April 27, 2016
Greensboro Eastern Loop
Rankin Mill Road /Buffalo Creek
Re:Bank Stabilization at Buffalo Creek Temporary Stream Crossing
NCDOT has stabilized the embankment along Buffalo Creek by
extending riprap along the bank in fulfillment to minimize impact to
the stream and surrounding wetlands. We have attached pictures
of this area described herein, as well as the stream’s bank within
200 feet up and downstream of the stabilization area. We will
continue to monitor the stream’s embankment to maintain
minimal disturbance. We have used a native seed mix to re-
establish vegetation for further stream bank stability. Monitoring
reports will be submitted to the Corps bi-weekly hereafter.
Please see the attached geo-referenced color photographs of the
bank stabilization area within 200 feet up and downstream. The
bank appears stable with no erosion concerns at this time. We look
forward to receiving any questions or concerns within the
parameters of the work that has been performed.