Loading...
HomeMy WebLinkAbout20161014 Ver 1_Columbus 230308 PCN Application Final Submitted 2016-9-29_20161020September 30, 2016 Wilmington Regulatory Field Office US Army Corps of Engineers 69 Dazlington Avenue Wilmington, NC 28403 ATTN: Liz Hair NCDOT Coordinator Deaz Madam: Subject: Pre-Construction Notificarion for proposed installation of a culvert at Bridge No. 230308 over Soules Swamp on SR 1005 (Peacock Rd.) in Columbus County The North Cazolina Department of Transportation (NCDOT) proposes to replace the elcisting two span (2 @ 18'-6") reinforced concrete deck on i-beams with reinforced concrete caps and timber piles. The proposed structure is a RCBC (3@ 12'X8') with a 1.0' sill on the center barrel and 2' sills on the outside bazrels. Traffic will follow an offsite detour during conshuction. Pennanent impacts to jurisdictional wetlands cover approximately 0.11 acres resulring from installation of the new culvert and abutments and temporary impacts totaling 0.04 acres due to hand clearing and sediment and erosion control devices. Permanent impacts to jurisdictional streams cover approximately 421f of permanent impacts and 91 lineaz feet of temporary impacts. A total of 0.22 acres of non-riparian wetlands and 84 linear feet of wazm streazn are being offered as mitigation for this proj ect. Please see enclosed copies of the Pre-Construction Notification (PCI�, Preliminary Jurisdictional Determination Form, DMS Mitigation Letter, stormwater management plan, pernut drawings, and the LIBR spreadsheet for the above-referenced project. This project was let on 6/2/2015 and construction is due to begin 10/3/2016. Regulatory Approvais Section 404 Permit: The NCDOT requests that these activities be authorized under a Narionwide 14 permit. Section 401 Permit: The NCDOT requests that these activities be authorized under Water Quality Certificarion Number 3886. We anticipate that written approval from the NC Depaztment of Water Resources will be required. If you haue any questions or need additional information, please contact me at (910) 437-0207. mcerely, � � I��S James J.�terko / Division Environmental Officer — Division 6 `O��F WA7F�QG � r � � a -c Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. A licant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 3886 1c. Has the NWP or GP number been verified by the Corps? � Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: Replacement of NCDOT Bridge 230308 on SR1005 over Soules Swamp 2b. County: Columbus 2c. Nearest municipality / town: Chadbourn 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P, or state NCDOT Project: 17BP.6.R.63 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. Not applicable 3c. Responsible Party (for LLC if �ames J. Rerko, Division Environmental Officer applicable): 3d. Street address: PO Box 1150 3e. City, state, zip: Fayetteville, NC 28302 3f. Telephone no.: (910) 437-0207 3g. Fax no.: (910) 486-1959 3h. Email address: jjrerko@ncdot.gov Page 1 of 10 4. Applicant Information (if difFerent from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Not applicable 1 b. Site coordinates (in decimal degrees): Latitude: 34.325283 Longitude: - 78.799314 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 6 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Soules Swamp proposed project: 2b. Water Quality Classification of nearest receiving water: C; Sw 2c. River basin: Lumber 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing conditions at the Project Site include maintained/ disturbed roadside shoulder and forest areas. Land use in the Project Vicinity is predominately agriculture and forest with scattered residential properties. 