HomeMy WebLinkAbout20080928 Ver 1_Individual_20080606UNITED STATES MARINE CORPS PAYMENT
MARINE CORPS BASE SEC EIS' L. iJ
PSC Box 20004
CAMP LEJEUNE, NORTH CAROLINA 28542.0004
IN REPLY REFER TO:
5090.11.2
BEMD
Ju% o 2 Boa
From: Commanding Officer, Marine Corps Base, Camp Lejeune
To: Commanding Officer, United States Army Corps of
Engineers, Wilmington District 69 Darlington Avenue,
Wilmington, NC 28403
Subj: APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT FOR PHASE
ONE MODERNIZATION OF K-2 RANGES (P-1135) OF MARINE CORPS
BASE (MCB), CAMP LEJEUNE, NORTH CAROLINA
Encl: (1) Application for Department of the Army Permit for
Phase One Modernization of K-2 Ranges in the Verona Loop
Training Area
1. The enclosure is submitted for approval of the proposed Phase
One Modernization of K-2 Ranges (P-1135) in the Verona Loop
Training Area on Marine Corps Base Camp Lejeune, North Carolina.
2. Camp Lejeune proposes to mechanically clear, cut, and fill
12.32 acres of Section 404 wetlands, and 141.5 linear feet of
intermittent stream to complete the project described in the
permit application. 39.74 acres of Section 404 wetlands will be
temporarily impacted during removal of unexploded ordinance.
3. The point of contact for this project is Mr. Martin Korenek,
Environmental Conservation Branch, Environment and Installations
Department, at telephone (910) 451-5063 or email
martin.korenek@usmc.mi1. �W�fflowf-R-3
Sincerely, JUN 6 2008
�� DENR - WATER WAUTY
WETLANDS AND STORMWATER BRANCH
0 R. TOWNSON
Director, Environmental Management
By direction of
the Commanding Officer
Copy to:
NCDENR, DWQ, 401 Section, 7 copies with application fee
NCDENR, DCM
APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT
Privacy Act Statement
Authority: 33 USC 401, Section 10: 1413, Section 404. Principal Purpose: These laws require permits authorizing activities in, or affecting, navigable
waters of the United States, the discharge of dredged or fill material into waters of the United States, and the transportation of dredged material for
the purpose of dumping it into ocean waters. Routing Uses: Information provided on this form will be used in evaluating this application for a permit.
Disclosure; Disclosure of requested information is voluntary. If information is not provided however, the permit application cannot be processed nor
can a permit be issued.
One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this
application (see sample drawings and instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed
activity. An application that is not completed in full will be returned
(ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS)
1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPL. COMPLETE
(ITEMS BELOW TO BE FILLED BY APPLICANT)
5. APPLICANT'S NAME
8. AUTHORIZED AGENTS NAME AND TITLE (an agent is not
Marine Corps Base Camp Lejeune
required) N/A
c/o Mr. Carl Baker
6. APPLICANT'S ADDRESS
9. AGENT'S ADDRESS
Marine Corps Base Camp Lejeune
Deputy Public Works Officer
N/A
Public Works Division
1005,Michael Road
Camp Lejeune, NC 28542
7. APPLICANT'S PHONE NOS. W/AREA CODE
10. AGENT'S PHONE NO. W/AREA CODE
a. Business (910) 451-2213
N/A
b. Fax
11
autno
entali
FURE
STATEMENT OF AUTHORIZATION
it Group, Inc. to act in my behalf as my agent in the processing of this application and to furnish, upon request,
of this permit application.
DATE
NAME, LOCATION AND DESCRIPTION OF PROJECT OR ACTIVITY
12. PROJECT NAME OR TITLE - Modernization of K-2 Ranges; Phase One
13. NAME OF WATERBODY, IF KNOWN (if applicable)
Tributaries of New River
15. LOCATION OF PROJECT
Onslow North Carolina
COUNTY STATE
16. OTHER LOCATION DESCRIPTIONS, IF KNOWN
14. PROJECT STREET ADDRESS (if applicable)
MCB Camp Lejeune
Jacksonville, NC
.)E di: 'vvAi ER (�JAW Y
WETLANDS AND STORMWATER BRANCH
17. DIRECTIONS TO THE SITE
From Wilmington, take Hwy 17 N into Onslow County. Turn right at gate into Camp Lejeune.
Site is located off of Rhodes Point Road (see vicinitv map).
�A"
18. NATURE OF ACTIVITY (Description of project, include all features) - i ., , Aruction of
four ranges: 50 Lane BZO Range (P-1), M16 Static Range (P-2), M249 SAW Range t. .lice Range
(P-4). In addition, support facilities for these ranges will be constructed. 12.32 acres of 404 wetianas dna 141.5 linear feet
of intermittent stream will be permanently impacted. In addition, 39.74 acres of 404 wetlands will be temporarily impacted
during an inspection for UXO (See Project Narrative).
19. PROJECT PURPOSE (Describe the reason or purpose of the project) - To transform these ranges into state-of-the-art,
interactive training facilities that could be used to readily meet Infantry Training and Readiness Manual requirements (See
Project Narrative).
USE BLOCKS 20-22 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED
20. REASON(S) FOR DISCHARGE
To realign ranges and construct roads on which to access ranges and support facilities.
21. TYPE(S) OF MATERIAL BEING DISCHARGED AND THE AMOUNT OF EACH TYPE IN CUBIC YARDS —
Clean, compacted sub -grade soil materials, clean ABC aggregate, pavement etc all above street reinforced concrete
culverts at map specified locations. See map for area in each location.
22. SURFACE AREA IN ACRES OF WETLANDS OR OTHER WATERS FILLED
12.32 acres of 404 wetlands and 141.5 linear feet of intermittent stream will be permanently impacted. In addition, 39.74
acres of 404 wetlands will be temporarily impacted during an inspection for UXO (See Project Narrative). _
23. IS ANY PORTION OF THE WORK ALREADY COMPLETE? no IF YES, DESCRIBE THE COMPLETED WORK
Ranges currently exist within site. Proposed project will modernize and realign ranges.
24. ADDRESSES OF ADJOINING PROPERTY OWNERS, LESSEES, Etc., WHOSE PROPERTY ADJOINS THE WATERBODY
N/A Property is confined entirely within Camp Lejeune
25. LIST OTHER CERTIFICATIONS OR APPROVALS/DENIALS RECEIVED FROM OTHER FEDERAL, STATE, OR LOCAL
AGENCIES FOR WORK DESCRIBED IN THIS APPLICATION N/A
AGENCY TYPE APPROVAL` IDENTIFICATION NUMBER DATE APPLIED DATE APPROVED DATE DENIED
26. Application is hereby made for a permit or permits to authorize the work described in this application. I certify that the
information in his application is complete and accurate. I further certify that I possess the authority to undertake the work
described I r n or am ac
,4g as the duly authorized agent of the applicant.
SIGNATURE OF APPLICANT DATE
18. U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or
representations o r makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall
be fined not more than $10,000 or imprisoned not more than five years or both.
PROJECT NARRATIVE
Phase One Modernization of K-2 Ranges
United States Marine Corps
Camp Lejeune
Onslow County, NC
May 2008
INTRODUCTION
The United States Marine Corps (USMC) proposes to modernize the K-2 ranges at Marine Corps Base
Camp Lejeune (MCBCL), North Carolina. The 23 existing ranges are inadequate and outdated. The
objective is to transform these ranges into state-of-the-art, interactive training facilities that could be
used to readily meet Infantry Training and Readiness Manual (Marine Corps Order 3501.34)
requirements. Modernization of the K-2 Ranges would be accomplished in two phases. This Individual
Permit application applies only to Phase One of this project. Phase One involves the construction of
four ranges: 50 Lane BZO Range (P-1), M16 Static Range (P-2), M249 SAW Range (P-3), and M203
Training Practice Range (P-4). In addition, support facilities for these ranges will be constructed.
Total proposed permanent impacts for Phase One are 12.32 acres of 404 wetlands and 141.5 linear feet
of intermittent stream. In addition, 39.74 acres of 404 wetlands will be temporarily impacted during an
inspection for unexploded ordnance (UXO). The entire project area is located within the White Oak
River Basin and is 470 acres in size. Please note that much of the information from this Project
Narrative comes from the Environmental Assessment prepared for this project in March of 2005. This
EA received a Finding of No Significant Impact.
PURPOSE AND NEED
Modernization of the K-2 ranges is needed because the existing design of the ranges no longer meets
the demand for modern warfare, using present-day warfare methods. Current technology is available
for use on modernized ranges that would optimize training, reduce cost, and save time, and would also
minimize logistical support and provide very high accuracy ratings during qualifications training.
The proposed modernization is required for several reasons: to meet training requirements, to provide
automated target systems, to upgrade the road network, and to realign the surface danger zones (SDZs)
in order to minimize their footprint over areas of the New River. Currently, while certain ranges are in
use, other nearby ranges cannot be scheduled due to safety concerns of overlapping SDZs. The
realignment of the ranges and SDZs would resolve these scheduling conflicts and allow simultaneous
use of all ranges. These changes would allow a high throughput of personnel through the range
complex, thus less ranges would be needed. By modernizing the K-2 ranges to fulfill these
requirements, the USMC would provide the highest possible return on their training investment.
EXISTING CONDITIONS
The 470 -acre project area is located in Onslow County, approximately four miles east of Highway 17
along Rhodes Point Road (Figure 1).
Habitat
Topography at the K-2 Ranges is characterized by upland terraces, with the highest elevation at
about 22 in (75 ft) (Figure 2). The terraces are dissected by drainage slopes with the lowest
elevation at about 3 in (10 ft). The terraces are primarily composed of Baymeade and Onslow
soil series while the slopes are composed of Marvyn loamy fine sand grading to Muckalee loam
along the tributaries of the New River. The Bohicket series occurs along a tributary to Mill
Creek. Smaller inclusions of Leon, Pantego, Alpin, and Norfolk soils are also respresented in
the project area (Figure 3).
The landscape surrounding the K-2 ranges is characterized by pine savannas that are dissected
by drainage slopes. The hydrology of the savannas varies from dry-mesic to wet-mesic, which
influences vegetation composition. The savannas are dominated by loblolly pine (Pinus taeda)
with several species of hardwoods including sweetgum (Liquidambar styraciflua), southern red
oak (Quercus falcata), white oak (Q. alba), and red maple (Acer rubrum). The shrub layer
varies with wetness, but generally consists of wax myrtle (Myrica cerifera), blue huckleberry
(Gaylussacia frondosa), and sparkleberry (Vaccinium arboreum). Groundcover species vary
with the degree of land disturbance and fire regimes but can include wiregrass (Aristida
stricta), bracken fern (Pteridium aquininum), and bluestem (Schizachyrium spp.), along with
more disturbance tolerant species like green briar (Smilax spp.) and broomsedge (Andropogon
virginicus). The drainage slopes are also dominated by loblolly pine with occurrences of
mockernut hickory (Carya tomentosa), white oak, beech (Fagus grandifolia), American holly
(Ilex opaca), and tulip poplar (Liriodendron tulipifera).
2
The most heavily used portions of the existing ranges are typically devoid of native
groundcover, may consist of turf -type grasses, or are graveled. Depending on the intensity of
current use, the K-2 impact area may support a variety of grasses and forbs or could be
dominated by lichens and mosses on bare soil. Only scattered and often stunted loblolly pines
or hardwoods persist down range from existing firing lines. The exact species composition of
the ranges cannot be field -verified because of the potential for UXO, but aerial photographs of
the region confirm the historic disturbance of the area (Figure 4).
While the Base's Forest Management Program staff conducts timber marketing at MCB Camp
Lejeune, the forest stands within the surface danger zones are not actively harvested or
regenerated, but are subject to fire fuels management. Merchantable timber is currently
harvested along the perimeter of the impact area. The Base contributes 40 percent of the net
proceeds from the sale of timber products to the Onslow County Schools System in accordance
with 10 US Code 2665.
In accordance with an agreement between MCBCL and U.S. Army Corps of Engineers
Wilmington District (USAGE) for the K-2 Ranges project, the approximate limits of wetlands
and other waters of the U.S. were determined by Geo -Marine Inc. (GMI) within the project area
without field survey due to the risk of unexploded ordnance (UXO). In lieu of the typical field
survey methods, a variety of remote sensing and mapping data were used in a geographical
information system (GIS) to support the determination of wetlands and other waters of the U.S.
As a result of comments generated during a pre -application meeting with representatives from
the USACE and the NC Division of Water Quality (DWQ), GMI provided an updated Wetland
Delineation and Stream Mapping Report to Wilmington District USACE in March of 2008.
Wilmington District USACE issued a Jurisdictional Determination letter dated 3/31/08
approving the mapping of wetlands and other waters of the U.S. Utilizing the methods outlined
in the report, 205.7 wetland acres (43.5 percent of total project area) were identified in the K2
Ranges project area (Figure 5). Palustrine emergent wetlands were the most prevalent
comprising 165 acres, or 78 percent of the wetlands that were identified. Thirty-nine acres of
palustrine forested wetlands and 0.2 acre of palustrine scrub -shrub wetlands were also
identified. Finally, there were 8,401 linear feet of intermittent stream segments and 3,441
linear feet of perennial stream segments identified within the project area.
3
Water Resources
The presence of submerged aquatic vegetation (SAV) in the New River is limited with no
records of SAV north of the NC 172 bridge. South of the NC 172 bridge there are records of
eelgrass (Zostera spp.) within Traps Bay, but SAV is absent in Courthouse Bay and Mile
Hammock Bay (Rohde, July 2003).
While roughly one-half of the K-2 impact area is bordered by the New River, the surface
hydrology of the area is also influenced by four tributaries to the New River (Figure 2). An
unnamed tributary of Mill Creek is located in the western portion of the impact area.
Whitehurst Creek flows through the center of the site. Town Creek, situated to the north of
Rhodes Point Road, runs eastward along the northern project boundary. A fourth tributary,
locally referred to as Little Creek, drains the southeastern portion of the impact area with its
outflow located near Hickory Point.
The New River and its watershed are located entirely within Onslow County. The upper
reaches of the New River and its tributary streams are narrow with flowing freshwater. The
lower reaches are estuarine waters, which are wider, slow moving, poorly circulating, and
affected by tides. Within the tidal portions of the New River, water quality classifications range
from SA to SC. Within the New River estuary, all waters downstream from Grey Point to the
New River Inlet at the Atlantic Ocean are classified as SA, with the exception of two areas of
SC waters around the historic outfalls for the rifle range and the old Courthouse Bay
wastewater treatment plants.
