Loading...
HomeMy WebLinkAbout20130918 Ver 8_U-2525BC Mods_20160902 (2) Wrenn, Brian L From:Cheely, Erin K Sent:Friday, September 02, 2016 3:03 PM To:Bailey, David E SAW Cc:Matthews, Monte K SAW; Wrenn, Brian L Subject:RE: U-2525BC mods Sounds like a plan, thanks! I will submit a mod for U-2525B for some modified bank stabilization activities once I get the info I need from the Division. I just notified Hydro and Roadway via e-mail that they should set up a CP4C to discuss the sites (he said there were three) associated with completing the work along US 29 that they'd like to go ahead and finish now instead of in 2018. I also informed them of the extra permitting time needed due to Public Notice. So I suppose now we just wait for something to show up on our calendars. Thanks so much for helping us work through the logistics. -erin -----Original Message----- From: Bailey, David E SAW \[mailto:David.E.Bailey2@usace.army.mil\] Sent: Friday, September 02, 2016 2:20 PM To: Cheely, Erin K <ekcheely@ncdot.gov> Cc: Matthews, Monte K SAW <Monte.K.Matthews@usace.army.mil>; Wrenn, Brian L <brian.wrenn@ncdenr.gov> Subject: U-2525BC mods Erin, Thanks for speaking with me this afternoon about the above referenced project. I understand that NCDOT has several permit sites to modify in the coming months, and that some were covered by permit plans and released for construction (section B) in the original permit. Other areas of proposed work were either proposed conceptually as part of section C, or may extend outside of the area covered by either the B or C sections. After speaking with Monte Matthews about the path forward we offer the following: For permit sites covered by permit plans and released for construction under section B: submit all of these modification requests to permitted sites together as one request. These will be reviewed in the same manner as other similar modification requests for U-2525B. Whether this request is placed on Public Notice or not will depend on the type and magnitude of proposed additional impacts. For permit sites proposed conceptually as part of section C or extending outside of the original section B or C permitted project: Organize a Merger 4C meeting for these sites to complete the process toward final design. Note that, in addition to the typical information regarding impacts to waters of the US, you will need to provide us the information necessary to complete our requirements under section 7 of the ESA and section 106 of the NHPA for sites extending outside of the original section B or C permitted project. Once the 4C meeting is held and any plan revisions resulting from the meeting are complete, submit these sites together as a separate modification request. These modification requests/new sites will be placed on Public Notice; please ensure that NCDOT's internal timelines reflect the additional time required for these processes. 1 Hopefully this gives you the path forward in terms of the Corps' expectations. Thank you as always for your early coordination efforts. If you have any questions please let me know. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2