3b. List the total estimated acreage of all existing wetlands on the property: Approximately 0.75 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Approximately 200 linear feet 3d. Explain the purpose of the proposed project: To replace a structurally deficient and functionally obsolete bridge 3e. Describe the overall project in detail, including the type of equipment to be used: Replace the existing two span (2 @ 18'-6") reinforced concrete deck on i-beams with reinforced concrete caps and timber piles. The proposed structure is a RCBC (3@ 12'X8') with a 1.0' sill on the center barrel and 2' sills on the outside barrels. Traffic will follow an offsite detour during construction. Standard road building equipment, such as trucks, dozers and cranes will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained fo�r this property / � Yes � No ❑ Unknown project (including all prior phases) in the past. Comments: 4b. If the Corps made the jurisdictional determination, what type � preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. Page 3 of 10 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): � Wetlands � Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem ora T Site 1� P❑ T Permanent Fill Bottomland � Yes � Corps 0.11 Hardwood Forest ❑ No ❑ DWQ Site 1❑ P� T Temporary Fill Bottomland � Yes � Corps 0.01 Hardwood Forest ❑ No ❑ DWQ Site 1❑ P� T Hand Clearin Bottomland � Yes � Corps 0.02 g Hardwood Forest ❑ No ❑ DWQ Site 2� P❑ T Permanent Fill Bottomland � Yes � Corps <0.01 Hardwood Forest ❑ No ❑ DWQ Site 2❑ P� T Temporary Fill Bottomland � Yes � Corps <0.01 Hardwood Forest ❑ No ❑ DWQ Site 2❑ P� T Hand Clearin Bottomland � Yes ❑ Corps <0.01 g Hardwood Forest ❑ No ❑ DWQ 2g. Total wetland impacts 0.15 2h. Comments:Permanent impacts (0.11 acres) due to road shoulder expansion. Temporary impacts (0.04 acres) due to installation of erosion control measures and hand clearing. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type ofjurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 � P❑ T Culvert Installation Soules Swamp � PER � Corps 18 42 ❑ INT ❑ DWQ S1 � P❑ T Bank Stabilization Soules Swamp � PER � Corps 18 91 ❑ INT ❑ DWQ S2 ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 133 3i. Comments: Permanent impacts are the result of installation of the RCBC. Temporary impacts are due to bank stabilization with rip rap. Page 4 of 10 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tem ora T 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 Sf. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surFace area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require miti ation, then ou MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Tem ora T im act re uired? B1 ❑P❑T ❑Yes ❑ No B2 ❑P❑T ❑Yes ❑ No B3 ❑P❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed culvert provides more effective hydraulic opening than the existing bridge and will be replaced in-place. The culvert will be buried to maintain stream bedform and there will be no excavation in non-permitted jurisdictional areas. The removal of road fill for the culvert bridge will increase the size of the opening. Promotion of sheet flow and infiltration over stabilized banks or grassed surfaces is proposed. Side slopes will be 2:1 and 3:1 to minimize the amount of fill in the wetland. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Best Management Practices for Protection of Surface Waters and for Bridge Demolition and Removal will be implemented during the construction phase. Drill shafts will not be utilized. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for � Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ � Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? � Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. � Yes 4b. Stream mitigation requested: 84 linear feet 4c. If using stream mitigation, stream temperature: � warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: 0.22 acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page7of10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes � No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? Not applicable 2b. Does this project require a Stormwater Management Plan? ❑ Yes � No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The Stormwater Management Plan is designed in accordance with NPDES Permit #NCS000250. Please see attached permit drawings and stormwater management plan. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local governmenYs jurisdiction is this project? Not applicable ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply � ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes � No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? � Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? � Yes ❑ No Page 8 of 10 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes � No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: Not applicable 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 26 .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Not applicable Page 9 of 10 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federelly protected species or habitat? 5b. Have you checked with the USFWS conceming Endangered Species Ad impacts? 5c. If yes, indicate the USFWS Field Oifice you have contacted. � Yes ❑ No ❑ Yes � No ❑ Raleigh ❑ Asheville Sd. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical HabitaY? NC Natural Heritage Program, USFWS website, and field surveys which determined no et%ct for all listed species. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? I❑ Yes 6b. What data sources did you use to detertnine whether your site would impact Essential Fish Habitat? NOAA Essential Fish Habifat Mapper 7. Historic or Prehistoric Cultural Resources (Corps RequiremeM) 7a. Will this project occur in or near an area that the state, federal or fibal govemments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or propeAies significarrt in North Carolina history and archaeology)? ❑ Yes �� . 7b. What data sources did yau usa to determine whether your site would impact historic or archeological resources? NCDOT PDEA — Human Environment Section 8. Flood Zone Designation (Corps Requirement) 8a. Will this project oxur in a FEMA-designated 100-year floodplain? I� Yes � No 8b. If yes, explain how project meets FEMA requirements: NCDOT-NCFMP Memorandum of P�qreement (MOA) Type 2b. 8c. What source(s) did you use to make the floodplain determination? FEMA James J. Rerko ApplicanUAgenYs Printed Name I (AgenYs if an Page 10 of 10 Floodplain Mapping Program September 30, 2016 ure��` I Date letter from the applicant Hi�hWay North Carolina Department of Transportation ����� � `���* HighwayStormwaterProgram I!:�.