Loading...
HomeMy WebLinkAbout20080652 Ver 3_Stormwater Info_20080602urban design planning civil engineering landscape architecture TRANSMITTAL 223 North Graham Street, Charlotte, NC 28202 V: 704.333.0325 F: 704.332.3246 E. x P ©g • 0 (p S 2L V DATE: 5/30/2008 NUMBER OF PAGES: 1 PROJECT NAME: Hadley PROJECT #: 1007154 TO: Joesphn Gyamfi BUS. PHONE: vi a NCDENR BUS. FAX: 1, V L? 2321 Crabtree Blvd. Suite 250 BUS. MOBILE: JUN ?, 208 DEW QUAU -WATERWMCH Raleigh NC 27604 S??? . y??IDS AND CC: PAY WE ARE SENDING: VIA: PURPOSE: DRAWINGS ? SPECIFICATIONS [Tcl APPLICATIONS FEES ? REDLINES ? DISK/ CD ? OTHER ? MAIL ? FAX ? COURIER ? FEDEX GROUND FEDEX OVERNIGHT ? HAND DELIVERY ? PICK UP ? EMAIL ? APPROVAL ? YOUR USE ? YOUR INFORMATION ? REVIEW/ COMMENT ? YOUR REQUEST ? SIGNATURE QUANTITY: ITEM: DESCRIPTION: 3 set 2x 36 plan sheet SMP Submittal 3 sets Application Express Review Stormwater Management Plan Application BMP Supplement and Required Items Check List 3 sets Forms Operation and Maintenance Agreements Check #1066 in the amount of $1,500.00 3 sets Agreements Engineering Calculation Books 1 Check 2 Books NOTES FROM: Frank J. McMahan, PE flm If this document was delivered via FAX, the accompanying transmission contains confidential information intended only for the use of the individual of the entity named above. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the contents of this facsimile information is strictly prohibited. If you have received this FAX in error, please immediately notify us by telephone to arrange for disposition or return of the documents to us. Charlotte NC Washington DC Tampa FL Asheville NC Pinehurst NC Charlotte NC Nashville TN Beijing PRC Permit No. UP 68 - C) 10 S a u 3 o be provided by DWO) OF W A TF9 h A-ZA NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I.' PFRWEC'F INFORMATM Project name HADLEY Contact person FRANK J. MCMAHAN, PE Phone number 704-333.0325 Date 28-May-08 Drainage area number SB-1 JIL N 0Fi;ItdA1VN Site Characteristics Drainage area 713,513.00 ft3 Impervious area 577,946.00 ft % impervious 81.00 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required 46,318.00 ft3 Volume provided 48,261.00 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth N/A in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.64 in Rational C, pre-development 0.25 (unitless) Rational C, post-development 0.70 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.11 in/hr Pre-development 1-yr, 24-hr peak flow 6.15 ft3/sec Post-development 1-yr, 24-hr peak flow 42.43 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 36.28 ft3/sec Basin Elevations Basin bottom elevation 612.00 ft Sediment cleanout elevation 613.50 ft Bottom of shelf elevation 617.50 ft Permanent pool elevation 618.00 ft SHWT elevation * see attachment ft p ? V Top of shelf elevation 618.50 ft ttt??? Temporary pool elevation 621.00 ft JUN 2 2008 DEW - WAFER UUAL; I WETLANDS AND STORMWATER BRANCH Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWO) IL DESKIN INFORMATION Volume and Surface Area Calculations SA/DA ratio 2.84 (unitless) Surface area at the bottom of shelf 13,521.00 ftz Volume at the bottom of shelf 19,170.00 ft3 Permanent pool, surface area required 20,256.00 ft3 Permanent pool, surface area provided 20,278.00 ftz OK Permanent pool volume 69,673.00 ft3 Average depth for SA/DA tables 3.44 ft OK Surface area at the top of shelf 17,860.00 ft2 Volume at the top of shelf 8,426.00 ft3 Forebay volume 14,548.00 ft3 Forebay % of permanent pool volume 20.88 % OK Temporary pool, surface area provided 25,685.00 -ft' Drawdown Calculations Treatment volume drawdown time 3.16 days OK Treatment volume discharge rate 0.17 ft3/s Pre-development 1-yr, 24-hr discharge 6.15 ft3/s OK Post-development 1-yr, 24-hr discharge 0.75 ft3/s OK Additional Information Diameter of orifice 3 in Design TSS removal 85 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 3.73 :1 OK Length to width ratio 3.78 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.65 ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies DRAIN VALVE Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 * per discussions with the Geotechnical engineer the SHWT is significantly deeper than the pond bottoms on site. Furthermore, all pond will have a clay liner and will not have an effect on the SHWT. Permit No. `'f (to be provided by DWQ) ,y r Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initia Sheet No. 1. Plans (1" 50' or larger) of the entire site showing: G" I ?t C ? 8; Design at ultimate build-out, C-?