Loading...
HomeMy WebLinkAbout20061576 Ver 2_General Correspondence_20080605ADAMS FARM _ "A planner! community of erceAence." June 4, 2008 Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 RE: Adams Farm Lake Bank Stabilization - DWQ Project #06-1576v2 Dear Ms. Karoly: We did not respond to your letter of February 13, 2008 because we were working with Andrew Williams from the Army Corps of Engineers to determine the type of permit needed to complete this project in its entirety. We will address each of your concerns in full and resubmit our application when we hear from the Corps of Engineers. Please provide us with a contact name and number so that we can discuss the issues and address all of your concerns at once and hopefully receive your approval. We are going to lower the level of the lake by pumping water from the lake. We will lower the level approximately 36" and this lowering will address the issue of stream impact; because with the lower level there should be water or stream disturbance. Please provide the requested information and we will resubmit our application as soon as possible. S' erely, ames Thompson Property Manager C I VJUN 5 p, DENR - WATER 'P ANDSANDSFpa pVQtjAU;} ?yHH P.O. Box 77726 9 Greensboro, NC 27417-7726 9 P: 336.455.1582 * P: 336.638.9366