ranges cannot be scheduled due to safety concerns of overlapping SDZs. The realignment of the ranges and SDZs would resolve these scheduling conflicts and allow simultaneous use of all ranges. These changes would allow a high throughput of personnel through the range complex, thus less ranges would be needed. By modernizing the K-2 ranges to fulfill these requirements, the USMC would provide the highest possible return on their training investment. EXISTING CONDITIONS The 470 -acre project area is located in Onslow County, approximately four miles east of Highway 17 along Rhodes Point Road (Figure 1). Habitat Topography at the K-2 Ranges is characterized by upland terraces, with the highest elevation at about 22 in (75 ft) (Figure 2). The terraces are dissected by drainage slopes with the lowest elevation at about 3 in (10 ft). The terraces are primarily composed of Baymeade and Onslow soil series while the slopes are composed of Marvyn loamy fine sand grading to Muckalee loam along the tributaries of the New River. The Bohicket series occurs along a tributary to Mill Creek. Smaller inclusions of Leon, Pantego, Alpin, and Norfolk soils are also respresented in the project area (Figure 3). The landscape surrounding the K-2 ranges is characterized by pine savannas that are dissected by drainage slopes. The hydrology of the savannas varies from dry-mesic to wet-mesic, which influences vegetation composition. The savannas are dominated by loblolly pine (Pinus taeda) with several species of hardwoods including sweetgum (Liquidambar styraciflua), southern red oak (Quercus falcata), white oak (Q. alba), and red maple (Acer rubrum). The shrub layer varies with wetness, but generally consists of wax myrtle (Myrica cerifera), blue huckleberry (Gaylussacia frondosa), and sparkleberry (Vaccinium arboreum). Groundcover species vary with the degree of land disturbance and fire regimes but can include wiregrass (Aristida stricta), bracken fern (Pteridium aquininum), and bluestem (Schizachyrium spp.), along with more disturbance tolerant species like green briar (Smilax spp.) and broomsedge (Andropogon virginicus). The drainage slopes are also dominated by loblolly pine with occurrences of mockernut hickory (Carya tomentosa), white oak, beech (Fagus grandifolia), American holly (Ilex opaca), and tulip poplar (Liriodendron tulipifera). 2 The most heavily used portions of the existing ranges are typically devoid of native groundcover, may consist of turf -type grasses, or are graveled. Depending on the intensity of current use, the K-2 impact area may support a variety of grasses and forbs or could be dominated by lichens and mosses on bare soil. Only scattered and often stunted loblolly pines or hardwoods persist down range from existing firing lines. The exact species composition of the ranges cannot be field -verified because of the potential for UXO, but aerial photographs of the region confirm the historic disturbance of the area (Figure 4). While the Base's Forest Management Program staff conducts timber marketing at MCB Camp Lejeune, the forest stands within the surface danger zones are not actively harvested or regenerated, but are subject to fire fuels management. Merchantable timber is currently harvested along the perimeter of the impact area. The Base contributes 40 percent of the net proceeds from the sale of timber products to the Onslow County Schools System in accordance with 10 US Code 2665. In accordance with an agreement between MCBCL and U.S. Army Corps of Engineers Wilmington District (USAGE) for the K-2 Ranges project, the approximate limits of wetlands and other waters of the U.S. were determined by Geo -Marine Inc. (GMI) within the project area without field survey due to the risk of unexploded ordnance (UXO). In lieu of the typical field survey methods, a variety of remote sensing and mapping data were used in a geographical information system (GIS) to support the determination of wetlands and other waters of the U.S. As a result of comments generated during a pre -application meeting with representatives from the USACE and the NC Division of Water Quality (DWQ), GMI provided an updated Wetland Delineation and Stream Mapping Report to Wilmington District USACE in March of 2008. Wilmington District USACE issued a Jurisdictional Determination letter dated 3/31/08 approving the mapping of wetlands and other waters of the U.S. Utilizing the methods outlined in the report, 205.7 wetland acres (43.5 percent of total project area) were identified in the K2 Ranges project area (Figure 5). Palustrine emergent wetlands were the most prevalent comprising 165 acres, or 78 percent of the wetlands that were identified. Thirty-nine acres of palustrine forested wetlands and 0.2 acre of palustrine scrub -shrub wetlands were also identified. Finally, there were 8,401 linear feet of intermittent stream segments and 3,441 linear feet of perennial stream segments identified within the project area. 3 Water Resources The presence of submerged aquatic vegetation (SAV) in the New River is limited with no records of SAV north of the NC 172 bridge. South of the NC 172 bridge there are records of eelgrass (Zostera spp.) within Traps Bay, but SAV is absent in Courthouse Bay and Mile Hammock Bay (Rohde, July 2003). While roughly one-half of the K-2 impact area is bordered by the New River, the surface hydrology of the area is also influenced by four tributaries to the New River (Figure 2). An unnamed tributary of Mill Creek is located in the western portion of the impact area. Whitehurst Creek flows through the center of the site. Town Creek, situated to the north of Rhodes Point Road, runs eastward along the northern project boundary. A fourth tributary, locally referred to as Little Creek, drains the southeastern portion of the impact area with its outflow located near Hickory Point. The New River and its watershed are located entirely within Onslow County. The upper reaches of the New River and its tributary streams are narrow with flowing freshwater. The lower reaches are estuarine waters, which are wider, slow moving, poorly circulating, and affected by tides. Within the tidal portions of the New River, water quality classifications range from SA to SC. Within the New River estuary, all waters downstream from Grey Point to the New River Inlet at the Atlantic Ocean are classified as SA, with the exception of two areas of SC waters around the historic outfalls for the rifle range and the old Courthouse Bay wastewater treatment plants. An SC water classification is given to all tidal salt waters protected for secondary recreation such as fishing, boating, and other activities involving minimal skin contact; fish and noncommercial shellfish consumption; aquatic life propagation and survival; and wildlife. An SA water classification is given to tidal salt waters that are used for commercial shellfishing or marketing purposes and are also protected for all Class SC and Class SB uses. All SA waters are also High Quality Waters (HQW) by supplemental classification. All waters draining to the New River north of Grey Point are considered Nutrient Sensitive Waters (NSW). The NSW classification is a supplemental designation intended for waters needing additional nutrient management due to their being subject to excessive growth of 0 microscopic or macroscopic vegetation. In general, management strategies for point and nonpoint source pollution control require control of nutrients (nitrogen and/or phosphorus usually) such that excessive growth of vegetation is reduced or prevented and there is no increase in nutrients over target levels. Management strategies are site-specific. No specific restrictions on development are involved. The New River and several of its tributaries within the project area (Mill Creek, Town Creek, and Whitehurst Creek) have the additional designation of High Quality Waters (HQW) and Primary Nursery Areas (PNA). The High Quality Waters classification is a supplemental designation intended to protect waters which are rated excellent based on biological and physical/chemical characteristics through Division monitoring or special studies, primary nursery areas designated by the Marine Fisheries Commission, and other functional nursery areas designated by the Marine Fisheries Commission. Primary Nursery Areas, as defined by the Marine Fisheries Commission, are those areas in the estuarine system where initial post - larval development takes place. These areas are usually located in the uppermost sections of a system where populations are uniformly very early juveniles. The Division of Marine Fisheries is responsible for preserving, protecting and developing Primary Nursery Areas for commercially important finfish and shellfish. Federally Protected Species Federally listed threatened and endangered species found at MCB Camp Lejeune are presented in Table 1. The Base has an endangered species program that focuses on conservation and protection of species and their management. No federally -listed species are known to occur in the K-2 Ranges project area. Table 1. Federally -listed species classified as endangered or threatened and known to occur in MCB Camp Leieune, NC. Common Name Scientific Name Status Animals American alligator Alligator mississippiensis T(S/A) Loggerhead sea turtle Caretta caretta T Green sea turtle Chelonia mydas T Piping plover Charadrius melodus T Bald eagle Haliaetus leiacocephalirs BPGA Red -cockaded woodpecker Picoides borealis E 5 Common Name Scientific Name Status Plants Roughleaf loosestrife Lysimachia asperulaefolia E Seabeach amaranth Amaranthus pumilus T KEY: Status Definition Endangered A taxon "in danger of extinction throughout all or a significant portion of its range." Threatened A taxon "likely to become endangered within the foreseeable future throughout all or a significant portion of its range." T(S/A) Threatened due to similarity of appearance - a species that is threatened due to similarity of appearance with other rare species and is listed for its protection. FSC Federal Species of Concern BPGA Species