Loading...
HomeMy WebLinkAboutNCG030099 DMR SW (15) ,J , 4f*'' , `L1/4/,', ? Y /N,�®�, ®QRS o/s ,,; 71p/V PR,LeeN Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 , Date submitted / /2015 CERTIFICATE OF COVERAGE NO.N00030000 SAMPLE COLLECTION YEAR 2015 FACILITY NAME Galvan Industries,Inc. SAMPLE PERIOD ❑Jan-June ❑July-Dec COUNTY Cabarrus or ®Monthly' April (month) PERSON COLLECTING SAMPLES Ian Haldeman DISCHARGING TO CLASS ❑ORW DHOW ETrout ❑PNA LABORATORY:Pace Analytical Services,Inc.Lab Cert.ft 5342 ❑Zero-flow ®Water Supply ESA Comments on sample collection or analysis: ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 - Part A:Stormwater Benchmarks and Monitoring Results El No discharge this penod?2 Date Sample 24-hour rainfall pH Non-Polar O&G/ Total Toxic Outfall No. Collected' amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics (mo/dd/yr) Inches; Hydrocarbons Benchmarks===> - - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 2 04/15/2015 1.4 79.5 8.8 0.119 0.016 29.9 ND ND 1 Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. °See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations,manufacture semiconductors,manufacture electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433 11;for semiconductor manufacture use the definition as found in 40 CFR 469 12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22;and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). ti3r ro`p Permit Date:11/1/2012-10/31/2017 t I SWU-245,last revised 10/25/2012 Page 1 of 3 • Note: If you report a sample value in excess of the benchmark,you must implement Tier 1,Tier 2,or Tier 3 responses. See General Permit text. FOR PART AND PART B MONITORING RESULTS • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS SEE PERMIT PART II SECTION B • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS SEE PERMIT PART II SECTION B. o TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO❑ IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑NO❑ REGIONAL OFFICE CONTACT NAME Mail an original and one copy of this DMR,including all"No Discharge"reports,within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system,or those persons d ectly responsible for Bath; g the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete I am aware . the e s.'fica .he jP-s for submitting false information,including the possibility of fineses®and imprisonment for knowing violations" ze s— (S. nature of Per ittee) (Da e) Permit Date 11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012 Page 3 of 3