An SC water classification is given to all tidal salt waters protected for secondary recreation
such as fishing, boating, and other activities involving minimal skin contact; fish and
noncommercial shellfish consumption; aquatic life propagation and survival; and wildlife. An
SA water classification is given to tidal salt waters that are used for commercial shellfishing or
marketing purposes and are also protected for all Class SC and Class SB uses. All SA waters
are also High Quality Waters (HQW) by supplemental classification.
All waters draining to the New River north of Grey Point are considered Nutrient Sensitive
Waters (NSW). The NSW classification is a supplemental designation intended for waters
needing additional nutrient management due to their being subject to excessive growth of
0
microscopic or macroscopic vegetation. In general, management strategies for point and
nonpoint source pollution control require control of nutrients (nitrogen and/or phosphorus
usually) such that excessive growth of vegetation is reduced or prevented and there is no
increase in nutrients over target levels. Management strategies are site-specific. No specific
restrictions on development are involved.
The New River and several of its tributaries within the project area (Mill Creek, Town Creek,
and Whitehurst Creek) have the additional designation of High Quality Waters (HQW) and
Primary Nursery Areas (PNA). The High Quality Waters classification is a supplemental
designation intended to protect waters which are rated excellent based on biological and
physical/chemical characteristics through Division monitoring or special studies, primary
nursery areas designated by the Marine Fisheries Commission, and other functional nursery
areas designated by the Marine Fisheries Commission. Primary Nursery Areas, as defined by
the Marine Fisheries Commission, are those areas in the estuarine system where initial post -
larval development takes place. These areas are usually located in the uppermost sections of a
system where populations are uniformly very early juveniles. The Division of Marine Fisheries
is responsible for preserving, protecting and developing Primary Nursery Areas for
commercially important finfish and shellfish.
Federally Protected Species
Federally listed threatened and endangered species found at MCB Camp Lejeune are presented
in Table 1. The Base has an endangered species program that focuses on conservation and
protection of species and their management. No federally -listed species are known to occur in
the K-2 Ranges project area.
Table 1. Federally -listed species classified as endangered or threatened and known to occur in MCB
Camp Leieune, NC.
Common Name
Scientific Name
Status
Animals
American alligator
Alligator mississippiensis
T(S/A)
Loggerhead sea turtle
Caretta caretta
T
Green sea turtle
Chelonia mydas
T
Piping plover
Charadrius melodus
T
Bald eagle
Haliaetus leiacocephalirs
BPGA
Red -cockaded woodpecker
Picoides borealis
E
5
Common Name
Scientific Name
Status
Plants
Roughleaf loosestrife
Lysimachia asperulaefolia
E
Seabeach amaranth
Amaranthus pumilus
T
KEY:
Status Definition
Endangered
A taxon "in danger of extinction throughout all or a significant portion of its range."
Threatened
A taxon "likely to become endangered within the foreseeable future throughout all or a
significant portion of its range."
T(S/A)
Threatened due to similarity of appearance - a species that is threatened due to
similarity of appearance with other rare species and is listed for its protection.
FSC
Federal Species of Concern
BPGA
Species protected by the Bald and Golden Eagle Protection Act and Migratory Bird
Treaty Act.
The population of American alligators at MCB Camp Lejeune has been monitored since 1980
and appears to be stable or slightly increasing (USMC, November 2001). American alligators
likely inhabit Mill Creek, Whitehurst Creek, and their tributaries.
Both loggerhead and green sea turtles nest at Onslow Beach. Monitoring for sea turtle nests
began in 1979 and is ongoing to allow for the immediate protection of the nests. Piping plover
nests have not been detected at Onslow Beach, but suitable habitat is available for nesting and
over -winter foraging. Piping plovers have been seen on Onslow Beach during all seasons of the
year. As such, surveys for the piping plover are conducted for evidence of nesting behavior
(USMC, November 2001). Onslow Beach is over 6.8 miles from the K-2 ranges.
A bald eagle nest was first documented on Base in 2000 along the New River where it meets
Sneads Creek. Protective buffers have been established around the nest site with restrictions on
both ground and air -use activities (USMC, November 2001). This nest is over three miles from
the K-2 ranges. Although bald eagles have been sighted by boaters on the New River, no nests
have been documented on the western shore of the river.
There are 74 active red -cockaded woodpecker (RCW) clusters at MCB Camp Lejeune. A
Mission Compatible Red -Cockaded Woodpecker Management Plan (MCB Camp Lejeune, May
1999) was developed to manage and direct continuing RCW growth on the Base. A goal was
31
set in the RCW management plan to have 173 active clusters within seven management areas.
As such, the Base manages occupied suitable habitat, unoccupied suitable habitat, and
unoccupied potential habitat to reach this recovery goal of 173 active clusters. An active RCW
cluster is located over 0.5 mile from the project area. The foraging area for this group does not
extend into the project area, where foraging resources are generally inadequate.
Seabeach amaranth is present on Onslow Beach often growing between dunes and the high tide
line. Monitoring of amaranth is ongoing to prevent vehicles or pedestrians from harming this
plant. Onslow Beach is over 6.8 miles from the K-2 ranges.
Roughleaf loosestrife is present in specific habitat types on approximately 22 acres at MCB
Camp Lejeune. Roughleaf loosestrife is not known to occur within the project area, though two
small occurrences of potentially high probability habitat for the plant have been identified.
Actual surveys for the plant in these high probability areas cannot be safely conducted due to
UXO. The closest known sites are over 2.5 miles from the K-2 ranges in the developed portion
of the Base or in the Greater Sandy Run Area.
Historic or Archaeological Resources
No historic structures are present within or adjacent to the K-2 ranges. Surveys for
archaeological resources (pedestrian and subsurface) have not been conducted within the K-2
impact area due to the hazards posed by UXO. However, investigations have been conducted
on the boundary of the SDZs at the K-2 ranges, where two archaeological sites have been
identified. One site was recorded and recommended not eligible for inclusion in the National
Register of Historic Places (NRHP) because of extensive previous disturbance. Another site
was investigated during a shoreline survey, conducted by boat, and was recommended for
further NRHP evaluation. However, no ground disturbing activities are planned in the vicinity
of this site (Brewer, August 2004).
ALTERNATIVES ANALYSIS
The project requirements (criteria) that must be met for an alternative to be a reasonable option for
fulfilling the purpose and need for the proposed action are as follows:
7
1. The alternative must allow the USMC to fulfill these specific training requirements:
infantry training and readiness manual requirements, individual training standards,
mission performance standards, and mission essential task listing.
2. The realignment of the surface danger zones (SDZs) must allow simultaneous use of
all ranges.
3. The alternative must allow for the continued use of the ranges while modernization
efforts are underway.
4. The footprint of SDZs over the New River must be minimized.
The alternatives evaluated include a no -action alternative, one off-site alternative, one on-site
alternative, and the preferred project.
No -Action Alternative
Under the no -action alternative, the existing K-2 ranges would remain the same, without
modernization. Training at these ranges would continue to be conducted in accordance with
Range and Training Regulations, Standard Operating Procedure for Range Control. However,
this training would be conducted under conditions that have become inadequate over the years.
Taking no action to modernize the K-2 ranges means that the USMC would be unable to
accommodate new technology on these ranges, such as automated targets. This would further
impact the ability of the forces to "train as they fight." Infantry training and readiness manual
requirements, individual training standards, mission performance standards, and mission
essential task listing would not be met efficiently or to the fullest extent possible. Additionally,
readiness training and the availability of adequate resources to other US military branches and
to allies would continue to be limited.
Without range realignment, the surface danger zones associated with the existing K-2 ranges
would continue to extend as far into the New River as they currently do. Safety for commercial
and recreational boaters on the river would not be improved. Furthermore, access to existing
targetry would continue to be difficult as the road network is in dire need of maintenance to
make the roads passable. Road maintenance is currently hindered by the presence of
unexploded ordnance (UXO) near the roads.
There are a large number of weapons that can be used at each of the existing K-2 ranges.
However, when some ranges are being used, other ranges are restricted from use because of
safety conflicts. Without consolidation into a lesser number of ranges, where each range is
dedicated to a particular weapon system, scheduling will not allow a higher throughput of
personnel at the range complex.
The No Action Alternative does not provide for the consolidation and modernization of the
existing K-2 ranges and cannot meet evaluation factors 1, 2, or 4. As such, it is not considered a
reasonable solution for satisfying the purpose and need for the proposed action.
Alternate Site
An important objective to modernizing the K-2 ranges is to realign the surface danger zones
and reduce the distance that they extend into the New River. One way to minimize the footprint
of surface danger zones over the river would be to move the existing range firing lines (line
from which ammunition is fired) north of Rhodes Point Road. This alternative would require
shifting Rhodes Point Road and an existing tank trail farther to the north. While this alternative
would meet evaluation factors 1, 2, and 4, it was dismissed because a northern shift to Rhodes
Point Road and the tank trail would cause considerable impacts to approximately 900 acres of
natural resources (e.g. wetlands, forested habitat, and protected species habitat).
On-site Alternative #1
The original project design that was prepared for Phase One of the K-2 Ranges project was
very similar to the preferred site design. However, the Range P4 — M203 Grenade Launcher
had a larger footprint that impacted the easternmost stream (Figure 6). Total proposed impacts
for this alternative were 12.32 acres of 404 wetlands and 912.5 linear feet of intermittent
stream. During a pre -application meeting with representatives of the USACE and DWQ to
discuss the project, it was requested that Range P4 be modified to reduce proposed stream
impacts. The USACE in Huntsville made the following changes to Range P4 in order to reduce
impacts:
• Extended firing berm and firing lanes to the west in order to minimize impact of stream to
range firing lanes.
• Modified firing berm lighting to accommodate increase in length to firing berm.
E
• Moved Control Tower to be centered on firing berm.
• Moved Ammo Breakdown building in order to maintain 15m separation from any range
support facility (closest facility = Control Tower).
• Graded range operation and control area to accommodate buildings moved and increase in
length to firing berm.
• Removed downrange grading that was done to re-route ditch and bring area above the
existing ditch up to grade in order to avoid environmental impacts on primary nursery area
(PNA).
The site plan that resulted from these revisions is the preferred project and is discussed below.
On -Site Alternative #2: Preferred Proiect
Modernization of the K-2 ranges would require the consolidation and realignment of the
existing K-2 ranges and the development of training facilities and automated targetry (Figure
7). The existing ranges would be realigned and re -numbered, and would become inactive.
Range development would be timed and coordinated so that the majority of existing ranges
could continue to be used during construction phases. For example, training at some of the
existing ranges would be temporarily rotated to other ranges while the upgraded ranges are
being constructed.
A description of the four proposed ranges within Phase One, along with some estimates of their
sizes, is provided below. Development of these ranges would include the construction of
support facilities.
PI — Baffled Battle Site Zero (3 ac) — This baffled range would allow for 50 shooters along a
firing line to fire to a distance of 30 meters (32.8 yards). It would be outfitted with bullet traps
(Figure 8).
P2 — Service Rifle (40 ac) — This range for M16 and M4 rifles and shotguns would have 15
firing positions and automated targets ranging from 50 to 550 meters (55 to 601 yards) (Figure
9).
P3 — Squad Automatic Weapon (20 ac) — A range for M249 squad automatic weapons would
have automated targets ranging from 50 to 800 meters (55 to 875 yards) (Figure 10).
10
P4 — M203 Grenade Launcher (30 ac) — A range for M203 grenade launchers would have only
training practice (TP) ammunition authorized (Figure 11). Targets would be placed up to 400
meters (437 yards) from the firing line.
The proposed ranges would be realigned with their surface danger zones barely extending into
the New River. The location and alignment of these ranges is designed to avoid impacts to the
oyster beds located in Stone Bay.
Once appropriate permits have been obtained and coordination with MCB Camp Lejeune's
Environmental Management Department has occurred, unexploded ordnance (UXO) cleanup
and removal at the existing ranges would begin. Thorough surface and subsurface scans and
sweeps for UXO would be conducted in the areas as depicted on Figure 12. Cleanup and
removal of UXO would occur prior to the construction and modernization efforts. All UXO
would be disposed of in accordance with proper safety and disposal standards using certified
disposal methods. The subsurface investigations would require excavation to a depth of up to
3.3 feet. Once the sweep is complete, soils removed from wetlands would be restored to
preconstruction elevations. This UXO removal would allow for maintenance on the existing
road network, which is necessary to make the roads passable. Other range debris (e.g. old
armor, vehicle hulks, and scrap metal) would be removed and disposed of in accordance with
proper disposal procedures. Also, existing berms, targets, and other support systems would
need to be removed so that the ranges could be upgraded.
Modernizing the K-2 ranges would involve installation of automated target systems,
construction of firing pits and bunkers on firing lines, construction of concrete fighting
positions, and construction of bleachers. Targets would be installed and support buildings and
some mock buildings would be constructed. Vegetation would need to be cleared at many of
the upgraded ranges to maintain a line of sight to the targets. Some grading would be required
to level out existing contours in the down range areas. Berms, pits, and trenches would be
constructed at the realigned ranges. Wooden walls, building facades, and a rubble pile would be
built on some of the berms. Vehicle -firing pads (e.g. concrete or gravel pads) would also be
constructed on berms.
11
Support buildings include maintenance buildings, classrooms, restrooms, and ammunition
supply. Parking lots would be added or expanded. Lighting, fencing, and signs would be
installed. Some ranges would accommodate bivouac areas (areas used as a temporary base)
nearby. Some ranges would require the installation of obstacle course items: concertina wire,
walls, sewer/tunnel/subway system with manholes added, and other artificial and natural
barriers.
In addition to maintaining the existing road network at the K-2 ranges, new 10-12 foot wide
gravel roads would be constructed to provide access to each automated target array (Appendix
A). In an effort to minimize impacts to wetlands and streams, all ditch side slopes and road fill
slopes were designed by Huntsville Division USACE at 2:1 to decrease the footprint of these
features. A 125 -foot tall safety tower would be constructed to provide for observation of the
river as well as the K-2 ranges and smaller towers would be constructed at most of the
upgraded ranges.
