Loading...
HomeMy WebLinkAbout20080902 Ver 1_More Info Received_20080606oy-OW- Environmental Consultants, PA Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 www.SandEC.com June 6, 2008 S&EC Project No. 7185.W10 Ms. Natalie Landry NCDENR-DWQ Raleigh Regional Office 3800 Barrett Drive, Suite 101 Raleigh, NC 27609 Reference: The Bluffs Phase 2 Mr. Danny Smith NCDENR-DWQ NPS Assistance and Compliance Oversight 1617 Mail Service Center Raleigh, NC 27699-1617 Notice of Violation Response NOV-2008-PC-0230 Chatham County, NC Dear Ms. Landry and Mr. Smith: 1= our= _r JUN 6 2008 DENR -WATER WAU Y WETLANDS AND STORMWATER BRANCH As requested in your May 8, 2008 Notice of Violation (NOV), Soil & Environmental Consultants, PA (S&EC) has been engaged by Chatham Partners, LLC & Polk Sullivan, LLC to prepare this NOV response. Within the May 8, 2008 NOV, the following violations were listed and identified: 1. Stormwater General Permit (NCG010000) Condition Violation The remainder of this letter will respond to each item individually; the original request will be in italics followed by our response: The approved Sedimentation Control Plan must be followed. Provide a statement documenting that the approved Erosion and Sediment Control Plan is on-site and available for review. The Erosion and Sedimentation Control Plan is kept in the monitoring box at the location discussed in a previous email correspondence (May 16, 2008). The applicant has no idea why the plans were not available on the day of your site inspection. It is possible that the plans were being updated and/or reviewed by another party during the timeframe of your particular visit. 2. A rain gauge must be maintained on site as required by the permit. Provide a photograph of a working rain gauge on site and note the location. The Bluffs, Phase 2 Soil & Environmental Consultants, PA June 6, 2008 Project No. 7185.W 10 Please see the attached picture of the rain gauge located at the logging access road. It should also be noted that there has been no activity on the Phase 2 side of the development since November of 2007. 3. Provide all rain gauge data collected to include the past four months of monitoring records through to the date of your written response to this letter. If you do not have data, explain why. Please see the attached rain gauge data for the Bluffs development. As discussed above, there has been no activity on the Phase 2 portion since November of 2007. 4. Provide inspection records to include the past four months of monitoring records through to the date of your written response to this letter. If you do not have records, explain why. As previously stated, there has been no active work on the Phase 2 portion of the Bluffs development since November of 2007 and therefore, there are no monitoring records; the applicant did not think it was necessary to monitor a site where no activity was taking place. 5. Remove the temporary erosion control measure (check dam) from the stream and restore the natural grade within 30 days of establishing permanent ground cover. This has been addressed as requested. Please see the attached pictures that demonstrate compliance with this item. We anticipate that this addresses all of the DWQ's concerns. If you have any further questions or any additional explanation is needed, please don't hesitate to call. Sincerely, Nicole J. Thomson Regulatory Specialist Cc: Mr. Monte Matthews, USACE, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Ms. Cyndi Karoly, DWQ, 2321 Crabtree Blvd., Suite 250, Raleigh, NC 27604 Mr. Darden Swain Mr. Robert Swain Ms. Cheryl Everette Page 2 of 2 STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 01-07-08 Inspection Date: 01-07-08 Amount Initials Rainfall Date No precip since - RDS last inspection By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 01-14-08 Inspection Date: 01-14-08 Amount Initials Rainfall Date No precip since - RDS last inspection By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 01-14-08 Inspection Date: 01-18-08 Amount Initials Rainfall Date 01/17/08 0.75" RDS COMMENTS: Site Stabilized By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 01-21-08 Inspection Date: 01-23-08 Amount Initials Rainfall Date 01/9/08 trace RDS COMMENTS: Site Stabilized By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 01-28-08 Inspection Date: 01-30-08 Amount Initials Rainfall Date No precip since - RDS last inspection By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 01-28-08 Inspection Date: 02-02-08 Amount Initials Rainfall Date 02/01/08 1.00" RDS By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 02-04-08 Inspection Date: 02-07-08 Amount Initials Rainfall Date No precip since - RDS last inspection By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 02-11-08 Inspection Date: 02-14-08 Amount Initials Rainfall Date 02/12-14/08 1.50" RDS COMMENTS: Site Stabilized By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-1LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road FOR WEEK BEGINNING: 02-18-08 Inspection Date: 02-20-08 Amount Initials Rainfall Date 02/17/08 0.20" RDS By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 02-25-08 Inspection Date: 02-27-08 Amount Initials Rainfall Date 02/22, 24, 26/08 0.80", RDS cumulative By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 03-03-08 Inspection Date: 03-05-08 Amount Initials Rainfall Date 03/04-05/08 1.25" RDS COMMENTS: Site Stabilized By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 03-03-08 Inspection Date: 03-08-08 Amount Initials Rainfall Date 03/07-08/08 1.50" RDS COMMENTS: Site Stabilized By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-1LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 03-10-08 Inspection Date: 03-12-08 Amount Initials Rainfall Date No precip since - RDS last inspection By this signature, I certify (in accordance with Part 11 Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 03-10-08 Inspection Date: 03-16-08 Amount Initials Rainfall Date 03/15-16/08 0.80" RDS By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 03-17-08 Inspection Date: 03-20-08 Amount Initials Rainfall Date 03/19/08 0.30" RDS COMMENTS: Site Stabilized By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 03-24-08 Inspection Date: 03-25-08 Amount Initials Rainfall Date No precip since - RDS last inspection By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 03-31-08 Inspection Date: 04-01-08 Amount Initials Rainfall Date 03/29, 30, 31, 1.30", RDS 01/08 cumulative By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 04-07-08 Inspection Date: 04-07-08 Amount Initials Rainfall Date 04/03-06/08 1.90", RDS cumulative By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 04-14-08 Inspection Date: 04-14-08 Amount Initials Rainfall Date 04/11/08 & light 0.25" RDS drizzle during inspection By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 04-21-08 Inspection Date: 04-21-08 Amount Initials Rainfall Date 04/19, 20, 21/08 0.50", RDS cumulative. Raining during inspection By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: Site Stabilized STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 04-28-08 Inspection Date: 04-29-08 Rainfall Date Amount Initials 04/27-29/08 severe t-storms at time of weekly inspection was delayed due to hazardous conditions 1.80", cumulative. By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road MONITORING FOR WEEK BEGINNING: 05-05-08 Inspection Date: 05-06-08 Amount Initials Rainfall Date No precip since - RDS last inspection By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III COMMENTS: STORMWATER INSPECTIONS FOR GENERAL PERMIT NCG01000-LAND DISTURBING ACTIVITIES PROJECT: The Bluffs - Logging Access Road : MONITORING FOR WEEK BEGINNING: 05-12-08 Inspection Date: 05-12-08 Rainfall Date Amount Initials 05/09-12/08 1.60", RDS cumulative COMMENTS: By this signature, I certify (in accordance with Part II Section B, 10 of the NCG01000 Permit) that this report is accurate and complete to the best of my knowledge: R. Darden Swain III Site Stabilized Figure 1 - Rain Gauge and Sediment & Erosion Control Monitoring Box Figure 2 - Approved Sediment & Erosion Control Plans in Monitoring Box Figure 3 - Bridge View (East) Prior to check dam removal Figure 4 - Bridge View (East) post check dam removal Figure 5 - Bridge view (west) prior to check dam removal Figure 6 - Bridge view (West) post check dam removal