� STORMWATER MANAGEMENT PLAN �"��=^�--'�� (Version 2.04; Released Navember 2015) FOR NCDOT PROJECTS WBS Element: 17BP.6.R.63 TIP No.: 230308 Count (ies): Columbus Pa e 1 of 2 General Project Information WBS Element: 17BP.6.R.63 TIP Number: 230308 Pro'ect T e: Brid e Re lacement Date: 5/23/2016 NCDOT Contact: Jonathan Moore Contractor / Desi ner: Brandon Barham, PE - Ecolo ical En ineerin Address: 1000 Birch Ridge Drive Address: 1151 SE Cary Parkway Ralei h, NC 27610 Suite 101 Car , NC 27518 Phone: 919-707-6738 Phone: 919-557-0929 Email: 'Imoore6@ncdot. ov Email: bbarham@ecolo icalen .com Cit /Town: Chadbourn Count ies : Columbus River Basin s: Lumber CAMA Count ? No Wetlands within Project Limits? Yes Pro ect Dessri tion Pro'ect Len th lin. miles or feet : 0.07 Surroundin Land Use: Forest and agricultrual land uses Pro osed Pro'ect F�cistin Site Pro'eCt Built-U on Area ac. 0.3 ac. 0.2 ac. Typical Cross Section Description: 2@ 11' lane with 7' shoulders 2@11.5' lane with total bridge width of 24 ft and total brige length of 37 ft Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 2500 Year: 2013 Existin : 2500 Year: 2013 General Project Narrative: State Project 17BP.6.R.63 involves the replacement of the existing NCDOT Bridge #230308 on SR 1005 over Soules Swamp. Bridge #230308 consists of 2@18'-6" RC Deck (Description of Minimization of Water on Ibeams with RC Caps and timber piles. The existing bridge will be replaced with a proposed 3@12'x8' RCBC with a 1' sill on the center barrel and 2' sills on the outside Quality Impacts) barrels. The proposed structure is located in Zone AE of FIRM Map number 3720026000J and was studied by "Limited Detail" methods. W ' �tformation Surface Water Bod (1): Soules Swam NCDWR Stream Index No.: 15-4-8 NCDWR Surface Water Classification for Water Body Primar Classification: Class C Su lemental Classification: Swam Waters Sw Other Stream Classification: None Im airments: None A uatic T&E S ecies? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Pro'ect Includes Brid e S annin Water Bod ? No Deck Drains Dischar e Over Buffer? N/A Dissi ator Pads Provided in Buffer? N/A Deck Drains Dischar e Over Water Bod ? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) /• v �� HlghWay North Carolina Department of Transportation Stormwater F i ��,",«.� Highway Stormwater Program ���;; STORMWATER MANAGEMENT PLAN -- �� (Version 2.04; Released November 2015) FOR NCDOT PROJECTS WBS Element: 17BP.6.R.63 TIP No.: 230308 Count (ies): Columbus Pa e 2 of 2 Bridge to Culvert Avoidance and Minimization Pro osed Structure Summa Sheet No. & Station Sheet No.: 4 Station: 13+87 -L- Number of Barrels: 3 Draina e Area (ac or s mi): 2.4 S. Miles Barrel Width/Diameter (ft): 12 Surface Water Bod : 1 Soules Swam Barrel Hei ht ft : 8 Culvert T e: Culvert Len th ft 42.1 Avoidance and Minimization Efforts: Erosion Control - Bank stabiliztion with Class II rip rap will be utilized up and downstream to avoid bank erosion. Impervious dikes will be used (Bridge to Culvert) during the construction of the culvert. Silt fence will be installed along the fill slopes and upstream of all wetlands and streams. Minimize Clearing During the construction of the proposed culvert and roadway there shall be minimal clearing of vegetation on the existing shoulders and side slopes. Stream Slo e Fish and/or A uatic Life Passa e Existing Average Stream Slope (%): 0.80 % Existing Low Flow Channel Dimensions 17 ft wide channel Proposed Culvert Slope (%): 0.05 % in the Stream: Culvert Burlal Proposed Culvert Burial Depth (ft): 1 Existing Streambed Material: Sand, silt Proposed Low Flow Dimensions The proposed culvert will be buried 1'. The Through the Culvert: center barrel with have a 1' sill and the two Proposed Sills/Baffles: The proposed culvert will be buried 1'. The center outside barrels will have 2' sills. barrel with have a 1' sill and the two outside barrels Existing Low Flow Velocities in the will have 2' sills. Stream (ft/s): 1'4 