The types of ammunition and weapons to be used at the realigned ranges would remain the
same as currently used at the existing K-2 ranges. Proposed utilization of the modernized K-2
ranges is expected to be about ten percent higher than current levels due to a higher throughput
of personnel, which would be possible with the consolidation and realignment. Also, a recently
reactivated Marine unit, the 4"' Marine Expeditionary Brigade, Anti -terrorism Battalion, would
add to the proposed utilization from their training. In addition to the Marine personnel, other
military services, the US Coast Guard, allied nationals, and other authorized agency personnel
would train at the K-2 ranges. Once proposed range modernization is complete, ranges would
be maintained based on evolving training requirements. Additionally, items such as bullet traps
could be expected to be installed.
The proposed action meets all four evaluation factors listed above. The proposed consolidation
and modernization of the K-2 ranges would allow the USMC to fulfill infantry training and
readiness manual requirements, individual training standards, mission performance standards,
and mission essential task listing. Realignment of ranges would allow for simultaneous use.
The UXO removal and construction efforts would be conducted in a manner that allows for the
continued use of the majority of existing ranges while modernization efforts are underway. As
a result, safety for commercial and recreational boaters on the river would be improved.
12
POTENTIAL ENVIRONMENTAL IMPACTS
404/401 Jurisdictional Areas
Phase One of the K-2 Ranges project would permanently impact 12.32 acres of 404 wetlands
and 141.5 linear feet of intermittent stream (Figure 13). In addition, 39.74 acres of 404
wetlands would be temporarily impacted during an inspection for UXO (Figure 12). Secondary
impacts to wetlands and water quality could occur during and after construction of the project
through erosion. Erosion impacts would be temporary and would be minimized by employing
applicable soil erosion and sedimentation control techniques at the construction sites. Best
management practices for vegetation management and land clearing would also be applied.
Threatened and Endangered Species
The proposed project would have no effect on the bald eagle or American alligator. With over
three miles of separation between the known bald eagle's nest and the K-2 ranges, construction
would have no effect on eagle reproduction or foraging. Riparian habitats supporting the
American alligator would not be directly affected by the project.
While high probability habitat for roughleaf loosestrife is present in the project area, the
percentage of surveyed high -probability habitat that actually supports the endangered plant is
very low. The presence of hazards associated with UXO prevents personnel from surveying for
the plant within the boundaries of the project area. While subterranean UXO sweeps would be
conducted in the area of potential habitat, it would be unlikely that a targeted excavation would
affect individual roughleaf loosestrife plants. For these reasons, Camp Lejeune has determined
that implementation of the proposed action may affect, but is unlikely to adversely affect
roughleaf loosestrife. The Base initiated informal consultation with the USFWS regarding the
proposed action's effects on roughleaf loosestrife and expects to comply with direction
provided by the USFWS.
Foraging habitat of active RCW clusters would not be impacted by the proposed action.
Construction of the grenade complex and a new Rhodes Point Observation Tower would take
place within two RCW recruitment partitions. After clearing 39 acres for construction of the
grenade complex, the affected partition would retain over 200 acres of potential habitat.
13
Construction of an observation tower would require land clearing of less than one acre.
Additionally, the project would not result in forest fragmentation that would hinder eventual
occupation of the partitions. The retention of over 200 acres of contiguous, suitable habitat
satisfies criteria for recruitment partitions outlined in both Camp Lejeune's Integrated Natural
Resource Management Plan and the 2003 Revision of the Recovery Plan for the Red -Cockaded
Woodpecker (Picoides borealis) (USMC, November 2001; USFWS, January 2003). Tree
clearing within the K-2 impact area would not affect recruitment partitions. Therefore,
implementation of the proposed action would not affect active RCW clusters nor would it affect
Camp Lejeune's ability to reach its long-term cluster goal.
While construction would not directly affect any endangered species or their habitat, upon
completion, the projected use of the ranges would change noise levels and patterns. Evidenced
by their continuing use of nearby habitats despite noise levels fluctuations from variations in
operational tempo, the projected changes in noise levels is not expected to affect protected
species. The K-2 ranges and associated SDZs do not support suitable or potential habitat for
any other protected species.
MITIGATION
A variety of mitigation measures has been developed to minimize potential environmental impacts.
These include:
• Construction effects would be controlled using standard management practices such as routine
sweeping and wetting to reduce air emissions.
• If during construction and site grading any site of potential historical or archaeological
significance is encountered, the installation commander would be notified. The unit
commander would order actions in the vicinity halted and the area marked. The unit
commander would immediately notify the Base archaeologist at (910) 451-7230.
• Best Management Practices (BMPs) would be used to avoid contamination of stormwater.
Mitigation plans would include both short-term (construction phase) and long-term (project
life) features to meet the requirements of the Base's Stormwater Pollution Prevention Plan.
• There will be a significant decrease in river area affected by surface danger zones.
• The proposed action is fully consistent with applicable coastal zone management policies.
• The Base will utilize credits from the Greater Sandy Run Area (GSRA) wetlands mitigation
bank to offset proposed wetland impacts. This bank is located within the base, approximately
14
seven miles west of the project site, and has bottomland hardwood credits available. Since the
proposed impacts will occur to degraded wetlands and because the mitigation site is located in
close proximity to the impact site, a 1:1 mitigation to impact ratio is proposed.
• Significant revisions to the original site plan have occurred to minimize impacts to streams
within the project area. Proposed stream impacts would be to degraded, intermittent stream
habitat. Therefore, no compensatory stream mitigation is proposed.
15
CAMA CONSISTENCY REVIEW
Phase One Modernization of K-2 Ranges
United States Marine Corps
Camp Lejeune
Onslow County, NC
Demands placed on lands and waters of the coastal zone from existing economic development
and population growth require that new projects or actions be carefully planned in order to avoid
stress on the coastal zone. This planning involves a review of state and local enforceable
policies, which are designed to provide effective protection and use of land and water resources
of the coastal zone. Enforceable policies and consistency are discussed below for the proposed
K-2 range consolidation, realignment, and modernization.
Areas of Environmental Concern
Areas of environmental concern are given protection because they are areas of statewide concern
within the coastal area. The following sections address the applicability of policies designed to
protect areas of environmental concern and consistency with those policies when applicable.
Section 7H.0200: Estuarine and Ocean Systems
Included within the Estuarine and Ocean System are the following AEC categories: estuarine
waters, coastal wetlands, public trust areas, and estuarine and public trust shorelines. The K-2
Ranges and surface danger zones (SDZs) are bordered by the New River, parts of which are
estuarine. Other than minimizing the footprint of SDZs over New River, range consolidation and
modernization are not expected to impact the New River or its tributaries. As such, the proposed
action would be consistent with policies intended to protect estuarine and ocean systems.
Section 7H .0300: Ocean Hazard Areas
Ocean Hazard Areas include beaches, frontal dunes, inlet lands, and other areas in which
geologic, vegetative, and soil conditions indicate a substantial possibility of excessive erosion or
flood damage. Proposed range modernization at the K-2 ranges is not located within an Ocean
Hazard Area. Therefore, policies on ocean hazard areas are not applicable.
Section 7H.0400: Public Water Supplies
This AEC category includes valuable small surface water supply watersheds and public water
supply well fields. The construction of proposed training support facilities would avoid areas
where there are small surface water supply watersheds or public water supply well fields.
Therefore, policies protecting public water supplies are not applicable.
Section 7H .0500: Natural and Cultural Resource Areas
This AEC includes areas containing environmental, natural, or cultural resources of more than
local significance in which uncontrolled or incompatible development could result in major or
irreversible damage to natural systems or cultural resources, scientific, educational, or
associative values, or aesthetic qualities. The K-2 ranges project area is free of fragile coastal
natural or cultural resources. As a result, policies designed to protect natural and cultural
resources of environmental concern are not applicable.
General Policy Guidelines
There are eleven General Policy Guidelines (15A NCAC 07M) issued by North Carolina for the
coastal area. Of these, three policies are applicable to the proposed facility construction and
training. Consistency with these applicable policies is addressed in the following paragraphs.
Section 7M.0700: Mitigation Policies
This policy requires that adverse impacts to coastal wetlands or waters be mitigated or minimized through
proper planning. Construction of range facilities and access roads at the K-2 ranges would be
consistent with North Carolina's policy that requires mitigation for adverse impacts to coastal
lands. Impacts to natural resources would be mitigated as outlined in the Project Narrative. The
Base will utilize credits from the Greater Sandy Run Area (GSRA) wetlands mitigation bank to
offset proposed wetland impacts. This bank is located within the base, approximately seven
miles west of the project site, and has bottomland hardwood credits available. In addition,
1
significant revisions to the original site plan have occurred to minimize impacts to streams within
the project area.
Section 7M .0800: Coastal Water Quality Policies
This policy guideline states that no land or water use shall cause the degradation of water quality
so as to impair the traditional uses of coastal waters. Designs for training support facilities at the
K-2 ranges would incorporate stormwater management aspects wherever appropriate. Subsurface
UXO sweeps would be conducted incrementally with the effect of minimizing the area of
disturbed soil at a given time. All training would be conducted in accordance with standard
procedures governing hazardous materials and petroleum, oils, and lubricants. Implementation of
the proposed action would be consistent with coastal water quality policies.
Section 7M.1000: Water and Wetland Based Target Areas for Military Training Areas Policies
This policy requires that, to the maximum extent practicable, the use of targets should not
infringe on public trust rights, cause damage to public trust resources, violate existing water
quality standards, or result in public safety hazards. The proposed range consolidation and
realignment would reduce the area of the New River affected by access restrictions. The
operation of the ranges with associated SDZs extending into the New River would not infringe
upon public trust rights, cause damage to public trust resources, violate water quality standards,
or result in public safety hazards because proposed training would be conducted in accordance
with established range procedures. The proposed action would be consistent with policies on
water and wetland based target areas for military training areas.
Conclusions
Based on the review of the General Policy Guidelines for Coastal Areas, we believe that the
proposed project is consistent with T15A NCAC Subchapter 07M.
Land Use Plan Review
Onslow County's coastal zone management policies, which have been approved by the North
Carolina Coastal Resources Commission, are listed in Table 1, along with their applicability to
proposed range consolidation, realignment, and modernization.
3
Table 1. Onslow County's coastal zone management policies and their applicability to proposed project.
Resource Protection Policies
Applicability
Soils:
Septic Tank Use
Not Applicable
• Wetlands Protection
Consistent
Flood Hazard Area:
• Coordinate development in floodplains with NCDCM, FEMA, COE
Not Applicable
Groundwater/Protection of Potable Water Supplies:
Support stormwater runoff regulations
Consistent
Coordinate activities involving USTs installed/abandoned
Not Applicable
Coordinate ground water protection with adjacent counties
Not Applicable
Manmade Hazards:
• Coordinate UST regulations with state
• Expansion of Albert Ellis Airport per Master Plan
Not Applicable
• No bulk storage of hazardous materials in urban areas
• No toxic waste dump sites in county or on military property
• No disposal of toxic wastes in county
Stormwater Runoff:
• Support state stormwater runoff regulations
Consistent
Support control of agricultural runoff
Not Applicable
• Support control of forestry runoff
Not Applicable
• Design projects to limit possible stormwater runoff to estuarine waters
Consistent
Cultural/Historic Resources:
Protect significant architectural/archaeological/cultural resources
Consistent
Industrial impacts on Fragil Areas
Not Applicable
Package Treatment Plant Use
Not Applicable
Marina and Floating Home Development
Not Applicable
Mooring Fields
Not Applicable
Off -Road Vehicles — No restrictions
Not Applicable
Development of Sound and Estuarine Islands
Not Applicable
Bulkhead Construction
Not Applicable
Sea Level Rise
Not Applicable
Maritime Forests:
Encourage acquisition of high quality tracts for conservation
Not Applicable
Development of residential nature
Estuarine System — develop water dependent uses along Estuarine Shoreline AEC
Not Applicable
Protection of Outstanding Water Resources at Stump Sound and Bear Island
Not Applicable
Water Quality Management in White Oak and Cape Fear Basins
Not Applicable
Resource Production Policies
Applicability
Community Attitude Toward Resource Management and Production
Not Applicable
Recreation Resources:
• Support access to waterfront/shoreline
• Apply for grand funds
• Priority to repairing/replacing damaged/destroyed shoreline access
Not Applicable
facilities
• Support year-round recreation program
Prepare county -wide comprehensive recreation plan
• Allow golf courses if meet buffer requirements and other regulations
Peat or Phosphate Mining
Not Applicable
Economic and Community Development Policies
Applicability
Water Supply:
• Support extension of central water service to areas not classed as rural
Support enforcement of potable water supplies
Not Applicable
Support grant funding to construct/expand public/private water systems
Support construction of adequately sized water systems
Sewer System:
• Provide water systems to county residents and study expansion
Not Applicable
• Secure grant funding
• Support "created" wetlands for treating waste effluent
Solid Waste:
Support operations of new county landfill
Not Applicable
• Support education on recycling and waste reduction
Consistent
• Support siting of recycling centers in all areas except conservation
Not Applicable
• Support clean community projects
Not Applicable
Energy Facility Siting and Development:
• Review any applications for electric -generating plants
Not Applicable
• Support preparation of an EIS for new energy-related facilities
Community Facilities
Consistent
Redevelopment of Developed Areas
Consistent
Land Use Regulation/Urban Growth Patterns:
Encourage urban development near existing urban areas
Not Applicable
Permit residential development to meet market needs
Enforce existing regulations
Estuarine Access
Consistent
Types and Locations of Desired Industry
Not Applicable
Commitment to State and Federal Programs
Consistent
Assistance to Channel Maintenance
Not Applicable
Assistance to Interstate Waterways
Not Applicable
Transportation:
• Identifies specific roadway improvements
Not Applicable
• Identifies specific improvements to Albert Ellis Airport
Land Use Trends:
• Development of 404 wetlands
Consistent
• Expansion of central water and sewer areas
Consistent
• Increasing traffic on US 17 and NC 24
Not Applicable
Continued support of economic and industrial development
Not Applicable
• Development of an industrial park
Not Applicable
Establishment of county wide zoning
Not Applicable
• Development of a new solid waste disposal facility
Not Applicable
• Support the US MCAS New River and Albert Ellis Airport
Not Applicable
• Intergovernmental cooperation
Consistent
• Expansion of county -wide recreational opportunities
Not Applicable
• Reduction of the county's substandard dwelling units
Not Applicable
• Low elevation and sea level rise
Not Applicable
Regulation of nonpoint sources of water pollution
Not Applicable
• Control of development in fragile areas
Consistent
Regulation of corporate farms and increased agricultural runoff
Not Applicable
Continuing Public Participation Policies
Consistent
Storm Hazard Mitigation
Not Applicable
Conclusions
Impacts to the coastal zone from the proposed action would not be significant. The Marine
Corps, through the EA process, has determined that implementing the proposed action would be
fully consistent with the applicable policies of the North Carolina Coastal Management Program
and Onslow County's Coastal Zone Management Policies.
