HomeMy WebLinkAbout20001432_US 421 slope failure_20160810 Carpenter,Kristi From:Wrenn, Brian L Sent:Wednesday, August 10, 2016 8:55 AM To:Paugh, Leilani Y; Williams, Andrew E SAW Cc:Moore, Byron G Subject:RE: US 421 slope failiure Leilani, Art gave us a brief description of the proposal in the field. I don’t recall any significant issues being raised by Andy or I with the proposal. Obviously, the permitting mechanism is up to Andy. I would appreciate seeing the design drawings prior to getting the application if possible. Thanks, Brian Wrenn 919-707-8792 (office) 919-710-6516 (mobile) From: Paugh, Leilani Y Sent: Monday, August 08, 2016 5:32 PM To: Williams, Andrew E SAW <Andrew.E.Williams2@usace.army.mil> Cc: Wrenn, Brian L <brian.wrenn@ncdenr.gov>; Moore, Byron G <bgmoore@ncdot.gov> Subject: US 421 slope failiure HI Andy and Brian Byron Moore and I reviewed the slope failure on US 421 in Sanford with Division personnel. After review of the site, we recommended that the stream channel should be left in place. This is due to the unstable conditions of the channel both upstream and downstream of the slope failure area. The existing root system is holding the channel in place. A channel relocation would require removal of the trees and excavation of a new channel in poor soils. The right of way available is very limited by the existing sewer line so we would have no control over the channel upstream of the area. Division has worked with Geotech to design a buttressed slope protection to stabilize the slope after grading it to a 2:1 ratio. We recommended a boulder toe protection in the outside bend of the channel adjacent to the slope repair. This would stabilize the channel in place while maintaining a natural bed and bank. For construction, Division would need a temporary stream impact at the repair area to build the buttressed slope protection and install the boulder toe. Access would be along the sewer line crossing of the channel upstream of the slope repair area and would also require a temporary stream crossing. We had discussed a NW 3 as the appropriate permitting mechanism. We should have final design drawings showing these recommendations but I wanted to get some feedback from you about the concept and permitting. Thanks LeiLani Paugh ICI/OSM Group Supervisor 919 707 6146 lpaugh@ncdot.gov NCDOT Project Development & Environmental Analysis 1 1020 Birch Ridge Dr. Raleigh, NC 27610 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2