protected by the Bald and Golden Eagle Protection Act and Migratory Bird Treaty Act. The population of American alligators at MCB Camp Lejeune has been monitored since 1980 and appears to be stable or slightly increasing (USMC, November 2001). American alligators likely inhabit Mill Creek, Whitehurst Creek, and their tributaries. Both loggerhead and green sea turtles nest at Onslow Beach. Monitoring for sea turtle nests began in 1979 and is ongoing to allow for the immediate protection of the nests. Piping plover nests have not been detected at Onslow Beach, but suitable habitat is available for nesting and over -winter foraging. Piping plovers have been seen on Onslow Beach during all seasons of the year. As such, surveys for the piping plover are conducted for evidence of nesting behavior (USMC, November 2001). Onslow Beach is over 6.8 miles from the K-2 ranges. A bald eagle nest was first documented on Base in 2000 along the New River where it meets Sneads Creek. Protective buffers have been established around the nest site with restrictions on both ground and air -use activities (USMC, November 2001). This nest is over three miles from the K-2 ranges. Although bald eagles have been sighted by boaters on the New River, no nests have been documented on the western shore of the river. There are 74 active red -cockaded woodpecker (RCW) clusters at MCB Camp Lejeune. A Mission Compatible Red -Cockaded Woodpecker Management Plan (MCB Camp Lejeune, May 1999) was developed to manage and direct continuing RCW growth on the Base. A goal was 31 set in the RCW management plan to have 173 active clusters within seven management areas. As such, the Base manages occupied suitable habitat, unoccupied suitable habitat, and unoccupied potential habitat to reach this recovery goal of 173 active clusters. An active RCW cluster is located over 0.5 mile from the project area. The foraging area for this group does not extend into the project area, where foraging resources are generally inadequate. Seabeach amaranth is present on Onslow Beach often growing between dunes and the high tide line. Monitoring of amaranth is ongoing to prevent vehicles or pedestrians from harming this plant. Onslow Beach is over 6.8 miles from the K-2 ranges. Roughleaf loosestrife is present in specific habitat types on approximately 22 acres at MCB Camp Lejeune. Roughleaf loosestrife is not known to occur within the project area, though two small occurrences of potentially high probability habitat for the plant have been identified. Actual surveys for the plant in these high probability areas cannot be safely conducted due to UXO. The closest known sites are over 2.5 miles from the K-2 ranges in the developed portion of the Base or in the Greater Sandy Run Area. Historic or Archaeological Resources No historic structures are present within or adjacent to the K-2 ranges. Surveys for archaeological resources (pedestrian and subsurface) have not been conducted within the K-2 impact area due to the hazards posed by UXO. However, investigations have been conducted on the boundary of the SDZs at the K-2 ranges, where two archaeological sites have been identified. One site was recorded and recommended not eligible for inclusion in the National Register of Historic Places (NRHP) because of extensive previous disturbance. Another site was investigated during a shoreline survey, conducted by boat, and was recommended for further NRHP evaluation. However, no ground disturbing activities are planned in the vicinity of this site (Brewer, August 2004). ALTERNATIVES ANALYSIS The project requirements (criteria) that must be met for an alternative to be a reasonable option for fulfilling the purpose and need for the proposed action are as follows: 7 1. The alternative must allow the USMC to fulfill these specific training requirements: infantry training and readiness manual requirements, individual training standards, mission performance standards, and mission essential task listing. 2. The realignment of the surface danger zones (SDZs) must allow simultaneous use of all ranges. 3. The alternative must allow for the continued use of the ranges while modernization efforts are underway. 4. The footprint of SDZs over the New River must be minimized. The alternatives evaluated include a no -action alternative, one off-site alternative, one on-site alternative, and the preferred project. No -Action Alternative Under the no -action alternative, the existing K-2 ranges would remain the same, without modernization. Training at these ranges would continue to be conducted in accordance with Range and Training Regulations, Standard Operating Procedure for Range Control. However, this training would be conducted under conditions that have become inadequate over the years. Taking no action to modernize the K-2 ranges means that the USMC would be unable to accommodate new technology on these ranges, such as automated targets. This would further impact the ability of the forces to "train as they fight." Infantry training and readiness manual requirements, individual training standards, mission performance standards, and mission essential task listing would not be met efficiently or to the fullest extent possible. Additionally, readiness training and the availability of adequate resources to other US military branches and to allies would continue to be limited. Without range realignment, the surface danger zones associated with the existing K-2 ranges would continue to extend as far into the New River as they currently do. Safety for commercial and recreational boaters on the river would not be improved. Furthermore, access to existing targetry would continue to be difficult as the road network is in dire need of maintenance to make the roads passable. Road maintenance is currently hindered by the presence of unexploded ordnance (UXO) near the roads. There are a large number of weapons that can be used at each of the existing K-2 ranges. However, when some ranges are being used, other ranges are restricted from use because of safety conflicts. Without consolidation into a lesser number of ranges, where each range is dedicated to a particular weapon system, scheduling will not allow a higher throughput of personnel at the range complex. The No Action Alternative does not provide for the consolidation and modernization of the existing K-2 ranges and cannot meet evaluation factors 1, 2, or 4. As such, it is not considered a reasonable solution for satisfying the purpose and need for the proposed action. Alternate Site An important objective to modernizing the K-2 ranges is to realign the surface danger zones and reduce the distance that they extend into the New River. One way to minimize the footprint of surface danger zones over the river would be to move the existing range firing lines (line from which ammunition is fired) north of Rhodes Point Road. This alternative would require shifting Rhodes Point Road and an existing tank trail farther to the north. While this alternative would meet evaluation factors 1, 2, and 4, it was dismissed because a northern shift to Rhodes Point Road and the tank trail would cause considerable impacts to approximately 900 acres of natural resources (e.g. wetlands, forested habitat, and protected species habitat). On-site Alternative #1 The original project design that was prepared for Phase One of the K-2 Ranges project was very similar to the preferred site design. However, the Range P4 — M203 Grenade Launcher had a larger footprint that impacted the easternmost stream (Figure 6). Total proposed impacts for this alternative were 12.32 acres of 404 wetlands and 912.5 linear feet of intermittent stream. During a pre -application meeting with representatives of the USACE and DWQ to discuss the project, it was requested that Range P4 be modified to reduce proposed stream impacts. The USACE in Huntsville made the following changes to Range P4 in order to reduce impacts: • Extended firing berm and firing lanes to the west in order to minimize impact of stream to range firing lanes. • Modified firing berm lighting to accommodate increase in length to firing berm. E • Moved Control Tower to be centered on firing berm. • Moved Ammo Breakdown building in order to maintain 15m separation from any range support facility (closest facility = Control Tower). • Graded range operation and control area to accommodate buildings moved and increase in length to firing berm. • Removed downrange grading that was done to re-route ditch and bring area above the existing ditch up to grade in order to avoid environmental impacts on primary nursery area (PNA). The site plan that resulted from these revisions is the preferred project and is discussed below. On -Site Alternative #2: Preferred Proiect Modernization of the K-2 ranges would require the consolidation and realignment of the existing K-2 ranges and the development of training facilities and automated targetry (Figure 7). The existing ranges would be realigned and re -numbered, and would become inactive. Range development would be timed and coordinated so that the majority of existing ranges could continue to be used during construction phases. For example, training at some of the existing ranges would be temporarily rotated to other ranges while the upgraded ranges are being constructed. A description of the four proposed ranges within Phase One, along with some estimates of their sizes, is provided below. Development of these ranges would include the construction of support facilities. PI — Baffled Battle Site Zero (3 ac) — This baffled range would allow for 50 shooters along a firing line to fire to a distance of 30 meters (32.8 yards). It would be outfitted with bullet traps (Figure 8). P2 — Service Rifle (40 ac) — This range for M16 and M4 rifles and shotguns would have 15 firing positions and automated targets ranging from 50 to 550 meters (55 to 601 yards) (Figure 9). P3 — Squad Automatic Weapon (20 ac) — A range for M249 squad automatic weapons would have automated targets ranging from 50 to 800 meters (55 to 875 yards) (Figure 10). 10 P4 — M203 Grenade Launcher (30 ac) — A range for M203 grenade launchers would have only training practice (TP) ammunition authorized (Figure 11). Targets would be placed up to 400 meters (437 yards) from the firing line. The proposed ranges would be realigned with their surface danger zones barely extending into the New River. The location and alignment of these ranges is designed to avoid impacts to the oyster beds located in Stone Bay. Once appropriate permits have been obtained and coordination with MCB Camp Lejeune's Environmental Management Department has occurred, unexploded ordnance (UXO) cleanup and removal at the existing ranges would begin. Thorough surface and subsurface scans and sweeps for UXO would be conducted in the areas as depicted on Figure 12. Cleanup and removal of UXO would occur prior to the construction and modernization efforts. All UXO would be disposed of in accordance with proper safety and disposal standards using certified disposal methods. The subsurface investigations would require excavation to a depth of up to 3.3 feet. Once the sweep is complete, soils removed from wetlands would be restored to preconstruction elevations. This UXO removal would allow for maintenance on the existing road network, which is necessary to make the roads passable. Other range debris (e.g. old armor, vehicle hulks, and scrap metal) would be removed and disposed of in accordance with proper disposal procedures. Also, existing berms, targets, and other support systems would need to be removed so that the ranges could be upgraded. Modernizing the K-2 ranges would involve installation of automated target systems, construction of firing pits and bunkers on firing lines, construction of concrete fighting positions, and construction of bleachers. Targets would be installed and support buildings and some mock buildings would be constructed. Vegetation would need to be cleared at many of the upgraded ranges to maintain a line of sight to the targets. Some grading would be required to level out existing contours in the down range areas. Berms, pits, and trenches would be constructed at the realigned ranges. Wooden walls, building facades, and a rubble pile would be built on some of the berms. Vehicle -firing pads (e.g. concrete or gravel pads) would also be constructed on berms. 11 Support buildings include maintenance buildings, classrooms, restrooms, and ammunition supply. Parking lots would be added or expanded. Lighting, fencing, and signs would be installed. Some ranges would accommodate bivouac areas (areas used as a temporary base) nearby. Some ranges would require the installation of obstacle course items: concertina wire, walls, sewer/tunnel/subway system with manholes added, and other artificial and natural barriers. In addition to maintaining the existing road network at the K-2 ranges, new 10-12 foot wide gravel roads would be constructed to provide access to each automated target array (Appendix A). In an effort to minimize impacts to wetlands and streams, all ditch side slopes and road fill slopes were designed by Huntsville Division USACE at 2:1 to decrease the footprint of these features. A 125 -foot tall safety tower would be constructed to provide for observation of the river as well as the K-2 ranges and smaller towers would be constructed at most of the upgraded ranges. The types of ammunition and weapons to be used at the realigned ranges would remain the same as currently used at the existing K-2 ranges. Proposed utilization of the modernized K-2 ranges is expected to be about ten percent higher than current levels due to a higher throughput of personnel, which would be possible with the consolidation and realignment. Also, a recently reactivated Marine unit, the 4"' Marine Expeditionary Brigade, Anti -terrorism Battalion, would add to the proposed utilization from their training. In addition to the Marine personnel, other military services, the US Coast Guard, allied nationals, and other authorized agency personnel would train at the K-2 ranges. Once proposed range modernization is complete, ranges would be maintained based on evolving training requirements. Additionally, items such as bullet traps could be expected to be installed. The proposed action meets all four evaluation factors listed above. The proposed consolidation and modernization of the K-2 ranges would allow the USMC to fulfill infantry training and readiness manual requirements, individual training standards, mission performance standards, and mission essential task listing. Realignment of ranges would allow for simultaneous use. The UXO removal and construction efforts would be conducted in a manner that allows for the continued use of the majority of existing ranges while modernization efforts are underway. As a result, safety for commercial and recreational boaters on the river would be improved. 12 POTENTIAL ENVIRONMENTAL IMPACTS 404/401 Jurisdictional Areas Phase One of the K-2 Ranges project would permanently impact 12.32 acres of 404 wetlands and 141.5 linear feet of intermittent stream (Figure 13). In addition, 39.74 acres of 404 wetlands would be temporarily impacted during an inspection for UXO (Figure 12). Secondary impacts to wetlands and water quality could occur during and after construction of the project through erosion. Erosion impacts would be temporary and would be minimized by employing applicable soil erosion and sedimentation control techniques at the construction sites. Best management practices for vegetation management and land clearing would also be applied. Threatened and Endangered Species The proposed project would have no effect on the bald eagle or American alligator. With over three miles of separation between the known bald eagle's nest and the K-2 ranges, construction would have no effect on eagle reproduction or foraging. Riparian habitats supporting the American alligator would not be directly affected by the project. While high probability habitat for roughleaf loosestrife is present in the project area, the percentage of surveyed high -probability habitat that actually supports the endangered plant is very low. The presence of hazards associated with UXO prevents personnel from surveying for the plant within the boundaries of the project area. While subterranean UXO sweeps would be conducted in the area of potential habitat, it would be unlikely that a targeted excavation would affect individual roughleaf loosestrife plants. For these reasons, Camp Lejeune has determined that implementation of the proposed action may affect, but is unlikely to adversely affect roughleaf loosestrife. The Base initiated informal consultation with the USFWS regarding the proposed action's effects on roughleaf loosestrife and expects to comply with direction provided by the USFWS. Foraging habitat of active RCW clusters would not be impacted by the proposed action. Construction of the grenade complex and a new Rhodes Point Observation Tower would take place within two RCW recruitment partitions. After clearing 39 acres for construction of the grenade complex, the affected partition would retain over 200 acres of potential habitat. 13 Construction of an observation tower would require land clearing of less than one acre. Additionally, the project would not result in forest fragmentation that would hinder eventual occupation of the partitions. The retention of over 200 acres of contiguous, suitable habitat satisfies criteria for recruitment partitions outlined in both Camp Lejeune's Integrated Natural Resource Management Plan and the 2003 Revision of the Recovery Plan for the Red -Cockaded Woodpecker (Picoides borealis) (USMC, November 2001; USFWS, January 2003). Tree clearing within the K-2 impact area would not affect recruitment partitions. Therefore, implementation of the proposed action would not affect active RCW clusters nor would it affect Camp Lejeune's ability to reach its long-term cluster goal. While construction would not directly affect any endangered species or their habitat, upon completion, the projected use of the ranges would change noise levels and patterns. Evidenced by their continuing use of nearby habitats despite noise levels fluctuations from variations in operational tempo, the projected changes in noise levels is not expected to affect protected species. The K-2 ranges and associated SDZs do not support suitable or potential habitat for any other protected species. MITIGATION A variety of mitigation measures has been developed to minimize potential environmental impacts. These include: • Construction effects would be controlled using standard management practices such as routine sweeping and wetting to reduce air emissions. • If during construction and site grading any site of potential historical or archaeological significance is encountered, the installation commander would be notified. The unit commander would order actions in the vicinity halted and the area marked. The unit commander would immediately notify the Base archaeologist at (910) 451-7230. • Best Management Practices (BMPs) would be used to avoid contamination of stormwater. Mitigation plans would include both short-term (construction phase) and long-term (project life) features to meet the requirements of the Base's Stormwater Pollution Prevention Plan. • There will be a significant decrease in river area affected by surface danger zones. • The proposed action is fully consistent with applicable coastal zone management policies. • The Base will utilize credits from the Greater Sandy Run Area (GSRA) wetlands mitigation bank to offset proposed wetland impacts. This bank is located within the base, approximately 14 seven miles west of the project site, and has bottomland hardwood credits available. Since the proposed impacts will occur to degraded wetlands and because the mitigation site is located in close proximity to the impact site, a 1:1 mitigation to impact ratio is proposed. • Significant revisions to the original site plan have occurred to minimize impacts to streams within the project area. Proposed stream impacts would be to degraded, intermittent stream habitat. Therefore, no compensatory stream mitigation is proposed. 15 CAMA CONSISTENCY REVIEW Phase One Modernization of K-2 Ranges United States Marine Corps Camp Lejeune Onslow County, NC Demands placed on lands and waters of the coastal zone from existing economic development and population growth require that new projects or actions be carefully planned in order to avoid stress on the coastal zone. This planning involves a review of state and local enforceable policies, which are designed to provide effective protection and use of land and water resources of the coastal zone. Enforceable policies and consistency are discussed below for the proposed K-2 range consolidation, realignment, and modernization. Areas of Environmental Concern Areas of environmental concern are given protection because they are areas of statewide concern within the coastal area. The following sections address the applicability of policies designed to protect areas of environmental concern and consistency with those policies when applicable. Section 7H.0200: Estuarine and Ocean Systems Included within the Estuarine and Ocean System are the following AEC categories: estuarine waters, coastal wetlands, public trust areas, and estuarine and public trust shorelines. The K-2 Ranges and surface danger zones (SDZs) are bordered by the New River, parts of which are estuarine. Other than minimizing the footprint of SDZs over New River, range consolidation and modernization are not expected to impact the New River or its tributaries. As such, the proposed action would be consistent with policies intended to protect estuarine and ocean systems. Section 7H .0300: Ocean Hazard Areas Ocean Hazard Areas include beaches, frontal dunes, inlet lands, and other areas in which geologic, vegetative, and soil conditions indicate a substantial possibility of excessive erosion or flood damage. Proposed range modernization at the K-2 ranges is not located within an Ocean Hazard Area. Therefore, policies on ocean hazard areas are not applicable. Section 7H.0400: Public Water Supplies This AEC category includes valuable small surface water supply watersheds and public water supply well fields. The construction of proposed training support facilities would avoid areas where there are small surface water supply watersheds or public water supply well fields. Therefore, policies protecting public water supplies are not applicable. Section 7H .0500: Natural and Cultural Resource Areas This AEC includes areas containing environmental, natural, or cultural resources of more than local significance in which uncontrolled or incompatible development could result in major or irreversible damage to natural systems or cultural resources, scientific, educational, or associative values, or aesthetic qualities. The K-2 ranges project area is free of fragile coastal natural or cultural resources. As a result, policies designed to protect natural and cultural resources of environmental concern are not applicable. General Policy Guidelines There are eleven General Policy Guidelines (15A NCAC 07M) issued by North Carolina for the coastal area. Of these, three policies are applicable to the proposed facility construction and training. Consistency with these applicable policies is addressed in the following paragraphs. Section 7M.0700: Mitigation Policies This policy requires that adverse impacts to coastal wetlands or waters be mitigated or minimized through proper planning. Construction of range facilities and access roads at the K-2 ranges would be consistent with North Carolina's policy that requires mitigation for adverse impacts to coastal lands. Impacts to natural resources would be mitigated as outlined in the Project Narrative. The Base will utilize credits from the Greater Sandy Run Area (GSRA) wetlands mitigation bank to offset proposed wetland impacts. This bank is located within the base, approximately seven miles west of the project site, and has bottomland hardwood credits available. In addition, 1 significant revisions to the original site plan have occurred to minimize impacts to streams within the project area. Section 7M .0800: Coastal Water Quality Policies This policy guideline states that no land or water use shall cause the degradation of water quality so as to impair the traditional uses of coastal waters. Designs for training support facilities at the K-2 ranges would incorporate stormwater management aspects wherever appropriate. Subsurface UXO sweeps would be conducted incrementally with the effect of minimizing the area of disturbed soil at a given time. All training would be conducted in accordance with standard procedures governing hazardous materials and petroleum, oils, and lubricants. Implementation of the proposed action would be consistent with coastal water quality policies. Section 7M.1000: Water and Wetland Based Target Areas for Military Training Areas Policies This policy requires that, to the maximum extent practicable, the use of targets should not infringe on public trust rights, cause damage to public trust resources, violate existing water quality standards, or result in public safety hazards. The proposed range consolidation and realignment would reduce the area of the New River affected by access restrictions. The operation of the ranges with associated SDZs extending into the New River would not infringe upon public trust rights, cause damage to public trust resources, violate water quality standards, or result in public safety hazards because proposed training would be conducted in accordance with established range procedures. The proposed action would be consistent with policies on water and wetland based target areas for military training areas. Conclusions Based on the review of the General Policy Guidelines for Coastal Areas, we believe that the proposed project is consistent with T15A NCAC Subchapter 07M. Land Use Plan Review Onslow County's coastal zone management policies, which have been approved by the North Carolina Coastal Resources Commission, are listed in Table 1, along with their applicability to proposed range consolidation, realignment, and modernization. 3 Table 1. Onslow County's coastal zone management policies and their applicability to proposed project. Resource Protection Policies Applicability Soils: Septic Tank Use Not Applicable • Wetlands Protection Consistent Flood Hazard Area: • Coordinate development in floodplains with NCDCM, FEMA, COE Not Applicable Groundwater/Protection of Potable Water Supplies: Support stormwater runoff regulations Consistent Coordinate activities involving USTs installed/abandoned Not Applicable Coordinate ground water protection with adjacent counties Not Applicable Manmade Hazards: • Coordinate UST regulations with state • Expansion of Albert Ellis Airport per Master Plan Not Applicable • No bulk storage of hazardous materials in urban areas • No toxic waste dump sites in county or on military property • No disposal of toxic wastes in county Stormwater Runoff: • Support state stormwater runoff regulations Consistent Support control of agricultural runoff Not Applicable • Support control of forestry runoff Not Applicable • Design projects to limit possible stormwater runoff to estuarine waters Consistent Cultural/Historic Resources: Protect significant architectural/archaeological/cultural resources Consistent Industrial impacts on Fragil Areas Not Applicable Package Treatment Plant Use Not Applicable Marina and Floating Home Development Not Applicable Mooring Fields Not Applicable Off -Road Vehicles — No restrictions Not Applicable Development of Sound and Estuarine Islands Not Applicable Bulkhead Construction Not Applicable Sea Level Rise Not Applicable Maritime Forests: Encourage acquisition of high quality tracts for conservation Not Applicable Development of residential nature Estuarine System — develop water dependent uses along Estuarine Shoreline AEC Not Applicable Protection of Outstanding Water Resources at Stump Sound and Bear Island Not Applicable Water Quality Management in White Oak and Cape Fear Basins Not Applicable Resource Production Policies Applicability Community Attitude Toward Resource Management and Production Not Applicable Recreation Resources: • Support access to waterfront/shoreline • Apply for grand funds • Priority to repairing/replacing damaged/destroyed shoreline access Not Applicable facilities • Support year-round recreation program Prepare county -wide comprehensive recreation plan • Allow golf courses if meet buffer requirements and other regulations Peat or Phosphate Mining Not Applicable Economic and Community Development Policies Applicability Water Supply: • Support extension of central water service to areas not classed as rural Support enforcement of potable water supplies Not Applicable Support grant funding to construct/expand public/private water systems Support construction of adequately sized water systems Sewer System: • Provide water systems to county residents and study expansion Not Applicable • Secure grant funding • Support "created" wetlands for treating waste effluent Solid Waste: Support operations of new county landfill Not Applicable • Support education on recycling and waste reduction Consistent • Support siting of recycling centers in all areas except conservation Not Applicable • Support clean community projects Not Applicable Energy Facility Siting and Development: • Review any applications for electric -generating plants Not Applicable • Support preparation of an EIS for new energy-related facilities Community Facilities Consistent Redevelopment of Developed Areas Consistent Land Use Regulation/Urban Growth Patterns: Encourage urban development near existing urban areas Not Applicable Permit residential development to meet market needs Enforce existing regulations Estuarine Access Consistent Types and Locations of Desired Industry Not Applicable Commitment to State and Federal Programs Consistent Assistance to Channel Maintenance Not Applicable Assistance to Interstate Waterways Not Applicable Transportation: • Identifies