•9 Off-site drainage (if applicable), C-2 3 Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 3. Section view of the dry detention basin (1" = 20' or larger) showing: x-2.c- 2, 3 Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. C'4.5 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. E 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. C- 2.v- 6-2.1 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. AL 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 Permit r- A *A NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along With all of the required information. (to be provided by DWQ) OBOE W AT r O ? T I. PA CT INFORMATION Project name HADLEY Contact person FRANK J. MCMAHAN, PE Phone number 704-333-0325 Date 28-May-08 Drainage area number SB-2 q. N O TV11 Site Characteristics Drainage area 413,820.00 ftz Impervious area 223,453.00 ftz % impervious 54.00 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required 18,484.00 ft3 Volume provided 20,593.00 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth N/A in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.64 in Rational C, pre-development 0.25 (unitless) Rational C, post-development 0.70 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.11 in/hr Pre-development 1-yr, 24-hr peak flow 85.27 ft3/sec Post-development 1-yr, 24-hr peak flow 134.07 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 48.80 ft3/sec Basin Elevations Basin bottom elevation 594.00 ft Sediment cleanout elevation 596.00 ft Bottom of shelf elevation 601.50 ft Permanent pool elevation 602.00 ft SHWT elevation ' see attachment ft Top of shelf elevation 602.50 ft Temporary pool elevation 605.20 ft Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) il. DE$WN # O:OWTMN Volume and Surface Area Calculations SA/DA ratio 2.03 (unitless) Surface area at the bottom of shelf 17,745.00 ft2 Volume at the bottom of shelf 24,825.00 ft3 Permanent pool, surface area required 8,400.00 ftz Permanent pool, surface area provided 21,687.00 ftZ OK Permanent pool volume 83,332.00 ft3 Average depth for SA/DA tables 3.84 ft OK Surface area at the top of shelf 25,820.00 ftZ Volume at the top of shelf 11,877.00 ft3 Forebay volume 20,319.00 ft3 Forebay % of permanent pool volume 24.38 % Must be approx. 20%, Adjust pond dimensions Temporary pool, surface area provided 21,687.00 -ft' Drawdown Calculations Treatment volume drawdown time 2.87 days OK Treatment volume discharge rate 0.08 ft3/s Pre-development 1-yr, 24-hr discharge 85.27 ft3/s OK Post-development 1-yr, 24-hr discharge 70.35 ft3/s OK Additional Information Diameter of orifice 2.5 in Design TSS removal 85 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 4.15 :1 OK Length to width ratio 4.46 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.16 ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies DRAIN VALVE Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 * per discussions with the Geotechnical engineer the SHWT is significantly deeper than the pond bottoms on site. Furthermore, all pond will have a clay liner and will not have an effect on the SHWT. Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Init' Sheet No. '' C-1.3 ro, --al y--,> e-118 C-q.7JCFy, a C• 2.2•, C• L.. 3 Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 10; C-8. l 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 1 3. Section view of the dry detention basin (1" = 20' or larger) showing: C - 2.2 , C - 2. 3 Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. ,xv 6A& 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. _ 6'?U: NJ 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. Ak 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 Permit No. (to be provided by DWQ) OBOE W ATFROG ?AX NCDENR ° STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. 1. PROJECT INFORMATION Project name HADLEY Contact person FRANK J. MCMAHAN, PE Phone number 704-333-0325 Date 28-May-08 Drainage area number SB-3 11. DESIGN INFORMATION Site Characteristics Drainage area 669,082.00 ft Impervious area 501,811.00 ftz % impervious 75.00 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required 40,243.00 ft3 Volume provided 41,209.00 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth N/A in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.64 in Rational C, pre-development 0.25 (unitless) Rational C, post-development 0.70 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.11 in/hr Pre-development 1-yr, 24-hr peak flow 85.27 ft3/sec Post-development 1-yr, 24-hr peak flow 134.07 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 48.80 ft3/sec Basin Elevations Basin bottom elevation 617.00 ft Sediment cleanout elevation 