Loading...
HomeMy WebLinkAbout20100752_WRC Comments_20161014 Wanucha, Dave From:Chambers, Marla J Sent:Friday, October 14, 2016 4:35 PM To:Matthews, Monte K SAW; Kichefski, Steven L SAW; Slaughter, Johnathan H; Eller, Douglas W Cc:Dagnino, Carla S; Wanucha, Dave; Barrett, William A; Shown, Marc T; Buncick, Marella; vanderwiele.cynthia@epa.gov Subject:RE: Permit Modification Application for R-2237C Watauga/Caldwell Counties I have reviewed the permit modification and have spoken with the property owner at the proposed outlet at Site XIV, Mr. Shannon Marshall. I'm scheduled to meet with him on site on Tuesday to get a better view of the situation. If I understand correctly, issues with Mr. Marshall (signing of drainage easement) will need to be resolved before the permit can be issued and construction take place. It looks like that will probably go beyond Nov. 1. Once we determine the best way to resolve this and the amount of work involved, I intend to allow a short suspension of the moratorium, just long enough to do the work. Mr. Marshall appears to be trying to ensure that long term negative impacts to the trout stream and his property do not occur and that this is resolved is the best manner. I'm told that shoulder berm gutters will be used to transport water along the US 321 project into the pipe that takes it downhill and outlets on his property to flow to Baileys Camp Creek. Then an 8' long riprap dissipater outlet pad is proposed between the pipe and the stream (although the end of pipe is marked at the stream channel in the field). This provides little to no filtration or treatment of the stormwater. The pipe does reduce the slope to be relatively flat the last 80' or so and outlets at a 90 degree angle to the stream. The concerns are with both water quality and quantity/velocity. Erosive forces in the channel could jeopardize a pond dam at the bank of the stream about 100 ' downstream, as well as impact the quality of the water in the trout stream. I'm wondering if there are any opportunities for improvements here that could help Mr. Marshall and me feel more comfortable with this work, so we can move forward and get the erosion situation fixed. Can riprap ditches be used instead of shoulder berm gutters? Can the pipe outlet location be changed to allow for a longer riprap treatment and energy dissipation and a better angle to the stream? Can the inside of the pipe be roughened (such as a series of sills)? Can NCDOT agree to monitor the channel at and downstream of the pipe outlet to ensure long term stability? I'm hoping we can find a way to protect the trout stream and move forward on this. Marla Marla Chambers // NCDOT Coordinator Habitat Conservation Program NC Wildlife Resources Commission c/o NCDOT 206 Charter Street Albemarle, North Carolina 28001 office: 704-982-9181 mobile: 704-984-1070 Marla.chambers@ncwildlife.org ncwildlife.org 1 -----Original Message----- From: Kichefski, Steven L SAW \[mailto:Steven.L.Kichefski@usace.army.mil\] Sent: Friday, September 30, 2016 2:07 PM To: Slaughter, Johnathan H <hslaughter@ncdot.gov>; Eller, Douglas W <dweller@ncdot.gov>; Chambers, Marla J <marla.chambers@ncwildlife.org> Cc: Matthews, Monte K SAW <Monte.K.Matthews@usace.army.mil>; Dagnino, Carla S <cdagnino@ncdot.gov> Subject: RE: Permit Modification Application for R-2237C Watauga/Caldwell Counties Heath/Marla, Just wanted to let you know that in an effort to get this modification done as soon as possible, Monte will be working on this one. I have copied him on this email. Regards, Steve -----Original Message----- From: Slaughter, Johnathan H \[mailto:hslaughter@ncdot.gov\] Sent: Friday, September 30, 2016 11:47 AM To: Eller, Douglas W <dweller@ncdot.gov>; Chambers, Marla J <marla.chambers@ncwildlife.org> Cc: Kichefski, Steven L SAW <Steven.L.Kichefski@usace.army.mil> Subject: \[EXTERNAL\] FW: Permit Modification Application for R-2237C Watauga/Caldwell Counties Marla, Be advised that this proposed work is being done to fix and ongoing erosion issue. I would think you would want it addressed even if during the winter. We are fine with doing the work prior to 11/1 but that is dependent on getting the modification back from the corps soon. From: Chambers, Marla J Sent: Friday, September 30, 2016 11:43 AM To: Dagnino, Carla S <cdagnino@ncdot.gov> Cc: Slaughter, Johnathan H <hslaughter@ncdot.gov> Subject: RE: Permit Modification Application for R-2237C Watauga/Caldwell Counties 2 If the work can be done by Nov. 1, we can agree to delay the start of the moratorium until then. If not, I'll need more info as to how long it will take to do the in-water/in-buffer work and how much soil disturbance and potential for losing sediment into the stream there will be. I do request that