Loading...
HomeMy WebLinkAbout20130223 Ver 6_U-2524D and U-2525C_20160714 Wrenn, Brian L From:Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Sent:Thursday, July 14, 2016 11:11 AM To:Wrenn, Brian L; Cheely, Erin K Cc:Matthews, Monte K SAW Subject:RE: U-2524D and U-2525C Hi Erin. Monte is reviewing the EA Addendum for U-2524D so hopefully we'll have our permit mod decision in the mail by the end of the week. I agree with Brian. The Corps certainly doesn't control how NCDOT crafts its contracts. But, it should be clear in the advertisement that sites 11 and 12 will be permitted under U-2525C. -Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message----- From: Wrenn, Brian L \[mailto:brian.wrenn@ncdenr.gov\] Sent: Thursday, July 14, 2016 10:07 AM To: Cheely, Erin K <ekcheely@ncdot.gov>; Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Subject: \[EXTERNAL\] RE: U-2524D and U-2525C Erin, I should have the mod to the mod signed on Monday, the 18th. As for how you advertise the contracts, I don't see a problem with this, as long as it is clear to the contractors that sites 11 and 12 will be permitted under U-2525C. Thanks, Brian Wrenn 919-707-8792 1 From: Cheely, Erin K Sent: Thursday, July 14, 2016 9:42 AM To: Bailey, David E SAW (David.E.Bailey2@usace.army.mil) <David.E.Bailey2@usace.army.mil>; Wrenn, Brian L <brian.wrenn@ncdenr.gov> Subject: U-2524D and U-2525C Dave/Brian- FYI - As we preliminarily discussed, we will be submitting a permit modification application in the near future for U-2525 B/C to include permit sites 11 and 12 that were originally included with the U-2524D modification application. Contracts can go ahead and advertise U-2524D this coming Tuesday the 26th (so long as we can provide them with the 404 and 401 permit package for Sites 1-10 by Monday the 25th) with the provision that we will secure the U-2525C modification within the next 6 months or sooner. Also, do you see any issue with us including permit sheets 21-24 in the permit package with a note that these areas will be permitted under U-2525C/D (similar to what I did on permit sheets 18 and 19 in the July 11th memo)? The Division has asked if that's possible to avoid confusion when the contractor is looking at the drawings since all of the work will be advertised at once. Thanks so much for helping us work though this! -erin Erin Cheely Environmental Biologist Natural Environment Section N.C. Department of Transportation 919 707 6108 office 919 323 5192 mobile ekcheely@ncdot.gov <mailto:ekcheely@ncdot.gov> 2 1598 Mail Service Center Raleigh, NC 27699-1598 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3