LIST OF FIGURES
Phase One Modernization of K-2 Ranges
United States Marine Corps Base Camp Lejeune
Onslow County, NC
Figure 1
Vicinity Map
Figure 2
Topographic Map
Figure 3
SCS Soils Map
Figure 4
Aerial Photograph
Figure 5
K2 Range Delineation
Figure 6
On -Site Alternative #1
Figure 7
On -Site Alternative #2: Preferred Project
Figure 8
Preferred Project: P1 Range
Figure 9
Preferred Project: P2 Range
Figure 10
Preferred Project: P3 Range
Figure 11
Preferred Project: P4 Range
Figure 12
Proposed Temporary Impacts from UXO Sweep
Figure 13
Proposed Permanent Wetland and Stream Impacts
Appendix A. Engineered Drawings of Proposed Ranges and Roads
Appendix B. Notification of Jurisdictional Detennination
V -Nib
Q� \. d
J t
R
I 'o #1 11
rte
IV ! /r
Ir
t, 2008
` �''� r`` ✓ � � DE�aAND STOR�A RB(tF�
V
f.% !/71
r
'
� 1}
! \
V -Nib
Q� \. d
J t
R
I 'o #1 11
rte
IV ! /r
Ir
t, 2008
` �''� r`` ✓ � � DE�aAND STOR�A RB(tF�
V
f.% !/71
r
'
SITE
'
\
t
1
t, -
N
t1
'Boundaries are approximate and are
not meant to be absolute
Map Source: Jacksonville South Quadrangle 7.5 minute (topographic) 1990. SCALE 1" = 1500'
K2 Ranges Project; Phase One LMG Figure 2
Marine Corps Base Camp Lejeune
LAND MANAGEMENT GROUP wc. USGS Topgraphic Map
Onslow County, NC Environmental Consultants
40-07-136 May 2008
2
Mumford umford
Point
Paradise
Porro
Ragged
Poiret
x
t
LE
�.... a
Naraot .�"` � ' •
luip
Point ..i�f..., ..
Town
SITE t
JUN 6 2008
Spr ngMiR - YVATER QUALITY
1461ANDS AND STORMWATER B
Rhodes
Point
j,
Boundaries are approximate and are
iot meant to be absolute
Map Source: North Carolina Atlas & Gazetteer. Pg 77.2003 SITE SCALE 1" = 1 Mile
K2 Ranges Project; Phase One
Marine Corps Base Camp Lejeune LMG Figure 1
Onslow Count NC LANE) MANAGTMLtiTGROUP
iNc VICInIIay Map
y+ €nvr. an n.vn tea! ronurh�tnts
40-07-136 May 2008
MaC: Marvyn loamy fine sand JUN 6 2008
'Boundaries are approximate and are DEivri - vVAfER QUAIJ-f
not meant to be absolute. WETLANDS AND STORMWAQQQ"!%.��
Map Source: NRCS Soil Survey.
SCALE 1" = 1000'
K2 Ranges Project; Phase One
LTG n�. Figure 3Marine Corps Base CampLejeune TO MANAGEMENT OUP
Onslow County, NC EnvironmentalConsultants Soils Map
40-07-136 May 2008
I
t
In
'Flo.
4
00
T
4-i
V-7 41
%
q
AN
N.
I rte N
jli t? 4 %w
A I I I � I ; "It I
ITzft—
to no
Will
Sit, P$11F.
W.,
F%
H14pv
J,
v -
JUN 6 2008
*Boundaries are approximate and are DENR - WATER QUAU-1-1
not meant to be absolute. WETLANDS AND STORMWATER BRANCH
Map Source: 1998 NAPP aerial photography SCALE 1" = 1000'
K2 Ranges Project; Phase One
Marine Corps Base Camp Lejeune LMG Figure 4
LAND NLNNAGEMENT GROUP wc.
&RWON. Aerial Photograph
Onslow County, NC Environmental Consultants�w
40-07-136 May 2008
%J
J,
v -
JUN 6 2008
*Boundaries are approximate and are DENR - WATER QUAU-1-1
not meant to be absolute. WETLANDS AND STORMWATER BRANCH
Map Source: 1998 NAPP aerial photography SCALE 1" = 1000'
K2 Ranges Project; Phase One
Marine Corps Base Camp Lejeune LMG Figure 4
LAND NLNNAGEMENT GROUP wc.
&RWON. Aerial Photograph
Onslow County, NC Environmental Consultants�w
40-07-136 May 2008
.icy" •,.\ "` s ,� y 4;'4-
T2; . `l •'ty f .ct�.r �. -
�'-. a is .}�" �..',• y. ai1F' F, �,A ry'1 '-++'• ._r
Z<0)1 •.'.�
4✓d itk�M n� 96. <
' "• .,s '.
a
Y y
a ♦ �.r� i �i iV' ' Y; al. [y^. � .Sa! �.. * 4',.,p '1� — x \�+/ � • Q j�
00
LLI
LIJ
W
IL
•�1
44111
LLI
Z O
IL
W J
Lu
IL
1.
r%F A
• 'I Z 1 ., a 4 S 31.
• r •
a
'T r
Y i
' T .k�"lFrn t«;�I'+`•� y � � r...tq$ <4 t b �'i•� �'C/'�'T�� ....
w
ZA
"— wit
. 1
a
_
,
? '%r . r ✓ \"• a i� �.^� � �1
,y, r. � ) t, y-�!' ,t ,. •e 3, i jr��� .r. ~^ •s.. a � a 4 ��,��y� y�: ,r•+j�, �",�.Gr � `-_^ _ .
1`�•Ye. '� n1 ��1 �- `i `^s+a_" ,�: tl� ~ . r .r�rr. -; �'� �..� �"► waw.{• � ..'J �c. Sr,�: _:� • i ate. ?�
` 'r'f, � e.r n 1 ri a.-.!� "• +L t'• tY.N' . f - ;� � :r. .,
r Qtr
1 ':A�4YhPwtrQ
1 � f rr{1•� w 7 .:.
t.014. Off. rM y i
�' xr F t �'',•{ ,� L. +"*t`i,1`�-.�' t* �," 7a fir# -. � ��i. 'u$1k.
�. *P � �,. ��' •tw:•� •/s> � ....F. � �.f - ,fiy�lyd�e�}� � '�R e
C.* /r g ''�'�f ;���r�' � *, �.r "k*"��i«•, r.•Yv' '�xµ�-
* r Y Y•.
-i ter`• • �� ,t- ,* .:. iY1
CL
a . • +F' wr.' +�„ .,. `c+ '`Tir,+.- �" i. � �.. �� �"+.� a lr t � r R p- 7
+r «., "rX:_ a.0 •i�+ m .� LD
�a U c
.� •,
_ •�i r`aG .C' '�CL
i''�'�i°. ," •' �# d ,O •— � U tom•
CO
' to
0 to
µ
M
'?�.� r r � ,:r ,� rK s.,•�-y A, r. ��y • ,� .,at.... s€'i_i. � �3', r, �'j' ` Y
��' �'` �- p; Vie.• ��4's ra a ¢. � � .:�S � '�`�ic�' _ ^�*' , .A: i
�x.�,-'' r � ;f �, «, .t�'��„�^ ,�.'`,ySi'{ rs h 4- > �' r< x� � �; « " • �: _�' '1�'' +w,�e�`'�$�'Fa''i z1
..�/ �,, •. "l •;':. +� � '"':.Yn"�' f�. Y'+ciJ` *�f f _.' ,. �' y�` ` ,yam a. a:'y � -
e.t v i` .fit t;E.r..-.���'�r �."X� %4' F`.,�"/+'� �-•,+�5 �zt i '}��AG
Lf
r
t
V w
S11WIl 30N33 iTS 4Nd 'ONieemjo '91\112 VTO
(I 38dHd) S3JNVd->I =10 NOUNZINUMOW a x �_ s
ON '3Nn3f 3l dwb'0 3SH8 ScI800 3NIdvvJ g
d
. w 's S �, 5 o b a tlIN10aN 'Ml0la0N - N011tl1S IVAVN Ldl VNI104V0 H1a0N SdW3 3NiaVV( 9 $ q Y ! 1
° g 0INVIIV00 N 3H10o�N3�a�rdaaWNbWWO�JNIM33NIJN3 S31
D a a aIaNaItl
l+ �
ui
¢¢w w \,. L:
03N Z ��V �i1j
V;O(.7 IrNa W r \\\ llI W
Z i Z O U z U B J \�\ lli W
O U o Q w
=r� w3
mwm Jr z i!
W ¢Ir Q � �c I J O
w S J r30 \+ O
2N J � w
r Q w Z
W XON W
(r W Cr O �o!!,�
W In O w V1 Q !{
O W W I W I
Z O V)UU J Z
D V1
Z
waa
J 2 S 2
O •0- Jrr r �C0 U1 O Z
D3 O Z K
'01— W m I Z �ij ¢ O {n w
W J 7 u f<1 (] � z r
mw0 ZOO SW Q^ W
mr^ w1— ro "f co M F o
r a w v w i a� m0N u
J V1 J Z 3 Ld N
Z Q O r Vl L/)
I'i t\�P-.� ZfLw 1P 0.
OWW JOr Vt 1:1 P NM 1QU C3 CD
NV Q
(Yrr — W 4 WCD co CDwz
J as V)N W W m �I',11 (`N'10 00� PJW Mm O
Iim x NN n()W �� o W
w QO OOVI QJ 5' c`700 ZW MN O
r mw -O z r J
0 0 m lO W Q w w D o a
z u—Z 1w0 w
c0r•--' c0xlnr o1n
A
J zal zw a a
a -xc�r J it n
m 0 =J • cDr A--,
w m w� 0 a J w w tDN:t ................................... O
z 0w¢r wazz„1 -....-.--...
wa: L/) x a J S^^ J^ N Nj . A....-•--�--•-•-------------•-------•--- -----------
U U `- 1- J U Vl J J Q J N
r
co B�ZW1I11 ■ .........................: ....... _........
^ N f7 J J V lM0 ,t 0 :_: C ........... ................ �Y
l0 .-. M m O ... ............ ................
........ ........
M m N co I.,,_ ... .... _.. .�..... .. •. W
zzrz NN MN 1'. _-_
OQ.. M(V ZW ill \\�� \
N z W i ..v \� d
m� co
r L7zJ II^ci�ulc _
INS N
O¢U zwz:Na, �M 00N LL
¢Jw Ii O M 0'�
co
N._7 NN MN
1W ;MO -1 MN ZW
:ANN...- �z _ ' MN
...w % ZW
mN
N I
Q'
N MN
NN - �M 1�1t. Zw
"!I
F
l
ZW1�I1MN
W
NN
a
mN
3
QO
UZ
QW
-- - =
P LD Z
_
M
j
11
aUW1
Z
W
-- - -- - -
to
0”
Ifl
m
Mi
-
(1)
N
•
N
M�
MN
_
_ _
_ _ _ __ _ _ _ _ _ _ __ __._
-
~.J.
N
co T
Nr
Nm
�:• MO-'
QZ1N--
wQ�
MN
c0N
M
0-
MQ•
i' n
II co
ZW
N
�N
i,'; MN
f'i;,
rf
OZ�
MN
ZW
„..
r,M
Z^
ir Lu
ZW
Lc)r,
mc u
ii
co
Z W Z
o Ld
10
i' "'
LDm
N
N
_j
uuLL
(D
0-
Z
�;
SmLD o
NN
MN
,liN
``:,
ON
OD
MN
�p U^
ZJ
ZW
�N
ZW
�WZ
(D CD
mN
Nr�
NN
,M„�
S-uU
"!I
F
l
Mw
MN
NN
if) (D
M 0'
NMN
ZW
lVNl3 03103e?303 :-hili ans a6P'33N3d os 0NV ON18Bf18O ONI8V310 - M -O :3WVN3113 LOOZ-inn-ZO :031101d 31VOA38
W
a
3
QO
UZ
QW
-- - =
P LD Z
j
11
aUW1
Mw
MN
NN
if) (D
M 0'
NMN
ZW
lVNl3 03103e?303 :-hili ans a6P'33N3d os 0NV ON18Bf18O ONI8V310 - M -O :3WVN3113 LOOZ-inn-ZO :031101d 31VOA38
r ¢ 44
-dt-
�'h-
1�wirr � .
x' r
`;� 1 ♦ � ; "paf E�- .r- _ ;.'.kt Yr•' � s J ..,tib
F
+.a
M1
BAN
.M{y� `� a M1AN rl
011" _�j"- 41Ak
cc
z
✓1
i
y rE
x4 , iy1
u :a �
xv
M i
� �' • `+,ff .�` +..� � ,,fr fir.- �.
LL
W
J
a
U
Cl)
N
d)
16
0
0
t-
-71
0
t�
2 w
a
LL O0 0
LL 0
a a a a
d'
N N
cl
C W W LL LLL
{Q
cz
V �
O
LL
7
C m a+
0 d c CD
c lC
a � U 5D
202 E Wa
G1
13 t� I I i
MLL
w •E - n
rLI
.► yep .� � ;�:..
tal
r
i ilF ! r p%.. ,'; ,.. �' � Trt ��9R' «y°.Y� � Y• �.•y rf,�
^3' xIx
7r.'..#.4
e;'.?:='t^.A.Ssx.�FrR .'�`-s!,...."r+.:S..J 'u' x •- ..w _ I,_E +90 .�'. a :•fit...;
x4 , iy1
oe
s'
.► yep .� � ;�:..
tal
r
i ilF ! r p%.. ,'; ,.. �' � Trt ��9R' «y°.Y� � Y• �.•y rf,�
^3' xIx
7r.'..#.4
e;'.?:='t^.A.Ssx.�FrR .'�`-s!,...."r+.:S..J 'u' x •- ..w _ I,_E +90 .�'. a :•fit...;
�' ., ��. � `r -•`rCa�' a Oi , r ' ��'`p - Tri'.,.:".^9.:',:.rz
i K � - '� \1 ��• I w
VP
i R»
,v k.
it-
0
t-
Lli
CN
.a,
y
Y
O
1
" 0 o
c m oo CJ
F
e y,y •1tr '«Y ,. ,' `'..Y•r,;Mz+�,,,;r.. •��,°f' y"d r r p p p L
I
CD 0
N
` o
Id
Y
V
f
VI
y_., � �.V 4 �•. ' ` sk �` � � x '�. �i�°'"�I "{�i �iMy r '� Rei .�� es'"� ' � Yom-
,y .�. t�k ._Ayy _�-' T_ \• ` • Y• iti ii� { ��.. ,.. off%
c 4 � j +.n''•y'w��y�y,'� ti' a v, d� � �d4 r � � rtu-.