ropose ow ow e oci ies roug the Culvert (ft/s): �'� Alternating Low Flow Sills/Baffles: The center barrel with have a 1' sill and the two outside barrels will have 2' sills. Culvert/Stream Ali nment Stream Patterns Upstream and Downstream The existing stream has some sinuosity but should not impact fish passage and bank stability. of the Culvert that Could Affect Fish Passage and Bank Stability: Bed Forms Impacted by Culvert (riffles, Existing features will not be impacted by the proposed culvert. pools, glides, etc.): Low Flow Floodplain Bench Required? No (provide justification) Sharp Bends at Inlet/Outlet? No (describe culvert ali nment with stream) Stream Realignment Necessary? (provide No justification) Bank Stabilization: Class II Rip Rap is proposed as bank stabalization approximately 45' upstream and downstream. Outlet Velocities Natural Stream Channel 2-yr Velocity (ft/s): 1.4 Natural Stream Channel 10-yr Velocity (ft/s): 0.7 Proposed Culvert 2-yr Outlet Velocity (ft/s): 0.7 Proposed Culvert 10-yr Outlet Velocity (ft/s): 1.5 Roadwa Geometric Considerations Evaluate/Describe Roadway Geometric Constraints: N/A See Sheet 9A For Index of Sheets See Sheet 18 For Conventlonal Symbols See Sheet 9C-9 For Survey Control Sheet d` � 0 N V � � � V � � 0 V �J ���`i1�� �ll' ����� �������� �.����y������� ���°� �����.� ���'y�°���v� COLUMBUS COU11tTY LOCATI011L• BRIDGE 1110. 230308 ON SR 100� (PEACOCK RD.) OVER SOULES SWAMP TYPE OF WORK GRADIIIIG, DRAi11lAGE, PAVI11tG, A111D CULVERT WETLAND AND SURFACE WATER IMPACTS PERMIT THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF CHADBOURN. • DETOUR ROUTE n u TO SR 1414 (OLD PINE LOGGING RD.) �.7I_AK=� �� �- o� m� SITE 1 =� I I f " . =DRIr � � ��� . � " . � wDR2- A DESIGN EXCEPTION IS REQUIRED FOR SHOULDER WIDTH. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II MODIFIED. � SITE 2 _, . . . _, . . . -- ��----•- - - �------- --y-- 1 5 < END CULVERT -L- STA. 14 + 05.50 + � �o � � � / y O O PERMIT DRAWING SHEET 1 OF 8 � TO NC 130 INCOMPLETE PII.ANS DO NOT L'SE FOR Rf W qCa[11SITION I'RELIMINARY IDLANS DO NOT USE FOR CONSTRUCTION GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared ln the Offlce of: FIyDRAULICS ENGLNEER � su�1r��T 5�4 Meadowla�d �n�e Hillsborough. NC 27278-8551 ADT 2013 = 2500 vo��e:�e,9��az-asaa Fax_(9'19)732-6776 2O �O O ZO QO DESIGNANDENGINEERINGSERVICES www.summitde.nel �� ���P� T= 6%* LENGTH ROADWAY PROJECT = 0.064 MILES FIRMNO.P-OS39 �� �� V= 55 MPH LENGTH STRUCTURES PROJECT = 0.007 MILES zoiz srAxnnnn srsciFrcATroxs �� ��o PLANS . r�. g TOTAL LENGTH PROJECT = 0.071 MILES sichArunE: � � 20 10 0 20 40 +�ST = 3% DUAL 3% RIGHT OF WAY DATE: TRACY N. PARROTT, PE � � JUNE 2, 2015 PRo�scr sxcr�ssn ROADWAY DESIGN PROFILE (HORIZONTAL) FUNC CLASS = ENGINEER ���� ���� 4 2 0 4 g RURAL MINOR COLLECTOR NCDOT CONTACT: VIRGINIA MABRY LETTING DATE: BRANDON W. JOHNSON, PE �� p����� MANAGER, PRIOR77Y PROfL•CTS UNIT J U N E 2, 2 015 �'XOJEC7' DESlGN ENG7NEEK PROFILE (VERTICAL) SUB—REGIONAL TIER pE S7GNATURE: N Z 0 N i rn C T CG 2. � a C 0 � � I� s � �� Q--� � BRIDGE N0.230308 PERMIT DRAWING SHEET 2 OF 8 Z �Q m n �� /� y O � � PROJECT REFERENCE NO. SHEET NO. l7BP.6.R.63 T 4 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOM]PLE E PLANS DO NOT USE FOR dW ACQI;ISITION FRELIMIN RY FLANS DO NOT USE FO COI�'STRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMP�ETED aporad 'in iFe nC FIRM uC�EW' ^No: P-OY. fi�e o6 ������ n.i_ aa n. ����zie ❑a.ee.m..