specific roadway improvements Not Applicable • Identifies specific improvements to Albert Ellis Airport Land Use Trends: • Development of 404 wetlands Consistent • Expansion of central water and sewer areas Consistent • Increasing traffic on US 17 and NC 24 Not Applicable Continued support of economic and industrial development Not Applicable • Development of an industrial park Not Applicable Establishment of county wide zoning Not Applicable • Development of a new solid waste disposal facility Not Applicable • Support the US MCAS New River and Albert Ellis Airport Not Applicable • Intergovernmental cooperation Consistent • Expansion of county -wide recreational opportunities Not Applicable • Reduction of the county's substandard dwelling units Not Applicable • Low elevation and sea level rise Not Applicable Regulation of nonpoint sources of water pollution Not Applicable • Control of development in fragile areas Consistent Regulation of corporate farms and increased agricultural runoff Not Applicable Continuing Public Participation Policies Consistent Storm Hazard Mitigation Not Applicable Conclusions Impacts to the coastal zone from the proposed action would not be significant. The Marine Corps, through the EA process, has determined that implementing the proposed action would be fully consistent with the applicable policies of the North Carolina Coastal Management Program and Onslow County's Coastal Zone Management Policies. LIST OF FIGURES Phase One Modernization of K-2 Ranges United States Marine Corps Base Camp Lejeune Onslow County, NC Figure 1 Vicinity Map Figure 2 Topographic Map Figure 3 SCS Soils Map Figure 4 Aerial Photograph Figure 5 K2 Range Delineation Figure 6 On -Site Alternative #1 Figure 7 On -Site Alternative #2: Preferred Project Figure 8 Preferred Project: P1 Range Figure 9 Preferred Project: P2 Range Figure 10 Preferred Project: P3 Range Figure 11 Preferred Project: P4 Range Figure 12 Proposed Temporary Impacts from UXO Sweep Figure 13 Proposed Permanent Wetland and Stream Impacts Appendix A. Engineered Drawings of Proposed Ranges and Roads Appendix B. Notification of Jurisdictional Detennination V -Nib Q� \. d J t R I 'o #1 11 rte IV ! /r Ir t, 2008 ` �''� r`` ✓ � � DE�aAND STOR�A RB(tF� V f.% !/71 r ' � 1} ! \ V -Nib Q� \. d J t R I 'o #1 11 rte IV ! /r Ir t, 2008 ` �''� r`` ✓ � � DE�aAND STOR�A RB(tF� V f.% !/71 r ' SITE ' \ t 1 t, - N t1 'Boundaries are approximate and are not meant to be absolute Map Source: Jacksonville South Quadrangle 7.5 minute (topographic) 1990. SCALE 1" = 1500' K2 Ranges Project; Phase One LMG Figure 2 Marine Corps Base Camp Lejeune LAND MANAGEMENT GROUP wc. USGS Topgraphic Map Onslow County, NC Environmental Consultants 40-07-136 May 2008 2 Mumford umford Point Paradise Porro Ragged Poiret x t LE �.... a Naraot .�"` � ' • luip Point ..i�f..., .. Town SITE t JUN 6 2008 Spr ngMiR - YVATER QUALITY 1461ANDS AND STORMWATER B Rhodes Point j, Boundaries are approximate and are iot meant to be absolute Map Source: North Carolina Atlas & Gazetteer. Pg 77.2003 SITE SCALE 1" = 1 Mile K2 Ranges Project; Phase One Marine Corps Base Camp Lejeune LMG Figure 1 Onslow Count NC LANE) MANAGTMLtiTGROUP iNc VICInIIay Map y+ €nvr. an n.vn tea! ronurh�tnts 40-07-136 May 2008 MaC: Marvyn loamy fine sand JUN 6 2008 'Boundaries are approximate and are DEivri - vVAfER QUAIJ-f not meant to be absolute. WETLANDS AND STORMWAQQQ"!%.�� Map Source: NRCS Soil Survey. SCALE 1" = 1000' K2 Ranges Project; Phase One LTG n�. Figure 3Marine Corps Base CampLejeune TO MANAGEMENT OUP Onslow County, NC EnvironmentalConsultants Soils Map 40-07-136 May 2008 I t In 'Flo. 4 00 T 4-i V-7 41 % q AN N. I rte N jli t? 4 %w A I I I � I ; "It I ITzft— to no Will Sit, P$11F. W., F% H14pv J, v - JUN 6 2008 *Boundaries are approximate and are DENR - WATER QUAU-1-1 not meant to be absolute. WETLANDS AND STORMWATER BRANCH Map Source: 1998 NAPP aerial photography SCALE 1" = 1000' K2 Ranges Project; Phase One Marine Corps Base Camp Lejeune LMG Figure 4 LAND NLNNAGEMENT GROUP wc. &RWON. Aerial Photograph Onslow County, NC Environmental Consultants�w 40-07-136 May 2008 %J J, v - JUN 6 2008 *Boundaries are approximate and are DENR - WATER QUAU-1-1 not meant to be absolute. WETLANDS AND STORMWATER BRANCH Map Source: 1998 NAPP aerial photography SCALE 1" = 1000' K2 Ranges Project; Phase One Marine Corps Base Camp Lejeune LMG Figure 4 LAND NLNNAGEMENT GROUP wc. &RWON. Aerial Photograph Onslow County, NC Environmental Consultants�w 40-07-136 May 2008 .icy" •,.\ "` s ,� y 4;'4- T2; . `l •'ty f .ct�.r �. - �'-. a is .}�" �..',• y. ai1F' F, �,A ry'1 '-++'• ._r Z<0)1 •.'.� 4✓d itk�M n� 96. < ' "• .,s '. a Y y a ♦ �.r� i �i iV' ' Y; al. [y^. � .Sa! �.. * 4',.,p '1� — x \�+/ � • Q j� 00 LLI LIJ W IL •�1 44111 LLI Z O IL W J Lu IL 1. r%F A • 'I Z 1 ., a 4 S 31. • r • a 'T r Y i ' T .k�"lFrn t«;�I'+`•� y � � r...tq$ <4 t b �'i•� �'C/'�'T�� .... w ZA "— wit . 1 a _ , ? '%r . r ✓ \"• a i� �.^� � �1 ,y, r. � ) t, y-�!' ,t ,. •e 3, i jr��� .r. ~^ •s.. a � a 4 ��,��y� y�: ,r•+j�, �",�.Gr � `-_^ _ . 1`�•Ye. '� n1 ��1 �- `i `^s+a_" ,�: tl� ~ . r .r�rr. -; �'� �..� �"► waw.{• � ..'J �c. Sr,�: _:� • i ate. ?� ` 'r'f, � e.r n 1 ri a.-.!� "• +L t'• tY.N' . f - ;� � :r. ., r Qtr 1 ':A�4YhPwtrQ 1 � f rr{1•� w 7 .:. t.014. Off. rM y i �' xr F t �'',•{ ,� L. +"*t`i,1`�-.�' t* �," 7a fir# -. � ��i. 'u$1k. �. *P � �,. ��' •tw:•� •/s> � ....F. � �.f - ,fiy�lyd�e�}� � '�R e C.* /r g ''�'�f ;���r�' � *, �.r "k*"��i«•, r.•Yv' '�xµ�- * r Y Y•. -i ter`• • �� ,t- ,* .:. iY1 CL a . • +F' wr.' +�„ .,. `c+ '`Tir,+.- �" i. � �.. �� �"+.� a lr t � r R p- 7 +r «., "rX:_ a.0 •i�+ m .� LD �a U c .� •, _ •�i r`aG .C' '�CL i''�'�i°. ," •' �# d ,O •— � U tom• CO ' to 0 to µ M '?�.� r r � ,:r ,� rK s.,•�-y A, r. ��y • ,� .,at.... s€'i_i. � �3', r, �'j' ` Y ��' �'` �- p; Vie.• ��4's ra a ¢. � � .:�S � '�`�ic�' _ ^�*' , .A: i �x.�,-'' r � ;f �, «, .t�'��„�^ ,�.'`,ySi'{ rs h 4- > �' r< x� � �; « " • �: _�' '1�'' +w,�e�`'�$�'Fa''i z1 ..�/ �,, •. "l •;':. +� � '"':.Yn"�' f�. Y'+ciJ` *�f f _.' ,. �' y�` ` ,yam a. a:'y � - e.t v i` .fit t;E.r..-.���'�r �."X� %4' F`.,�"/+'� �-•,+�5 �zt i '}��AG Lf r t V w S11WIl 30N33 iTS 4Nd 'ONieemjo '91\112 VTO (I 38dHd) S3JNVd->I =10 NOUNZINUMOW a x �_ s ON '3Nn3f 3l dwb'0 3SH8 ScI800 3NIdvvJ g d . w 's S �, 5 o b a tlIN10aN 'Ml0la0N - N011tl1S IVAVN Ldl VNI104V0 H1a0N SdW3 3NiaVV( 9 $ q Y ! 1 ° g 0INVIIV00 N 3H10o�N3�a�rdaaWNbWWO�JNIM33NIJN3 S31 D a a aIaNaItl l+ � ui ¢¢w w \,. L: 03N Z ��V �i1j V;O(.7 IrNa W r \\\ llI W Z i Z O U z U B J \�\ lli W O U o Q w =r� w3 mwm Jr z i! W ¢Ir Q � �c I J O w S J r30 \+ O 2N J � w r Q w Z W XON W (r W Cr O �o!!,� W In O w V1 Q !{ O W W I W I Z O V)UU J Z D V1 Z waa J 2 S 2 O •0- Jrr r �C0 U1 O Z D3 O Z K '01— W m I Z �ij ¢ O {n w W J 7 u f<1 (] � z r mw0 ZOO SW Q^ W mr^ w1— ro "f co M F o r a w v w i a� m0N u J V1 J Z 3 Ld N Z Q O r Vl L/) I'i t\�P-.� ZfLw 1P 0. OWW JOr Vt 1:1 P NM 1QU C3 CD NV Q (Yrr — W 4 WCD co CDwz J as V)N W W m �I',11 (`N'10 00� PJW Mm O Iim x NN n()W �� o W w QO OOVI QJ 5' c`700 ZW MN O r mw -O z r J 0 0 m lO W Q w w D o a z u—Z 1w0 w c0r•--' c0xlnr o1n A J zal zw a a a -xc�r J it n m 0 =J • cDr A--, w m w� 0 a J w w tDN:t ................................... O z 0w¢r wazz„1 -....-.--... wa: L/) x a J S^^ J^ N Nj . A....-•--�--•-•-------------•-------•--- ----------- U U `- 1- J U Vl J J Q J N r co B�ZW1I11 ■ .........................: ....... _........ ^ N f7 J J V lM0 ,t 0 :_: C ........... ................ �Y l0 .-. M m O ... ............ ................ ........ ........ M m N co I.,,_ ... .... _.. .�..... .. •. W zzrz NN MN 1'. _-_ OQ.. M(V ZW ill \\�� \ N z W i ..v \� d m� co r L7zJ II^ci�ulc _ INS N O¢U zwz:Na, �M 00N LL ¢Jw Ii O M 0'� co N._7 NN MN 1W ;MO -1 MN ZW :ANN...- �z _ ' MN ...w % ZW mN N I Q' N MN NN - �M 1�1t. Zw "!I F l ZW1�I1MN W NN a mN 3 QO UZ QW -- - = P LD Z _ M j 11 aUW1 Z W -- - -- - - to 0” Ifl m Mi - (1) N • N M� MN _ _ _ _ _ _ __ _ _ _ _ _ _ __ __._ - ~.J. N co T Nr Nm �:• MO-' QZ1N-- wQ� MN c0N M 0- MQ• i' n II co ZW N �N i,'; MN f'i;, rf OZ� MN ZW „.. r,M Z^ ir Lu ZW Lc)r, mc u ii co Z W Z o Ld 10 i' "' LDm N N _j uuLL (D 0- Z �; SmLD o NN MN ,liN ``:, ON OD MN �p U^ ZJ ZW �N ZW �WZ (D CD mN Nr� NN ,M„� S-uU "!I F l Mw MN NN if) (D M 0' NMN ZW lVNl3 03103e?303 :-hili ans a6P'33N3d os 0NV ON18Bf18O ONI8V310 - M -O :3WVN3113 LOOZ-inn-ZO :031101d 31VOA38 W a 3 QO UZ QW -- - = P LD Z j 11 aUW1 Mw MN NN if) (D M 0' NMN ZW lVNl3 03103e?303 :-hili ans a6P'33N3d os 0NV ON18Bf18O ONI8V310 - M -O :3WVN3113 LOOZ-inn-ZO :031101d 31VOA38 r ¢ 44 -dt- �'h- 1�wirr � . x' r `;� 1 ♦ � ; "paf E�- .r- _ ;.'.kt Yr•' � s J ..,tib F +.a M1 BAN .M{y� `� a M1AN rl 011" _�j"- 41Ak cc z ✓1 i y rE x4 , iy1 u :a � xv M i � �' • `+,ff .�` +..� � ,,fr fir.- �. LL W J a U Cl) N d) 16 0 0 t- -71 0 t� 2 w a LL O0 0 LL 0 a a a a d' N N cl C W W LL LLL {Q cz V � O LL 7 C m a+ 0 d c CD c lC a � U 5D 202 E Wa G1 13 t� I I i MLL w •E - n rLI .► yep .� � ;�:.. tal r i ilF ! r p%.. ,'; ,.. �' � Trt ��9R' «y°.Y� � Y• �.•y rf,� ^3' xIx 7r.'..#.4 e;'.?:='t^.A.Ssx.�FrR .'�`-s!,...."r+.:S..J 'u' x •- ..w _ I,_E +90 .�'. a :•fit...; x4 , iy1 oe s' .► yep .� � ;�:.. tal r i ilF ! r p%.. ,'; ,.. �' � Trt ��9R' «y°.Y� � Y• �.•y rf,� ^3' xIx 7r.'..#.4 e;'.?:='t^.A.Ssx.�FrR .'�`-s!,...."r+.:S..J 'u' x •- ..w _ I,_E +90 .�'. a :•fit...; �' ., ��. � `r -•`rCa�' a Oi , r ' ��'`p - Tri'.,.:".^9.:',:.rz i K � - '� \1 ��• I w VP i R» ,v k. it- 0 t- Lli CN .a, y Y O 1 " 0 o c m oo CJ F e y,y •1tr '«Y ,. ,' `'..Y•r,;Mz+�,,,;r.. •��,°f' y"d r r p p p L I CD 0 N ` o Id Y V f VI y_., � �.V 4 �•. ' ` sk �` � � x '�. �i�°'"�I "{�i �iMy r '� Rei .�� es'"� ' � Yom- ,y .�. t�k ._Ayy _�-' T_ \• ` • Y• iti ii� { ��.. ,.. off% c 4 � j +.n''•y'w��y�y,'� ti' a v, d� � �d4 r � � rtu-. 1 7 ;n C N r 1 (V w •Rl � ` i v� u XI CD w y LL LL Q. a Ao LL a Vol r i i s r e r •e ' t '� .. 1 w 4' At 1 .Y t � '. � A i"t � � _• �� [;•.. ''r ink �:. �� �R �� a •. - t " + •, � 1�• A T f . y 1. ,� ... •Qi ;" .? �,d� '.ter•,` ,.�„ •�'- •A' .