1 7
;n C
N
r
1 (V
w
•Rl � `
i v�
u
XI
CD w
y
LL LL
Q. a
Ao LL
a
Vol
r
i
i
s
r
e
r •e
' t
'� ..
1
w
4'
At
1
.Y t
� '. � A i"t � � _• �� [;•.. ''r ink �:. �� �R ��
a •.
- t " + •, � 1�• A T f . y 1. ,� ... •Qi
;" .? �,d� '.ter•,` ,.�„ •�'- •A' .� AR �� +/• .,` ♦ '_-Y� 1 Ili Q.0
Z
1/ Af
• -..r `:. :�' wyr >r°a. <. r y Y _�
. • � �.. _ ter' {;•,� - s=
w
' < '� - `' i' a° i Y .k t"v r.. �..k. ,`�' h v-• �(.w,�~f1•'4 .O M
• .. f1
CD
IrL
Aid
00
, R
• a
�a ♦ - `. . +M Y ,fir K Lj:�• r 4,/�i� ' kr.. L� 1 F '�,�''( xl
`r.'l..Ir ki .. \ -� - ':''T.�[ -4�� .D�iL�.4�...:1,'i'..� '��►• 'w. �' - - `���
ii a -.— -
n
-7qV loo- -w J
lold
JL
k
'41
44
4-M "4,
lit.
x'�'ie
ON
CL
0
c
0
00
0
00
CL
.2
w
cm
Q
CD 0
r
0
E
0
Z
is
C
(D
L)
CL
to
CM
CL
a)
M
(D
L-
a
c
Lij
an.
LL
LL
as
LL
a.
n
-7qV loo- -w J
lold
JL
k
'41
44
4-M "4,
lit.
x'�'ie
t \
5
{
\ W
.: i ". ,"..''��/`t�"i'.. •,,. 9 :.?�,`.� fi.�.�. ., �... � i _';.^. s `,4 +t'4! t• 4 x,:�, II gg
9• t _. +a � ul
�4
1p
�.
NLM
54 ,
..
Q% LL C 3
CL
. y
to
CL
4 46
C
x+�` •e CO)E
r�.
�`"m
w
. _ .. .• _ � tai
t
• f y —
°
. .fir: � � � •#i •� � x � � � �
Zak
•' `: ,3 'r iii., w a
�1,'�L ity ��t ! •s a (�;p s a T C W CL
Q LL LL
LL L
Mr r �.:.z • �,,. s�
�p
�F x
1// r ) r • JJ
F�
„sr ka t �w
4� r '� T � t • * e t'
... � ♦ ,,,Y � >)� "�. . * •� +- r x � ...r gyp.:
•. • .vc* r� r � � • ..'fin - � � � � , •` r ,, �.�
t Fry. f �• ��� • .+� �.� � ����' S y j' ' + f r �,• Yp. _ •v '`t�y
. .
r
,
IA
Al
Ak
le
3f 7-u
.7ae ..,,�tf y r• ,.41
fS
��";'�„q r ''ISR } . \ ,f�,♦l ,y. f r
Qi
z
C iv)
r,•
1* fX&I _71 0:1�rldri
in 04
"III's
'i
LO
C14
k4
U) LQ
CN
LO
hl,
CN
U
4
CL
J o
r_ CL .2
LLc
U)
00 0
Aj CL .2
'C� N
= U
mz
0
ti
M
LN 4k,
R
a) ami
CL
a)
1 44, E
�r 4
44 vi 11 -, , .
4
r mac' 3z
0 0 0
o
h, iL-
J it Is it
Nv
let
V
At
' F � '�'
!�
� E ` p
�
�`t r'
qq • � 4 l ,fF � apt
FA
+' '� �
FW
(D
Y'il
A
Z.,
zj bc.l�*f 4o?
—
WAlf
414*—*.V W.
'Aff-kYNb"—Mw:
0
(D
(D
CL Z
r
CL 0
E
�p
C')
o
0
cu L) CD
O
(A
0-
CL —
L. (n
0 c
C.) 0
4)
c
.�!' i!i`S• >} .�..� a sr i- .. •� ,,�' rri �} � ��..kCe._.rr-e.ui•.s .
w.. �' � y r< _ '�r � •�nv r � -��` y n <Y X� 3� rS` i,.t' i� •c� r ,�t�{��fi ' v.•...- _ y '..
,' Y 'I� J % L _ .. _ .r 'gYy�'yn.� �, �� JY�r1r. ' At'•
' �.- " ��- r'.r •{._ �� }� '�l. }yrd'i s r a •?r` •� c A.i} rr`t'�
CD
f y - .. - .aiy A yf p „� ;,•�',�CD
Lei
co
Nt
y x
r'
�'. ` '.fir � `��p`� r,Y�'69K"+f q'F'L .r.•- ......
.. •�CErn: 1"'+� A "#�,t. .h'+• 4 �_ z �.�y _ - a •1�aE�- *Ow'•
'>"r ""�3� �'!�7Y� �'r"� �y}Z -�y 4' -�•S "'r�.r-„' ti .v ' r nY:. •
- w.�Y R, 6''Tr Cri. ✓y' e^* �.al ,�,s�il+ � t :» • y ;i.., - _ .
'����� � •. ^ � ..�,. �, ,, �' a •�'"�»'�'+ r �, + �� ,� r °• to
gig
�y�
,. {r ` ` •ry i, •,:. Ge3a _ �x 7i •y '1 Y�G�Y�`f"
,; a' s -it' + :'='tii iA' - �r; � n� •r , "T4' �;..f '+ �' y'� _
[ 11 � .. :,+ r .r�',Cd`. • S f 1�; s r i}�"'y{£ ,y.. t -y}�,
•` .� - f '.�:. tura
F SFr• .
#' ;;. •„ V N
�—- • ?[, '
r 'i his'{•�!'�" .. tx ..
�C a �^'.Y'1 4 3 �:' 7r� L 4 r Yti�1'- i< �i•+t : �'w
O
C
O
L
a -
w a
~ O O m
W LL. LL. O
m
m a m m
91 It,
CRI �ild
r `gid �� • ,rhx' '.a1' L'Sha�t'a'�if , �' h '� >�,� °�i ry S,. r r • �i•. •yt 'i '
�. � t e �� r { « ern► •sr.. . r e r �
+#, r +�. 'ft_.° � ,jfa r y� +j, ,� �t '� `yS'�"N�'` � - �4 f .• { t : _ �'".- _ - -
,
a f
�� +s �� sr.. >a'1�y '� ��i , J �- '" ��,,�.� .iu=-'il. • �+ "+' ��.. �A "n Y 'i• < e. . +` Qfl. '
s.
�,, „ `-- - ,�. � � #` ! � ef++''['cam I � �" • - +r' • ;�, �'�° r'}= � + � �, ,� .
� }.. , "` ! �. n . x✓" � -� . � .., v `: .�5+'.����. �c �' c�• r � Ria - �,% � i lt�.t " r T
r # 5;�.L�:{ .� ..••,p a ".%r . rf# ,r„4-,�•.� •�, ,.yy j may. rr1�• i!�" ,
' 1 •aN�Y+ a..-« -. , � •. 'v: W `, P A'�� - _ �. �f Sir '_
'�'•�" t 'fir°,w f- �. f .ar r ., �' `�.�. ,if�3 � ,
it
s
•,
or uo
I i:j r�,"�' +�7 r • ,r .4s •-►ify�+�,•.'�� • . '�• ..'�.. - �-_ ,� � � f"'>E * a ".�,a ' - '� _
�7 s +�i�y�C � rJ .•</ �.7'. .al ur' - �7. Mir "' r '�e ^1 .
K+
•
oe
51 4
46 AO
CL Z
n•
yy
k, y{ ' .Yi` ! �,: y� ai '.. . .ry' �, �i♦ •� .�%' ���"�,�.3 y�, iQ''�`� �. A .G ..... '�` ,r.�` � �, ,f
-
�{ •ro. ,� • � is v�, e` �-' •r'�.ii► r.. + p- j„ �ia`� �r `� _ ,r�a r � � � Y? •
6
M1 �
�� y a _ yYir�,rk a �`` L� ± `. f • ; �,,.� � � '�' r :'f ... •• .. •�, z' �L' ^�L-•"1 % s 'r
rt
C'7 a E
y'^r 1k `:y Yp%r am 3
�
..'t. :.., ,rS% ..3•'' �%. ' t*,,, �'4 ar` +4 -•. �Ilt �' '.. ,w'�'� ..,:- �cr'�•. • fy wQ,+ U O
,�•., h4�+�5' r �� 3a Fa: _ 'v T, �� }{l r :sc, :+. L w xr�- "__` M d
,� .. ' � '�. ;. •.w �'_ c. ..- � .: ry � .!_r sr•t1�► �K -'fit TMr � LL �
Yr var,.',Lx'' _' �%er •�;..'• �A�ti"f�,'r` `` ^'� .w1�3 _'.�'r,,.f.Pu. +.�o.r"y � '"_�+ . .F• T'• fV .10
c i R ,dYtr' -_ �,� .,.; � � a7✓i�!''� ,�; !; t �;+�[. L h° �" � •a. � ,,Y, �.v , 9'f }. �� a C
4*
1
le
i,M. K'C � �f�+ �,�,,,yj,,yw� ��r �t!t i+I• �X,4•,'� � �'�� ����•, ,�a�' ti •1>. �• .ak ,t •��t. .< ,�i� . •, �k � -
w" '£i"'ra -!?aj•:,;��� �IFx'�,"(r•K¢^ "'` ;'d� .i:: i�s'i ;` q'
x1 < ,7+•, r:W �: -:-t. � •.;i •.. ":�:-f .r :.k11.:Z-�ia� '� -r - .A"� „ <�` . k ��� sr• � :.��, �° ,,��1
I
-1 vr�rl
X1,
�4t
r� , ..
04w.,
n-
Ck-,
. . . . . . ......
pr,
'oilL
-Zwc
AOP'
♦
Al
M
Q.Z
iL 0 E
46
'W
A106
0 CL
iL
0 0 n r1Z
cu
Aq If
�t' ,
!fry
'04
5;4
Appendix A. Engineered Drawings of Proposed Ranges and Roads
c
REVDATE PLOTTED: 0] -APF -2008 FILENAFE E- 113 91E LAIOUT Ig.SUBMITTAL: CORRECTED FINAL
2799C
im
it av n n ai
nti _v nv mov
0o czizol
n
titi n
I
n aT r
11
SO
nin nr
3
a $ o[PAxTu[xT or Irv[ xnvv
"AllL
xna
IA -1111 E
a R 3 a P q NAVAL FACILITIES ENGINEERING COMMAND -MID -ATLANTIC
i q uARNE —11
s NDATN Fa NA D NA SIATiax _ xaNEa MNNNA {
MARINE CORPS BASECAMP LEJEUNE, NC
P
a o MODERNIZATION OF K -RANGES (PHASE 1) 10
I SITE LAYOUT PLAN
R
m n f 7 na
I"
Ic
n
0
I
n
■
� E'J:IQ1
ME
11
lo 11
3
e A p € ucou+. x.v. .....
. ...............�.......o t, `
p NAVAL FACILRIES ENGINEERING COMMAND— MID -ATLANTIC € 3' Q y g a
WARN[ Cams Nax.. C—IN. mn �.
32 7 g a Q MARINE CORPS BASE 1�' xAVAL CAMP LEJEUNE, INC ; q ➢x, e9 a`s' 3
€ MODERNIZATION OF K -RANGES (PHASE 1) e $ a
9 SITE LAYOUT PLAN
9
P
PA RANGE
SEPARATpR
OW (TG
1OM YP)
N
t
■
� E'J:IQ1
ME
11
lo 11
3
e A p € ucou+. x.v. .....
. ...............�.......o t, `
p NAVAL FACILRIES ENGINEERING COMMAND— MID -ATLANTIC € 3' Q y g a
WARN[ Cams Nax.. C—IN. mn �.
32 7 g a Q MARINE CORPS BASE 1�' xAVAL CAMP LEJEUNE, INC ; q ➢x, e9 a`s' 3
€ MODERNIZATION OF K -RANGES (PHASE 1) e $ a
9 SITE LAYOUT PLAN
9
P
r
E—ATC PLO,TEO. 0} -AGR -3008 faENAIAE: C-115 SI'E IAIOU1eg.—NITIAL: CORRECTED FINAL
280200
280300
Iti
lo
o
3 p _
o
9 C $ GNAVAL FACILITIES ENGINEERING'COMMA . —1. MID -ATLANTIC ROR�a.
§ � u.aNc curs Ate.. c^Ra�uA u.v. s,.,�o. - u Rau..
ms a ' MARINE CORPS BASE ° CAMP LEJEUNE,NC .`�' g; N
U, MODERNIZATION OF K -RANGES (PHASE 1) .^
SITE LAYOUT PLAN
C
rn n n
I
C7
ti
Dw
D w
3
��
R
6
o
� oev.a�xeryor .� x.vr n.v.� r.c�nes ew.xceairve ceuxnrvo
s NAVAL FACILRIcAaarvA ES ENGINEERING COMMAND
o I ry rQMZD-ATLANTIC
nw.ax. xaurvA
� A
A A i
A ; A
3 �
� �
8 �
F � o
a u
6
rvAvu
MARINE CORPS BASE CAMP LEJEUNE, INC
a
...
a
p
?
.n
i
Iv
a u
o
MODERNIZATION OF K -RANGES (PHASE 1)
x$
"o
x
GRADING AND DRAINAGE PLAN
rr,
n
I
n
280500
F7
x y = $ NAVAL FACILRIES ENGINEERINGnCOMMANDx—MZD-ATJWTIC
y unaixc cares xwi c as xn
MARINE CORPS nBASE P Vµ CAMP LEJEUNE aNC
MODERNIZATION OF K -RANGES (PHASE 1)
GRADING AND DRAINAGE PLAN
c
am
280300
. INAVAL FACILRIES ENGINEERING ACOMMAND MID -ATLANTIC h= 0 4 q a A
xa+*x c xu x.
