HomeMy WebLinkAbout20071466 Ver 1_Triage Check List_20080414Triage Check List
Date: Al Alb; Project Name: 0&?l <V'
DWQ#: C)-?-
To: ? ARO Kevin Barnett
FRO Ken Averitte
MRO Alan Johnson
? RRO Lauren W*therspoon
From:
County:
? WaRO Kyle Barnes
? WiRO Joanne Steenhuis/Chad Coburn
? WSRO Sue Homewood
Telephone : (919) ?/?_- 631
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
? Stream length impacted
? Stream determination
? Wetland determination and distance to blue-line surface waters on USFW topo maps
? Minimization/avoidance issues
? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
? Pond fill
? Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
? Is the application consistent with pre-application meetings?
? Cumulative impact concern
Comments: