Loading...
HomeMy WebLinkAbout20051795 Ver 1_DCM Permit_20080523Permit Class ?T p 5 _ 11 S-, 0'1 Permit Number MODII ICATION/MINOR 44-07 STATE OF NORTH CAROLINA 1 LO Department of Environment and Natural Resources and Coastal Resources Commission l'a MAY 2 3 2008 Vermit for ?pS AND SI EORNNtRBRA X Major Development in an Area of Environmental) Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Riverfront Marina, c/o City Marina of Wilmington, LLC, 7741 Market St., Suite H, Wilmington, NC 28411 Authorizing development in New Hanover County at Cape Fear River along Wilmington waterfront , as requested in the permittee's application letter dated 3/26/08, including attached workplan drawings (7) Drawings 1-6 all dated revised 1/4/08 & Drawing M1 dated revised 3/20/08 This permit, issued on May 212008 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically altered herein, this minor modification authorizes the following modifications to the originally permit design, all as specifically depicted in the application letter dated 3/26/08 and the attached"workplan drawings: a. A revision of the previously authorized marina basin dredge limits, b. A revision of the location of dredge disposal areas, c. A revision in the alignment of a section of the previously authorized bulkhead, and d. A reconfiguration of the previously authorized marina, resulting a a reduction in the number of authorized open water boat slips from 204 to 195. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2010 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. 1 --) !i James • .?Gregson, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Riverfront Marina c/o City Marina of Wilmington, LLC ADDITIONAL CONDITIONS Marina Facility Permit #44-47 = Page 2 of 2 ' 2) The permittee is reminded that Condition No. 11 of the original of Permit 44-07 remains in force under this minor modification. This condition reads as follows: In accordance with commitments made by the permittee, 32 slips shall be designated as transient docks. This transient designation shall remain in force for the life of the permitted project. 3) This minor modification does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including any authorizations that may be required from the U.S. Army Corps of Engineers, or any authorizations resulting from the handling, containment, and/or disposal of contaminated materials. 4) This minor modification shall be attached to the original of Permit No. 44-07, which was issued on 3/30/07, and copies of both documents shall be readily available on site when a Division representative inspects the project for compliance. 5) All conditions and stipulations of the original permit remain in force under this minor modification unless specifically altered herein. REVISED DREDGING AND DISPOSAL CONSTRUCTION PLANS FOR ; THE CITY MARINA WILMINGTON, LLC WILMINGTON, NORTH CAROLINA oB rsr R„ rs, mar DRAWING INDEX E? I g z 1 COVER SHEET ' 2 SITE LAYOUT - EXISTING CONDITIONS - Cl OF 2 3 SITE LAYOUT - EXISTING CONDITIONS • 2 OF 2 `rysr ?? vaR-G ° .c 11 4 PROPOSED SEDIMENT SAMPLE LAYOUT ? C IF t 5 PROPOSED SOIL STAGING AREAS g u o PPD oFFlce „ 4pE rE 6 DETAIL SHEET ww? COMPIE% 3 -T I 9R C > J W ?,?. ? OMMLNrTY rsrN Nag N rw+Rrr,Fnsr GnE FEAR aER PARKING H CD(LFG? ¢FO 0 r? __J 1I ° yy w W ARE BLDG FUTURE SLOG FUTURE HOTEL ... N.cT I S ' u„rr rER sr xoxr„wnrFa 2 S Q SJ i Y ? PROPOSED wn sr 2 1° VICINITY MAP I caNYENnoN' NOTES: .-- 1. G?L e BASEMAP PROVIDED BY CRISER R I V E R F R O N T CENTER a e TROUT AN TANNER CONSULTING RECEIVED ENGINEERS WITH UPDATES BASED MAR 1 N A - ry ON CATLIN FIELD RECONNAISSANCE. _ 2. THESE DREDGING AND DISPOSAL ON, NC CONSTRUCTION PLANS ARE O g N Rr DCM WILMINGT dw SUPPORTING DOCUMENTS yE.gs - FOR THE DREDGING. DISPOSAL. GROUNDWATER RG SAMPLING AND T C E c PEAR 0 ZQO$ PLAN. BOTH DOCUMENTS SHOULD BE R/VER REVIEWED BY CONTRACTOR PRIOR TO START OF WORK. 3. SEDIMENTATION AND EROSION CONTROL PLAN WILL BE PREPARED BY OTHERS UNDER A SEPARATE SUBMITTAL. THESE SEC MEASURES SHOULD BE IMPLEMENTED PRIOR START OF THIS WORK. 4. NOTIFY THE MARINA IN THE EVENT OF ?L DISCOVERY OF ANY UNKNOWN HISTORICAL ARCHAEOLOGICAL REMAINS. 5. THE TEMPORARY PLACEMENT OF s ` a EXCAVATED FILL MATERIALS WITHIN n'PCpj OR" WATERS OR VEGETATED WETLANDS f/ -' bm IS NOT PFRMITTED. mwr w?RO / c > : 5 ry SITE MAP a ° No su?E ????e? e .I N e 9LNw-,J a ----------- ------ ----------------- - - --- ®?®® ®® ®0 LARD -- --------------f.•-- - Na $ IMROF pSrI ABwtE NSA - ? ® A Leff! of p5ruaeANGT AREA ® ® ® ® ® ?® ® ® . ® ? 5505 ®® 0 0 O 0® 0 0 0 -OSIP uw.J e eJ Nwi All ..pp X16 ? B sse . ss ----------- e„ uw., --------- ---- rEAUFAeLe RFACTNE enaaER? ? rn?w B 8? ZR ® ® APPROXIMATE LIMIT OF EXCAVATION - - ?u ®, Y ALMONT FOR COMPLETED, r x 'O W. . e.lo ® B . mss! ® cP. L?u?y?Z 0? ® ® ® 3 >p KFw ecLx.siAO? ® { 00 S 2 w U sna ,! Nev ;, d VT SA. e 10 . ev.,, NFw eMKREAO V N. e e ? ffl - IOR?WNAL LOGlpN AdWDOK . BT z$ .°. -1- LIX'w.gv. KWNE of ® ® ® ve ® ® ® a e ® ® ® 0 ? g 4Sr e?I ? ?,e e? \ ecl ,, e 5 ? ` ? ` ? ? br% < IoR x R..nnwoucol ? snns >B 1 d Nrz \ ? \ IoRiexuL Eol ; i c NAL LOCnrioN- AaANOOREOI BsA is .,.. oRE ' °? ? ? &?8 4$ = LEGEND Q . . Nr woR. \ e EXISTING ELEVATION (PRE-DREDGE) -10 PROPOSED DREDGE ELEVATION OR GRADE v' ® INJECTION/SPARGE WELL(CATLIN FIELD LOCATED) \ ® ABC INJECTION WELL(CATLIN FIELD LOCATED) . Cl ? '? AENAmstx ao wvooEN eLKNSKD 9 MONITORING WELL (CATLIN FIELD LOCATED) . ` ? - - - _? `- - B ® MONITORING WELL (APPROXIMATE LOCATIONS) - I x o B SOIL BORING (APPROXIMATE LOCATIONS) P- -1 " - SURFACE WATER SAMPLE (APPROXIMATE LOCATION S) ? - SC=SURFACE SOIL SAMPLE NOTE: 1. BASE MAP SUPPLIED BY CRISER TROUTMAN TANNER CONSULTING ENGINEERS WITH - - ` GP • GEOPROBE SOIL SAMPLE UPDATES BASED ON CATLINLIN FIELD RECONNAISSANCE. 2. A PORTION OF THE SAMPLE LOCATIONS. SOIL BORINGS. MONITORING WELLS ARE - - ' - O SW- SURFACE WATER SAMPLE ILLUSTRATED AS APPROXIMATE. APPROXIMATE LOCATIONS BASED ON REFERENCE TO ` AVAILABLE EXISTING SITE FEATURES ILLUSTRATED ON BASE MAP AND COMPARISON TO \ - MW = MONITORING WELL REPORTS PREPARED BY OTHERS. REFER TO SUPPORTING TEXT FOR PREVIOUS REPORT SOURC I S C FI OC - - _ - ?. SA SOIL SAMPLE E . ATL N ELD L ATED ITEMS ARE BASED ON SITE OBSERVATIONS, FIELD MEASUREMENTS AND GPS SURVEYS. SiENT - A" UNE - - `' - O HIGH WATER LINE (CATLIN FIELD LOCATED) 7. ALL UNDERGROUND UTILITIES ARE APPROXIMATE AND ARE TO BE LOCATED BY CONTRACTOR PRIOR TO START OF WORK. 6. HIGH WATERLINE IB DIVIDER FOR SEDIMENT VERSUS SOIL TO BE EXCAVATED AND 6 BASED ` nS . J _ RECE ON CATLINS FIELD RECONNAISSANCE. ACTUAL LOCATION TO BE LOCATED BY REGISTERED LA NDSURVEYOREORBROWNFIELDSAGREEMENT ` ?'J - sc,? ...... . 5. REFER TO TABLES OF THE SUPPORTING TEXT FOR AVAILABLE SOIL ANALYTICAL LABORATORY DATA ASSOCIATED WITH REFERENCED SAMPLE LOCATIONS. ?•L ?lL A' ACM WILMINGTON NC - -? , APR 0 8 2008 tM?TOTasaMre?.AU ' n \ IM'I L 5 nF zN °wU NO W z'.o H 0ZU ° W W Ep 3yo we .0 s? 3 HU a 3 m ?o - \ ?zs to \ LEGEND -. EXISTING ELEVATION (PRE-DREDGE) =0 PROPOSED DREDGE ELEVATION OR GRACE gryl \ ® INJECTIOWSPARGE WELL (CATLIN FIELD LOCATED) -------.. Mw?owa [-, ? V ?s=a (0- ABC INJECTION WELL(CATLIN FIELD LOCATED) - \ 9 MONITORING WELL (CATLIN FIELD LOCATED) ® MONITORING (APPROXIMATE WELL LOCATIONS) NOTE: - - B SOIL BORING (APPROXIMATE (APPRO%IMATE t. BASE MAP SUPPLIED BY CRISER AN TANNER CONSULTING ENGINEERS WITH \ UPDATES BASED ONCATLIN LIN FIELD RECONNAISSANCE. SURFACE WATER SAMPLE (APPROXIMATE LOCATIONS) 2. A PORTION THE SAMPLE LOCATIONS, SOIL BORINGS MONITORING WELLS ARE ILLUSTRATED D APPROXIMATE. APPROXIMATE LOCATIONS BASED ON REFERENCE TO SS =SURFACE SOIL SAMPLE E AVMIABLE EXIS STING SITE FEATURES ES ILLUSTRATED ON ON BASE IMP AND COMPARISON REPORTS PREPAREDLY OTHERS. REFER FER TO SUPPORTING TEXT FOR PREVIOUS REPORT GP = GEOPROBE SOIL SAMPLE SOURCES. CATLIN FIELD LOCATED ITEMS ARE BASED ON SITE OBSERVATIONS ATpNS. FIELD ELD MEASUREMENTS AND GPS SURVEYS. SW SURFACE WATER SAMPLE J. ALL ARE APPROXIMATE AND ARE TO BE LOCATED BY CONTRACTOR R TO START OF WORK. PRKM TO START . W ORK MW =MONITORING WELL A. HIGH WATERLINE IS DIVIDER IS FOR SEDIMENT VERSUS SOIL TO BE EXCAVATED AND IS BASED ON CATLIN'S FIELDRECONN RECONNAISSANCE. ACTUAL LOCATION TO BE LOCATED BY REGISTERED SA=SOIL SAMPLE LANE SURVEYOR FOR BROWNFIELDS AGREEMENT. 5. REFER TO TO TABLES THE SUPPORTING TEXT %T FOR FOR M SUP LE SOIL ANALYTICAL HIGH WATER LINE (CATLIN FIELD LOCATED) A P ASSOCIATED WITH REFERENCED D SAMPLE LOCATIONS. LABORATORY DATA ASSOCIATED TIONS. ?fa ton?Gwaa out eNauOxEO? eg AsA-ro aAOe .. ,: . RECEIVED DCM WILMINGTON, NC S T arc .. ? gg n n. u z z» DO S z > ,Ew eu.?i ,o ° ? w ? ? ? o } a a \ u ?j LEGEND EXISTING ELEVATION PRE DREDGE ? ? ??- ( - ) ? ® ® ` ® ® ,\ , uA F L t? PROPOSED DREDGE ELEVATION OR GRADE INJECTIONISPARGE WELL(CATLIN FIELD LOCATED) ABC INJECTION WELL (CATLIN FIELD LOCATED) !, i MONITORING WELL (CATLIN FIELD LOCATED) ' - t ® ® ® ® i \ _ ?. MONITORING WELL (APPROXIMATE LOCATIONS) 1 SOIL BORING (APPROXIMATE LOCATIONS) \ ' SURFACE WATER SAMPLE (APPROXIMATE LOCATIONS) ® PROPOSED SEDIMENT SAMPLE LOCATIONS NOTE: 1. BASE MAP SUPPLIED BY CRISER TROUTMAN TANNER CONSULTING ENGINEERS WITH ' - , SS = SURFACE SOIL SAMPLE UPDATES BASED ON CATLIN FIELD RECONNAISSANCE Z A PORTION OF THE SAMPLE LOCATIONS. SOIL BORINGS. MONITORING WELLS ARE ILLUSTRATED AS APPROXIMATE APPROXIMATE LOCATIONS BASED ON REFERENCE TO GP= GEOPROBE SOIL SAMPLE . AVAILABLE EXISTING SITE FEATURES ILLUSTRATED ON BASE MAP AND COMPARISON TO SW = SURFACE WnTFR SAMPLE REPORTS PREPARED BY OTHERS. REFER TO SUPPORTING TEXT FOR PREVIOUS REPORT SOURCES. CATLIN FIELD LOCATED ITEMS ARE BASED ON SITE OBSERVATIONS, FIELD - ` - RECEIVED I = MW MONITORING WELL MEASUREMENTS AND GPS SURVEYS. \ ARE APPROXIMATE AND ARE TO BE LOCATED BY CONTRACTOR J. ALL UNDERGROUND J = SA SOIL SAMPLE PRKM TO START . WORK. A. HIGH WATERLINE IS WORK IS DIVIDER FOR SEDIMENT VERSUS 301E TO BE EXCAVATED AND IS BASED DC M ,NG W i LM I N N / 1 HIGH WATER LINE (CATLIN FIELD LOCATED) ON CATLIN'S FIELD RECONNAISSANCE. ACTUAL LOCATION TO BE LOCATED BY REGISTERED LAND SURVEYOR FOR BROWNFIELDS AGREEMENT. 5. REFER TO SUPPORTING TEXT FOR SAMPLING PUN SPECIFICS TO BE IMPLEMENTED. It APR n (? Z008 APR 1 i } l 1 V V ) ?- -- -------------- ----------------- - =- -- - - -- ----_---- -- - k ti p 2 E vi ?u y S x _ W ?Z OQ aF?0PO5?FiFw ... O .. o e O ? u 0 soMF so\ sT : o aFFamcemi F 1piomn.cun e. I \ a tF 1 AF P.°a ? Aar ?, ( H€ . ? ?, FFAioPFiwaaFFT, ' t W ? ; \ 1 r 1,( sPASrACIN?.aeA - • • .. \ \ 1 i N i0 BE - \ ' SE-TE ? • j iAAGTdiI - y UC F YA*If ' S? ? TO °EL/J. ss LEGEND . - ?. 3 ? . i EXISTING ELEVATION (PRE-DREDGE) -10 PROPOSED DREDGE ELEVATION OR GRADE `?\ \ uAF INJECTIONSPARGE WELL(CATLIN FIELD LOCATED) ` - ABC INJECTION WELL (CATLIN FIELD LOCATED) MONITORING WELL (CAT(IN FIELD LOCATED) MONITORING WELL (APPROXIMATE LOCATIONS) y ` - ' l - SOIL BORING (APPROXIMATE LOCATIONS) `- - ? y l SURFACE. WATER SAMPLE (APPROXIMATE LOCATIONS) ? - SS = SURFACE SOIL SAMPLE NOTE: 1. BASE MAP SUPPLIED BY CRISER TROUTMAN TANNER CONSULTING ENGINEERS WITH GP a GEOPROBE SOIL SAMPLE UPDATES BASED ON CATLIN FIELD RECONNAISSANCE. 2. A PORTION OF THE SAMPLE LOCATIONS, SOIL BORINGS. MONITORING WELLS ARE - F - - SW =SURFACE WATER SAMPLE ILLUSTRATED AS APPROXIMATE. APPROXIMATE LOCATIONS BASED ON REFERENCE TO AV LE EXISTING SITE FEATURES ILLUSTRATED ON BASE MAP AND COMPARISON TO - - - MW=MONITORINGWELL REPORTS PREPARED BY OTHERS. REFER TO SUPPORTING TEXT FOR PREVIOUS REPORT SOURCES. CATLIN FIELD LOCATED ITEMSAREBASED ONSITE OBSERVATIONS,FIELD /''? SA = SOIL SAMPLE MEASUREMENTS AND On SURVEYS. J. ALL UNDERGR VINO UTILITIES ARE APPROXIMATE AND ARE TO BE LOCATED BY CONTRACTOR { CD- - - RECEIV LLLi/// - - HIGH WATER LINE (CATLIN FIELD LOCATED) PRIOR TO START OF WORK. HIGH WATER R LINE IS IS DIVIDER FOR SEDIMENT VERSUS SOIL TO BE EXCAVATED AND 5 BASED ^ NC LJ D V ILtl/? / WILMINGTON ON CATLIWS FIELD RECONNAISSANCE. ACTUAL LOCATION TO BE LOCATED BY REGISTERED , LAND SURVEYOR FOR BROWNFIELDS AGREEMENT. 5. REFER TO THE SUPPORTING TEXT FOR DISCUSSION ON SOL STAGING AREAS. APR 6 r S1p. 52E?PBC ?1EILiE" ?M SiRAFEIC RAiE?, SUMP DETAIL SCALE:NTS SOIL STAGING AREA OUTSIDE MARINA FOOTPRINT SCALE:NTS SOIL STAGING AREA INSIDE MARINA FOOTPRINT, CROSS SECTION SCALE:NTS e'iMC"-% DsMC M, iE" PLAN VIEW - SUMP SCALE:NTS RECEIVED DCM WILMINGTON, NC APR 0 8 2008 „w g w 'do F"? w o0 2 N uu Z o?;F D f so a ?17 o o j q SITE DATA TABLE ®B0AT SLIP COUNT R=io o PROJECT ADDRESS: 10 HARNETT ST, BUILDING SIZE: PHASE I DOCKMASTER 0' FROM RIVER IMPERVIOUS SURFACE: AREA BEFORE AREA AFTER PIER PIER SLIP NO. OF NO. OF TOTAL NO. OF w i3`i o 5 wawtNOraN, N, C. 26401 MAX. HALLOW. 35.00' DESIGNATION LENGTH LENGTH STANDARD SLIPS TRANSIENT SLIPS SLIPS PER PIER PHASE I MARINA 466.092 SF WA PIER A 511.50' 23 60' 1 24 z >I; w m ZONING DISTRICT: CENTRAL BUSINESS DISTRICT (CBD) ACT, H: 2 STORIES 0 10'r AOFF LOGO 35.00' RIVERWALK 85.764 SF 45,004 SF - -_- _ 31 ?z?x RIVERWALK SHELTER 16.00, PIER B 474' 60' 42 2 44 K _ BUILDING SET BACKS: PHASE 1 MARINA (NOT APPLICABLE) PHASE 11 2 MUTT ST. PARCELS 208.698 SF 219,813 SF ? ? a m rc m m PHASE II NUTT ST, PARCELS 1 0 350' FROM RIVER - - PIER C 443.50' 50' 43 2 45 PHASE II MUTT ST. FRONTAGE 6 FT, SETBACK MAX. I PARCEL NUTT ST,/BRUNSWICK PIER 0 259' _ 45' 25 olp m o 1 0 450' 2 27 SITE AREA: PHASE I MARINA WATER 10.70 ACREAS PARKING SPACES: 58 _ PIER E 193' 35 21 2 23 ?i4!z z 1 0 600' FROM RIVER N n< m LANG 0.94 ACREAS CAMA LAND USE CLASSIFICATION: CONSERVATION 0 URBAN MAX. N ALLOW. 134.75' PIER F 200' 50' 9 ' - 9 RIVERWALK 1,09 ACREAS 163,25' BASE FLOOD ELEVATION: IO,G' NGVD rz PIER G 40 40' - 8 B RZ - PHASE 11 2 NUTT ST. PARCELS 2.90 ACREAS 206,00' PIER H 77' 40' - ! 2 2 I PARCEL MUTT ST./BRUNSWICK 1.30 ACREAS ACT, H: TO BE DETERMINED PIER 1 652' 50' - 13 13 BUILDING SIZE: PHASE 1 DOCKMASTER 55'x134'x35' HIGH x 3 STORIES 2,850' 163 -}- 32 = 195 ?i RIVERWALK SHELTER I5'x20'-6'x16' HIGH x I STORY w c TOTAL LENGTH TOTAL NO. OF W PHASE 11 NUTT ST. PARCELS 2 0 21400 SF x H (TO BE DETER.) ALONG PIER CE BOAT SLIPS E< z l 1 0 43200 SF x H (TO BE DETER,) I^ 5 I I I V PDJo " m W ZU9 NUT STREET _ -- NUT STREET [? Q?u R acute " -- m ----- u"? 66.05fifi E z QZry I- 2Fm i a m __ •-. .... . ..... . I X44 ? aU f7 t? ? n 3 ? W a a 2(I' 2'12 RECEIVEL) ° FUTURE BUILDING FUTURE BUILDING I F `U FUTURE BUILDING ml I U MA 9.5t IR' I T L " Z m 't 91 h APR 0 7 2008 'AAkL UMPSffRI OMPACT0URa 786, I 215-7J4' = p? NC I 0V1 W'YILi11994tlY7N9 E GANGWAY T SECURITY GATE 14.5' RIVERWALK , WIDE . ,. IH SHELTER - IYP. NTH BROW ... ?--- -. y LIG FUEL TANKS 30' 30' 30' MOP -SEE C4 SHTS. MOP SEE SMT. 59 12' WIDE DOCK 0 EA. GANGWAY P' 3d IApERMOUS PAVERS I 50' I a w 40' RIVERWALK EASEMENT CARTS CARS" -' TRASH 3O JO_ TO ALLOW GOLF CART TO PASS I GANGWAY WITHOUT BROW MDP so ASHI H CCARIS TR IIJI? a y ?i °KH C? g I A VEG FlLIER Il 'P1N111NG •PuWTNG BED PLANTING VEG. FlLIER PVNttIG I. _?-_ AA 1 .^ 40' RIVERWALK 50,_11• I < • W TA1G i. 1116 I PLANTING EASEMENT I I I III' " 11- • BULKHEAD ? r 4-6 DATING DOCK M PWITNG 7.97 12 50' " CAP - SEE y 9 20' - y TRASH , s x, x n 5 N SHT. SS i < .- - i .- j •-- CARTS Q 34 52.47' 4.09' S061621'E U ? -? H C u. m < x- ?. ---y I o BEGIN NEW BULKHEAD J 0 BEARING S63T'44'39'W J Z - ---. i N o o x- --? F ?--' Q r---- j ----' •-L-. 1- 4a°y? 50' z n Q 1?4y}H o J Z t2 QED ?Z+ Z O *•' -.'?' ! CANCIXAY '? iP i Q n I '{P• + -SEE C4 L irc - V --. I -- A U' N V u) ? N S F b r POSED BULKHEAD H J pp ?¢ (APPROX. 118 6 .J 1") 1M BULKH AD o »o QL?• ' _? F '" z-. h a --- ---- r ?--- --? " BEARING 563'44' 9"W f' J 0O `L?•'.A rW4 CU BUWI9ADI xW A) ry r nN I n a a .. ?.-_ .-_y '-F-_ ry ® Z Z Pms? lo < Q Dlyl, wl fs m \• v i y o o ,. Q Z PIER ?, 136' _ ':g n?'nu i e `- -_ WE ?F o a rz a Z 0 ZE FLOATING FAIRWAY o RIVERWALK F Q DOCK PZ W M'S'7R - - u i z i ~'na I N r v R W W Q V' C Is/ ?4yS G y PIER E a' I ?-. S_41 _j fF \ I G N _ I . F N - v y o N- 1,_6, HE, R?r 3 ?kG GGhcy? \ 70' C' \TRAAS - " n - '- + n BULK U S1J? ?Doo FAIRWAY PIER [11 S^ I voi °o --_ -_-< 7 4 I 6• (5) 11'1 PIER GLIDE PILES P ,,ys•? '?51' ?4 45' 9 """ - -LOCALE AS SHOWN '? PIER 7 ( AXE'R m I n « 4S =-_-_ --.---• I--- q ?. ORIGINAL PROPERTY LINE yE - T o 'OI 583'44'39'W 791.62' r ry W? p. r EU KHE FROM SURVEY BY yr MICHAEL N. UNDERWOOD C q pE i pp I 4 G < _ BULKHE / DATED 12/20/06 'LQ I'e/1 (? :' -` - b I ' 'D F ® ," AAFE33o:y•t Eee °0 ?I MI RI Z' n2 m - _ j - $ s -. 52.47 SEAL OTMMFCAP LAWS. 'ill. 'PC '?CINE4 r: 1---TRANS. rv 3 'iry FS E 14'4 PIER GUIDE ---- -.- _ _y I .- ' -- PILES 0100' O.C. PIER O EXIST. DOCK TRANS. AN S. m =' EW BULKHEAD LINE = OUTSIDE rcsa4o xe CED - ',? Iw FACE (NORTH) OF CONC. CAP= HNL (BEARING S83"44'39'W) WAU" a CED PIER B W '45-49. = 50' 5831 NAO'13 MARINA LAYOUT TRANS N" ueuNU1921/2/08 a.c GR10 x . ? 275- 3/12/06 500}g'38•W SCALE: 1° = 50' PIER A MARINA LAYOUT GRAPHIC SCALE: 1'=50' 75' _ 50' 9 50' 9O CO. 9 60' B2'-6'3 60 9-6' 9EIT 1w 1_ FAIRWAY FAIRWAY FARWAY 50 0 50 100 150 M1 "