Loading...
HomeMy WebLinkAbout20160656 Ver 1_USACE Permit_20160811� �_a-c(05�a U.S. ARMY CORPS OF ENGINEERS COPY WILMINGTON DISTRICT Action Id. SAW -2016-01522 County: Surry U.S.G.S. Quad: NC-COPELAND GENERAL PERMIT (REGIONAL, AND NATIONWIDE) VERIFt)�p®rtment of Permittee: The Resource Institute, Inc. Environmental Quality Charles Anderson Received Address: 2714 Henning Drive AUG 15 2016 Winston-Salem, NC 27106 Winston-Salem Telephone Number: 336-750-0522 Regional Office Size (acres) 2.5 (approximately) Nearest Town Dobson Nearest Waterway King Creek River Basin Upper Yadkin USGS HUC 03040101 Coordinates Latitude: 36.339368 Longitude: -80.707699 Location description: The site is located approximately 2000 feet east of the State Highway 601, Serenity Way intersection, near Dobson, Surry County, North Carolina. Description of projects area and activity: This authorization is for the permanent discharge of clean fill material along 4,684 linear feet of King Creek associated with a National Resources Conservation Service (NRCS) Environmental Quality Incentives Program Project (EQIP). The final project will result in approximately 4,422 linear feet of stream channel. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: NWP 27 Aquatic Habitat Restoration, Establishment, and Enhancement Activities. SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated 07/01/2016. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. Special Conditions: 1. Monitoring of stream reconstruction areas shall be conducted in accordance with Monitoring Level III of the Stream Mitigation Guidelines April 2003. Monitoring shall be conducted for a minimum of three years and two bankful events. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. ;, If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Andrew Williams at 919-554-4884 x26 or And rew.E.Williams2(a,usace.army.mil. Corps Regulatory Official: Ate , A Az--� Date: 08/11/2016 Expiration Date of Verification: 03/18/2017 Determination of Jurisdiction: A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ® There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued . Action ID: SAW - Basis For Determination: The stream, King Creek, is a relatively permanent water (RPW) and a tributary to the Fisher River, an RPW. The Fisher River flows to the Yadkin River, a traditionally navigable water (TNW). The Yadkin River is a tributary to the Pee Dee River, a navigable water of the United States. This jurisdictional determination is only for the stream proposed for impacts associated with this Nationwide Permit verification and does not include any other waters/wetlands that may be located on the project site. Remarks: None E. Attention USDA Program Participants This del ineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B and C above). This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above. address by October 10, 2016. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: Z,2"� X,,/v �/�� Andrew Williams Date of JD: 08/11/2016 Expiration Date of JD: 08/11/2021 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our customer Satisfaction Survey online at http://regulato!y.usacesurvey.com/. Copy Furnished: Kevin Tweedy Ecosystem Planning and Restoration 559 Jones Franklin Road Raleigh, NC 27606 Sue Homewood NC DENR Winston-Salem Regional Office Division of Water Resources - Water Quality Programs 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Bobby Bledsoe 149 Bledsoe Road Dobson, NC 27017 Jan Gordon 358 Cedar Run Road Dobson, NC 27017 Linda Causey 348 Cedar Run Road Dobson, NC 27017 .4 Action ID Number: SAW -2016-01522 County: Surry Permittee: The Resource Institute, Inc. Charles Anderson Project Name: Anderson, Charles/King Creek Stream Enhancement Proiect Date Verification Issued: 08/11/2016 Project Manager: Andrew Williams Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMS' CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Andrew Williams 3331 Ileritiage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date 'Y Applicant: The Resource Institute, Inc. File Number: SAW -2016-01522 Date: 08/11/2016 Charles Anderson Attached is: See Section below ❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A ❑ PROFFERED PERMIT (Standard Permit or Letter of permission) B ❑ PERMIT DENIAL C / ® APPROVED JURISDICTIONAL DETERMINATION D F11 PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION'I The. f'oll'owing udenfifes your iiglit's and optuons.regarding an•adniumst_`rafive appeal'of the above decision. Add itional'inforniation may be found at or'http://www.usace.army.mil/Missions/CivilWorks/Re ulatoryProgramandPermits aspx or th' Co s re ulations at 3� CFR' Paft.3" 1. ?1? - g A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Pennission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the pen -nit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section 1I of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the pen -nit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terns and conditions therein, you may appeal the declined pen -nit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED XURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. 'SEC T IONI I - REQUES,TFFOR APPEAL_or, OBJECTIONS TO AMINITIAL PROFFERED) PERMIT__ REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF`CONTACT FOR QUESTIQNS OR ;INFORMATION If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Attn: Mr. Jason Steele, Administrative Appeal Review Officer Andrew Williams CESAD-PDO 3331 Heritiage Trade Drive, Suite 105 U.S. Army Corps of Engineers, South Atlantic Division Wake Forest, North Carolina 27587 60 Forsyth Street, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any govermnent consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137