I,—
MARINE CORPS ABASE III CAMP 71 L. NC
MODERNIZATION OF K -RANGES (PHASE 1) s 1 uo
GRADING AND DRAINAGE PLAN s
9
mu
on
D
'.
-
?Z
m
{
I j
j
. INAVAL FACILRIES ENGINEERING ACOMMAND MID -ATLANTIC h= 0 4 q a A
xa+*x c xu x.
I,—
MARINE CORPS ABASE III CAMP 71 L. NC
MODERNIZATION OF K -RANGES (PHASE 1) s 1 uo
GRADING AND DRAINAGE PLAN s
9
mu
on
D
RATE PLOTTED. 09—APR-1008 FILENAIAE: G-132 — CLEARING GRUBBING AND SIL, FENCE19, SI 17TAL: CORRECTED FINAL
E •t F s1G :�F #-� :'F 6 - of P 11'�
"lk if
a
mrf
�
� u�
— z
I, o f r IFr f o f
o f
'.:F.:1'::s�k:; :_Ai::lF:.".at E ak re IF
#� IE of Ik �! R ro E rk � r! E f IF •f �'I`rd't'
'
`"
Zfa
k
t 'k• 'f• 'k•w
a F f o f o f
m Itf'I tf•
RFwm
tk"w; t, tk•I
tl.omt
m
r E
.,p,
AIF
j rF IF •F 4 •F p 'E It e E ak F aF IF rf If rF
IE• S@ IE t IF 01. E rF
IE
6
r f
t f a h F r i r f a k
f a i f F
y _
� a o •
N
.Nn� f t
a �
F f F F F f t f F k -;L .: �R
m a i r l r l a l a i a l a i r i a
IF f�
IF IF F f E f E k t IF
IF rt
Dz_
N
r F r f a! a F o f F IF r k r R r f E -_lz
f
ak F rk
it
k
o
_
afl rFi aFi rFi rFl
at
z I
t __
� rF � ak g •k R •F 6
._
liv
rF rF r! �F rkk
v
—m ti 9
R y
z
3
F•
1' moi
F
m
' utm
krf
o z z
rF
E •F
rt LE
a a
IF
• •
a k l f F k
� i i F F i - �
•
F F
aY IF of E rt 6 •f k •1 h 3# k -]f F- k-? t F IE' i
- -E.1
k—
lz
• t • k r t �2
t - -� f AY F R: #
_
F
'F�UIF
a i J r' akl
— —
k'•F'•fI
aE R' .F IF .F IF a3'-FIk::
_ y kl
1 -"IF"- •t ! rF k k of
_
k
a k E r f
E o f FF k
Fa r FI
—<
a o a
a!
_
k f ! f R t k k t t R F
y
F
'21N,
f�af rF I
aF rf rFl a! aF rt rF rf�rFl
w
r N
'R E •f SF •k IF of'krF
Wt of IF •k •k ak IF aF rF i. •F �. rF
p �!'PIE,
�h rk �1 rt
� rt �R �E rF at ak rk
o
—
i a t a t l a IFA
rF
mva x
3 m i
a
nFU I n
mlm
U.
— O l IF
Is
: TI
oss r nova
m mo aoa f
rx '
v v vos
n a t
o 'F
~
o
m 10
m C
3
f
v
U
4
s
e
E R
7
f NAVAL FACIL NTIES ENGINEERING' COMMAND
e =FA
A-1 uOHIO-A7LMJ71C g
AP x^VA
u.c c�P s ua„ wq c .
? ;
y R
ga
g
e
F
Gti
a
MARINECORPS BASECAMP LEJEUNEs,.
.
� n
N
q e °
MODERNIZATION OF K -RANGES (PHASE 1)
CLEARING, GRUBBING, AND SILT FENCE LIMITS
c
.m. _mIls
I,
c
D
I I\
IC,
N
n -
_
-
m
-
-o
z
•
;�?s
d
a ^
F
a NAVAL FACILITIES ENGINEERINGCOM Ds-MID•ATLANTIC
3'
1
2c
4
g _
. xeU IUE [OUP unUix [nhni ix> iait ox xoUE'n x. vi �x
iPi unvni. SCAMP
SCORPS
9 .
a
A
� _'
MARINE BASE LEJEUNE NC
�
"
H3
P
a N
=
MODERNIZATION OF K -RANGES (PHASE 1)
1
UTILITIES SITE LAYOUT PLAN
n
,. I m
i
n
I
r.•
N
D I uj I n 1 0
ul
ill Ih
n
3
m \ _
1 �
tiW
a£
. a.
m i
s m y
� n a
I
3Ton
Nam o
�m I
MR
I D
I
Nm
I a;;
Wm ;�
�N
IN N m ina
3
oNAVAL
FACILITIES ENGINEERINGCOMMAND —MIAT.LT.cmPS—TAixr —T—
TxMARINECORPS
g
p
} mn
MARINE CORPSBASE CAMP LEJEUNE.NInCC.
'MODERNIZATION OF K -RANGES (PHASE I)
= 4
R9en
45
3g N9
I
-
UTILITIES SITE LAYOUT PLAN
---
„t
D I uj I n 1 0
ul
D I ci I C) I u
9
_
—
v�w
i
m_ om i
_ I
� J
i
a
a i ow
I
I
D
9
1Z
w
"
- -- D"
m
mo
N
m=
Nw
o
01
----------------
IZ
0000
lz
I Z� 1 -1
x
"
o
NAVAL FACILITIES ENGINEERING nCOMMANDn- MID -ATLANTIC
nBASE o va
LBO
MARNE CORPS CAMP NC
i
ea
O
a
n
MODERNIZATION OF K -RANGES (PHASE 1)
S
RANGE P4 ENLARGED SITE LAYOUT PLAN
9
RATE PLOTTED. 02 -nal -1008 ITLEN—: C-601 RWY TRANSiSTiON KIEouLE.d, SU01/IiTAL: CORRECTED riNAL
n n
y
nn
nnnnnnnn
N�yy
mmOmmmmmmmmNmmmmm
mirynmti�m
"yn
ann
nsn">">yn�n
m�mmm�mmmNmm
"n
nygrg
..............
yn nnlyy
010
pOmmmmO
nynnn
Da
nn_p�A
m~
mOmmmmmmmmmm"mnmmmmmmmmmmmmmmmm0
nnnnayn
ylyy
nas
yn
>
nn
ylyy
yn
yn nn
yDa
yn
yn n
yn ns
yn
yn
mmp___
paa
«
<<<
<
0o
m"
mmmmmmmmmmmmmmm"
n -
mmmmmm
m m'
m m
m mmmmm
o
'-'
ooppppp
l$
n�c,�mm
o
m s
nnonn0000000nn000
p
-
_ _
-
0000mm
00000000000000000000000000000o00000000o
n n000001°n
,8—>G>33
boonoDoaooDooDoaoaononoDODooln000looDoaooaaoo
a
"
Doloo
$ I�$ffiffi�`off`5�9�
Do of
DO Do
➢o on
no Do
Do nod
&RoRax
Don'oolDoDon000000.00000000000000000000ny
n
#&
o.
noon
o0,
R
on0000D
noo➢o
oo➢o
000aD
Do o
no oo
Do
>o
NIS
I
si8gg�ffiWw�vtiNNti.�.x:ate
�YemwNaWONeBmw�vo8
�aNe�
�N
S
e�SSHe�N
88�
oaNv�38�
�N��m8Uv888Ne8
�8o$�H8�o88800��88888800�
N
81888888
N N888UU8o
88Wo..H888NN8o88888
�'��80008$Bo�U88o808�
0
a
8Ne
8 R
a z;,N'
8
88E]8
NI
°
B
�yNUm
u,$SBUH$8$88%88U�$8888
$a.2
U
$8888%o88
m �,o888�
o
�BoUNa,0000m8o8u,
o.
u,.
u,o
o8$88U�w88B8
mwUvwWo
y
0
$88�mg$oBM
n"
f
m
m
pn�Dn
m
f
A
gs
�p
m
fal$o�l
N
m
n
m
nnln
m
pnnpnpnnpa
W
oo�u�oo$gZoo5
f
m
m
J
m
J
m
yp
m
p
m
n
o$Zg�ooZg�oo
mm
yD
pnPyp
m
�p
ED
N
o
o
nn
X08
-
n
-
n
8
�&
-
n
o
-
n
Bd
-
n
-
n
vAod
a
�
ani
,8
m
pnypynnpn
m
6Z�8
n
dZh$
m
ypy nnpa
m
Dyyn
m
W
o
3
3
3
y
3
y
N
m
N
N
N
N
N
N
N
N
N
N
N
N
J O
n
O
O
O
O
3
3
i
3
O
3
o
3
O
3
o
y
o
3
o
O
3
O
3
O
O
O
o
�
O
y
O
z
�
SON
y
y
O
y
O
y
O
y
O
O
y
O
O
y
O
y
O
1.
O
O
O11
Gi
m
p
PT
y
N
N
N
N
➢
N
r
y
O
y
O
D
O
y
O
y
O
D
O
D
O
o
o
o
o
n
A
n
A
nn
°
p
nn
m8
`
nn
mm
v
a
m88
1
nm
n
n
`o
Dn
0
o
o
n
��
_
D
�
mvNi
n
�
oo
_
na
_
oo
_
ao
_
�m
0o
z
D
w
o
z
n
0y
o0
z
vN,�
00
n
NN
0o
m
o0.0
0
z
o0
0
Nm
00
y
0
N
0
00
n
m
o
n
00
i
7
mm
00
n
mm
oo
a
mm
oo
n
uN
oo
n
y
o
m
ao
z
ao
no
o
I
D, Da
oo
p
A
no Do
A
a
n
n
p
no
Do
n
Do
a
n
n a
n
oDo
a
n
n a
n
O
<
a O
<
n n
�O a
bp�l
n
n
a
66,
O
D
D r7i
m
y rm7i
n
m]
D y
F
DyDa
F o
y F
Dy➢p
o
D D
ml
Z D
D F
DppD
Z m]
2 n
p
p➢➢
m D
D D_
m
n
y
n
Z
Z
A
z y
2 D
D
m
D➢➢
m?
D
D
D
m z
m
Z>
D
y D
m
yO
mmp
pmn~Dmm
mm
m
yDppD
mm
~
P,
O
mmpn3Dpm
m_
.nm.D.'amm
mn
mm
�Dm0D�'n
m0D;
m
y 0
m
O
y
;
's
R;
�",y
i
y
y
y0
S
��
S
S
ti�
5
n
y
n
S
S
A
A
S
p
S
A
n
S
n
a
mm
m
__
n
<<
n
__
n
m
0
(y
__
m
_
<
nm
_
_
pp
z
p
mm
MP
00
o
oo
oo
oo
go
o0
00
9
00
5
g
o0
0
00
00
00
00
0o
n
0
00
00
Do no
Dno
_
_
_
_
_
m
�
3
y
D
�
-
�Cnlo
o(Tno
O
�
o
D O
� o
0000000
_
n
DO
n �LE�Y
LLQ
O
u O
mtt -
88
o
o
� o
PmDO
op
o
o
i
o
-
n
3
0
0
0
0
�
000
o
Z
0
m C
010,
��
R
F8
9 "'�
$If
i
d
E ofr.xusrv. or ..e xnv. x.vnL r.euncs exaNcsxwe cauu.rvu
s NAVAL FACILRIES ENGINEERING COMMAND OxMID-ATLANTIC
P
o uAR xE cwn xaxix c,.ea xA nAc - xoxrax. Nrscixu
o '. 5
s f a
X i
£�
OMNI
+
ss
3
`;
MARINE CORPS BASE VA CAMP LEJEUNE. NC
ID
r m
MODERNIZATION OF K—RANGES (PHASE 1)
a
ROADWAY TRANSITION SCHEDULE
J
n
m
o
m
nim
l$
o
m s
pp
a�
0 00
p
EEg
mn
0
J
n
REVDATE PLOTTED: 02 -APR -2008 FILENAME: C-604 ACCESS RD t-) SCHEDULE , SUBMITTAL: CORRECTED FINAL
Fn n n
0
»o 000000»,�+o c a
ol
D
PEPAATNENT R, 1.L,... ,A�A.,A����RLSLN�NELR�N�1�.MANR
FACILRIES ENGINEERING COMMANDT MID-A7IANTIC
PT VA
112 1
11
NWS ......................
ma
_
U $
_ a
MARINE CORPS
a
q 4
£
.. ..
.. ..
.. .... .. ....
.._
00000'o»°.
:. .. ..
>
-,
= m
tt
mem
.. ....
....
..
..
..
'
o
tt
11 ED
HORIZONTAL ALIGNMENT SCHEDULE
9
0 x
'r, m
I
n
0
»o 000000»,�+o c a
ol
D
PEPAATNENT R, 1.L,... ,A�A.,A����RLSLN�NELR�N�1�.MANR
FACILRIES ENGINEERING COMMANDT MID-A7IANTIC
PT VA
NWS ......................
ma
_
U $
_ a
PEPAATNENT R, 1.L,... ,A�A.,A����RLSLN�NELR�N�1�.MANR
FACILRIES ENGINEERING COMMANDT MID-A7IANTIC
PT VA
U $
MARINE CORPS
a
q 4
£
CAMP LEJEU NE,ARNCA
o
= m
=
MODERNIZATION OF K -RANGES (PHASE 1)
HORIZONTAL ALIGNMENT SCHEDULE
9
0 x
'r, m
I
n
REWATE PLOTTED, 01 -PPR -2009 RIUENAME: C-505 Pa DITCH A ICNUENT SCHEDULE d9l SUBMITTAL: CORRECTED "Ill
n
D
N N
G
R e � � � NAVAL FACILITIES ENGINEERINGnC.OMMANDx—MTD-ATLANTIC h � " R � "s e � � � � g -_ y m
an 6 � `e ?I e a unxnrt cox s xwTx c xaxn snTlox - xoaTax. rxumA n ; 4 d . d o,P
6
rl
nBASE o xnVu
MARINEP CORPS CAMP LEJEUNE. NO
a
o
a N
MODERNIZATION OF K -RANGES (PHASE 1)
P4 DITCH ALIGNMENT SCHEDULE
E
-
m
n
�
rl
r
D
I"
Ic-
u , ,L
R B
6 g€
NAVAL FA�.