� AR �� +/• .,` ♦ '_-Y� 1 Ili Q.0 Z 1/ Af • -..r `:. :�' wyr >r°a. <. r y Y _� . • � �.. _ ter' {;•,� - s= w ' < '� - `' i' a° i Y .k t"v r.. �..k. ,`�' h v-• �(.w,�~f1•'4 .O M • .. f1 CD IrL Aid 00 , R • a �a ♦ - `. . +M Y ,fir K Lj:�• r 4,/�i� ' kr.. L� 1 F '�,�''( xl `r.'l..Ir ki .. \ -� - ':''T.�[ -4�� .D�iL�.4�...:1,'i'..� '��►• 'w. �' - - `��� ii a -.— - n -7qV loo- -w J lold JL k '41 44 4-M "4, lit. x'�'ie ON CL 0 c 0 00 0 00 CL .2 w cm Q CD 0 r 0 E 0 Z is C (D L) CL to CM CL a) M (D L- a c Lij an. LL LL as LL a. n -7qV loo- -w J lold JL k '41 44 4-M "4, lit. x'�'ie t \ 5 { \ W .: i ". ,"..''��/`t�"i'.. •,,. 9 :.?�,`.� fi.�.�. ., �... � i _';.^. s `,4 +t'4! t• 4 x,:�, II gg 9• t _. +a � ul �4 1p �. NLM 54 , .. Q% LL C 3 CL . y to CL 4 46 C x+�` •e CO)E r�. �`"m w . _ .. .• _ � tai t • f y — ° . .fir: � � � •#i •� � x � � � � Zak •' `: ,3 'r iii., w a �1,'�L ity ��t ! •s a (�;p s a T C W CL Q LL LL LL L Mr r �.:.z • �,,. s� �p �F x 1// r ) r • JJ F� „sr ka t �w 4� r '� T � t • * e t' ... � ♦ ,,,Y � >)� "�. . * •� +- r x � ...r gyp.: •. • .vc* r� r � � • ..'fin - � � � � , •` r ,, �.� t Fry. f �• ��� • .+� �.� � ����' S y j' ' + f r �,• Yp. _ •v '`t�y . . r , IA Al Ak le 3f 7-u .7ae ..,,�tf y r• ,.41 fS ��";'�„q r ''ISR } . \ ,f�,♦l ,y. f r Qi z C iv) r,• 1* fX&I _71 0:1�rldri in 04 "III's 'i LO C14 k4 U) LQ CN LO hl, CN U 4 CL J o r_ CL .2 LLc U) 00 0 Aj CL .2 'C� N = U mz 0 ti M LN 4k, R a) ami CL a) 1 44, E �r 4 44 vi 11 -, , . 4 r mac' 3z 0 0 0 o h, iL- J it Is it Nv let V At ' F � '�' !� � E ` p � �`t r' qq • � 4 l ,fF � apt FA +' '� � FW (D Y'il A Z., zj bc.l�*f 4o? — WAlf 414*—*.V W. 'Aff-kYNb"—Mw: 0 (D (D CL Z r CL 0 E �p C') o 0 cu L) CD O (A 0- CL — L. (n 0 c C.) 0 4) c .�!' i!i`S• >} .�..� a sr i- .. •� ,,�' rri �} � ��..kCe._.rr-e.ui•.s . w.. �' � y r< _ '�r � •�nv r � -��` y n <Y X� 3� rS` i,.t' i� •c� r ,�t�{��fi ' v.•...- _ y '.. ,' Y 'I� J % L _ .. _ .r 'gYy�'yn.� �, �� JY�r1r. ' At'• ' �.- " ��- r'.r •{._ �� }� '�l. }yrd'i s r a •?r` •� c A.i} rr`t'� CD f y - .. - .aiy A yf p „� ;,•�',�CD Lei co Nt y x r' �'. ` '.fir � `��p`� r,Y�'69K"+f q'F'L .r.•- ...... .. •�CErn: 1"'+� A "#�,t. .h'+• 4 �_ z �.�y _ - a •1�aE�- *Ow'• '>"r ""�3� �'!�7Y� �'r"� �y}Z -�y 4' -�•S "'r�.r-„' ti .v ' r nY:. • - w.�Y R, 6''Tr Cri. ✓y' e^* �.al ,�,s�il+ � t :» • y ;i.., - _ . '����� � •. ^ � ..�,. �, ,, �' a •�'"�»'�'+ r �, + �� ,� r °• to gig �y� ,. {r ` ` •ry i, •,:. Ge3a _ �x 7i •y '1 Y�G�Y�`f" ,; a' s -it' + :'='tii iA' - �r; � n� •r , "T4' �;..f '+ �' y'� _ [ 11 � .. :,+ r .r�',Cd`. • S f 1�; s r i}�"'y{£ ,y.. t -y}�, •` .� - f '.�:. tura F SFr• . #' ;;. •„ V N �—- • ?[, ' r 'i his'{•�!'�" .. tx .. �C a �^'.Y'1 4 3 �:' 7r� L 4 r Yti�1'- i< �i•+t : �'w O C O L a - w a ~ O O m W LL. LL. O m m a m m 91 It, CRI �ild r `gid �� • ,rhx' '.a1' L'Sha�t'a'�if , �' h '� >�,� °�i ry S,. r r • �i•. •yt 'i ' �. � t e �� r { « ern► •sr.. . r e r � +#, r +�. 'ft_.° � ,jfa r y� +j, ,� �t '� `yS'�"N�'` � - �4 f .• { t : _ �'".- _ - - , a f �� +s �� sr.. >a'1�y '� ��i , J �- '" ��,,�.� .iu=-'il. • �+ "+' ��.. �A "n Y 'i• < e. . +` Qfl. ' s. �,, „ `-- - ,�. � � #` ! � ef++''['cam I � �" • - +r' • ;�, �'�° r'}= � + � �, ,� . � }.. , "` ! �. n . x✓" � -� . � .., v `: .�5+'.����. �c �' c�• r � Ria - �,% � i lt�.t " r T r # 5;�.L�:{ .� ..••,p a ".%r . rf# ,r„4-,�•.� •�, ,.yy j may. rr1�• i!�" , ' 1 •aN�Y+ a..-« -. , � •. 'v: W `, P A'�� - _ �. �f Sir '_ '�'•�" t 'fir°,w f- �. f .ar r ., �' `�.�. ,if�3 � , it s •, or uo I i:j r�,"�' +�7 r • ,r .4s •-►ify�+�,•.'�� • . '�• ..'�.. - �-_ ,� � � f"'>E * a ".�,a ' - '� _ �7 s +�i�y�C � rJ .•</ �.7'. .al ur' - �7. Mir "' r '�e ^1 . K+ • oe 51 4 46 AO CL Z n• yy k, y{ ' .Yi` ! �,: y� ai '.. . .ry' �, �i♦ •� .�%' ���"�,�.3 y�, iQ''�`� �. A .G ..... '�` ,r.�` � �, ,f - �{ •ro. ,� • � is v�, e` �-' •r'�.ii► r.. + p- j„ �ia`� �r `� _ ,r�a r � � � Y? • 6 M1 � �� y a _ yYir�,rk a �`` L� ± `. f • ; �,,.� � � '�' r :'f ... •• .. •�, z' �L' ^�L-•"1 % s 'r rt C'7 a E y'^r 1k `:y Yp%r am 3 � ..'t. :.., ,rS% ..3•'' �%. ' t*,,, �'4 ar` +4 -•. �Ilt �' '.. ,w'�'� ..,:- �cr'�•. • fy wQ,+ U O ,�•., h4�+�5' r �� 3a Fa: _ 'v T, �� }{l r :sc, :+. L w xr�- "__` M d ,� .. ' � '�. ;. •.w �'_ c. ..- � .: ry � .!_r sr•t1�► �K -'fit TMr � LL � Yr var,.',Lx'' _' �%er •�;..'• �A�ti"f�,'r` `` ^'� .w1�3 _'.�'r,,.f.Pu. +.�o.r"y � '"_�+ . .F• T'• fV .10 c i R ,dYtr' -_ �,� .,.; � � a7✓i�!''� ,�; !; t �;+�[. L h° �" � •a. � ,,Y, �.v , 9'f }. �� a C 4* 1 le i,M. K'C � �f�+ �,�,,,yj,,yw� ��r �t!t i+I• �X,4•,'� � �'�� ����•, ,�a�' ti •1>. �• .ak ,t •��t. .< ,�i� . •, �k � - w" '£i"'ra -!?aj•:,;��� �IFx'�,"(r•K¢^ "'` ;'d� .i:: i�s'i ;` q' x1 < ,7+•, r:W �: -:-t. � •.;i •.. ":�:-f .r :.k11.:Z-�ia� '� -r - .A"� „ <�` . k ��� sr• � :.��, �° ,,��1 I -1 vr�rl X1, �4t r� , .. 04w., n- Ck-, . . . . . . ...... pr, 'oilL -Zwc AOP' ♦ Al M Q.Z iL 0 E 46 'W A106 0 CL iL 0 0 n r1Z cu Aq If �t' , !fry '04 5;4 Appendix A. Engineered Drawings of Proposed Ranges and Roads c REVDATE PLOTTED: 0] -APF -2008 FILENAFE E- 113 91E LAIOUT Ig.SUBMITTAL: CORRECTED FINAL 2799C im it av n n ai nti _v nv mov 0o czizol n titi n I n aT r 11 SO nin nr 3 a $ o[PAxTu[xT or Irv[ xnvv "AllL xna IA -1111 E a R 3 a P q NAVAL FACILITIES ENGINEERING COMMAND -MID -ATLANTIC i q uARNE —11 s NDATN Fa NA D NA SIATiax _ xaNEa MNNNA { MARINE CORPS BASECAMP LEJEUNE, NC P a o MODERNIZATION OF K -RANGES (PHASE 1) 10 I SITE LAYOUT PLAN R m n f 7 na I" Ic n 0 I n ■ � E'J:IQ1 ME 11 lo 11 3 e A p € ucou+. x.v. ..... . ...............�.......o t, ` p NAVAL FACILRIES ENGINEERING COMMAND— MID -ATLANTIC € 3' Q y g a WARN[ Cams Nax.. C—IN. mn �. 32 7 g a Q MARINE CORPS BASE 1�' xAVAL CAMP LEJEUNE, INC ; q ➢x, e9 a`s' 3 € MODERNIZATION OF K -RANGES (PHASE 1) e $ a 9 SITE LAYOUT PLAN 9 P PA RANGE SEPARATpR OW (TG 1OM YP) N t ■ � E'J:IQ1 ME 11 lo 11 3 e A p € ucou+. x.v. ..... . ...............�.......o t, ` p NAVAL FACILRIES ENGINEERING COMMAND— MID -ATLANTIC € 3' Q y g a WARN[ Cams Nax.. C—IN. mn �. 32 7 g a Q MARINE CORPS BASE 1�' xAVAL CAMP LEJEUNE, INC ; q ➢x, e9 a`s' 3 € MODERNIZATION OF K -RANGES (PHASE 1) e $ a 9 SITE LAYOUT PLAN 9 P r E—ATC PLO,TEO. 0} -AGR -3008 faENAIAE: C-115 SI'E IAIOU1eg.—NITIAL: CORRECTED FINAL 280200 280300 Iti lo o 3 p _ o 9 C $ GNAVAL FACILITIES ENGINEERING'COMMA . —1. MID -ATLANTIC ROR�a. § � u.aNc curs Ate.. c^Ra�uA u.v. s,.,�o. - u Rau.. ms a ' MARINE CORPS BASE ° CAMP LEJEUNE,NC .`�' g; N U, MODERNIZATION OF K -RANGES (PHASE 1) .^ SITE LAYOUT PLAN C rn n n I C7 ti Dw D w 3 �� R 6 o � oev.a�xeryor .� x.vr n.v.� r.c�nes ew.xceairve ceuxnrvo s NAVAL FACILRIcAaarvA ES ENGINEERING COMMAND o I ry rQMZD-ATLANTIC nw.ax. xaurvA � A A A i A ; A 3 � � � 8 � F � o a u 6 rvAvu MARINE CORPS BASE CAMP LEJEUNE, INC a ... a p ? .n i Iv a u o MODERNIZATION OF K -RANGES (PHASE 1) x$ "o x GRADING AND DRAINAGE PLAN rr, n I n 280500 F7 x y = $ NAVAL FACILRIES ENGINEERINGnCOMMANDx—MZD-ATJWTIC y unaixc cares xwi c as xn MARINE CORPS nBASE P Vµ CAMP LEJEUNE aNC MODERNIZATION OF K -RANGES (PHASE 1) GRADING AND DRAINAGE PLAN c am 280300 . INAVAL FACILRIES ENGINEERING ACOMMAND MID -ATLANTIC h= 0 4 q a A xa+*x c xu x. I,— MARINE CORPS ABASE III CAMP 71 L. NC MODERNIZATION OF K -RANGES (PHASE 1) s 1 uo GRADING AND DRAINAGE PLAN s 9 mu on D '. - ?Z m { I j j . INAVAL FACILRIES ENGINEERING ACOMMAND MID -ATLANTIC h= 0 4 q a A xa+*x c xu x. I,— MARINE CORPS ABASE III CAMP 71 L. NC MODERNIZATION OF K -RANGES (PHASE 1) s 1 uo GRADING AND DRAINAGE PLAN s 9 mu on D RATE PLOTTED. 09—APR-1008 FILENAIAE: G-132 — CLEARING GRUBBING AND SIL, FENCE19, SI 17TAL: CORRECTED FINAL E •t F s1G :�F #-� :'F 6 - of P 11'� "lk if a mrf � � u� — z I, o f r IFr f o f o f '.:F.:1'::s�k:; :_Ai::lF:.".at E ak re IF #� IE of Ik �! R ro E rk � r! E f IF •f �'I`rd't' ' `" Zfa k t 'k• 'f• 'k•w a F f o f o f m Itf'I tf• RFwm tk"w; t, tk•I tl.omt m r E .,p, AIF j rF IF •F 4 •F p 'E It e E ak F aF IF rf If rF IE• S@ IE t IF 01. E rF IE 6 r f t f a h F r i r f a k f a i f F y _ � a o • N .Nn� f t a � F f F F F f t f F k -;L .: �R m a i r l r l a l a i a l a i r i a IF f� IF IF F f E f E k t IF IF rt Dz_ N r F r f a! a F o f F IF r k r R r f E -_lz f ak F rk it k o _ afl rFi aFi rFi rFl at z I t __ � rF � ak g •k R •F 6 ._ liv rF rF r! �F rkk v —m ti 9 R y z 3 F• 1' moi F m ' utm krf o z z rF E •F rt LE a a IF • • a k l f F k � i i F F i - � • F F aY IF of E rt 6 •f k •1 h 3# k -]f F- k-? t F IE' i - -E.1 k— lz • t • k r t �2 t - -� f AY F R: # _ F 'F�UIF a i J r' akl — — k'•F'•fI aE R' .F IF .F IF a3'-FIk:: _ y kl 1 -"IF"- •t ! rF k k of _ k a k E r f E o f FF k Fa r FI —< a o a a! _ k f ! f R t k k t t R F y F '21N, f�af rF I aF rf rFl a! aF rt rF rf�rFl w r N 'R E •f SF •k IF of'krF Wt of IF •k •k ak IF aF rF i. •F �. rF p �!'PIE, �h rk �1 rt � rt �R �E rF at ak rk o — i a t a t l a IFA rF mva x 3 m i a nFU I n mlm U. — O l IF Is : TI oss r nova m mo aoa f rx ' v v vos n a t o 'F ~ o m 10 m C 3 f v U 4 s e E R 7 f NAVAL FACIL NTIES ENGINEERING' COMMAND e =FA A-1 uOHIO-A7LMJ71C g AP x^VA u.c c�P s ua„ wq c . ? ; y R ga g e F Gti a MARINECORPS BASECAMP LEJEUNEs,. . � n N q e ° MODERNIZATION OF K -RANGES (PHASE 1) CLEARING, GRUBBING, AND SILT FENCE LIMITS c .m. _mIls I, c D I I\ IC, N n - _ - m - -o z • ;�?s d a ^ F a NAVAL FACILITIES ENGINEERINGCOM Ds-MID•ATLANTIC 3' 1 2c 4 g _ . xeU IUE [OUP unUix [nhni ix> iait ox xoUE'n x. vi �x iPi unvni. SCAMP SCORPS 9 . a A � _' MARINE BASE LEJEUNE NC � " H3 P a N = MODERNIZATION OF K -RANGES (PHASE 1) 1 UTILITIES SITE LAYOUT PLAN n ,. I m i n I r.• N D I uj I n 1 0 ul ill Ih n 3 m \ _ 1 � tiW a£ . a. m i s m y � n a I 3Ton Nam o �m I MR I D I Nm I a;; Wm ;� �N IN N m ina 3 oNAVAL FACILITIES ENGINEERINGCOMMAND —MIAT.LT.cmPS—TAixr —T— TxMARINECORPS g p } mn MARINE CORPSBASE CAMP LEJEUNE.NInCC. 'MODERNIZATION OF K -RANGES (PHASE I) = 4 R9en 45 3g N9 I - UTILITIES SITE LAYOUT PLAN --- „t D I uj I n 1 0 ul D I ci I C) I u 9 _ — v�w i m_ om i _ I � J i a a i ow I I D 9 1Z w " - -- D" m mo N m= Nw o 01 ---------------- IZ 0000 lz I Z� 1 -1 x " o NAVAL FACILITIES ENGINEERING nCOMMANDn- MID -ATLANTIC nBASE o va LBO MARNE CORPS CAMP NC i ea O a n MODERNIZATION OF K -RANGES (PHASE 1) S RANGE P4 ENLARGED SITE LAYOUT PLAN 9 RATE PLOTTED. 