Loading...
HomeMy WebLinkAbout20130517 All Versions_R-2413B site 1 overflow culvert inlet wetland impact restoration_20160627 Wrenn, Brian L From:Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Sent:Monday, June 27, 2016 4:58 PM To:Paul Hobson Cc:Wrenn, Brian L; Parker, Jerry A; Thomson, Nicole J; 'Robby Hoffman'; scott.baughman@summitde.net Subject:RE: \[EXTERNAL\] R-2413B permit site 1, overflow culvert, inlet wetland impact restoration Thanks Paul. Based on your pictures I consider the compliance issues mentioned in paragraphs 2 and 3 of my 1/14/2016 email complete. I appreciate your follow-up. Please let me know if you have any questions. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message----- From: Paul Hobson \[mailto:paul.hobson@summitde.net\] Sent: Wednesday, June 22, 2016 2:06 PM To: Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Cc: brian.wrenn@ncdenr.gov; jparker@ncdot.gov; njthomson2@ncdot.gov; 'Robby Hoffman' <robby.hoffman@summitde.net>; scott.baughman@summitde.net Subject: \[EXTERNAL\] R-2413B permit site 1, overflow culvert, inlet wetland impact restoration David, During the recent stretch of drier weather we were able to photograph this location. I believe that you can see the restoration buildup the Contractor performed. Wetland vegetation has begun to get established also. Should you require any further information about this site Please don't hesitate to contact either myself, or Robby. 1 Thank you, Paul Hobson Paul Hobson, CPESC Roadway Environmental Inspector I-73 DB, R-2413 A&B, I-5110 2