ground-disturbing work occurring in the buffer during the 2-week delay be minimized. Marla Marla Chambers // NCDOT Coordinator Habitat Conservation Program NC Wildlife Resources Commission c/o NCDOT 206 Charter Street Albemarle, North Carolina 28001 office: 704-982-9181 mobile: 704-984-1070 Marla.chambers@ncwildlife.org <mailto:Marla.chambers@ncwildlife.org> ncwildlife.org <Blockedhttp://ncwildlife.org/> <Blockedhttp://twitter.com/ncwildlife> <Blockedhttp://www.facebook.com/pages/NC-Wildlife-Resources-Commission/169986143088699?ref=tn_tnmn> <Blockedhttp://instagram.com/ncwildlife> <Blockedhttp://www.youtube.com/user/NCWRC?blend=2&ob=video-mustangbase> 3 From: Dagnino, Carla S Sent: Thursday, September 29, 2016 3:24 PM To: Chambers, Marla J <marla.chambers@ncwildlife.org <mailto:marla.chambers@ncwildlife.org> > Subject: FW: Permit Modification Application for R-2237C Watauga/Caldwell Counties Hi Marla, Please see the email below. The Division is asking for an allowance to work instream beyond the moratorium date of October 15th. Will you please give input on this - so they can address the problem at this site? Thanks! Carla From: Eller, Douglas W Sent: Wednesday, September 28, 2016 9:43 AM To: Dagnino, Carla S Cc: Slaughter, Johnathan H; Beaver, G Trent Subject: RE: Permit Modification Application for R-2237C Watauga/Caldwell Counties Carla 4 Is there anyway we can get a verbal to proceed with this work or permission to install these rip rap dissipater pads after Oct 15. We desperately need to correct and prevent any further erosion damages to the property receiving our storm drain flow from the project. Currently we're waiting on AT&T to move they're lines in conflict. AT&T in notoriously slow and I'm afraid by their fault we will be pushed a little passed the Oct 15 timeframe. I think this is a benefit to all to get this addressed. Thanks Doug Eller District Engineer From: Slaughter, Johnathan H Sent: Wednesday, September 28, 2016 8:36 AM To: Beaver, G Trent; Eller, Douglas W Subject: FW: Permit Modification Application for R-2237C Watauga/Caldwell Counties FYI From: Dagnino, Carla S Sent: Tuesday, September 27, 2016 5:11 PM To: 'Steven.L.Kichefski@usace.army.mil' <Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil> >; Chapman, Amy <amy.chapman@ncdenr.gov <mailto:amy.chapman@ncdenr.gov> > Cc: clarence.coleman@fhwa.dot.gov <mailto:clarence.coleman@fhwa.dot.gov> ; Cynthia VanDerWiele <vanderwiele.cynthia@epa.gov <mailto:vanderwiele.cynthia@epa.gov> >; Joyner, Drew <djoyner@ncdot.gov <mailto:djoyner@ncdot.gov> >; Militscher, Chris (militscher.chris@epa.gov <mailto:militscher.chris@epa.gov> ) <militscher.chris@epa.gov <mailto:militscher.chris@epa.gov> >; Monte Matthews (Monte.K.Matthews@usace.army.mil <mailto:Monte.K.Matthews@usace.army.mil> ) <Monte.K.Matthews@usace.army.mil <mailto:Monte.K.Matthews@usace.army.mil> >; Tony Able (Able.tony@Epa.gov <mailto:Able.tony@Epa.gov> ) <Able.tony@Epa.gov <mailto:Able.tony@Epa.gov> >; Al-Ghandour, Majed N <malghandour@ncdot.gov <mailto:malghandour@ncdot.gov> >; Koch, Thomas K <tkoch@ncdot.gov <mailto:tkoch@ncdot.gov> >; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov <mailto:kristilynn.carpenter@ncdenr.gov> >; Chambers, Marla J <marla.chambers@ncwildlife.org <mailto:marla.chambers@ncwildlife.org> >; Mellor, Colin <cmellor@ncdot.gov <mailto:cmellor@ncdot.gov> >; NCDOT Service Account - Roadway Design <roadwaydesign@ncdot.gov <mailto:roadwaydesign@ncdot.gov> >; Pettyjohn, Michael A <mpettyjohn@ncdot.gov <mailto:mpettyjohn@ncdot.gov> >; Slaughter, Johnathan H <hslaughter@ncdot.gov <mailto:hslaughter@ncdot.gov> >; Staley, Mark K <mstaley@ncdot.gov <mailto:mstaley@ncdot.gov> >; Wanucha, Dave <dave.wanucha@ncdenr.gov <mailto:dave.wanucha@ncdenr.gov> >; Wilkins, Ronald B <rbwilkins@ncdot.gov <mailto:rbwilkins@ncdot.gov> >; RaSharon King (rmking@tva.gov <mailto:rmking@tva.gov> ) <rmking@tva.gov <mailto:rmking@tva.gov> >; marella_buncick@fws.gov <mailto:marella_buncick@fws.gov> ; Barrett, William A <wabarrett@ncdot.gov <mailto:wabarrett@ncdot.gov> > Subject: Permit Modification Application for R-2237C Watauga/Caldwell Counties 5 The Permit Modification Application for R-2237C has been posted to the website. The electronic copy can be viewed /downloaded at Blockedhttps://connect.ncdot.gov/resources/Environmental/ Named: R-2237C MOD Caldwell Watauga September 27 2016 Thank you. Carla Dagnino Western Region Environmental Program Supervisor II Natural Environment Section Project Development and Environmental Analysis NC Department of Transportation 919 707 6110 office cdagnino@ncdot.gov <mailto:cdagnino@ncdot.gov> 1598 Mail Service Center Raleigh, NC 27699 -1598 6 1020 Birch Ridge Drive Raleigh, NC 27610 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 7