Loading...
HomeMy WebLinkAbout20160299_FW R2536_ENV_SEC01 - Channel Stabilization_20161012 Wrenn, Brian L From:Dilday, Jason L Sent:Wednesday, October 12, 2016 7:26 AM To:Wrenn, Brian L; 'andrew.e.williams2@usace.army.mil' Subject:FW: R2536_ENV_SEC01 - Channel Stabilization Attachments:IMG_1.pdf; IMG_2.pdf; IMG_3.pdf; 026-R2536_EC_psh08A.pdf; 027-R2536 _EC_psh08B.pdf Brian and Andy, Below is an email I received from the design build team for the Asheboro Bypass concerning a stream relocation. They are having some problem with establishing grass on a section of the relocation. Because of the stipulation in their contract that the consultants cannot directly contact agency members, I had Matt Cook summarize below what the problem was. Please let me know what you think. Jason From: Matthew Cook \[mailto:mcook@rkk.com\] Sent: Tuesday, October 11, 2016 3:52 PM To: Dilday, Jason L <jldilday@ncdot.gov> Cc: Michael Prince <mprince@wbcci.com>; Tina Swiezy <tswiezy@rkk.com>; Mike Merritt <mmerritt@rkk.com>; Jim Eisenhardt <jeisenhardt@rkk.com>; Jeff Meador <jmeador@rkk.com>; Blakley, Reuben <rblakley@ncdot.gov> Subject: R2536_ENV_SEC01 - Channel Stabilization Jason We have a location on the Asheboro Bypass where we are having issues establishing a grass lined channel. It is -L- 66+00 – 71+00 RT. This is the outlet of RCBC 100. It is a large channel relocation with overbanks. Currently no water has been released in to it so that the liner can be established. The contractor finished construction of this channel over a month ago. This is shown in the attached pdf 026- R2536_EC_psh08A.pdf, the first phase of the RCBC construction sequence. Our plan was to sod the bottom and low flow banks so that it would stabilize quickly. This would then allow us to release water through it. DWR advised against this because fescue sod is not considered a native seed. So, the contractor seeded the area. Prior to Hurricane Matthew, they had seeded it three times in the last five weeks. They also had their seeding contractor on site yesterday to see what additionally they could do. From the attached pictures, you can see that the seed in some locations has taken root and is becoming established, especially at the pic taken closest to the proposed RCBC outlet. IMG_3.pdf was taken near the outlet of the proposed RCBC facing upstream, IMG_2.pdf was taken half way down the channel facing upstream, and IMG_1.pdf was taken where the channel ties in to the existing stream facing upstream. In order to move to phase 2 (attached 027-R2536_EC_psh08B.pdf), the channel needs to be stabilized. The contractor has even been using the water truck to try to water the area when it hasn’t rained. The pics attached were taken October 10 which is about 24 hours after they had just received 4” of rain from Hurricane Matthew. The site is holding up well. There is some grass established. The standing water near the stream tie in is due to the erosion control device there keeping it from leaving the site. Also, this area is more shaded than the areas near the proposed RCBC outlet. If we are allowed to release water through the channel, this would essentially remove almost 1200’ of meandering jurisdictional stream through the site and place it in a stable plastic lined channel. The RCBC construction could then begin. My question is how much grass is needed to be considered stable? The bottom of the channel currently is not erodible material since it has been lined with coir fiber matting. Also, jurisdictional streams do not generally exhibit grass in the 1 flow line. While we realize the necessity to not allow sediment to leave the site, once water is released through this channel the grass will probably die off due to the constant presence of water. I am asking this because we want to do what is right, but we don’t want to wait another month to establish grass that is going to die when the water is released. Are we primarily waiting for grass to become established on the overbanks? Please feel free to forward this to Brian Wrenn and Andy Williams. We would like to have their input as well. We are also having our monthly ride through next Tuesday, October 18 and would like them to come. Any guidance you can provide would be welcomed. Thanks. ___________________________________ Matthew L. Cook, P.E. Project Manager RK&K 900 Ridgefield Dr., Suite 350 Raleigh, NC 27609 919.878.9560 P | 919.653.7350 D www.rkk.com RESPONSIVE PEOPLE | CREATIVE SOLUTIONS "RK&K" and "RK&K Engineers" are registered trade names of Rummel, Klepper & Kahl, LLP, a Maryland limited liability partnership. This message contains confidential information intended only for the person or persons named above. If you have received this message in error, please immediately notify the sender by return email and delete the message. Thank you. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2