Loading...
HomeMy WebLinkAbout20161008 Ver 1_Justification for culvert construction for Bridge_20161019 Justification for culvert construction for Bridge #228 Montgomery County The project is on a single lane dead end road that currently provides access to 6 houses. The proposed prefabricated aluminum culvert will meet the hydraulic requirements, (see included Storm water Management Plan) and will provide the most cost effective and time efficient alternative for construction. To our knowledge there is no additional development anticipated for the properties that use this road for access.