Pre -Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the Corps:
❑X Section 404 Permit ❑ Section 10 Permit
1 b.
Specify Nationwide Permit (NWP) number: 27 or General Permit (GP) number:
1c.
Has the NWP or GP number been verified by the Corps?
❑ Yes NX No
1 d.
Type(s) of approval sought from the DWQ (check all that apply):
❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes X❑ No
For the record only for Corps Permit:
❑ Yes ❑X No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
N Yes ❑X No
1 g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes NX No
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ❑X No
2.
Project Information
2a.
Name of project:
Wilson Stream Restoration Project
2b.
County:
Buncombe
2c.
Nearest municipality / town:
Candler
2d.
Subdivision name:
2e.
NCDOT only, T.I.P. or state project no:
3.
Owner Information
3a.
Name(s) on Recorded Deed:
See attached sheet for Landowner Information
3b.
Deed Book and Page No.
3c.
Responsible Party (for LLC if
applicable):
3d.
Street address:
3e.
City, state, zip:
3f.
Telephone no.:
3g.
Fax no.:
3h.
Email address:
Page 1 of 10
PCN Form — Version 1.4 January 2009
4.
Applicant Information (if different from owner)
4a.
Applicant is:
❑X Agent ❑ Other, specify:
4b.
Name:
Jacob McLean
4c.
Business name
(if applicable):
Wildlands Engineering, Inc.
4d.
Street address:
167-B Haywood Road
4e.
City, state, zip:
Asheville, NC 28806
4f.
Telephone no.:
828-545-3865
4g.
Fax no.:
704-332-3306
4h.
Email address:
jmclean@wildlandseng.com
5.
Agent/Consultant Information (if applicable)
5a.
Name:
Jacob McLean
5b.
Business name
(if applicable):
Wildlands Engineering, Inc.
5c.
Street address:
167-B Haywood Road
5d.
City, state, zip:
Asheville, NC 28806
5e.
Telephone no.:
828-545-3865
5f.
Fax no.:
704-332-3306
5g.
Email address:
jmclean@wildlandseng.com
Page 2 of 10
B.
Project Information and Prior Project History
1.
Property Identification
1a.
Property identification no. (tax PIN or parcel ID):
9608443077
1 b.
Site coordinates (in decimal degrees):
Latitude: 35.572924 Longitude: -82684595
1 c.
Property size:
40 acres
2.
Surface Waters
2a.
Name of nearest body of water to proposed project:
Little Pole Creek
2b.
Water Quality Classification of nearest receiving water:
2c.
River basin:
French Broad (06010105)
3.
Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The project area is located within a primarily agricultural area in Buncombe County near Candler, NC. Some residential land uses are also
located nearby. The land use within the project boundaries is pasture.
3b.
List the total estimated acreage of all existing wetlands on the property: 0
3c.
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 2,000 ft
3d. Explain the purpose of the proposed
project: Stream stabilization and enhancement
3e. Describe the overall project in detail, including the type of equipment to be used: Stream grade and stream banks will be
manipulated with grading and in -stream structures to create a more stable system. Trackhoes and Tracktrucks will be used in the grading process.
A pump around system will be utilized during construction to decrease water quality impacts.
4.
Jurisdictional Determinations
4a.
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (includingall prior phases) in the past?
❑ Yes ❑ No ❑X Unknown
Comments:A PJD is being requested with this submittal.
9
4b.
If the Corps made the jurisdictional determination, what type
of determination was made?
❑ Preliminary ❑ Final
4c.
If yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
4d.
If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5.
Project History
5a.
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes ❑X No ❑ Unknown
5b.
If yes, explain in detail according to "help file" instructions.
6.
Future Project Plans
6a.
Is this a phased project?
❑ Yes Q No
6b.
If yes, explain.
Page 3 of 10
PCN Form — Version 1.4 January 2009
This is a revised permit request for addition of UT to Little Pole Creek to permit #16-005 issued February 2, 2016.
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary T
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1 -
Choose one
Choose one
Yes/No
-
W2 -
Choose one
Choose one
Yes/No
W3 -
Choose one
Choose one
Yes/No
W4 -
Choose one
Choose one
Yes/No
W5 -
Choose one
Choose one
Yes/No
W6 -
Choose one
Choose one
Yes/No
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 T
Restoration
Little Pole Creek
PER
Corps
10
2,000
S2 T
Restoration
UT to Little Pole Creek
INT
Corps
4
184
S3 P
Culvert
UT to Little Pole Creek
INT
Corps
4
16
S4 -
Choose one
S5 -
Choose one
S6 -
Choose one
3h. Total stream and tributary impacts
2,200
3i. Comments:
Impacts will include restoration and enhancement activities to stabilize and improve the channel. Some grading of the stream channel
and banks will be required. The stream impact falls under both Corps and NCDWR jurisdiction.