Cl ,RIES ENGINEERING C.Mw,iao��uio=niiiwnG"�
�,� c
'.1al
7 ?
N s
5
MARINE CORPS BASE CAMP LEJEUNE, NO
MODERNIZATION OF K -RANGES (PHASE 1)
<
< <
m <
ny D
<
A A
2
O
rnrnm�im�g�`•
m
�u}n�}nN
�umN�nuiriin}nN
NSU
`°Ns�n�o`ciei�
PIPE SCHEDULE
I
ns��21
F
9
Am
"`
N$s$ro
��m
N�
m a
u
m m
a
m 19�g
6.
m
N iF
E m
m mi
u W
S'.K�
i
e
a
1 m
w o
m
e
A
n
r.
v"'ou
'Z°
i, i
x
>�e
88
N52
N
W
e N
5
u p
1 m&
o
w
9 T
o
e
B o
= ffi
m
N o
n
u S
e u
v 5,2
ml
g u
m
N m
v�
m N
N
8 2
8 t
t
T
n
mem
.x,....
..'.'m�����m
_
15
O O
A
0 0
0 0
0 00
0 0
0 0
0 0
0 I.
I.0I.
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
�1 a
A A
P n
D A
PP A
A A
...
C
C C
..
..
v A
a n
A A
A p
v z
v P
c A
n A
T
a
m
D➢
m O
D D
O O
D
O OD
D D
O O
D D
O O
D D
O O
D D
O O
D D
O O
D D
O m
D D
m O
A D
O O
D➢
O m
D D
O O
D D
O
D D
O O
D A
O O
D➢
O a
D
o o
D D
O v
m7m�7m777�mmrt7��Ny7�7y
O
7m77m
m7�m�ym
go
A
A A
A A
9
m A
A A_
A
O
r7, y
ryi m
rt7 r7i
� r7i
� r7r
� r7i
17i �
f7i m'
� t7i
r7i m
m r7i
r7i rt7
� m
r7 m7
rt7 r7i
r7i t-%
r7r t7i
� r7i
r7i r7r
rt7 �
O >D
O O
O O
O O
O O
O O
O O
O O
O O
O O
O P
O 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
D
0 0
D
D O
o 0
0 0
0 0
0 0
0 o➢
O
o o
D o
D O
o o
D o
D o➢➢
o➢
0 0
0 o
0 o➢
o
O
I"
Ic-
u , ,L
J
n
R B
6 g€
NAVAL FA�.
Cl ,RIES ENGINEERING C.Mw,iao��uio=niiiwnG"�
�,� c
'.1al
7 ?
N s
5
MARINE CORPS BASE CAMP LEJEUNE, NO
MODERNIZATION OF K -RANGES (PHASE 1)
R �:•
I Y "°
°
PIPE SCHEDULE
F
e
"`
J
n
11
I
3t
S �
m
N
In
� o
O
r, n
N PVI STA 0+00.00
PVI EL 9.28
PVI STA 0+13.19
D PVI EL 9.41
G7
= m PVI STA 0+40.70
0
PVI EL 9.43
m o
PVI STA 0+45.16
� PVI EL 9.39
n PVI STA 0+89.46
m
�
PVI El .36
0 9+9
.93
D
PVI EL 9.31
PVI STA 1+00.16
w PVI EL 9.31
PVI STA 1+16.44
a m ro PVI EL 9.22
PVI STA 0+00.00
PVI EL 9.31
D PVI STA 0+4G.79
PVI EL 9.38
C1
S fT1
-i PVI STA 0+51.26
0
-' a
N
PT
C
PVI STA 0+95.56
PV1 EL 9.21
n
m
PVI STA 1+00.03
�PVI EL 9.1s
,oSTA 1+04.70
EL 9.14
PVI STA 1+16.44
PVI EL 9.11
1 .-
D IG
IN
a g ;i mo
FACILITIES ENGINEERING COMMANDS MID -ATLANTIC n
m F A xi s ,:, +.
MMARsINE�CORPS CA-
BASE !PT wnoi SCAMP L„E JEUNE, Wald %NCp
a= MODERNIZATION OF K -RANGES (PHASE I)
ROAD PROFILES -
I
awoArE amrrcm mz-ncazmme ruseawc• c-emz. ocv suee�nnc. coaaEcrEo nr�nc
n
i>
w -
T
nCminnn (Din D 3y
or
"sP
3
y m 2
N
�nSu
ZOO
we.°i� m >O�
ZOO
mX'e o g 0 o p
`oma
O p U O D
N�mg >N-
o
mo51z
�
o,m yo IW�
ue 3 7
y
mD
000(]
ego
m8a $ S
0
n
To
N
N
wwfi+,rvwW � �w �p
nn
1.
in6u g�
9
� _
�
m O
-��S D �
a88�oS�S8o
D
gyo
o
mem e�
mWa ro
�
��
D
o 0 zo
o
vvv m o 0
V >.,
•pN
N�aeieN mo�•-°Sgu y
v>
m�m Nen m O
�Oppj000 y000y0
�OOOSO00sO00s0
f�
m�
Z�Tn�ZEyDZ*
�ODT�9 �O _
c�c
ntT rt,t L7 A
L]
CSC
y 2AAAyAAAyAAgyA
is �'i��nc,n���n6�� 'o
p000T000-000-� O
-yypN33��33zy
ogggogggogggvo
lm2
m29
D
�'
yUNUy�'n-NNi,n$a
yr�r�r
ivi�i
g-�r.�g=f
�r
o
Dw D
T4�vOi
�LiG�tOii
p
a
s
aI
sNAVAL FACILRIES ENGINEERINGPCOMMANDS EMID-ATLANTIC
P �Vp SLRMP
xMARINEPSCORPS
1
o
y
o ogo�o
y
o
�090
cc
Noo
y(]
yiny
BASE LNEJEUNE•�NLQ
4
yiny
v
vOi
ag�gag�gagNgag
MODERNIZATION OF K -RANGES (PHASE I)
H
N
y
4
FANGE DATA SHEET
-
-
m
y
g
n O
T
or
"sP
�nSu
ZOO
`oma
� 0
I O
<O�
z
mgamoaoo
o
�
0
ego
n
To
W�
nn
1.
n
9
� _
�
o
�
��
D
8i D�
V >.,
v>
e
f�
m�
my�
z
c�c
CSC
2 m��tm
lm
lm2
m29
D
�'
yr�r�r
ivi�i
�r
o
T4�vOi
�LiG�tOii
29y
LSA
L1
g
o
y
o ogo�o
y
o
�090
Noo
y(]
yiny
n4i�y�
yiny
v
vOi
ag�gag�gagNgag
A
-
-
iug=
-n
y
g
T
or
"sP
�nSu
ZOO
`oma
� 0
I O
<O�
z
mgamoaoo
o
�
0
ego
n
To
W�
nn
1.
n
9
� _
�
o
�
��
D
8i D�
V >.,
v>
e
f�
m�
my�
z
c�c
CSC
2 m��tm
lm
lm2
m29
D
�'
yr�r�r
ivi�i
�r
o
T4�vOi
�LiG�tOii
29y
LSA
L1
g
o
y
o ogo�o
y
o
�090
Noo
y(]
yiny
n4i�y�
yiny
v
vOi
ag�gag�gagNgag
A
REVDITE P1011- 02 IPR 2000 FILENAME• C-803. 0GN $DBMliIt+L• CORPECTED FINIL
n
o
s
D D
AT
o
i
D
3�>;�i3��iizz�
DDDDDyDDD�D�JJDD➢
5555555555555555 yz
a
mo_ r'_v_ 'u
»
v �+ Ln Q+ v � a �'n � ➢
ox
Pl
i555r5rm
zA
A A
w3�
sz
s s
x z
I>
A x
AA
oS�SooSS0000000Ydoo�a'6'o"aoo
oo
�m'•�S
m�wN�oem9mm'n
v v N Z N
D
a
wN,offi>o'�mm`A'wN=omm
8me NSm m i� �
��mddm m�m m
O j
33Z?i�iii�Lii>i
•m
N
V
8_
mOSSv
D
m
555555555555555555555555555
m O S
"0, m>
m��� �
m g
O
yg
01 o;;m
�J�gw�l�l��eyNvg��
vim
w w
O
y
A o
2
°-zy
s
m� a SS El O
mmm
v
"0,
+Nuo
555555555555555555555555555555555555555555555555555
04
m
T
Ap
Nm���m
nn5���555m
mW�mm
m
✓J
z55����m
m5
m55555S55�mN�eeem��eeee�N���'enp
z
a�NzziS$
z55555555555555555555555555555555555555555
zA
wwwwuuwwwuwwwwwwwwuwwuummm�p
°
mY�m
�
zm
xs;�W��xNxif;•muwuurm.,i;em�m�c%��gm
SS
o_
y
wammma=am=P�,amN&m=��°
ma
o
a
�
33yyyyyA�yyyAa
°
ohm
z N L
Aa
'g8o
D DA
ADA
m�°°m9�
DNA FACILITIES ENGINEERINGCOM
PAAxzF
y D
wM��mmM�ga0000ao�w°mMm�wmmmmmmmmmmm��mm��
�m�m$o-Nw�HmwwwwSg>�SNGU&�S�
m
u
=
a s
a XMPRINE SLORTPS AF3PSE v MAYA CAMP LEJEUNE•�NCA
�
w�`6w'mmywy++��mm�m�„'mwmmmmm'6w'mm�mmm
i
m•mu
e•mnnmm
MODERNIZATION OF K -RANGES (PHASE 1)
ui'i•uu
o
�n A O
m
Z
XYX'n
L^ E''�v'a
L' a
Yee
•mon
4
RANGE DATA SHEET
m
u
-
.
v
u��
m
D
y
3J
F)
O
o
m�����iiN��Zi�i���p��3
i
D
3�>;�i3��iizz�
DDDDDyDDD�D�JJDD➢
s
»
�
D
A A
w3�
sz
s s
x z
I>
A x
AA
oS�SooSS0000000Ydoo�a'6'o"aoo
�m'•�S
m�wN�oem9mm'n
D
wN,offi>o'�mm`A'wN=omm
QmQ++m�wm
mXm�om
33Z?i�iii�Lii>i
Om
8_
mOSSv
A A
m
555555555555555555555555555
m g
O
�J�gw�l�l��eyNvg��
y
mi
°-zy
s
mmm
mfF�o
+Nuo
555555555555555555555555555555555555555555555555555
mmm
m
T
Ap
Nm���m
nn5���555m
mW�mm
m
n5rr
z55����m
m5
m55555S55�mN�eeem��eeee�N���'enp
z
a�NzziS$
z55555555555555555555555555555555555555555
zA
wwwwuuwwwuwwwwwwwwuwwuummm�p
°
mY�m
�
zm
xs;�W��xNxif;•muwuurm.,i;em�m�c%��gm
SS
o_
y
wammma=am=P�,amN&m=��°
ma
o
a
�
33yyyyyA�yyyAa
°
ohm
Aa
'g8o
D DA
ADA
m�°°m9�
mmm�m�m
www
PAAxzF
y D
wM��mmM�ga0000ao�w°mMm�wmmmmmmmmmmm��mm��
�m�m$o-Nw�HmwwwwSg>�SNGU&�S�
�
w�`6w'mmywy++��mm�m�„'mwmmmmm'6w'mm�mmm
i
m•mu
e•mnnmm
ui'i•uu
o
�n A O
m
Z
XYX'n
L^ E''�v'a
L' a
Yee
•mon
m
u
-•me�
v
u��
u�+
D
y
3J
NIN
'g�8m��
�OOOOOOOOOCO000�
N
m
pp
pp
3
�p
o_
SEE NOTE t
�
O
o
m�����iiN��Zi�i���p��3
i
D
3�>;�i3��iizz�
DDDDDyDDD�D�JJDD➢
s
»
�
D
A A
w3�
sz
s s
x z
I>
A x
AA
oS�SooSS0000000Ydoo�a'6'o"aoo
�m'•�S
m�wN�oem9mm'n
D
wN,offi>o'�mm`A'wN=omm
QmQ++m�wm
mXm�om
33Z?i�iii�Lii>i
Om
8_
mOSSv
A A
m
555555555555555555555555555
m g
O
�J�gw�l�l��eyNvg��
y
mi
°-zy
s
mmm
mfF�o
+Nuo
555555555555555555555555555555555555555555555555555
mmm
m
T
Ap
Nm���m
nn5���555m
mW�mm
m
n5rr
z55����m
m5
m55555S55�mN�eeem��eeee�N���'enp
z
a�NzziS$
z55555555555555555555555555555555555555555
zA
wwwwuuwwwuwwwwwwwwuwwuummm�p
°
mY�m
�
zm
xs;�W��xNxif;•muwuurm.,i;em�m�c%��gm
SS
o_
y
wammma=am=P�,amN&m=��°
ma
o
a
�
33yyyyyA�yyyAa
°
ohm
Aa
'g8o
D DA
ADA
m�°°m9�
mmm�m�m
www
PAAxzF
y D
wM��mmM�ga0000ao�w°mMm�wmmmmmmmmmmm��mm��
�m�m$o-Nw�HmwwwwSg>�SNGU&�S�
�
w�`6w'mmywy++��mm�m�„'mwmmmmm'6w'mm�mmm
i
m•mu
e•mnnmm
ui'i•uu
o
�n A O
m
Z
XYX'n
L^ E''�v'a
L' a
Yee
•mon
O
3J
NIN
'g�8m��
ti
N
m
�
o_
��'=�"�"u
y
N
�w
N`m°mu`gn
�aa
b"&'
O
a
y
z
u
v
09
_
i°i•mm
w°'u
a
yy
m•g
in
Dm
m
DD
oS
i°
- O
u S
�mm
op1v
'ui��
a
� mi'
m
mmme
n•avD
O
m
�OOOSSOOOSNNOSOOOOSSOOOSOON
Sww
mxut"i_,
�y
�m
m4]GT�
I z
_
m0
SEE NOTE 1
O
o
m�����iiN��Zi�i���p��3
i
D
3�>;�i3��iizz�
DDDDDyDDD�D�JJDD➢
»
�
D
A A
w3�
sz
s s
x z
I>
A x
AA
_
�m'•�S
m�wN�oem9mm'n
D
wN,offi>o'�mm`A'wN=omm
QmQ++m�wm
mXm�om
Om
8_
mOSSv
A A
m
m g
O
�J�gw�l�l��eyNvg��
y
°-zy
s
mfF�o
555555555555555555555555555555555555555555555555555
y
� ➢
m
_
Nm���m
mW�mm
m
m5
m55555S55�mN�eeem��eeee�N���'enp
z
a�NzziS$
z55555555555555555555555555555555555555555
z
n
°
mY�m
�
zm
SS
o_
y
ma
a
�
33yyyyyA�yyyAa
DDDDD➢iS�bp�
Aa
D DA
ADA
DA x
mmm�m�m
www
PAAxzF
mmmmmmmmmm�fo�mmmmmmmwmm�mmmmm�mmmmmmmmmmmmmA
wM��mmM�ga0000ao�w°mMm�wmmmmmmmmmmm��mm��
Zm
i
NIN
ti
o_
��'=�"�"u
y
N
�w
N`m°mu`gn
�aa
b"&'
�m2rinN
a
y
z
i°i•mm
w°'u
a
m
m
o$$oas'�sa$�o��a'ease'$$a'��$a'oo�
Sww
mxut"i_,
I z
_
vm
`B
m
n�
m$$
?�
� o
y
� my
v
No„
ml I
mmv
°
z
ml,wP
v"y"Um&l;S
�•d
'�"
NGa
'�°?'�°
y
�'mmmw�mmwm�`
zSiv.w.Nov•°
m�'SSS'S100M-�
mmm�'�Sm�SS�'SmmSmmmm�SSmmmwSmm
�
mX•=eS>No��wom
°m'W�
� o
O
000000000000000000000
00000OOOOOOOOOOOOOOOOOSO000000�OOmm
�0'
m�
SEE NOTE t
y
0
i
D
3�>;�i3��iizz�
DDDDDyDDD�D�JJDD➢
�
D
A A
A
m AF
AAAANA
s s
x z
I>
A x
AA
_
�m'•�S
D
QmQ++m�wm
mXm�om
� O
8_
mOSSv
A A
m
m g
O
�J�gw�l�l��eyNvg��
y
°-zy
s
mfF�o
y
� ➢
m
_
Nm���m
mW�mm
m
�
z
a�NzziS$
z
n
°
mY�m
�
�ge000��oNNggmn
SS
o_
y
ma
a
�
33yyyyyA�yyyAa
DDDDD➢iS�bp�
Aa
D DA
ADA
DA x
AT.xF
Al
PAAxzF
AAA
Zm
HIM
TI
n
_,o
.!I
C--)
FTI
R
" s
gl5
I
A s'
2
"�o
a
�
r ZA
g
X
@
n
_,o
.!I
C--)
FTI
R
" s
gl5
NAVAL FACILITIESENGINEERING NCOMMAND �—MID-AT1AN 71C
AAixs cwrs xox,x CaAa �vn iP, xnv.,� s,ar w xoxraK u�xcixin
xMARI
A s'
2
"�o
p
o
g
X
@
-I�
to 3
NE CORPS BASE CAMP LE JEUNE, NC
o y,
a.
