Loading...
HomeMy WebLinkAbout20130918 All Versions_Buffalo Creek Bank Stabilization Report 4-28-16_20160513 April 27, 2016 Greensboro Eastern Loop Rankin Mill Road /Buffalo Creek Re:Bank Stabilization at Buffalo Creek Temporary Stream Crossing NCDOT has stabilized the embankment along Buffalo Creek by extending riprap along the bank in fulfillment to minimize impact to the stream and surrounding wetlands. We have attached pictures of this area described herein, as well as the stream’s bank within 200 feet up and downstream of the stabilization area. We will continue to monitor the stream’s embankment to maintain minimal disturbance. We have used a native seed mix to re- establish vegetation for further stream bank stability. Monitoring reports will be submitted to the Corps bi-weekly hereafter. Please see the attached geo-referenced color photographs of the bank stabilization area within 200 feet up and downstream. The bank appears stable with no erosion concerns at this time. We look forward to receiving any questions or concerns within the parameters of the work that has been performed.