Loading...
HomeMy WebLinkAbout20140584 All Versions_RE Certifications of completion_20160510 Wrenn, Brian L From:Thomson, Nicole J Sent:Tuesday, May 10, 2016 2:00 PM To:Bailey, David E SAW; Wrenn, Brian L Cc:Parker, Jerry A Subject:RE: Certifications of completion - Bridge 151 on Staley Store Rd, Alamance Co. Attachments:picture doc for USACE and DWR post compliance review may 2016.docx; upstream R bank.jpg; downstream L Bank.jpg; downstream R bank.jpg; upstream L bank.jpg Good afternoon team! I've attached pictures of the above Bridge showing both the upstream and downstream ends. The original issues at this bridge included some geotextile fabric left in the channel, 57 stone mixed in/on top of the rip rap at the wing walls, unstable/non-matted banks, and an area within the stream (upstream end) where there appeared to be a large area of sediment/57 stone (possibly left from the pump around operation during the culvert installation). I've attached a quick word document that has the "before" and "after" shots of the creek/culvert crossing (just by way of reference). I've also included a few other pictures here for your review. Again, my apologies for dropping the ball on photo documentation. Let me know if you have any questions or additional concerns. Thanks Nik -----Original Message----- From: Bailey, David E SAW \[mailto:David.E.Bailey2@usace.army.mil\] Sent: Wednesday, April 06, 2016 2:09 PM To: Thomson, Nicole J; Wanucha, Dave Cc: Parker, Jerry A Subject: RE: Certifications of completion Thanks Nikki. --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. 1 -----Original Message----- From: Thomson, Nicole J \[mailto:njthomson2@ncdot.gov\] Sent: Tuesday, April 05, 2016 12:47 PM To: Bailey, David E SAW <David.E.Bailey2@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Parker, Jerry A <jparker@ncdot.gov> Subject: \[EXTERNAL\] RE: Certifications of completion Dang it! Yes, the repair work was done. I think I dropped the ball on this one. This was about the same time my cell phone ate itself, including the post pictures I took. I may have to go back out there - of course, I'm not driving just yet. I'll follow up on this. I am so sorry! Nikki Sent from my Verizon Wireless 4G LTE Tablet -------- Original message -------- From: "Bailey, David E SAW" <David.E.Bailey2@usace.army.mil> Date: 3/25/2016 11:38 AM (GMT-05:00) To: "Thomson, Nicole J" <njthomson2@ncdot.gov>, "Wanucha, Dave" <dave.wanucha@ncdenr.gov> Cc: "Parker, Jerry A" <jparker@ncdot.gov> Subject: RE: Certifications of completion Hi Nikki. Thanks for the info. One of the completion certificates jogged my memory. Bridge 151 on SR 2307 (SAW-2014- 001079) was found to have a few compliance issues during our August field visit last year (see attached correspondence). I couldn't find confirmation that the issues were corrected and resolved. Can you provide me the documentation that the compliance work has been completed? Pictures post correction would be most helpful. Thanks! -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. 2 -----Original Message----- From: Thomson, Nicole J \[mailto:njthomson2@ncdot.gov\] Sent: Tuesday, March 01, 2016 2:55 PM To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Cc: Parker, Jerry A <jparker@ncdot.gov> Subject: \[EXTERNAL\] Certifications of completion Good afternoon! Please see the attached certificates of completion for several bridges that I've finaled during the last few months. As I gather them up, I'll forward them along to you! Let me know if you have any questions. Thanks! Nikki Nicole J. Thomson Division Environmental Supervisor Assistant Division Environmental Office 919-754-7806 Mobile Njthomson2@ncdot.gov PO Box 14996 Greensboro, NC 27415-4996 Email correspondence to and from this address is subject to the 3 North Carolina Public Records Law and may be disclosed to third parties. ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 4