Loading...
HomeMy WebLinkAbout20010220 Ver 1_Other Agency Comments_20080514?rr,.r.aNro.?.a?o.??M:. can-rrr:+N.?on?aao-a-::-c-?o-a.-rrco-wac.`aN :•,??r,•uar,.:.a.?a.rx•ww r,?,+?a.c-sa:.?ac?.-?.w ;•:«•rwrao•?c?o-:st?:?rra•}o-o?ona?.?o•co?o•,?a?w-rr?wa+,c•?rrM•rrr??-r:?o?,b-}c?H:?:?x,. c-rw> . Permit Class O f _ Qqz Permit Number NIODIFICATION/NUNOR 105-07 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission p (? LzD W? D MAY 1 4 2008 for X Ma'or Develo ment in an Area of Environmental C NR WAiER0UAUIY l p Wk AND STORMWA BRANCH pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Chapman Lumber Company, and Kenneth G. and Sharon M. Rhodes, 19585 Fullers Mill Rd., Boykins, VA 23827 Authorizing development in Currituck County at Currituck Sound, SR 1245, Bells Island Rd., Bells Island , as requested in the permittee's letter dated 2/27/08, including the attached drawing (2), 1 dated "revised 4/25/08", and 1 dated 2/27/08 This permit, issued on May 5, 2008 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization 1) The alignment of the authorized bulkhead shall be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of any construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions shall require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. 2) The bulkhead alignment shall be located landward of the normal water level and all regularly flooded Coastal Wetlands at the time of construction. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2010 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. James H. gson, Director ivision of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Chapman Lumber Company, and Kenneth G. and Sharon M. Rhodes Permit # 105-07 Page 2 of 2 ADDITIONAL CONDITIONS 3) The bulkhead shall be constructed prior to any backfilling activities. 4) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles or other suitable materials approved by Division personnel. No new excavation or other land disturbing activities is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. 6) The fill material shall be clean and free of any pollutants except in trace quantities. 7) All fill material shall be obtained from a high ground source and confined behind the permitted bulkhead. General 8) No new open water areas, Coastal Wetlands, or beds of Submerged Aquatic Vegetation shall be excavated or filled, even temporarily. 9) This minor modification shall be attached to the original of Permit No. 105-07, which was issued on 7/25/07, and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. 10) All conditions and stipulations of the active permit remain in force under this minor modification, unless specifically altered herein. NOTE: This minor modification does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. Channel Marker \ Red Existing Uepth 2.7ftNWL ?G x GC ?cF s 404 ec\ara f s Channel Marker Green G / / Shop Riprap Authorized By Chapman Lumber Compan QQ? / / ?en? AVs v Major Permit `mac ay / abed ?01,?0 / P44t?x ?o/ \ cp Gomm / \ / SA i t t / SAVs OExisting Concrete Pad Major Pe / Riparian Line \ Major Pe pproved / ?- Propertxxof \ Boatramp & Dock Kenneth RRpdes \ \ Proposed 3 5f{et a 11 Bulkhead / Property of: w e PAC/ / Existing Residence Chapman Lumber Co. tee/ ?et?ara Property of: I AoQ \ v •' f Chapman Lumber Co. rom drawings of Environmental rDrawing Currituck Co. CIS. onals for Chapman Lumber Co. s are for permitting purposes only, truction; objects othe r than water- ntstructures are located mately. PROPOSED BULKHEAD CHAPMAN LUMBER COMPANY, INC. Sheet 1 of 2 Rev. 1, 04/25/08 Minor Modification for Bulkhead 0 10 20 30 60 Scale: I inch = 65 teet Typical Bulkhead ?4 Sections C e Yp?` f'0 Sf q:. Level of Adjoining Existing Ground ? I ? ? ? II F II II N II I P Normal Water I Level (NW L) Bottom Not Representative of Piling or Sheet-Pile Depths Below Bottom: To Be Determined By Assessment of Soil Conditions Notes: (1) These drawings are for permitting purposes only, and should not be used for construction. (2) Piling depths do not represent needed depths; piling depths are to be determined on site by soil assessment and conditions encountered during construction. CHAPMAN LUMBER COMPANY, INC. Minor Modification for Bulkhead BULKHEAD DETAILS Sheet 2 of 2 Rev. 0, 02/27/08 S.A.M.P.S.O.N. and Company 125 Hunters Trail West Elizabeth City, NC 27909 Permit Applicant: Chapman Lumber Company, Inc. Project: Bulkhead Date Drawn: 27 February 2008 Drawn By: TS Scale: 1" = 5' 0 5 10 15 Scale: 1" = 5' 6