�.s b�9i91 i�2-3883 :pored 'in fhe - iue af_ .SI y �ECOLOC�ICAL BNGINP;F:RING i�is'ssi� oz9a SEE SHEET 5 FOR PROFILES �DENOTES IMPACTS IN SURFACE WATER � DENOTES FILL IN WETLAND � DENOTES HAND CLEARING DENOTES TEMPORARY FILL IN WETLAND 20' 0' 40' GRAPHIC SCALE STANDARD 'V' DITCH wnnnc crxa� I�a��a s=aiel WLET DETAIL Ni5 G�al rol ound 1.� ,�� Gr�ound D d Geo�e+�ile � Min. D-7.0 F. NAiuPnL Type of Liner- CLASS B R�PRAP Mox. d=1.0 Ft. cRouNo ExCnVnTION FROM STA. TO STA. CLA55 I flIP RFPRYPI MOIR FIBEP niiii [r n[rnii TTINC ITVPI A DESIGN EXCEPTION IS REQUIRED FOR SHOULDER WIDTH. Z O z �/ � � . . . . ... . �� � � / � � BL—1 �� ���E E— ---- srvoxNrt-------- --asrarv�_ -- —� F ' ��—�—_— -- -- " l - —===-� _ — � -- — � a -------- --- � �\\ � TAIL TCH I � SEE D TAIL 1 � �� E5T 3 TONS EST 8 SY I � , GEOTE%T E I � �'� DDE _ � ( k 1`k i i � \ GRAU 350 TL-3 � _---_--__--/ � �.—_—__—� F � ' � — —Blx. � --ie _ _ '� �^ � — `-----`—"--w�s—_ 'k � � _ � � � � � � � � � � � � � � � � F `k � i � � � �DENOTES IMPACTS IN SURFACE WATER � DENOTES FILL IN WETLAND � DENOTES HAND CLEARING DENOTES TEMPORARY FILL IN WETLAND p TAIL DITCM J �� I � SEE DEfA1L 1 �:� EST 7 TONS �E5T 27 SY GEOTEXTILE I DDE = 7 CY 20' 0' 40' GRAPHIC SCALE � � BRIDGE N0.230308 PERMIT DRAWING SHEET 3 OF 8 Z �Q m n �� /� y O � PROJECT REFERENCE NO. SHEET NO. l7BP.6.R.63 4 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOM]PLE E PLANS DO NOT USE FOR dW ACQI;ISITION FRELIMIN RY FLANS DO NOT USE FO COI�'STRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMP�ETED aporad 'in iFe nC FIRM uC�EW' ^No: P-OY. fi�e o6 ������ n.i_ aa n. ����zie ❑a.ee.m..�.s b�9i91 i�2-3883 :pored 'in fhe - iue af_ .SI y ECOLOC�ICAL BNGINP;F:RING i�is'ssi� oz9a SEE SHEET 5 FOR PROFILES CLASS I RIP RAP �EST 105 TONS � �y E5T 120 CY GEOTEXTILE SITE 1 � �k � � � � � � � � SITE 2 � � '� � � I� � * � � � � � i � � � � � � � I � � � � � � � I � � � � � � � � � � � � � � � � � � � � � � �� � � � � � � � � � � � i � � � i — ,� ,� � � / �. —` L'BlM— _ _ _ _� _ _ � _ � 1k � I _ � _ � � _aJ„� � � �e � � I "� . . � � �t � � m . � � � �—____� — _ _ _ — _ _ — 6RA4Y 35B 3�3- — _ � � — — — — — — � — — _ _ _ e�x — — — — — _ CLASS I RIP RAP � EST l45 TONS E5T 160 CY GEOTEXTILE � GRAU 35o I��� E� '���������—�—��� r r_� _ F aiw F�Nct . � j ... FROM STA. TO STA. A DESIGN EXCEPTION IS REQUIRED FOR SHOULDER WIDTH. Z 0 � > � a � � PERMIT DRAWING SHEET 4 OF 8 SITE 1 BRIDGE N0.230308 PROJECT REFERENCE NO. SHEET NO. l7BP.6.R.63 4 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOM]PLE E PLANS DO NOT USE FOR dW ACQI;ISITION FRELIMIN? RY FLANS DO NOT USE FO COI�'STRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMP�ETED aporad 'in iFe nC FIRM uC�EW' ^No: P-OY. fi�e o6 ������ n.i_ aa n. ����zie ❑a.ee.m..�.s b�9i91 i�2-3883 :pored 'in fhe - iue af_ .SI y ECOLOC�ICAL FNGINF;F.RING SEE SHEET 5 FOR PROFILES � 90 n � � /y�0 O 10' 0' 20' INSET GRAPHIC SCALE � � � � � \ � � ` � � � ____----- � SITE 2 �DENOTES IMPACTS IN SURFACE WATER F F DENOTES FILL IN WETLAND � DENOTES HAND CLEARING DENOTES TEMPORARY FILL IN WETLAND A DESIGN EXCEPTION IS REQUIRED FOR SHOULDER WIDTH. N Z 0 N i � � PERMIT DRAWING SHEET 5 OF 8 SITE 1 PROJECT REFERENCE NO. SHEET NO. RNJ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOM]PLE E PLANS DO NOT USE FOR dW ACQI;ISITION FRELIMIN RY FLANS DO NOT USE FO COI�'STRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMP�ETED rad 'in tFe nC FIRM uC�EW' ^No: P-09. : 06 � ����� n.i_ aa n. ����zie ❑a.ee.m..�.s b�9i91 i�2-3883 ,ea � me , oe s r �ECOLOC�ICAL „g,ss 9zq FNGINF;F.RING 2 90 n � � /y�0 O I 0' 0' 2 0' INSET GRAPHIC SCALE � � � � � \ � � ` � � � ____----- � SITE 2 �DENOTES IMPACTS IN SURFACE WATER F F DENOTES FILL IN WETLAND � DENOTES HAND CLEARING DENOTES TEMPORARY FILL IN WETLAND --------- ---- c . . . . . . . . . . �. �. �. �. �. . . . . . . . . . . �. . �. �. . . _ � . . . . . . . . . . . . . . . . . . . . . . �. �. . . �. �. . . . . . . . . . . . . . . �. �. . . �. �. �. �. . . . . . . . . . . �. . . �. . . . . . . DOCUMENT NOT CONSIDERED FINAL PROIECT REFERENCE NO. SHEET NO. N � � � � �. � � � � � � � � � BRIDGE NO. 2.3O.3OS UNLESS AL� SIGNATURES COMPLETED l7BP.6.R.63 .S � a�epa,e � r e ❑ '°� R ADWAY DE N YDRAULIC � , , , , , . . , , � � ., , . or�ce or- H ENGINEER � � � . p� t SuMMIT �%H � � � �� � �� � � � � �� �I ' ' I � I � I I I I i _�P�RMIT � �Df�l1WIN � .. i i � � � : �� �_��_ , � m w.M.a»� z,z;ee �eN�weeas O SIG . . . . . . . i � Precare 'o � e � M m� . . .�. I-- � : : . orrte or: � .. . � way48 �.y�i R � �c,o�o�ICA� INCOA�I�LE E FL.�NS _ � � � I . . . �� S, H. L. L.T �. �. � O F V �_I I i �- � � -I� � _ �F',NCINFF'.RINc � Nor uss nox / w wcQc�sir�ox � BM #1: � - - - - -I.. .. � � _B- T T . . 'RT . . .... . i'. . _ _ _ . . . . .. i. ` . i. .. ... . . � . evs�-r „s's � s A s v9 00, sa oo � FRELINLIN RY PLANS 94 j -L- STA 12+20.66, 33.30' RT � i - - - � - - - . i, . I li . - ---- � -� � . PO NOT tiSF. FO CONSTRUCTION _.... I I I �I _'i .i _I _.__'i ,_ _ J._L' _..__ _...-_ _ __. � EL 81.98' � . .'i .. r . . . . . . �� ...� �...�. . I-� I � I , , . � �. �.i . . . ; . . .I . . . I Ji : ... .. � tY�F�'i . � � . . . '. .: . . . . . . . .. . . . ._ __:_._ _�:_:._ � , _ ___. . BE6/N GRADE Y I - , I � � I _ _ _- _ _ _ _ _ . _ END I II Pl l3+15.00 90 L STA 12t00A0 GRADE 90 EL = 83.30 I; EL = 83.68' li ', j I. Pl = 14t80.00 -- - -- -L- STA 15+75.00 _ I-' I I I VC = l50' ' I I I I I I I I I I I I ' i- -- --- - � EL = 83J5' _�I-,-I- �� -_ __. _ i EC = 82.67 _.I II i,i i,l i,� i,iii, il I, , , , , I ; _ ., _ ,_ , ; _ vc - 5a I _ !II II! K - 230 � - - - , I 86 � � �--� K = 272 ` I . ' , 86 OS = )65mph DS = )65mph -- ----------(t�.3304% (-1U.32/2% -JU.32/2% (-J0.5053% ----------------- 82 ------------- --- ------- ----- ---- ------ ----------------- 82 . _ J-��-�_ �_�- � EXISTING GRADE --- - _ _� _- _ __,-_ _,_ � -,_;_ � _, -,_;__ ---/A - — ;. - — -- _ _ EXISTING GRADE il (-JOJ392% - I II � I I-I - -- i- l-X1.0072% - 78 . _-�� � � i � � � � 78 _ - 1 / - _ I I I _ � �'� I�� �'� '� � I� � �'� '� '� �'� � - - - - I __ :- I � / I '�I ��I '� �'�� I'I 'I� III� I I� I� � � � � ��� � � � �: � . -, � � �� � � 74 . \ I - �,. � � � �, � ,. �,. � I� �I; , � � � �_ CULVERT HYDRAUUC DATA 74 - � / ��, �, �� � ��� ���� �� � �� � DESIGN DISCHARGE = 420 CFS I� I DESIGN FREQUENCY = 25 YR �'�I� '�, 'I� ��� � � �� ��� '���� �� 70 � � � DESl6N HW ELEVATION 795 fT 70 - '��� - � BASE DISCHARGE = 750 CFS _ '� � '� � �� �, � � � � � � � � �� �� � �' I � � � � � BASE FREQUENCY = l00 YR - � -i �I -- BASE HW ELEVATION = 80.87 fT 66 ' ' ' ' ' ' ' ' ' ' '' OVERTOPPING DISCHARGE _ 1669 CFS 66 � �'�� �'�'� '�� �� � �� '�� � � � � � �� ��� � �-�-,_, � � �- n_,_ r -. I' , � I �, � � � i I � OVERTOPPING FREQUENCY= 500t YR --- - - -__� - - - -�-- -� --- � , - ___ -�-- � � -___• - �- - r ------- -: - - -- -- -- OVERTOPPING ELEVATION = 829 FT _ _ -,-''____ _� _ � _- - - _ �_ ____- � � _ - - �--_ __ _ _� - - - -- -_ - -- -_ �- — - - -� � �� � _� � � , -�- ' �-1 -- ,--. � _- , � �= - - -� � - � �- _� _ � - - -- 11 12 13 14 15 16 ._ - - - - - - - - - -_ � _ � � � �, � �'�, '� �', 98 98 -- �'= 98 _ � � � �� ��� '�,� �'�,'� '� '�,� ��� � � �� ��� '�,���� �� '�� ��� � � �'�� ��� '��� �'I� �'� � � � .._ - � � �� �� �,� � �� � � �� �� �� I,� � � �� � � �� � � � � ' I �I� - � � , - � � � � �� I .