Loading...
HomeMy WebLinkAboutNCG030516_Monitoring - -2015_20151228 Semi-annual Stormwater Discharge Monitoring Report or North Car. '' . Division of Water Quality General Permit No. NCG030000 V3051 r e submitted ineryo r L SAMPLE COLLECTION YEAR 26 I`* CERTIFICATE OF COVERAGE O. Netil L� FACILITY NAME U& ab '—C ___Ln G SAMPLE PERIOD E Jan-June ❑✓July-Dec COUNTY 1n 1!..E or ❑ Monthly' (month) PERSON COLLECTING SAMPLES <-‘RrnCS ' c-U.e- DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY CQ,,,,P u- C IP M Lab Cert.# ❑Zero-flow ❑Water Supply ESA W_ Comments on sample collection or analysis: R'e /VETLI ❑Other DEC 2 8 4015 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 - CEvTRA Part A: Stormwater Benchmarks and Monitoring Results DI/VR SECT/0N n No discharge this period?2 Non-Polar O&G/ Total Toxic Date Sample 24-hour rainfall pH, Outfall No. Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics Collected' amount, (mo/dd/yr) Inches3 Hydrocarbons Benchmarks===> _ - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L Oo k W-I,1-l5 0329 13. Imq Lc. x -2- 1 6.00 o-Dbo) (k).01-z. 1Pt b b62 g-11-i5 (D.7-9 )3 . 1M� kL (Q *1-1 /3 -6 11 G.b_b3 ( ,O l2 1 -al'6b3 1-1\--1,Cb,2°( ► 1 M� 2� .O0 6 . MO 3 t).D [Z Of 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. '\, 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 DDao 1 of 1 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) 6,A.4 6"„r_ri'veo 7 ' Title (Print title) 09 (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non-detect, ND, or other similar non-numerical format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?2 Outfall No. Date Sample 24-hour rainfall Collected' amount, Non-polar O&G/TPH by (mo/dd/yr) Inches3 EPA 1664(SGT-HEM) Total Suspended Solids pH Benchmarks===> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0—9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text,Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3