Impacts to the UT are for restoration, primarily la severe head cut has destabilized banks and is temporarily arrested at a driveway
culvert). The ur ose of the culvert cross,n is for access foragriculture. The length of the culvert has been ke t to the minimum
necessary and there was no alternative that would allow for access. The culvert will be embedded with lower mobility bed material to
promote a stable substrate and more natural stream conditions. The priority 1 restoration of the reach will be an overall improvement in
stability and habitat, although passage is not a goal that can be addressed with this project since the reach will still be passage -limited by
the required tie-in to the mainstem which is at a much lower elevation than the raised tributary. The restoration may enhance passage
upstream of the existing driveway by eliminating a 3' dropout of the driveway culvert. The restoration will also fence livestock out of the
creek which is the primary benefit, in addition to addressing bank and bed stability issues.
Page 4 of 10
PCN Form — Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then indivi ually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary T
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02 -
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin?
❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b.
Buffer Impact
number —
Permanent (P) or
Temporary (T)
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet)
6g.
Zone 2
impact
(square
feet
B1
Yes/No
B2 -
Yes/No
B3 -
Yes/No
B4 -
Yes/No
B5 -
Yes/No
B6 -
Yes/No
6h. Total Buffer Impacts:
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Due to the nature of the stream restoration project stream impacts are necessary. Efforts to minimize impacts during design include keeping
the stream nearly on-line with the existing channel to reduce bank grading and a pump around system during construction to reduce
sedimentation impacts.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Silt fencing will be installed between staging areas and the project stream. Construction practices will follow guidelines from the NC Erosion and
Sediment Control Planning and Design Manual. A pump around system will be utilized while construction and grading is occurring in the stream.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes ❑X No
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
El Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
Choose one
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non -riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
❑ Yes ❑X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c.
6d.
6e.
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
Zone 2
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
1a.
Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes X❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b.
If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
2.
Stormwater Management Plan
2a.
What is the overall percent imperviousness of this project?
0
2b.
Does this project require a Stormwater Management Plan?
❑ Yes ❑X No
2c.
If this project DOES NOT require a Stormwater Management Plan, explain
why: This is a stream restoration project that will not result in an increase in impervious surface.
2d.
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative
description of the plan:
2e.
Who will be responsible for the review of the Stormwater Management Plan?
3.
Certified Local Government Stormwater Review
3a.
In which localgovernment's jurisdiction is thisproject?
❑ Phase II
❑ NSW
3b.
Which of the following locally -implemented stormwater management programs
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Other:
3c.
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4.
DWQ Stormwater Program Review
❑Coastal counties
❑HQW
4a.
Which of the following state -implemented stormwater management programs apply
❑ORW
(check all that apply):
❑Session Law 2006-246
❑ Other:
4b.
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
5.
DWQ 401 Unit Stormwater Review
5a.
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b.
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F.
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1 a.
Does the project involve an expenditure of public (federal/state/local) funds or the
® Yes ❑ No
use of public (federal/state) land?
1 b.
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes X❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c.
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter.)
Comments:
2.
Violations (DWQ Requirement)
2a.
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑ Yes ❑X No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b.
Is this an after -the -fact permit application?
❑ Yes ❑X No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3.
Cumulative Impacts (DWQ Requirement)
3a.
Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes ❑X No
additional development, which could impact nearby downstream water quality?
3b.
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
This project is a stream restoration project that seeks to stabilize and enhance a confined stream using natural channel design and bank
enhancements
on an agricultural land parcel. No additional work beyond stream and bank improvements are associated with this project. The
project
will use natural channel design and proper sediment erosion control measures.
4.
Sewage Disposal (DWQ Requirement)
4a.
Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 9 of 10
PCN Form — Version 1.4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
❑ Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
❑ Yes ❑ No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted.
Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
A copy of this permitting package has been forwarded to the USFWS Asheville Office to request comment on the project's effects on federally
protected species and habitat.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑X No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
The enclosed permitting package has been forwarded to the USFWS Asheville Office and the NC Wildlife Resource
Commission to request additional information on the projects effects on Essential Fish Habitat
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ❑ No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or
archeological resources? This is an NRCS planned project and the cultural resources were screened in-house
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA -designated 100 -year floodplain?
❑ Yes ❑X No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
North Carolina Floodplain Mapping Program National Flood Insurance Rate Map (FIRM) Panel 9608. Map Number 3700960800J, revised
date 1/6/2010. Project site falls within a Zone X, Minimal Flood Risk area.
Jacob P. McLean, PE, CFM
#11W_ AC
Applicant/Agent's Printed Name
Date
Applicant/Agent's Signature
(Agent's signature is valid only if an authorization
letter from the applicant is provided.
Page 10 of 10