Loading...
HomeMy WebLinkAbout20050949 Ver 2_More Info Received_20080529LAW OFFICES OF F. BRYAN BRICE, JR. ATTORNEYS AT LAW 19 W. HARGETT ST. SUITE 600 RALEIGH, NC 27601 May 28, 2008 Jean Manuel US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Dr., Suite 105 Wake Forest, NC 27587 Re: Partners Equity Group PEG 404 Permit (1.67 acre impact) Smithfield, NC Johnston County Dear Jean, Telephone: 919-754-1600 Facsimile: 919-832-0301 bi•van<ii;attvbrvanbrice coin MAY 2 9 2008 DENR - WATER QUAUIY WETLANDS AND STORMWATER SaANCH Pursuant to our conversations and meetin s, and my last discussion with Justin, I wanted you to know that it is my understanding that the Town of Smithfield will not allow Partners Equity Group to develop the lots you have inquired about due to new roadway alignment issues. Also, I understand the town has sent a letter explaining the town's parking requirements as it pertains to the proposed site plan/development. As to the earlier permit issue, I now know that PEG planted the enhancement area on or around February 1999 according to the permit terms (see attached check), to which Mrs. Spain, neighboring property owners and the town can verify. The area became so overgrown that, in or around the spring/summer of 2004, neighboring businesses and the Town of Smithfield complained about feral cats and worse, transients living on the property. To alleviate those concerns, PEG received approval from Kevin Yates and Mike Horan to mow the area consistent with Corps regulations. Nothing was ever said to PEG about the condition of the property until after we filed the permit request. These are the facts surrounding that issue, and I just wanted you to know that this enhancement condition was properly followed. With this new road and parking information, I hope we are close to finalizing the 404 permit for the above referenced matter. In talking with Cyndi, she said that Annette would like to review the final stormwater plan in order to finalize the 401 certification. If we can confirm the final site plan to be permitted with you, which we believe with this road impact information and parking information from the municipality should be fairly close to what we have submitted, we can then forward the final SW plan to be reviewed/approved by Annette/Cyndi. Jean, we have worked very hard from where we started in this process to produce a permitable site and plan with corresponding 401 certification. We have reduced the size of May 28, 2008 Page 2 the development, retained a contiguous section of wetland along the east border of the property, have reduced the total number of parking spaces, and spent a great deal of time, effort and money researching and producing ways to improve water quality on the property and especially water quality issues as it leaves the original 50 acre parcel. I am proud of the fact that we have clearly demonstrated that water quality will be significantly improved leaving the site as compared to current conditions. If you will let me know anything else we need to do in order to complete this process, I would be most appreciative. Again, thank you and Thomas for working with us to finalize the permit. If you have any questions, or wish to discuss any of these issues (or any others) further, please do not hesitate to call. Sincerely, At w'l /1't?c ?- F. Bryan Brice, Jr. Cc: Justin McCorcle Cyndi Karoly PARTNERS EQUITY GROUP P. O. BOX 1089 >? SMITHFIELD, NG 27577 lY.l V ll f 119. 6625WSM DATE_aFebr uary 1, 1.995 PAY 1 TOTN_E= fishle i n 1 4 -)RD 0 Hundred • nd Fifty Dollar and DOLLARS r y, .A ,., •: .... ?: Mc. OFa. ?yy:? q Plar+tinCi TrGG rc)R - - -- - _. -- ,, 0?0000 b I9 idle ;:Q 5 3 La 2 5a6E.L rm a8 L6 ? 111 COU00 5 C? . ,