Qa
i
MODERNIZATION OF K -RANGES PHASE I
s
s "�
p
P3 ORDNANCE REMEDIATION ACTIVITIES
=�
n
L
acvoarE aLor*Eo. ez naa zmee F�LEHw�E. aE ima az mamiaa�cE RENEoinrimr+ ac.ivi*IEs.mcR --71L, cmRREcrED aIa«
N
3
I—
D I N
IC,
F
N
3
I—
D I N
IC,
Yl
I/
s
I
1
n
O
o
4 O
fTl
re;
a
a 5°
a; a
nNAVAL FACILITIES ENGINEERING COMMANDS MID-ATLMITIC
o —1- 1 PSRoa„ v AaIve
ABASE P SCAMP
f
'"
¢
e
m
m n 0
;tee
4
MARINE CORPS LEJEUNE NC
4—
D
b 5
$MODERNIZATION OF K -RANGES (PHASE
F W
I
PC ORDNANCE REMEDIATION ACTIVITIES
Yl
REVOnTE vLOiiEO02 nvR-2008 FILENaME• 0E-10<- ca DRDININCE REME-7ICN ICi1VIT1ES.GGN SIIRMITTIL. CORRECTED FINAL
n
N N
N
O
01
3
L
GG
m m
a L
3 0 Q 6 M DEvnAtxExl IxE xR r nnv EA riEs ExDIrvtERiw Cwxau €�- p R� R i A tl C 2^
O n NAVAL
9 Tl Nsg 9 ¢6 Pe � - -a xM+IxE cwF�ACxIwLRrx
I—. EERING COMMSANrDx - N.—I. 1-111A
NC
MARINE 8R5E CAMP LEJEUNE
e a e 3 MODERNIZATION OF K -RANGES (PHASE 1) R s'
4 P4 ORDNANCE REMEDIATION ACTIVITIES F
m n O
I
ti
L
D Fj I n C�D
m
P
Diu
o�
m�
279900
28
�a
280189
ag
D m�
mo � m ti
25
I
0
- o 0
o_
3
m
t
e
x
y
asp
4 �
p
n E deo
xj b -
e
NAVAL FACILRIESENGINEERING�COMMANDx—MID-ATLANTIC
S unix[ ca+ s xwrn c xnixr, srxriox - xoxrarc, Hxnxin
MARINE °CORPS °BASE x^sµ CAMP LEJEUNE, NC
MODERNIZATION OF K -RANGES (PHASE 1)
n � a
£
i
�
d
F
e? n'3 O
j
ELECTRICAL LAYOUT PLAN
r�
m
P
Diu
a
(J
D CID I n E:D
D I CU I cJ I v
il
3
I
3
3
I
o=
D
0 0
J3 n Z
Qm
¢
R
g
'P
�
g � �
"J $
-
� NAVAL FACILITIES ENGINEERINGnCCMMANDx—MID-ATANTC
o unxmr ca+ s na+sx c xarrvn � srnnax - xanrax. "nrmin
MARINEP CORPS nBASE P xnvr CAMP LE JEUNE, NC
$MODERNIZATION OF K—RANGES (PHASE 1)
°i, � o
4 �
"s x �
f
,"sly p
� �
�
d
A s
4
E � m�
''3 'O3
ELECTRICAL LAYOUT PLAN
D I CU I cJ I v
il
2
L+
-T
L
"I c n 1 0
x�
o
D
D
N
E3
m
3
--
=
4
R
C
R
a o
a o
� "
'o
a g
6�' `
� 1 -
� NAVAL FACILITIES ENGINEERING C.OMMAND-MIDATLANTIC
� 4nnix[ con s xcarx c nairvn srnnax xaxrax vnuxi
nBASE�vr xn�n�CAMP
' "
� ' g
2 y a§
R `
Y e
_
4 y A
yg
i B'
9g
B
Q
�
� d
� � m� O
3 e N
MARINEn CORPS LEJEUNE, NC
MODERNIZATION OF K -RANGES (PHASE 1)
ELECTRICAL LAYOUT PLAN
Appendix B. Notification of Jurisdictional Determination
Cvk ARNTY CORPS OF UN,GINEERS
DISTRICT
AC. ;_i T J, 2 fl, 0 7 3423 0 67 C")u.T'fyr: OnOo"V"- 17.S�f,1S, Qu;,d: jackson0le Awth
NOTIFICATION OF JU'l-USDICTIONAL RETEIVINUNATION
Agent: Gen -Marble Inc.
enr, Ov"D U'SNIC— Cam-, 1xieun
A act, -v ittri: Martin Korefick. attli: Jef Dellern,
ply; C UNWO 4 203 Thmdu Bhd
Camp Lle"e. NQ 2, 542 11aninton. VA 23666-1572
flropz'rty je'scriptiorl:
She (Mr.) 4407() Nearest Tovvn Jacksonvilie
Nemnst Vlater"uy 'Whitehurst Creel./' -own Creel; Rivcr L�asiri White Oak
USCIS iTUC 03030001 Coorjinaies 34.643TINT, 77.3926"W
Location description Tbg site is loymd on Me nvoun portion of the Rise northeast of Stone Bay Me Ra= Tile
nroject area was vomprked of Eve bornhing nmgm 1301- 305 and the associated downran-.e fields .The'.zite is located
west of the Nem, Mer and south of,laclsonville. onslow County.
Inmeme Which of the Following A r)lv:
A. Preffininai-y Deterraiination
Based on prelttninar�y informarion, there may be wetlands on th� above described prop�.fty We stongly suL., Lst you 'have
this PTOPCI-ty iT_ISPeCILCd to CICtormine the extent of Department ofthe Arrriy (DA") jurisdiction. To be considered final, a
jurisdictional detcrntiriation must be verified by be Corps. This prelhinary dettermination is not an appcallable action
under the RegUI3t0ry P -Mg -Tarn Admirdsarabe Appeal Process ( Reference _13 CY'R Part 331).
B. Approved Determination
There are Navigable Waters of the United States whhdn the above described propert), sutJect to the pcnnit requirerneT.as of
Section 10 of the Rivcrs and Harbors Act and Section 404 of the Clean 'Aater Act. Unless there is a change in the law or
om- published r,,�gullations, this dote-=, may be NO upon R a period not toexceed five years from the date ofthis,
notification.
There, are wctlan'ds on be above described propene- subject to the pernfit requirements of Section, 404 ofthe Clean Water
Act (CW_k)(3_3 (J SC 6 1 .3441). Unless there is a change in the law or our published %gulations,this dete—mination 1-11ay be
Kied upon Rx a puld w4 u) exceed Ave yews ftornthe date of this T101i.fiCation.
— Ale strongy, suggest yu hmv be wee Nnds on your property delineated. Due to the iz-, ofyour property and/or our
presew wowbal Ve Corps rnny not beable to acconiplish this wetland deli ncath n in a timmly rnuincr, For a more, Llincly
delineation.
, y ou fnay uisb to Utah a consulumt. To be considered final, arty iclincation muf'I be Vcrific-cl by, the Cc -in, S.
X The mT&nd on 3am pnTmy Me bun d 0 innawd and the delineation has been ;xi Bed by Ow Cor i 11wCorp sha.'s
agvcj to 1. eri?y the -�vetlandsa,,isociaied with the K2 7-mige utilizing remote sensitni sitioe access, is prohibited, Tine package
endtledArnendod Delinazation Suppicnient for the K2 Ranc Prqjjw; Niod _M-�uclh, 225" 2009 is the cu—ia, approved
jurisIctional Y_-niap.
The wMands have be, -m delincx.od aiKl urrvqwd and are accur:aely dJq)ictc-,d on tht, plat sign�d by th-cCorps
iZg;ulalx-_
, % offlcial klontified bLI(Iii on _� UnIcss there N a change in the la"- or our published regukakur, this
ddermMion may be up o -in for o. jarkid not to exceed five years Rom the dai,, iii lThis notificanion.
Thzw am no a mus of At LES. R, KE. Wdc "TAwKs, Ivesew an the abowe MOM 1mopedy "Odi are QV ci to lh,c
purnh reViremens of Sevion 404 oF5,I- Clean V,`LtcrAcI 03 IISC 1344). UnKs then h a change in Ve In or on -'r
publislwd ruguhcion s. 00 c4tearjundonmay be MY st hur a pw4d nx to exand Pit jous Rom do to of Ks
, 1 ht Froporp 4 knowd K 09C of tic 10 Quol cownbs',," U', reguMmi under the OYU Area Manqwmmn Act
YCAIIA! You Mid now blanagamms in NC. a-, t,,'25,_'� tcj JI_n,_rn,-Jrne
m1n,000"WaScr Q in= KiN "! hin a w, HE, t� nk.l"MAS Wn" 'm il 11,-
makme a Admin, I .._w. v.. 301 of AeCkni Ts to- Act (;F !:�C'y 111 :!if you a:,.,t
daminkmon MAN ,yo e comao load Qn "I m QW2540 M
C Basis loorlhimaination,
Pm suldeor area an wars to psyss chargAMMs whasmAWAAMM 'N%m u,j .Inj is abutfi,,-2o
to pi?.her Tons CreekorVajahum Clod" horh I= oftlic''N vsjzn% It 'e
1). Re.nnut-Ls
Tbe Ate w, -s iorifliA uAkAs Ow but mmRAQ remye gnsirm ALPLorypatolmn mly)XV011tv-di ON; Gno Miritme We
cT
-Aq3PC,--,N lrf4rmation (This ifform—tiom app[ks qnl� to approved jt,,,,-isjiczkw.21 dicermirations as indicia -d in
B. above)
TO cou,)ctudenco consthutcs mn approvull judUktional f,-)rdhe allo7
-,ination, I ou nmy
Na ,r anadrninvztralivc, -,l.ppoalundt-r Corpsit 30 CFR pan 33L Endond you W find a
N7otit-jcamioil of."'Pp":at Process (NAP) fact slh�ect and req--+ •st for --u rect"!-sl to s
ou ni,,is-L Wmh a umTkad RFA Rrm to We Woming address:
IDD M`ilniinigion Rcggtdato�� i 'isi )
-i - i c t I --, 1, 1 , i -i a 7� D 11
A-i�,ui Brad SLa,,,�r,
P.0, BOX I R90
in oricr for an 1',,F -A to b.., 2 1 thc COT& Ow cori's rnust jen-nmnint. -dhm it is conliplete, th'at it '!11-;c crit.aria -br
appeal under 33 CFR part 3 31,5. and Ltiat it has bc`e n r*.ceived by iht- Dis,,Jct Office -wi-Lhiin 60 days ofthe diate of Jt N4,,R
shm"M �ou dt"cid-c- to R:FA fiotrniit mas, IN', aI III)'- above is is lhS 5/31!,2001S'
**h is not rwcegm, to subSt an RFA Rmmi to :at District ffl.,,?ou JCnol ol!�,ect to'dhiL
�:orrcspondtincL. * ,
COTS Reguknory- of"111cial:
Doe 33MM8
F--%pirati,nn Date, 3�,'31/2013
Tbe 'Wili,ningion District is emmined to rwoviding die highest Wel (Al'SU70i)(41-1 to public. To 111 !P us cnsure Co'ntimuc lo
W sm p. .vim umMk,�.flh,G arnacllhedl custom n MOW% Swwy o"N't
TAI 1ANDM rj dichnnLl If, C,. mnr,.Ctc ihc sur",
_
QT; Rumided:
WAVFAC NNIAMMe arn: WHO jones 6506 MnThm Bhd, LRA BQV MAM %A 23=27i