Loading...
HomeMy WebLinkAbout20160710 Ver 1_Stage Coach Trail Draft Purpose and Need_20160506 Wrenn, Brian L From:Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Sent:Friday, May 06, 2016 2:15 PM To:Wrenn, Brian L Subject:RE: Stage Coach Trail Draft Purpose and Need Thanks for wading into this one, Brian. If you have any questions about the origination of this project feel free to call. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message----- From: Wrenn, Brian L \[mailto:brian.wrenn@ncdenr.gov\] Sent: Friday, May 06, 2016 2:02 PM To: Bailey, David E SAW <David.E.Bailey2@usace.army.mil>; Lewis, Ed F <elewis@ncdot.gov>; Matthews, Monte K SAW <Monte.K.Matthews@usace.army.mil> Cc: Wilson, Patrick D <pwilson@ncdot.gov> Subject: \[EXTERNAL\] RE: Stage Coach Trail Draft Purpose and Need Ed, I would echo David's comments. It seems that the changes in the development around the airport along with the LOS data should be the focus in the need statement not the master plan. In addition, I don't recall many projects where the LOS has been compared for crash/closure scenarios versus normal roadway operation scenarios to demonstrate need. Are there other traffic metrics available to demonstrate the need for the project? Thanks, Brian Wrenn 919-707-8792 -----Original Message----- From: Bailey, David E SAW \[mailto:David.E.Bailey2@usace.army.mil\] Sent: Friday, April 22, 2016 11:12 AM To: Lewis, Ed F <elewis@ncdot.gov>; Matthews, Monte K SAW <Monte.K.Matthews@usace.army.mil>; Chapman, Amy <amy.chapman@ncdenr.gov>; Wrenn, Brian L <brian.wrenn@ncdenr.gov> Cc: Wilson, Patrick D <pwilson@ncdot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov> 1 Subject: RE: Stage Coach Trail Draft Purpose and Need Thanks Ed. I read through the information you sent and have the following comments: The big question from the Corps' view point is, "what has changed since the Ballinger Road extension was installed that would require an additional access?" My impression from reading your information is that what has changed is additional development and more employees commuting on PTIA's east side. This type of information is relevant and lends directly to the project need. Traffic LOS data is likewise helpful and provides useful information for evaluating alternatives that don't require a permit. Relying on the PTIA Master Plan, on the other hand, is less useful as the Master Plan focuses much of its forecasted growth on the west side of PTIA. The Corps generally would not accept a purpose and need based on a linkage showing up on a Master Plan. Furthermore, referencing the PTIA Master Plan is not necessary given the other data provided. Hopefully these comments help as you move forward. Please let me know if you have any questions. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message----- From: Lewis, Ed F \[mailto:elewis@ncdot.gov\] Sent: Thursday, April 14, 2016 2:56 PM To: Bailey, David E SAW <David.E.Bailey2@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Matthews, Monte K SAW <Monte.K.Matthews@usace.army.mil>; Chapman, Amy <amy.chapman@ncdenr.gov> Cc: Wilson, Patrick D <pwilson@ncdot.gov> Subject: \[EXTERNAL\] Stage Coach Trail Draft Purpose and Need Importance: High Folks, I wanted to send this draft purpose and need statement for your review. Please provide comments and questions. I am working on the avoidance and minimization draft that I will be forwarding for your review and comments as well. That 2 will probably be sometime next week before it is ready to come to you (don't break your neck trying to get it back to me in the next few days). I would like to note that Table 2 has a Legend included with the 8 intersections identified by number, and that the LOS/Delay spreadsheet has 8 scenarios identified by number. I will clear that up with my final revisions. I am in the office and available for the most if you need to speak with over the course of the next week. Thanks, Ed Lewis Division Planning Engineer NCDOT Division Seven 336 487 0000 office elewis@ncdot.gov PO Box 14996 Greensboro, NC 27415+4996 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ 3 Facebook <Blockedhttps://www.facebook.com/NCDOT1/> Twitter <Blockedhttp://ncdot.gov/travel/twitter/> YouTube <Blockedhttps://www.youtube.com/user/NCDOTcommunications> ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 4