02 -nal -1008 ITLEN—: C-601 RWY TRANSiSTiON KIEouLE.d, SU01/IiTAL: CORRECTED riNAL n n y nn nnnnnnnn N�yy mmOmmmmmmmmNmmmmm mirynmti�m "yn ann nsn">">yn�n m�mmm�mmmNmm "n nygrg .............. yn nnlyy 010 pOmmmmO nynnn Da nn_p�A m~ mOmmmmmmmmmm"mnmmmmmmmmmmmmmmmm0 nnnnayn ylyy nas yn > nn ylyy yn yn nn yDa yn yn n yn ns yn yn mmp___ paa « <<< < 0o m" mmmmmmmmmmmmmmm" n - mmmmmm m m' m m m mmmmm o '-' ooppppp l$ n�c,�mm o m s nnonn0000000nn000 p - _ _ - 0000mm 00000000000000000000000000000o00000000o n n000001°n ,8—>G>33 boonoDoaooDooDoaoaononoDODooln000looDoaooaaoo a " Doloo $ I�$ffiffi�`off`5�9� Do of DO Do ➢o on no Do Do nod &RoRax Don'oolDoDon000000.00000000000000000000ny n #& o. noon o0, R on0000D noo➢o oo➢o 000aD Do o no oo Do >o NIS I si8gg�ffiWw�vtiNNti.�.x:ate �YemwNaWONeBmw�vo8 �aNe� �N S e�SSHe�N 88� oaNv�38� �N��m8Uv888Ne8 �8o$�H8�o88800��88888800� N 81888888 N N888UU8o 88Wo..H888NN8o88888 �'��80008$Bo�U88o808� 0 a 8Ne 8 R a z;,N' 8 88E]8 NI ° B �yNUm u,$SBUH$8$88%88U�$8888 $a.2 U $8888%o88 m �,o888� o �BoUNa,0000m8o8u, o. u,. u,o o8$88U�w88B8 mwUvwWo y 0 $88�mg$oBM n" f m m pn�Dn m f A gs �p m fal$o�l N m n m nnln m pnnpnpnnpa W oo�u�oo$gZoo5 f m m J m J m yp m p m n o$Zg�ooZg�oo mm yD pnPyp m �p ED N o o nn X08 - n - n 8 �& - n o - n Bd - n - n vAod a � ani ,8 m pnypynnpn m 6Z�8 n dZh$ m ypy nnpa m Dyyn m W o 3 3 3 y 3 y N m N N N N N N N N N N N N J O n O O O O 3 3 i 3 O 3 o 3 O 3 o y o 3 o O 3 O 3 O O O o � O y O z � SON y y O y O y O y O O y O O y O y O 1. O O O11 Gi m p PT y N N N N ➢ N r y O y O D O y O y O D O D O o o o o n A n A nn ° p nn m8 ` nn mm v a m88 1 nm n n `o Dn 0 o o n �� _ D � mvNi n � oo _ na _ oo _ ao _ �m 0o z D w o z n 0y o0 z vN,� 00 n NN 0o m o0.0 0 z o0 0 Nm 00 y 0 N 0 00 n m o n 00 i 7 mm 00 n mm oo a mm oo n uN oo n y o m ao z ao no o I D, Da oo p A no Do A a n n p no Do n Do a n n a n oDo a n n a n O < a O < n n �O a bp�l n n a 66, O D D r7i m y rm7i n m] D y F DyDa F o y F Dy➢p o D D ml Z D D F DppD Z m] 2 n p p➢➢ m D D D_ m n y n Z Z A z y 2 D D m D➢➢ m? D D D m z m Z> D y D m yO mmp pmn~Dmm mm m yDppD mm ~ P, O mmpn3Dpm m_ .nm.D.'amm mn mm �Dm0D�'n m0D; m y 0 m O y ; 's R; �",y i y y y0 S �� S S ti� 5 n y n S S A A S p S A n S n a mm m __ n << n __ n m 0 (y __ m _ < nm _ _ pp z p mm MP 00 o oo oo oo go o0 00 9 00 5 g o0 0 00 00 00 00 0o n 0 00 00 Do no Dno _ _ _ _ _ m � 3 y D � - �Cnlo o(Tno O � o D O � o 0000000 _ n DO n �LE�Y LLQ O u O mtt - 88 o o � o PmDO op o o i o - n 3 0 0 0 0 � 000 o Z 0 m C 010, �� R F8 9 "'� $If i d E ofr.xusrv. or ..e xnv. x.vnL r.euncs exaNcsxwe cauu.rvu s NAVAL FACILRIES ENGINEERING COMMAND OxMID-ATLANTIC P o uAR xE cwn xaxix c,.ea xA nAc - xoxrax. Nrscixu o '. 5 s f a X i £� OMNI + ss 3 `; MARINE CORPS BASE VA CAMP LEJEUNE. NC ID r m MODERNIZATION OF K—RANGES (PHASE 1) a ROADWAY TRANSITION SCHEDULE J n m o m nim l$ o m s pp a� 0 00 p EEg mn 0 J n REVDATE PLOTTED: 02 -APR -2008 FILENAME: C-604 ACCESS RD t-) SCHEDULE , SUBMITTAL: CORRECTED FINAL Fn n n 0 »o 000000»,�+o c a ol D PEPAATNENT R, 1.L,... ,A�A.,A����RLSLN�NELR�N�1�.MANR FACILRIES ENGINEERING COMMANDT MID-A7IANTIC PT VA 112 1 11 NWS ...................... ma _ U $ _ a MARINE CORPS a q 4 £ .. .. .. .. .. .... .. .... .._ 00000'o»°. :. .. .. > -, = m tt mem .. .... .... .. .. .. ' o tt 11 ED HORIZONTAL ALIGNMENT SCHEDULE 9 0 x 'r, m I n 0 »o 000000»,�+o c a ol D PEPAATNENT R, 1.L,... ,A�A.,A����RLSLN�NELR�N�1�.MANR FACILRIES ENGINEERING COMMANDT MID-A7IANTIC PT VA NWS ...................... ma _ U $ _ a PEPAATNENT R, 1.L,... ,A�A.,A����RLSLN�NELR�N�1�.MANR FACILRIES ENGINEERING COMMANDT MID-A7IANTIC PT VA U $ MARINE CORPS a q 4 £ CAMP LEJEU NE,ARNCA o = m = MODERNIZATION OF K -RANGES (PHASE 1) HORIZONTAL ALIGNMENT SCHEDULE 9 0 x 'r, m I n REWATE PLOTTED, 01 -PPR -2009 RIUENAME: C-505 Pa DITCH A ICNUENT SCHEDULE d9l SUBMITTAL: CORRECTED "Ill n D N N G R e � � � NAVAL FACILITIES ENGINEERINGnC.OMMANDx—MTD-ATLANTIC h � " R � "s e � � � � g -_ y m an 6 � `e ?I e a unxnrt cox s xwTx c xaxn snTlox - xoaTax. rxumA n ; 4 d . d o,P 6 rl nBASE o xnVu MARINEP CORPS CAMP LEJEUNE. NO a o a N MODERNIZATION OF K -RANGES (PHASE 1) P4 DITCH ALIGNMENT SCHEDULE E - m n � rl r D I" Ic- u , ,L R B 6 g€ NAVAL FA�. Cl ,RIES ENGINEERING C.Mw,iao��uio=niiiwnG"� �,� c '.1al 7 ? N s 5 MARINE CORPS BASE CAMP LEJEUNE, NO MODERNIZATION OF K -RANGES (PHASE 1) < < < m < ny D < A A 2 O rnrnm�im�g�`• m �u}n�}nN �umN�nuiriin}nN NSU `°Ns�n�o`ciei� PIPE SCHEDULE I ns��21 F 9 Am "` N$s$ro ��m N� m a u m m a m 19�g 6. m N iF E m m mi u W S'.K� i e a 1 m w o m e A n r. v"'ou 'Z° i, i x >�e 88 N52 N W e N 5 u p 1 m& o w 9 T o e B o = ffi m N o n u S e u v 5,2 ml g u m N m v� m N N 8 2 8 t t T n mem .x,.... ..'.'m�����m _ 15 O O A 0 0 0 0 0 00 0 0 0 0 0 0 0 I. I.0I. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �1 a A A P n D A PP A A A ... C C C .. .. v A a n A A A p v z v P c A n A T a m D➢ m O D D O O D O OD D D O O D D O O D D O O D D O O D D O O D D O m D D m O A D O O D➢ O m D D O O D D O D D O O D A O O D➢ O a D o o D D O v m7m�7m777�mmrt7��Ny7�7y O 7m77m m7�m�ym go A A A A A 9 m A A A_ A O r7, y ryi m rt7 r7i � r7i � r7r � r7i 17i � f7i m' � t7i r7i m m r7i r7i rt7 � m r7 m7 rt7 r7i r7i t-% r7r t7i � r7i r7i r7r rt7 � O >D O O O O O O O O O O O O O O O O O O O P O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D 0 0 D D O o 0 0 0 0 0 0 0 0 o➢ O o o D o D O o o D o D o➢➢ o➢ 0 0 0 o 0 o➢ o O I" Ic- u , ,L J n R B 6 g€ NAVAL FA�. Cl ,RIES ENGINEERING C.Mw,iao��uio=niiiwnG"� �,� c '.1al 7 ? N s 5 MARINE CORPS BASE CAMP LEJEUNE, NO MODERNIZATION OF K -RANGES (PHASE 1) R �:• I Y "° ° PIPE SCHEDULE F e "` J n 11 I 3t S � m N In � o O r, n N PVI STA 0+00.00 PVI EL 9.28 PVI STA 0+13.19 D PVI EL 9.41 G7 = m PVI STA 0+40.70 0 PVI EL 9.43 m o PVI STA 0+45.16 � PVI EL 9.39 n PVI STA 0+89.46 m � PVI El .36 0 9+9 .93 D PVI EL 9.31 PVI STA 1+00.16 w PVI EL 9.31 PVI STA 1+16.44 a m ro PVI EL 9.22 PVI STA 0+00.00 PVI EL 9.31 D PVI STA 0+4G.79 PVI EL 9.38 C1 S fT1 -i PVI STA 0+51.26 0 -' a N PT C PVI STA 0+95.56 PV1 EL 9.21 n m PVI STA 1+00.03 �PVI EL 9.1s ,oSTA 1+04.70 EL 9.14 PVI STA 1+16.44 PVI EL 9.11 1 .- D IG IN a g ;i mo FACILITIES ENGINEERING COMMANDS MID -ATLANTIC n m F A xi s ,:, +. MMARsINE�CORPS CA- BASE !PT wnoi SCAMP L„E JEUNE, Wald %NCp a= MODERNIZATION OF K -RANGES (PHASE I) ROAD PROFILES - I awoArE amrrcm mz-ncazmme ruseawc• c-emz. ocv suee�nnc. coaaEcrEo nr�nc n i> w - T nCminnn (Din D 3y or "sP 3 y m 2 N �nSu ZOO we.°i� m >O� ZOO mX'e o g 0 o p `oma O p U O D N�mg >N- o mo51z � o,m yo IW� ue 3 7 y mD 000(] ego m8a $ S 0 n To N N wwfi+,rvwW � �w �p nn 1. in6u g� 9 � _ � m O -��S D � a88�oS�S8o D gyo o mem e� mWa ro � �� D o 0 zo o vvv m o 0 V >., •pN N�aeieN mo�•-°Sgu y v> m�m Nen m O �Oppj000 y000y0 �OOOSO00sO00s0 f� m� Z�Tn�ZEyDZ* �ODT�9 �O _ c�c ntT rt,t L7 A L] CSC y 2AAAyAAAyAAgyA is �'i��nc,n���n6�� 'o p000T000-000-� O -yypN33��33zy ogggogggogggvo lm2 m29 D �' yUNUy�'n-NNi,n$a yr�r�r ivi�i g-�r.�g=f �r o Dw D T4�vOi �LiG�tOii p a s aI sNAVAL FACILRIES ENGINEERINGPCOMMANDS EMID-ATLANTIC P �Vp SLRMP xMARINEPSCORPS 1 o y o ogo�o y o �090 cc Noo y(] yiny BASE LNEJEUNE•�NLQ 4 yiny v vOi ag�gag�gagNgag MODERNIZATION OF K -RANGES (PHASE I) H N y 4 FANGE DATA SHEET - - m y g n O T or "sP �nSu ZOO `oma � 0 I O <O� z mgamoaoo o � 0 ego n To W� nn 1. n 9 � _ � o � �� D 8i D� V >., v> e f� m� my� z c�c CSC 2 m��tm lm lm2 m29 D �' yr�r�r ivi�i �r o T4�vOi �LiG�tOii 29y LSA L1 g o y o ogo�o y o �090 Noo y(] yiny n4i�y� yiny v vOi ag�gag�gagNgag A - - iug= -n y g T or "sP �nSu ZOO `oma � 0 I O <O� z mgamoaoo o � 0 ego n To W� nn 1. n 9 � _ � o � �� D 8i D� V >., v> e f� m� my� z c�c CSC 2 m��tm lm lm2 m29 D �' yr�r�r ivi�i �r o T4�vOi �LiG�tOii 29y LSA L1 g o y o ogo�o y o �090 Noo y(] yiny n4i�y� yiny v vOi ag�gag�gagNgag A REVDITE P1011- 02 IPR 2000 FILENAME• C-803. 0GN $DBMliIt+L• CORPECTED FINIL n o s D D AT o i D 3�>;�i3��iizz� DDDDDyDDD�D�JJDD➢ 5555555555555555 yz a mo_ r'_v_ 'u » v �+ Ln Q+ v � a �'n � ➢ ox Pl i555r5rm zA A A w3� sz s s x z I> A x AA oS�SooSS0000000Ydoo�a'6'o"aoo oo �m'•�S m�wN�oem9mm'n v v N Z N D a wN,offi>o'�mm`A'wN=omm 8me NSm m i� � ��mddm m�m m O j 33Z?i�iii�Lii>i •m N V 8_ mOSSv D m 555555555555555555555555555 m O S "0, m> m��� � m g O yg 01 o;;m �J�gw�l�l��eyNvg�� vim w w O y A o 2 °-zy s m� a SS El O mmm v "0, +Nuo 555555555555555555555555555555555555555555555555555 04 m T Ap Nm���m nn5���555m mW�mm m ✓J z55����m m5 m55555S55�mN�eeem��eeee�N���'enp z a�NzziS$ z55555555555555555555555555555555555555555 zA wwwwuuwwwuwwwwwwwwuwwuummm�p ° mY�m � zm xs;�W��xNxif;•muwuurm.,i;em�m�c%��gm SS o_ y wammma=am=P�,amN&m=��° ma o a � 33yyyyyA�yyyAa ° ohm z N L Aa 'g8o D DA ADA m�°°m9� DNA FACILITIES ENGINEERINGCOM PAAxzF y D wM��mmM�ga0000ao�w°mMm�wmmmmmmmmmmm��mm�� �m�m$o-Nw�HmwwwwSg>�SNGU&�S� m u = a s a XMPRINE SLORTPS AF3PSE v MAYA CAMP LEJEUNE•�NCA � w�`6w'mmywy++��mm�m�„'mwmmmmm'6w'mm�mmm i m•mu e•mnnmm MODERNIZATION OF K -RANGES (PHASE 1) ui'i•uu o �n A O m Z XYX'n L^ E''�v'a L' a Yee •mon 4 RANGE DATA SHEET m u - . v u�� m D y 3J F) O o m�����iiN��Zi�i���p��3 i D 3�>;�i3��iizz� DDDDDyDDD�D�JJDD➢ s » � D A A w3� sz s s x z I> A x AA oS�SooSS0000000Ydoo�a'6'o"aoo �m'•�S m�wN�oem9mm'n D wN,offi>o'�mm`A'wN=omm QmQ++m�wm mXm�om 33Z?i�iii�Lii>i Om 8_ mOSSv A A m 555555555555555555555555555 m g O �J�gw�l�l��eyNvg�� y mi °-zy s mmm mfF�o +Nuo 555555555555555555555555555555555555555555555555555 mmm m T Ap Nm���m nn5���555m mW�mm m n5rr z55����m m5 m55555S55�mN�eeem��eeee�N���'enp z a�NzziS$ z55555555555555555555555555555555555555555 zA wwwwuuwwwuwwwwwwwwuwwuummm�p ° mY�m � zm xs;�W��xNxif;•muwuurm.,i;em�m�c%��gm SS o_ y wammma=am=P�,amN&m=��° ma o a � 33yyyyyA�yyyAa ° ohm Aa 'g8o D DA ADA m�°°m9� mmm�m�m www PAAxzF y D wM��mmM�ga0000ao�w°mMm�wmmmmmmmmmmm��mm�� �m�m$o-Nw�HmwwwwSg>�SNGU&�S� � w�`6w'mmywy++��mm�m�„'mwmmmmm'6w'mm�mmm i m•mu e•mnnmm ui'i•uu o �n A O m Z XYX'n L^ E''�v'a L' a Yee •mon m u -•me� v u�� u�+ D y 3J NIN 'g�8m�� �OOOOOOOOOCO000� N m pp pp 3 �p o_ SEE NOTE t � O o m�����iiN��Zi�i���p��3 i D 3�>;�i3��iizz� DDDDDyDDD�D�JJDD➢ s » � D A A w3� sz s s x z I> A x AA oS�SooSS0000000Ydoo�a'6'o"aoo �m'•�S m�wN�oem9mm'n D wN,offi>o'�mm`A'wN=omm QmQ++m�wm mXm�om 33Z?i�iii�Lii>i Om 8_ mOSSv A A m 