HomeMy WebLinkAbout20130517 All Versions_R-2413B site 1 overflow culvert inlet wetland impact restoration_20160627
Wrenn, Brian L
From:Bailey, David E SAW <David.E.Bailey2@usace.army.mil>
Sent:Monday, June 27, 2016 4:58 PM
To:Paul Hobson
Cc:Wrenn, Brian L; Parker, Jerry A; Thomson, Nicole J; 'Robby Hoffman';
scott.baughman@summitde.net
Subject:RE: \[EXTERNAL\] R-2413B permit site 1, overflow culvert, inlet wetland impact
restoration
Thanks Paul. Based on your pictures I consider the compliance issues mentioned in paragraphs 2 and 3 of my 1/14/2016
email complete. I appreciate your follow-up. Please let me know if you have any questions.
-Dave Bailey
---
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message-----
From: Paul Hobson \[mailto:paul.hobson@summitde.net\]
Sent: Wednesday, June 22, 2016 2:06 PM
To: Bailey, David E SAW <David.E.Bailey2@usace.army.mil>
Cc: brian.wrenn@ncdenr.gov; jparker@ncdot.gov; njthomson2@ncdot.gov; 'Robby Hoffman'
<robby.hoffman@summitde.net>; scott.baughman@summitde.net
Subject: \[EXTERNAL\] R-2413B permit site 1, overflow culvert, inlet wetland impact restoration
David,
During the recent stretch of drier weather we were able to photograph this location. I believe that you can see the
restoration buildup the
Contractor performed. Wetland vegetation has begun to get established also. Should you require any further
information about this site
Please don't hesitate to contact either myself, or Robby.
1
Thank you, Paul Hobson
Paul Hobson, CPESC
Roadway Environmental Inspector
I-73 DB, R-2413 A&B, I-5110
2