618.50 ft Bottom of shelf elevation 622.50 ft Permanent pool elevation 623.00 ft SHWT elevation ' see attachment ft Top of shelf elevation 623.50 ft Temporary pool elevation 625.40 ft Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) II. DESIGN INFORMATION Volume and Surface Area Calculations SAIDA ratio 2.61 (unitless) Surface area at the bottom of shelf 18,501.00 ft3 Volume at the bottom of shelf 25,601.00 ft3 Permanent pool, surface area required 17,463.00 ft2 Permanent pool, surface area provided 21,690.00 ft2 OK Permanent pool volume 70,966.00 ft3 Average depth for SAIDA tables 3.27 ft OK Surface area at the top of shelf 25,098.00 ft2 Volume at the top of shelf 11,697.00 ft3 Forebay volume 14,010.00 ft3 Forebay % of permanent pool volume 19.74 % OK Temporary pool, surface area provided 28,420.00 ft Drawdown Calculations Treatment volume drawdown time 3.02 days Treatment volume discharge rate 0.15 ft3/s Pre-development 1-yr, 24-hr discharge 85.27 ft3/s Post-development 1-yr, 24-hr discharge 70.35 ft3/s Additional Information Diameter of orifice Design TSS removal Basin side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies 3 85 3.00 10.00 10.00 3.30 1.55 Y 1.84 N Y Y DRAIN VALVE in ft (Y or N) ft (Y or N) (Y or N) (Y or N) OK OK OK OK OK OK OK OK OK OK Design must be based on 90% TSS removal OK OK Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 * per discussions with the Geotechnical engineer the S1 WT is significantly deeper than the pond bottoms on site. Furthermore, all pond will have a clay liner and will not have an effect on the SHWT. ° Permit (to be provided by DWQ) III: REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initi Sheet No. m i C- 4, C_ Z' a Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. ( A- C 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. u € `' 3. Section view of the dry detention basin (1" = 20' or larger) showing: z;c-2.3 Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. g Q?f, ,F -ape (At c t y v 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 OFFICE USE ONLY Date Received Fee Paid Permit Number(s) X 0 -oto52v State of North Carolina Department of Environment and Natural Resources Division of Water Quality 401/Wetlands Unit EXPRESS REVIEW PROGRAM STORMWATER MANAGEMENT APPLICATION FORM This form may be photocopied far use as an original QI 1. GENERAL INFORMATION JUN 2 2008 1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project): DENR .WATER Q U41' 1 BRAN ARROWOOD STATION LLC i ANDS 0,0 STORO 2. Owner/Signing Official's name and title (person legally responsible for facility and compliance): MATT BROWDER - ASSOCIATE 3. Owner Mailing Address for person listed in item 2 above: /60p CWorn aEjy 90Al> City: CHARLOTTE State: NC Zip. 28203 Phone Number: 04 887-4765 Fax Number: ?) 342-3453 Email Address: matt@harrisdevelopmentgroupig 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, inspection and maintenance agreements, etc.): HADLEY 5. Location of project (Street Address): 7500 ENGLAND STREET City: CHARLOTTE County: MECKLENBURG 6. Directions to project site (from nearest major intersection): From the intersection of South Blvd. and E. Arrowood Dr heading westerly along E Arrowood Dr making a left on England Street. 7. Latitude: 35.13255249021852 Longitude: -80.88072011566 of project 8. Contact person who can answer questions about the project: Name: Frank J. McMahan, PE Telephone Number: L04)333-0325 Fax Number: 704 376-8235 Email Address: fmcmahan(a7landdesign.com 1/2008 Version 1.0 Page 1 of 5 II. PERMIT INFORMATION 1. Specify whether project is (check one): ? New Renewal Modification .' .0 ibis A a newaproject;iunder which local government's jurisdiction does the project fall (e.g. Town of Cary, City of Raleigh, or Wake County)? City of Charlotte 3. Is there a state-approved stormwater management program implemented by the local government or state under any of the following programs (Check all that apply)? Phase lI Post Construction Water Supply Watershed Neuse or Tar Pamlico NSW Randleman WSWS USMP Coastal Counties HQW ORW 4. If this application is being submitted for a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 5. Specify the type of project (check one): Low Density ? High Density Redevelopment General Permit Other 6. Additional Project Requirements (check the ones applicable): _CAMA Major Sedimentation/Erosion Control 404/401 Permit _ NPDES Stormwater Other CVWQ -0Og - 0652 ApproveD) _ _ Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 in. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Storm water shall be treated utilizing a Wet Detention Basin and the NCDENR SAIDA Ratio 2. Stormwater runoff from this project drains to the Catawba River basin. 3. Total Project Area: 46.778 acres 5. How many drainage areas does the project have? 3 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Receiving Stream Name Drainage Area 1 Kin s Branch Drainage Area 2 Kin s Branch Receiving Stream Class C C Drainage Area 16.38 ac 9.5 ac Existing Impervious* Area 0 0 Proposed Impervious*Area 13.26 ac 5.13 ac % Impervious* Area (total) 81 54 Project Built Upon Area: 64 1/2008 Version 1.0 Page 2 of 5 Impervious" Surface Area Drainage Area 1 Drainage Area 2 On-site Buildings 3.20 2.50 On-site Streets 2.80 1.93 On-site Parking 0 0 On-site Sidewalks 1.14 .7 Other on-site 2.20 0 Off-site 3.92 0 Total: 13.26 ac Total: 5.13 ac impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 7. How was the off-site impervious area listed above derived? Offsite impervious area was based on possible future build out conditions and drainage patterns IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state riparian buffer authorization or General Certification numbers DWQ #08-0652 as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than N/A square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossing. 4. Built-upon area in excess of the permitted amount requires a modified water quality certification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. 1/2008 Version 1.0 Page 3 of 5 V. SUPPLEMENT FORMS The applicable stormwater management supplement form(s) listed below must be submitted for each BMP specified for this project. The most current form(s) located on the 401/wetlands unit website at http://b2o.enr.state.nc.us/su/bmp forms.htm must be used. Please include both the Design Summary and the Required Items Checklist along with all required items and supporting design calculations. Bioretention Supplement Wet Detention Supplement Dry Detention Supplement Level Spreader/Filter Strip/Restored Buffer Supplement Stormwater Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Infiltration Trench Supplement Infiltration Basin Supplement VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Central Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Iuiti 1 • Original and two copies of the Express Review Stormwater Management Application • Signed and Notarized Inspection and Maintenance Agreement • Three copies of the applicable Supplement Form(s) for each BUT • Application processing fee (payable to DWQ) • Detailed narrative description of stonmwater treatment/management • Three copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands and streams delineated, or a note on plans that none exist - Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) 1/2008 Version 1.0 Page 4 of 5 Section 6 Continued Basin Information Drainage Area 3 Receiving Stream Name Kings Branch Receiving Stream Class C Drainage Area 15.36 ac Existing Impervious Area 0 Proposed Impervious Area 11.52 % Impervious Area total 75 Impervious Surface Area Drainage Area 3 On-site Buildings 1.2 On-Site Streets 1.3 On-site Parkin 0 On-site Sidewalks 0.4 Other on-site 7.9 Total: 11.52 VU. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Mailing Address: City: State: Zip: Phone: Fax: VIII. APPLICANT'S CERTIFICATION I, (print or type name ofperson listed in General Information, item 2) Matt Brower certify that the information included on this application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of ISA NCAC 2H.1000. Signature: Date: S Z 0/c) 8 112008 Version 1.0 Page 5 of 5 ay'v b&- 065a us STORMWATER MANAGEMENT NARATIVE FOR HADLEY Purpose The purpose of this study is to analyze the Water Quality/ Detention for Pre and Post conditions and size the proposed Wet Ponds. Stormwater Management The objective of the BMP is to minimize the effects of the development by meeting the runoff characteristics of the pre developed state of the project site. The main objective of the BMP is to remove pollutants. The removal mechanisms used for this project are Wet Detention Basins. Within the Wet Detention Basin forebays are utilized as settling basins near the inlet to dissipate energy of the incoming stormwater and to settle the larger incoming sediment particles. The Wet Detention Basins have been designed to achieve 85 Percent TSS removal efficiency, this was achieved by using the surface area to drainage area ratio tables. Engineering Background Detention Wet Pond #1, Wet Pond #2 and Wet Pond #3 will match the pre development peak storm water release rates for the 2 and 10 year, 24 hour storm events for the on site drainage area. The offsite