HomeMy WebLinkAbout20130918 All Versions_U-2525 Bank Stabilization Report 7-20-16_20160720 July 20 , 2016 Greensboro Eastern Loop Rankin Mill Road /Buffalo Creek Re:Monitoring of Bank Stabilization at Buffalo Creek Temporary Stream Crossing The bank stabilization at the Buffalo Creek Temporary Crossing appears to be stable with increased vegetation on the downstream side at the top of bank and increased vegetation upstream of the area that received the riprap. The wetland at the top of slope on the downstream side also appears to have increased vegetation and impacts from mats utilized to place the riprap are now barely visible. Pictures of the area described herein, as well as, the stream’s bank within 200 feet up and downstream of the stabilization area are attached. We will continue to monitor the stream’s embankment to maintain minimal disturbance. Please let us know if you have any questions or comments.