Loading...
HomeMy WebLinkAbout20071670 Ver 1_Approval Letter_20080527 ©�O� W A T�9QG Michael F.Easley,Governor William G.Ross Jr.,Secretary 1 North Carolina Department of Environment and Natural Resources .r Coleen H.Sullins,Director Division of Water Quality May 27, 2008 DWQ Project#07 1670 Carteret County US Coast Guard Civil Engineering Unit Attn: Ray Pipak 1240 E Ninth Street Cleveland, OH 44199-2060 Subject Property: USCG at Station Emerald Isle Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Pipak: You have our approval, in accordance with the attached conditions and those listed below,to perform maintenance dredging of the basin and access channel at the subject property, as described within your application dated September 19, 2007 and received by the N.C. Division of Water Quality(DWQ) Wilmington Regional Office (WiRO) on April 10, 2008. After reviewing your application,we have decided that the impacts are covered by General Water Quality Certification Numbers 3700 (GC 3700), 3703 (GC3703) and 3691 (GC 3691). These Certifications can also be found on line at: http://h2o.enr.state.nc.us/ncwetlands/certs.html.. These Certifications allows you to use Nationwide Permit 16 and GP 198000048 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including(but not limited to)Erosion and Sediment Control,Non- discharge, and stormwater regulations. Also,this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project,you must notify us and you will be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project(now or in the future)exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506(h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit)are met. No other impacts are approved including incidental impacts: N'o�nCarolina ,/naturally North Carolina Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 Phone(919)733-7015 Customer Service Internet: www.ncwaterqualitv.ora Location: 512 N.Salisbury St. Raleigh,NC 27604 Fax (919)733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper Page Two US Coast Guard Civil Engineering Unit Attn: Ray Pipak DWQ Project#07 1670 May 27, 2008 Amount Approved nits Plan Location or Reference 404 Wetlands N/A acres Open Water(Bogue Project area includes 100 USCG Station Emerald Isle Sound)Dredging acres for both dredging basin and project area shown as and disposal sites (the dashed line on aerial areas of impacts is limited to as-needed areas and the entire 100 acres would not be impacted at any one time Near shore (Atlantic Project area includes 100 Existing Corps' beach disposal Ocean shore of Emerald acres for both dredging area as shown on aerial or Isle or upland diked and disposal sites (the otherwise authorized area disposal site)Disposal areas of impacts is limited to as-needed areas and the entire 100 acres would not be impacted at any one time) 2. Erosion& Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed,the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites,borrow sites, and waste pile (spoil)projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites,the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Page Three US Coast Guard Civil Engineering Unit Attn: Ray Pipak DWQ Project#07 1670 May 27, 2008 4. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications,the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center,Raleigh,NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts),you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition,which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions,please telephone Ian McMillan in the Central Office in Raleigh at 919.733.1786 or Joanne Steenhuis in the DWQ Wilmington Regional Office at 910.796.7215. Si erely, Coleen H. Sullins, Director Division of Water Quality Attachment Enclosures: GC 3700, 3703 & 3691 Certificate of Completion cc: Jeff Richter—USACE Wilmington Environmental Resources Section Mickey Sugg-USACE Wilmington Regulatory Field Office Ian McMillan -DWQ 401 Unit Stephen Rynas-DCM Morehead City Central Files WiRO �.4 fly + , �. i r^ a SA e r s p i� USA Station Emerald Isle ••,'``� � �a eA ` 3 a g w-� ��Hh``