drainage areas will bypass the aforementioned Wet Ponds. However, the bypass flow and the flow from Wet Ponds #2 and #3 have the same discharge point, therefore it will be demonstrated within these calculations that the pre and post developed flows for Wet Pond #2, Wet Pond #3 and the bypass flow will be combined. Wet Pond #1 has also been designed to detain the additional 2.36 acres from the CATS Volume #3 plans as requested by CATS. Wet Pond #1 has been adjusted so that the pre development peak storm water release rates for the 2 and 10 year storm events for the on site drainage areas. Water Quality Wet Pond 91, Wet Pond #2, and Wet Pond 43 have been designed to provide detention for the 1" storm event above the Permanent Pool Elevation. The detention provided for the 1" storm event is for on site drainage areas. The water quality volume formulas used were based on the SA/DA Ratio. Wet Pond #1 has been designed to provide detention for the additional 2.36 acres from the CATS Volume #3 plans as requested by CATS for the 1" storm event above the Permanent Pool Elevation. JUN 2 2008 yJ? l ? iiN17SHxU gSORM`NATER Summary of Results Wet Pond #1 • Temporary Water Quality Pool Volume: Required: Provided: • Forebay Volume: Required: Provided: • 2 year, 24 hour Design Storm Pre Developed Runoff Post Developed Runoff (no control): Post Developed (w\ pond): Max. Stage: • 10 year, 24 hour Design Storm Pre Developed Runoff: Post Developed Runoff (no control) Post Developed (w\ pond): Max. Stage: Wet Pond #2 and Wet Pond #3 46,318 cf 48,261 cf @ Elevation 620.1 13,935 cf 14,548 cf (21%) 9.39 cfs 53.26 cfs 1.92 cfs 621.38 22.94 cfs 91.23 cfs 21.54 cfs 622.67 • Temporary Water Quality Pool Volume (Wet Pond #2): Required: 18,484 cf Provided: 20,593 cf @ Elevation 602.90 • Forebay Volume (Wet Pond 92): Required: 16,666 cf Provided: 20,319 cf (24%) • Temporary Water Quality Pool Volume (Wet Pond #3): Required: 40,423 cf Provided: 41,209 cf @ Elevation 624.64 • Forebay Volume (Wet Pond #3): Required: 14,193 cf Provided: 14,010 cf (19%) • 2 year, 24 hour Design Storm (Wet Pond #2, #3 and Bypass) Pre Developed Runoff: 104.69 cfs Post Developed Runoff (no control): 167.61cfs Post Developed (w\ pond): 91.28 cfs Max. Stage: 604.46 (Wet Pond 92) 625.62 (Wet Pond #3) • 10 year, 24 hour Design Storm (Wet Pond #2, #3 and Bypass) Pre Developed Runoff: 194.20 cfs Post Developed Runoff (no control): 285.39 cfs Post Developed (w\ pond): 190.32 cfs Max. Stage: 605.34(Wet Pond #2) 626.51 (Wet Pond #3) Conclusion The engineering analysis presented herein this document demonstrates the ability that Wet Pond #1, Wet Pond #2, and Wet Pond #3 to meet the design requirements for water quality and detention. The calculations show the Wet Ponds have sufficient volume to meet the requirements for BMPs. Moreover, the routing calculations show the Wet Ponds ability to detain flows to pre-developed rates. ???yr???Il i.? UN ? Z!l08 p1f. WA7EP; A WJ N, Permit Number: WEtlAND3 P, 1) STQRN (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BUM elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does ® does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of lon [approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.3 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future roblems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the lants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.3 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair . The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 1.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.0 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (flll in the blanks) Sediment Removal Bottom Permanent Pool Elevation 602 597.5 1 --------------- FOREBAY /--ft Min. Sediment Storage Pool Sediment Removal Elevation 596 Volume ---------------------------------------- ------ Bottom Elevation 1-ft MAIN POND Storage Form SW401-Wet Detention Basin O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:HADLEY BMP drainage area number:SB-2 Print name:MATT BROWDER Title:ASSOCIATE Address: 1600 CAMDEN ROAD CHARLOTTE NORTH CAROLINA 28203 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, -?;? uvN%ckn , a Notary Public for the State of 1?f? Gs-Ic01? , County of O e in Ir2 , do hereby certify that ?• ?? personally appeared before me this day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, F R E E4 f 44, ?O ?o;dcV Coo" ?r\?oo 2Q 0 OR T H G I I P? ??????\`• SEAL My commission expires 11;rflug Form SW401-Wet Detention Basin O&M-Rev.3 Page 4 of 4 Date: . A /0 IrqP Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BNT. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BNT. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided.?i This system (check one): 0 `-' ? ? does ® does not incorporate a vegetated filter at the outlet. UN 2 2008 This system (check one): o ",?? STTo?MW??e F1 does ® does not incorporate pretreatment other than a forb" Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. ?Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.3 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the lants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plan ts rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.3 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the roblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 1.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 1.5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Sediment Removal Bottom Permanent Pool Elevation 618 613.5 Pe ane Pool --------------- -- Volume Sediment Removal Elevation 613.5 Volume 612 ft Min. -------------------------------------------- ------ Sediment Bottom Elevation 612 1-ft n Storage Sedimer Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:HADLEY BMP drainage area number.SB-1 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I,??bnr,?q? , a Notary Public for the State of County of 1 , do hereby certify that personally appeared before me this @ Ict?l day of ` , o 8 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, NNA i Notr 92 2 Un/ nount C O CAR "111111 SEAL My commission expires 9 (A"71 ()3 Form SW401-Wet Detention Basin O&M-Rev3 Page 4 of 4 Print name:MATT BROWDER Title:ASSOCIATE Address: 1600 CAMDEN ROAD CHARLOTTE NORTH CAROLINA 28203 JUN 2 2008 DENR • WATER CUA R BRANCH Permit Number: D 8- O to S 2, u 3 LANDS AND S7DRMW (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMW elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does ® does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. rVe eta tion is too short or too Maintain vegetation at a height of long. a roximatel six inches. Form SW401-Wet Detention Basin O&M-Rev.3 Page 1 of 4 "rte n Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ver if a soil test indicates necessary. Weeds are present. he weeds, preferably by L m an d. esticide is used, wipe it on rather than spraying. The main treatmen t area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the al al growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.3 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 1.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 1.55 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 623 Sediment Removal Bottom 6185--------- Pe manen Pool -- Volume ------Sediment Removal Elevation 618.5----------- Volume 617 -ft Min. Sediment Bottom Elevation 617 1-ft n Storage Sedimer Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:HADLEY BMP drainage area number:SB-3 Print name:MATT BROWDER Title:ASSOCIATE Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of _ o lr1 p,,nbLL!r? , do hereby certify that Mme` ?? • f ??,.?cX? personally appeared before me this R-Ij- day ofr , opCkJ? , and acknowledge the due execution of the forgoing wet detention `basin maintenance requirements. Witness my hand and official seal, a II I ALL C\ , Notory Public c Union County ?Pb SEAL My commission expires (a1 ??g Form SW401-Wet Detention Basin O&M-Rev.3 Page 4 of 4 Address: 1600 CAMDEN ROAD CHARLOTTE, NORTH CAROLINA 28203 Tai and Associates, PLLC V3 ?.xP o8- *Irr. 5561 McNeely Dr., Suite 101 ? Raleigh, NC 27612 ? (919) 782-9525 ? (919) 782-9540 (FAX) April 12, 2007 Mr. Matt Browder Harris, Murr & Vermillion, LLC 1600 Camden Road Charlotte, North Carolina 28203 Re: Preliminary Subsurface Exploration Services Arrowood Station Charlotte, North Carolina Tai Job No. 07-121-1 MAY 2 7 2008 Dear Mr. Browder: ?DEvR-WgTER.?n MID STORNW E? BRMIgr In accordance with your authorization, we have completed a preliminary subsurface exploration and geotechnical engineering program for the referenced project. The work items performed are in general conformance with our March 6, 2007 proposal, and include the drilling of forty (40) soil borings, site visits, analyses of data, and the preparation of a report. This report presents the results of the subsurface exploration program. FIELD EXPLORATION The field exploration program consisted of the drilling of forty (40) soil borings (B-1 through B-43 excluding B-35, 36, 40) to a maximum depth of 55.0 feet below the existing ground surface. The borings were drilled by a CME 550 drill rig using 2-'/4" inside diameter hollow stem augers to advance the boreholes. Standard Penetration Tests (ASTM D-1586) were performed at depths of 1.0, 3.5, 6.0, 8.5 feet and at every five-foot interval thereafter. The boring locations were determined by measuring from existing site features and should be considered approximate. The approximate locations and logs of the forty (40) soil borings are shown on the attached "Boring Location Plans" and "Boring Logs". SURFACE OBSERVATIONS The project site is bound by South Boulevard, Sweden Road and England Street. There is an existing City of Charlotte Maintenance Facility occupying the south side of the site. The remaining portion of the project site is mostly heavily wooded. A Park and Ride lot and the construction access road is located beyond the north side of the site. A fueling facility is located near Boring B-11. Debris and other construction dump is noticed in the general area of Borings B-13, 19, 28 and 30. Y • I'Mr. Matt Browder ' Re: Tai Job No. 07-121-1 April 12, 2007 Page 2 LABORATORY TESTING PROGRAM All soil samples were classified on the basis of texture and plasticity in accordance with the Unified Soil Classification System (ASTM D-2488). The description for each soil sample is indicated in the soil type on the boring logs. The various soil types were grouped into the major types noted on the boring logs. The stratification lines designating the interfaces between earth materials on the boring logs and profiles are approximate. SUBSURFACE MATERIALS Based on the results of the field exploration/testing and the visual classification of the soil, the subsurface materials at the project site consist of the following units: Topsoil and Pavement: The topsoil encountered in the borings was mostly 8.0 to 10.0 inches thick and consisted of organics. Root mat may extend to a deeper depth. Boring B- 1 encountered 1.1 feet of topsoil. The pavement systems typically consisted of 2 to 3 inches of asphalt over 8.0 inches of ABC stone and is encountered in Borings B-11, 18, 26, 27, 34, 41 and 42. Fill: Up to 18.5 feet of man-placed fill or backfill material was found in seventeen (17) of the forty (40) boreholes drilled. Deeper fill and backfill may exist elsewhere on site. The fill/backfill is soft. Trash fill is found in Borings B-28, 31, 39, 41 and 42. Surface trash is found on the north side of the site. Four (4) feet of asphalt and concrete fill is found in B- 27. Soft Soil: In Borings B-7, 16, 22, 24, and 31, a relatively thick layer of soft alluvial deposit is found down to 7.0 to 11.0 feet deep. This unit of soil is wet, very soft to soft; and is not suitable for any use. This unit of material should be wasted off site along with most of the existing fill material. 4. Residual Soil: Below the fill and above the weathered rock is a layer of residual soil consisting mostly of stiff to very stiff to hard, natural, clayey-silty soil, with varying amounts of find sand and mica, which is present in most borings. It is the by-product of in-place weathering of the parent rock. This unit of soil is of moderate to good engineering quality, and contains boulders. Weathered Rock: The density of the residual soil usually increases with depth to very hard or dense, weathered rock. Weathered rock (WR) is defined as very hard, rock-like material having an N-value of 50 blows per-foot or more. It was encountered at shallow depths below the ground surface in Borings B-9, 10, 15, 20, 21, 23, 32 and 43 and much deeper elsewhere. The weathered rock layer contains boulders. Mr. Matt Browder Re: Tai Job No. 07-121-1 April 12, 2007 Page 3 Partially Weathered Rock: The hardness of the weathered rock also increases with depth to partially weathered rock (PWR). For this project, PWR is defined as very hard, rock like material having an N value of 50 blows per two (2.0) inches or less. PWR is encountered only in Borings B-1 and B-9. Rock and Boulders: Defined by auger refusal, hard rock was encountered in Borings B-I at 46.0 feet and B-9, 32 at 11.0 and 8.0 feet below the existing ground surface. Shallow rock ledges may exist between borings. Groundwater: The water table was encountered in borings B-7, 16, 22 and 24 at depths of 6.0 to 9.0 feet below the ground surface. These groundwater levels most likely represent springs or perched water table. The subsurface materials encountered in the forty (40) borings are shown in the "Summary of Subsurface Materials" attached to this report. PROPOSED PROJECT The project information available at the time of this report is preliminary and very limited. Our understanding of the proposed project will consist of the demolition of existing City of