Loading...
HomeMy WebLinkAbout20071466 Ver 1_Triage Check List_20080414Triage Check List Date: Al Alb; Project Name: 0&?l <V' DWQ#: C)-?- To: ? ARO Kevin Barnett FRO Ken Averitte MRO Alan Johnson ? RRO Lauren W*therspoon From: County: ? WaRO Kyle Barnes ? WiRO Joanne Steenhuis/Chad Coburn ? WSRO Sue Homewood Telephone : (919) ?/?_- 631 The file attached is being forwarded to your for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination ? Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill ? Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: