HomeMy WebLinkAboutNCG030589 DMR SW (14) Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Qualit Ge erral Permit No. NCG030000
Date submitted g�/ 2 /,
� /r
CERTIFICATE OF COVERAGE NO. NCG030000 hCcol:Kr SAMPLE COLLECTION YEAR �D(5
FACILITY NAME Elkay Plumbing Products RECEIVED SAMPLE PERIOD nJan-June n`ly-Dec
COUNTY Robeson or L� onthlyl II 0/ (month)
PERSON COLLECTING SAMPLES Rodney Vernon AUG 21 2015 DISCHARGING TO CLASS fORW fHQW Trout fPNA
LABORATORY Microbac Lab Cert.#37714 Water Supply SA
Comments on sample collection or analysis: CENTRALpWR SECTION Other
n
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -›
Part A: Stormwater Benchmarks and Monitoring Results
o discharge this period?2
Non-Polar O&G/
Date Sample 24-hour rainfall pH, Total Toxic
Outfall No. Collected) amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics
(mo/dd/yr) Inches3 Hydrocarbons
Benchmarks===> - - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L
Outfall 1
Outfall 2
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
'For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for 110 monitoring
may be waived The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement.
"Based upon my inquiry of the person or persons directly responsible for managing compliance witn the permit monitoring requirement for total to•:c organics
(TTO), I certify that to the best of my knowledge and belief,no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report I further certify that this facility is implementing the at the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan "
Derek Piinele
Name(Print name)
Plant Manager
Title , � io l -
(..„) ' 4
C ;rr;t Trey
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non-detect, ND, or other similar non-numerical
format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection
limit, reporting limit, etc in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging> 55 gal of new oil per month.
n No discharge this period?2
Date Sample 24-hour rainfall
Outfall No. Collected' amount, Non-polar O&G/TPH by
(mo/dd/yr) Inches' EPA 1664(SGT-HEM) Total Suspended Solids pH
Benchmarks===> - - 15 mg/L 100 mg/L or 50 mg/Ls 6.0—9.0 SU
Footnotes from Part A also apply to this Part B
' See General Permit text, 'fable 5, identifying the especially sensitive receiving water classifications where the mme protective benchmark applies
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Perinit t)ato 11x1/2011 10/3i/2017 SWU 2-15 last revised 10/25/2012
Page 2 of 3
Y `
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO n
REGIONAL OFFICE CONTACT NAME: Mike Lawyer
Mail an original and one copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period
in the case of"No Discharge"reports)to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law,that this tocument and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel pro.= • gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system,or
those person -ctl respons .le f r g. hering the information,the information submitted is,to the best of my knowl:dge and belief,true,accurate,and complete. I
am aware-that th- ar/si: a pens ies for submitting false information,including the possibility of fine; and im.nsonment for knowing violations."
iliSature of Per tee) (Dat-
Permit Date: 11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012
Page 3 of 3