-. _ -,.,._,_,� �_-. _'_: ,_--. � ---- ---- -� -__ _ � � � � � � �� ��� ���� �� � �� �� ��� � � � �� ��� �� �� � ._: .-- � 94 �- ,_ _ _ _I_ 94 _ _ : � �� � � �� � �� � � � �� � �� ,-- _ _ _ I 94 '-,-, - � , , � BEGIN GRADE '� �_I - 80R2- S��OtIlBS -.. � � , � � � � � I � � � � � � � � � � � � � END GRADE I � -DRI- STA lOt//.77 , DRl- STA //+295 EL 83.43 I I 90 EL = 83.32 ---�---_ _-� �-'. ',_, �-� END G79�2 90 �.,_� _.__. —__.._� — � �I � � � � � � � , EDR2 78 2A //+2893 � 90 _ � I_ _ � �'�� �� l � a hi EL -/ 83.35P/ _ lO+18.58 Pl = 1Ot60A0 � ��� � 86 ��-�� � _ _,. ___ _ � J i- 86 �, . ��� �, . � � � � _ EL = 83J1' EL = 78.89' I� ,�- � f - - - ��, � �_�L VC = 90' _ � � � � � �' EL -' � 25 /0 /8.42 �_ . � � � � � � � � _ �_ � � _. �_ 86 � �� i� _ -,- - , � � .000�'. _ . � '- -' -�L I � '� I � J2 Pl - 10-�45.00 � _ - � � , � _ EL 83A0' EL - 79.65 i _ _ �- !-J2J44gy K 4 . � _ '� '�i � � '� � .- I • � ' � � ,:. \ r ��%. _ . _. i _i � :..-: I $2 i i i i i i ���� I � �� �. —1� / J "�• -„--�.i i �i i i i �i i i �i �, i I � �. �. . . _ . _ ...-_ _ -_ i . B � . �. i � I / vc .sa J _ � � � � �-. � � � � � 82 .:_ � �r•� K - 4 i __ ___ - � � � _ � � � �� �, � _ 82 � \ �s�. � � � � � �� � - - i , _ ', , - � _ . — , : � �� � � � � � __ - \ ' (-X1S100/ --- -_ �I_ - � � � � � � �'� i � i i �' � � i: � l��'�893. _ '� � � � � � � - m � � � N I i- 61 . , � � `_ .�� /. , i -- _ �. I . \ . '_ 78 � � � � � ; ; — __� � __-� __ 78 N 78 ' �� �--- -------� �, � I � � � � � � (-�o.39n% --- i � /-- , ° __ F �� �'I- _ � � � � �: I � � - � _a �� � � �� � � ��� � �� �� ��� � �' ^' 74 _ � '-�_ � � � � � � , _ - ' _ - � EXISTING GRADE � � - �-�-�-�- �--�-=i= -�_� _�_�J_ � �, i � � 7`� � � � � �� � � � � � -- I - � � � � 1-10.759'/. � 74 E � - -I-�-�� I---I ' - �)0 5/9/% GRADE , � II',I_ � � � � � � � � � �'� '� � � � � � � � � �'� I� � � � � I� � � ' , �' I � �'� � � � � � I-�-�-� � �'J- � � o _ _ i � � - - _ - _ - - - � �� � �� �'� � � �'� ', �'� �� '� � '��' �' ' > _- - - - � � � - ` 70 � - - - 70 , 70 w � � � � .. , � ---_ ___ _ _ ---- - -- � , � �� � � � � w -- _ I --- --- --- � � — _:_:� - - - �, _ —'-- ; � . _ -- - _ _ '� _ ___ _ _ __ _ _ __ _ 66 -. __ -�—_ —'--_—. —.. - __-_-'� __- —'---- -_.. . -,_'_—._. -- __. _—.. - 66 - 66 - --- -- -- --- -- - __ - -- --- - -- _._._� __ __ _ � _ �,� -DRI- � -DR2- � �-o a� 10 11 10 11 _� � 1 :/ ❑� 50' 0 50' l00' �� � BRIDGE N0.230308 PERMIT DRAWING I SHEET 7 OF 8 I CL STA 13+87.50 -L- - 3@ 12' x 8' RCBC GP = 83e45' - SKEW = 90° i � PROPOSED 2.5' HEADWALL �, 4�14 4�14 �; TB RT _ _ , -- - C—� TB LT —� '�' ---_—^"._ .------ - --- -- ---- -- , ---� I� - --- /�-- ---- -----� � PROPOSED 12" SS LINE W/24"ENCASEMENT ,� NWS EL = 75.3' BEp EXISTING SS LINE TO BE RELOCATED DATE OF SURVEY 6/30/2015 - ___ __ CL EL = 71e91' . . . . . . . . . . .I .�_. .—. � � I_. .--. . I � - G R A D E= 0 e 0 5% �I—I�TT�-I�I—I- _ � _ PROJECT REFERENCE NO. SHEET NO. l7BPbR.6.3 RM/ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE E PLANS DO NOT U9F FOR C W pCQU19ITION PRELIMIN RY PLANS DO NOT UBB PO CON3TRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES GOMP�ETED rePo,a � �� s�,�r��T ����RM ���E�QE ti _ Office of: n - rapare f e iiCEr�SE6rv - Office of: n iisi oy �ECOLOGICAL FNGINF.FRING SEE SHEET 5 FOR PROFILES � WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (tt) (ft) 1 12+59/14+16 -L- . 3@ 12' X 8' RCBC 0.11 0.01 0.02 0.02 42 12+59/14+16 -L- . Rip Rap Bank Stabalization 0.04 91 2 15+24/15+75 -L- LT. Roadway Embankment < 0.01 < 0.01 < 0.01 TOTALS': 0.11 0.02 0.02 0.06 133 0 0 *Rounded totals are sum of actual impacts NOTES: � LowlMinimal Impact Bridge Project Dah Sheet 9H611016