555555555555555555555555555 m g O �J�gw�l�l��eyNvg�� y mi °-zy s mmm mfF�o +Nuo 555555555555555555555555555555555555555555555555555 mmm m T Ap Nm���m nn5���555m mW�mm m n5rr z55����m m5 m55555S55�mN�eeem��eeee�N���'enp z a�NzziS$ z55555555555555555555555555555555555555555 zA wwwwuuwwwuwwwwwwwwuwwuummm�p ° mY�m � zm xs;�W��xNxif;•muwuurm.,i;em�m�c%��gm SS o_ y wammma=am=P�,amN&m=��° ma o a � 33yyyyyA�yyyAa ° ohm Aa 'g8o D DA ADA m�°°m9� mmm�m�m www PAAxzF y D wM��mmM�ga0000ao�w°mMm�wmmmmmmmmmmm��mm�� �m�m$o-Nw�HmwwwwSg>�SNGU&�S� � w�`6w'mmywy++��mm�m�„'mwmmmmm'6w'mm�mmm i m•mu e•mnnmm ui'i•uu o �n A O m Z XYX'n L^ E''�v'a L' a Yee •mon O 3J NIN 'g�8m�� ti N m � o_ ��'=�"�"u y N �w N`m°mu`gn �aa b"&' O a y z u v 09 _ i°i•mm w°'u a yy m•g in Dm m DD oS i° - O u S �mm op1v 'ui�� a � mi' m mmme n•avD O m �OOOSSOOOSNNOSOOOOSSOOOSOON Sww mxut"i_, �y �m m4]GT� I z _ m0 SEE NOTE 1 O o m�����iiN��Zi�i���p��3 i D 3�>;�i3��iizz� DDDDDyDDD�D�JJDD➢ » � D A A w3� sz s s x z I> A x AA _ �m'•�S m�wN�oem9mm'n D wN,offi>o'�mm`A'wN=omm QmQ++m�wm mXm�om Om 8_ mOSSv A A m m g O �J�gw�l�l��eyNvg�� y °-zy s mfF�o 555555555555555555555555555555555555555555555555555 y � ➢ m _ Nm���m mW�mm m m5 m55555S55�mN�eeem��eeee�N���'enp z a�NzziS$ z55555555555555555555555555555555555555555 z n ° mY�m � zm SS o_ y ma a � 33yyyyyA�yyyAa DDDDD➢iS�bp� Aa D DA ADA DA x mmm�m�m www PAAxzF mmmmmmmmmm�fo�mmmmmmmwmm�mmmmm�mmmmmmmmmmmmmA wM��mmM�ga0000ao�w°mMm�wmmmmmmmmmmm��mm�� Zm i NIN ti o_ ��'=�"�"u y N �w N`m°mu`gn �aa b"&' �m2rinN a y z i°i•mm w°'u a m m o$$oas'�sa$�o��a'ease'$$a'��$a'oo� Sww mxut"i_, I z _ vm `B m n� m$$ ?� � o y � my v No„ ml I mmv ° z ml,wP v"y"Um&l;S �•d '�" NGa '�°?'�° y �'mmmw�mmwm�` zSiv.w.Nov•° m�'SSS'S100M-� mmm�'�Sm�SS�'SmmSmmmm�SSmmmwSmm � mX•=eS>No��wom °m'W� � o O 000000000000000000000 00000OOOOOOOOOOOOOOOOOSO000000�OOmm �0' m� SEE NOTE t y 0 i D 3�>;�i3��iizz� DDDDDyDDD�D�JJDD➢ � D A A A m AF AAAANA s s x z I> A x AA _ �m'•�S D QmQ++m�wm mXm�om � O 8_ mOSSv A A m m g O �J�gw�l�l��eyNvg�� y °-zy s mfF�o y � ➢ m _ Nm���m mW�mm m � z a�NzziS$ z n ° mY�m � �ge000��oNNggmn SS o_ y ma a � 33yyyyyA�yyyAa DDDDD➢iS�bp� Aa D DA ADA DA x AT.xF Al PAAxzF AAA Zm HIM TI n _,o .!I C--) FTI R " s gl5 I A s' 2 "�o a � r ZA g X @ n _,o .!I C--) FTI R " s gl5 NAVAL FACILITIESENGINEERING NCOMMAND �—MID-AT1AN 71C AAixs cwrs xox,x CaAa �vn iP, xnv.,� s,ar w xoxraK u�xcixin xMARI A s' 2 "�o p o g X @ -I� to 3 NE CORPS BASE CAMP LE JEUNE, NC o y, a. Qa i MODERNIZATION OF K -RANGES PHASE I s s "� p P3 ORDNANCE REMEDIATION ACTIVITIES =� n L acvoarE aLor*Eo. ez naa zmee F�LEHw�E. aE ima az mamiaa�cE RENEoinrimr+ ac.ivi*IEs.mcR --71L, cmRREcrED aIa« N 3 I— D I N IC, F N 3 I— D I N IC, Yl I/ s I 1 n O o 4 O fTl re; a a 5° a; a nNAVAL FACILITIES ENGINEERING COMMANDS MID-ATLMITIC o —1- 1 PSRoa„ v AaIve ABASE P SCAMP f '" ¢ e m m n 0 ;tee 4 MARINE CORPS LEJEUNE NC 4— D b 5 $MODERNIZATION OF K -RANGES (PHASE F W I PC ORDNANCE REMEDIATION ACTIVITIES Yl REVOnTE vLOiiEO02 nvR-2008 FILENaME• 0E-10<- ca DRDININCE REME-7ICN ICi1VIT1ES.GGN SIIRMITTIL. CORRECTED FINAL n N N N O 01 3 L GG m m a L 3 0 Q 6 M DEvnAtxExl IxE xR r nnv EA riEs ExDIrvtERiw Cwxau €�- p R� R i A tl C 2^ O n NAVAL 9 Tl Nsg 9 ¢6 Pe � - -a xM+IxE cwF�ACxIwLRrx I—. EERING COMMSANrDx - N.—I. 1-111A NC MARINE 8R5E CAMP LEJEUNE e a e 3 MODERNIZATION OF K -RANGES (PHASE 1) R s' 4 P4 ORDNANCE REMEDIATION ACTIVITIES F m n O I ti L D Fj I n C�D m P Diu o� m� 279900 28 �a 280189 ag D m� mo � m ti 25 I 0 - o 0 o_ 3 m t e x y asp 4 � p n E deo xj b - e NAVAL FACILRIESENGINEERING�COMMANDx—MID-ATLANTIC S unix[ ca+ s xwrn c xnixr, srxriox - xoxrarc, Hxnxin MARINE °CORPS °BASE x^sµ CAMP LEJEUNE, NC MODERNIZATION OF K -RANGES (PHASE 1) n � a £ i � d F e? n'3 O j ELECTRICAL LAYOUT PLAN r� m P Diu a (J D CID I n E:D D I CU I cJ I v il 3 I 3 3 I o= D 0 0 J3 n Z Qm ¢ R g 'P � g � � "J $ - � NAVAL FACILITIES ENGINEERINGnCCMMANDx—MID-ATANTC o unxmr ca+ s na+sx c xarrvn � srnnax - xanrax. "nrmin MARINEP CORPS nBASE P xnvr CAMP LE JEUNE, NC $MODERNIZATION OF K—RANGES (PHASE 1) °i, � o 4 � "s x � f ,"sly p � � � d A s 4 E � m� ''3 'O3 ELECTRICAL LAYOUT PLAN D I CU I cJ I v il 2 L+ -T L "I c n 1 0 x� o D D N E3 m 3 -- = 4 R C R a o a o � " 'o a g 6�' ` � 1 - � NAVAL FACILITIES ENGINEERING C.OMMAND-MIDATLANTIC � 4nnix[ con s xcarx c nairvn srnnax xaxrax vnuxi nBASE�vr xn�n�CAMP ' " � ' g 2 y a§ R ` Y e _ 4 y A yg i B' 9g B Q � � d � � m� O 3 e N MARINEn CORPS LEJEUNE, NC MODERNIZATION OF K -RANGES (PHASE 1) ELECTRICAL LAYOUT PLAN Appendix B. Notification of Jurisdictional Determination Cvk ARNTY CORPS OF UN,GINEERS DISTRICT AC. ;_i T J, 2 fl, 0 7 3423 0 67 C")u.T'fyr: OnOo"V"- 17.S�f,1S, Qu;,d: jackson0le Awth NOTIFICATION OF JU'l-USDICTIONAL RETEIVINUNATION Agent: Gen -Marble Inc. enr, Ov"D U'SNIC— Cam-, 1xieun A act, -v ittri: Martin Korefick. attli: Jef Dellern, ply; C UNWO 4 203 Thmdu Bhd Camp Lle"e. NQ 2, 542 11aninton. VA 23666-1572 flropz'rty je'scriptiorl: She (Mr.) 4407() Nearest Tovvn Jacksonvilie Nemnst Vlater"uy 'Whitehurst Creel./' -own Creel; Rivcr L�asiri White Oak USCIS iTUC 03030001 Coorjinaies 34.643TINT, 77.3926"W Location description Tbg site is loymd on Me nvoun portion of the Rise northeast of Stone Bay Me Ra= Tile nroject area was vomprked of Eve bornhing nmgm 1301- 305 and the associated downran-.e fields .The'.zite is located west of the Nem, Mer and south of,laclsonville. onslow County. Inmeme Which of the Following A r)lv: A. Preffininai-y Deterraiination Based on prelttninar�y informarion, there may be wetlands on th� above described prop�.fty We stongly suL., Lst you 'have this PTOPCI-ty iT_ISPeCILCd to CICtormine the extent of Department ofthe Arrriy (DA") jurisdiction. To be considered final, a jurisdictional detcrntiriation must be verified by be Corps. This prelhinary dettermination is not an appcallable action under the RegUI3t0ry P -Mg -Tarn Admirdsarabe Appeal Process ( Reference _13 CY'R Part 331). B. Approved Determination There are Navigable Waters of the United States whhdn the above described propert), sutJect to the pcnnit requirerneT.as of Section 10 of the Rivcrs and Harbors Act and Section 404 of the Clean 'Aater Act. Unless there is a change in the law or om- published r,,�gullations, this dote-=, may be NO upon R a period not toexceed five years from the date ofthis, notification. There, are wctlan'ds on be above described propene- subject to the pernfit requirements of Section, 404 ofthe Clean Water Act (CW_k)(3_3 (J SC 6 1 .3441). Unless there is a change in the law or our published %gulations,this dete—mination 1-11ay be Kied upon Rx a puld w4 u) exceed Ave yews ftornthe date of this T101i.fiCation. — Ale strongy, suggest yu hmv be wee Nnds on your property delineated. Due to the iz-, ofyour property and/or our presew wowbal Ve Corps rnny not beable to acconiplish this wetland deli ncath n in a timmly rnuincr, For a more, Llincly delineation. , y ou fnay uisb to Utah a consulumt. To be considered final, arty iclincation muf'I be Vcrific-cl by, the Cc -in, S. X The mT&nd on 3am pnTmy Me bun d 0 innawd and the delineation has been ;xi Bed by Ow Cor i 11wCorp sha.'s agvcj to 1. eri?y the -�vetlandsa,,isociaied with the K2 7-mige utilizing remote sensitni sitioe access, is prohibited, Tine package endtledArnendod Delinazation Suppicnient for the K2 Ranc Prqjjw; Niod _M-�u­clh, 225" 2009 is the cu—ia, approved jurisIctional Y_-niap. The wMands have be, -m delincx.od aiKl urrvqwd and are accur:aely dJq)ictc-,d on tht, plat sign�d by th-cCorps iZ­g;ulalx-_ , % offlcial klontified bLI(Iii on _� UnIcss there N a change in the la"- or our published regukakur, this ddermMion may be up o -in for o. jarkid not to exceed five years Rom the dai,, iii lThis notificanion. Thzw am no a mus of At LES. R, KE. Wdc "TAwKs, Ivesew an the abowe MOM 1mopedy "Odi are QV ci to lh,c purnh reViremens of Sevion 404 oF5,I- Clean V,`LtcrAcI 03 IISC 1344). UnKs then h a change in Ve In or on -'r publislwd ruguhcion s. 00 c4tearjundonmay be MY st hur a pw4d nx to exand Pit jous Rom do to of Ks , 1 ht Froporp 4 knowd K 09C of tic 10 Quol cownbs',," U', reguMmi under the OYU Area Manqwmmn Act YCAIIA! You Mid now blanagamms in NC. a-, t,,'25,_'� tcj JI­_n,_­rn,-Jrne m1n,000"WaScr Q in= KiN "! hin a w, HE, t� nk.l"MAS Wn" 'm il 11,- makme a Admin, I .._w. v.. 301 of AeCkni Ts to- Act (;F !:�C'y 111 :!if you a:,.,t daminkmon MAN ,yo e comao load Qn "I m QW2540 M C Basis loorlhimaination, Pm suldeor area an wars to psyss chargAMMs whasmAWAAMM 'N%m u,j .Inj is abutfi,,-2o to pi?.her Tons CreekorVajahum Clod" horh I= oftlic''N vsjzn% It 'e 1). Re.nnut-Ls Tbe Ate w, -s iorifliA uAkAs Ow but mmRAQ remye gnsirm ALPLorypatolmn mly)XV011tv-di ON; Gno Miritme We cT -Aq3PC,--,N lrf4rmation (This ifform—tiom app[ks qnl� to approved jt,,,,-isjiczkw.21 dicermirations as indicia -d in B. above) TO cou,)ctudenco consthutcs mn approvull judUktional f,-)rdhe allo7 -,ination, I ou nmy Na ,r anadrninvztralivc, -,l.ppoalundt-r Corpsit 30 CFR pan 33L Endond you W find a N7otit-jcamioil of."'Pp":at Process (NAP) fact slh�ect and req--+ •st for --u rect"!-sl to s ou ni,,is-L Wmh a umTkad RFA Rrm to We Woming address: IDD M`ilniinigion Rcggtdato�� i 'isi ) -i - i c t I --, 1, 1 , i -i a 7� D 11 A-i�,ui Brad SLa,,,�r, P.0, BOX I R90 in oricr for an 1',,F -A to b.., 2 1 thc COT& Ow cori's rnust jen-nmnint. -dhm it is conliplete, th'at it '!11-;c crit.aria -br appeal under 33 CFR part 3 31,5. and Ltiat it has bc`e n r*.ceived by iht- Dis,,Jct Office -wi-Lhiin 60 days ofthe diate of Jt N4,,R shm"M �ou dt"cid-c- to R:FA fiotrniit mas, IN', aI III)'- above is is lhS 5/31!,2001S' **h is not rwcegm, to subSt an RFA Rmmi to :at District ffl.,,?ou JCnol ol!�,ect to'dhiL �:orrcspondtincL. * , COTS Reguknory- of"111cial: Doe 33MM8 F--%pirati,nn Date, 3�,'31/2013 Tbe 'Wili,ningion District is emmined to rwoviding die highest Wel (Al'SU70i)(41-1 to public. To 111 !P us cnsure Co'ntimuc lo W sm p. .vim umMk,�.flh,G arnacllhedl custom n MOW% Swwy o"N't TAI 1ANDM rj dichnnLl If, C,. mnr,.Ctc ihc sur", _ QT; Rumided: WAVFAC NNIAMMe arn: WHO jones 6506 MnThm Bhd, LRA BQV MAM %A 23=27i