Attachments:picture doc for USACE and DWR post compliance review may 2016.docx; upstream R
bank.jpg; downstream L Bank.jpg; downstream R bank.jpg; upstream L bank.jpg
Good afternoon team!
I've attached pictures of the above Bridge showing both the upstream and downstream ends. The original issues at this
bridge included some geotextile fabric left in the channel, 57 stone mixed in/on top of the rip rap at the wing walls,
unstable/non-matted banks, and an area within the stream (upstream end) where there appeared to be a large area of
sediment/57 stone (possibly left from the pump around operation during the culvert installation).
I've attached a quick word document that has the "before" and "after" shots of the creek/culvert crossing (just by way of
reference). I've also included a few other pictures here for your review.
Again, my apologies for dropping the ball on photo documentation. Let me know if you have any questions or additional
concerns.
Thanks
Nik
-----Original Message-----
From: Bailey, David E SAW \[mailto:David.E.Bailey2@usace.army.mil\]
Sent: Wednesday, April 06, 2016 2:09 PM
To: Thomson, Nicole J; Wanucha, Dave
Cc: Parker, Jerry A
Subject: RE: Certifications of completion
Thanks Nikki.
---
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
1
-----Original Message-----
From: Thomson, Nicole J \[mailto:njthomson2@ncdot.gov\]
Sent: Tuesday, April 05, 2016 12:47 PM
To: Bailey, David E SAW <David.E.Bailey2@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Parker, Jerry A <jparker@ncdot.gov>
Subject: \[EXTERNAL\] RE: Certifications of completion
Dang it!
Yes, the repair work was done. I think I dropped the ball on this one. This was about the same time my cell phone ate
itself, including the post pictures I took. I may have to go back out there - of course, I'm not driving just yet. I'll follow up
on this. I am so sorry!
Nikki
Sent from my Verizon Wireless 4G LTE Tablet
-------- Original message --------
From: "Bailey, David E SAW" <David.E.Bailey2@usace.army.mil>
Date: 3/25/2016 11:38 AM (GMT-05:00)
To: "Thomson, Nicole J" <njthomson2@ncdot.gov>, "Wanucha, Dave" <dave.wanucha@ncdenr.gov>
Cc: "Parker, Jerry A" <jparker@ncdot.gov>
Subject: RE: Certifications of completion
Hi Nikki. Thanks for the info. One of the completion certificates jogged my memory. Bridge 151 on SR 2307 (SAW-2014-
001079) was found to have a few compliance issues during our August field visit last year (see attached
correspondence). I couldn't find confirmation that the issues were corrected and resolved. Can you provide me the
documentation that the compliance work has been completed? Pictures post correction would be most helpful.
Thanks!
-Dave Bailey
---
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
2
-----Original Message-----
From: Thomson, Nicole J \[mailto:njthomson2@ncdot.gov\]
Sent: Tuesday, March 01, 2016 2:55 PM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Bailey, David E SAW <David.E.Bailey2@usace.army.mil>
Cc: Parker, Jerry A <jparker@ncdot.gov>
Subject: \[EXTERNAL\] Certifications of completion
Good afternoon!
Please see the attached certificates of completion for several bridges that I've finaled during the last few months. As I
gather them up, I'll forward them along to you!
Let me know if you have any questions.
Thanks!
Nikki
Nicole J. Thomson
Division Environmental Supervisor Assistant
Division Environmental Office
919-754-7806 Mobile
Njthomson2@ncdot.gov
PO Box 14996
Greensboro, NC 27415-4996
Email correspondence to and from this address is subject to the
3
North Carolina Public Records Law and may be disclosed to third parties.
________________________________
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
________________________________
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
4