HomeMy WebLinkAbout20160299 All Versions_RE R2536_SEC1_ENV_UPCOMING CHANNEL RELOCATIONS_20160906
Wrenn, Brian L
From:White, Martin F
Sent:Tuesday, September 06, 2016 9:12 AM
To:Wrenn, Brian L
Cc:mprince@wbcci.com; Matthew Cook (mcook@rkk.com); Lambert, Dwayne E; Erin
Hager (ehager@sepiengineering.com); Blakley, Reuben
Subject:RE: R2536_SEC1_ENV_UPCOMING CHANNEL RELOCATIONS
Brian,
We will monitor the progress of the installation and the vegetation and schedule a time for you to look at it.
Thanks for your help.
Thanks,
Marty
From: Wrenn, Brian L
Sent: Friday, September 02, 2016 9:37 AM
To: White, Martin F
Cc: mprince@wbcci.com; Matthew Cook (mcook@rkk.com); Lambert, Dwayne E; Erin Hager
(ehager@sepiengineering.com); Blakley, Reuben
Subject: RE: R2536_SEC1_ENV_UPCOMING CHANNEL RELOCATIONS
Marty,
Condition 3 of the 401 requires coir fiber matting and native vegetation on channel relocation banks. We do not
consider fescue native vegetation, so fescue sod would not be appropriate in this situation. Once the banks are matted
and vegetation begins appearing, I’m usually comfortable with turning the water into the channel. I can come out and
take a look on 9/12 or 13 to see the progress of the vegetation if you think it will be coming up at that point. As for the
rip rap channels, I don’t need to see those prior to turning the water into them as long as the channel has been
completed as designed and approved. If you want to discuss this, please don’t hesitate to contact me.
Thanks,
Brian Wrenn
919-707-8792 (office)
919-710-6516 (mobile)
From: White, Martin F
Sent: Friday, September 02, 2016 8:25 AM
To: Wrenn, Brian L <brian.wrenn@ncdenr.gov>
Cc: mprince@wbcci.com; Matthew Cook (mcook@rkk.com) <mcook@rkk.com>; Lambert, Dwayne E
<delambert@ncdot.gov>; Erin Hager (ehager@sepiengineering.com) <ehager@sepiengineering.com>; Blakley, Reuben
<rblakley@ncdot.gov>
Subject: FW: R2536_SEC1_ENV_UPCOMING CHANNEL RELOCATIONS
Brian,
Please review the plan outlined below for the channel changes. The Contractor is requesting to use fescue sod to line
the ditch (Section 1 Roadway Plans SH8 and C100 Culvert Construction Sequence drawings) and they are installing the
1
permanent channel change at –L- 62+40 – 63+11 LT – See attached SH7. If the placement of sod is acceptable please
schedule a review for the channel on or near Sept. 12.
Please contact me if you have any comments or questions.
Thanks,
Marty
From: Michael Prince \[mailto:MPrince@wbcci.com\]
Sent: Thursday, September 01, 2016 3:25 PM
To: White, Martin F
Cc: Redd Boelte; Don Phillips; Lambert, Dwayne E; Matt Cook (mcook@rkk.com); Jim Eisenhardt;
ehager@sepiengineering.com; Blakley, Reuben
Subject: R2536_SEC1_ENV_UPCOMING CHANNEL RELOCATIONS
Marty,
We are planning on starting a couple of permanent channel changes next week in Section 1 around the new 64
interchange. The first one is at the outlet of C-100 - see attached Section 1 Roadway Plans SH8 and C100 Culvert
Construction Sequence drawings. Weather permitting, we will start the excavation for this channel relocation on 9/6 and
should be completed by the end of next week. A large portion of this work is to be constructed using ditch detail F – see
attached, which calls to be grass lined. In lieu of waiting on vegetation to grow and become established before we can
turn water into the new channel we are proposing to use fescue sod to line the channel if no one has any issues. Per the
project specific conditions of the 401 permit, could you tentatively schedule NC Division of Water Resources and any
thth
others regulatory agencies to review the new channel for September 12 or 13 so we can turn Cable Creek through a
temporary channel and into the permanent channel relocation per Erosion Control Sheet 8B and get started with the
culvert construction as soon as possible.
The other permanent channel change is at –L- 62+40 – 63+11 LT – See attached SH7 - that we would like to construct
next week. The proposed channel is only 70’ and the JS is dry at this point. This channel change is lined with Class B Rip-
Rap and can be completed in a half a day. Do you think we could get permission from NC Division of Water Resources to
complete this channel change without them physically being onsite and reviewing or do we need to coordinate this
work?
Once we complete the channel relocation at the outlet of C100 we plan on moving directly to the permanent channel
relocation at the inlet of C300 –Y4RPA- 10+00 – 21+50 RT.
Michael Prince
Wright Brothers Construction Company, Inc.
w: 423.336.2261 m: 423.463.5041 f: 423.336.2079
mprince@wbcci.com