Charlotte structures and the design/construction of two (2) parking garages with nurnerous wood framed condos, town homes, and apartment buildings. The grading plan is not available. We assume that up to 10.0 feet of cut and fill will probably be required. Retention systems, basement walls, etc will probably be required. We also assume that the structure loads will be heavy for the two (2) parking decks, but light for the wood residential structures. ENGINEERING BEHAVIOR OF SOILS The project site soils are sensitive to surface water damage. Grading operations performed in the cold, wet season of November through March will be difficult, time-consuming and expensive. Rock, partially weathered rock, boulders and rock ledges will be encountered in the deep cut areas, especially in the general area of Borings B-8, 9, 15, 20, 21, 23, 32, and 43. RECOMMENDATIONS Shallow Foundations It appears all the building columns and walls should be supported on a shallow foundation system consisting of single, continuous, or combined footings. The footings supported on new, controlled fill and the stiff natural residual soil should be designed for a net allowable bearing pressure (or net contact pressure) of 3,000 to 4,000 pounds per square foot. The net allowable bearing pressure (net contact pressure) refers to the pressure, which may be transmitted to the foundation bearing material in excess of Mr. Matt Browder Re: Tai Job No. 07-121-1 April 12, 2007 Page 4 _ the final minimum surrounding overburden pressure. Those footings supported on hard soil and weathered rock in the general areas of Borings B-8, 9, 15, 20, 21, 23, 32, and 43 should be designed for a net allowable bearing pressure of 8,000 to 12,000 pounds per square foot. All footings should be supported on either the improved subgrade, new controlled fill, hard residual soil, or weathered rock, but not on the existing fill or the soft alluvial soils found in Borings B-6, 7, 11, 16, 17, 18, 22, 24, 25, 26 thru 31, 33, 39, 41, and 42. Deep undercut (10.0+) and backfill is required in Borings B-28, 39, 41 and 42 to remove trash fill. Fill and Cut Slope In the natural soil, a two (2) horizontal on one (1) vertical cut and fill slope should offer sufficient margin of safety in any area not protected by a temporary or permanent shoring system. The soil in the cut slope is very susceptible to surface erosion in localized areas. Shoring It appears some of the proposed deep excavation may require shoring system along the England Street to protect the roadway. Additionally, the temporary excavation between two different finished floor levels may also require shoring. When the site plan and grading plans become available, the proposed excavation should be re-evaluated for potential shoring locations. We can provide this service upon request. It appears that a soil nail wall will be the most cost-effective shoring system to retain natural soil and weathered rock, but not the existing fill or soft soils. This system utilizes top-down construction. The temporary shoring system should be designed by a registered engineer in accordance with FHWA soil nail wall design guidelines, and applicable building codes, and properly maintained at all times during construction. Seismic For the design of the two (2) parking decks, the site subsoil belongs to Seismic Class C according to the International Building Code 2000. CONSTRUCTION CONSIDERATIONS Soft Fill/Soil All the existing soft fill and alluvial deposits found on site should be removed and wasted off site. As an alternate, the existing fill can be selectively mixed with dry soil and be used as new fill in the non- structural areas such as yard fill. It may be feasible to over excavate the borrow areas or the retention ponds and backfill partially with the unsuitable soils. Mr. Matt Browder Re: Tai Job No. 07-121-1 April 12, 2007 Page 6 CLOSURE We appreciate the opportunity to work with you on the preliminary phase on this project. If there are any questions with regard to the infonnation and recommendations contained in this letter report, or if we may be of further service to you in any way, please do not hesitate to contact us. Very truly yours, Tai and Associates, PLLC Attachments: 1. Boring Location Plans (1) 2. Summary of Subsurface Materials 3. Boring Logs (40) O O _ / ;' man J o' i' KC i H I v // J,?c/ t4 a A`- Er _ N % Z H rl I ax r H a ? a O U 2 z GQ!?. O ` H co 0 E-4 H., - - O ,? \ M N O 11 rl ?_ • I __ I% Y i 1? 1 I't ?. r, i 10 II `yy?yy d' N N \ . `.1a r'1 CY) JW P4 .. ?` - . ?? 1 I -.?. '. NOWSInbov .:6ppgxd i I 'ill idaroddia?uoaiu H rros \ ? , } It IOWN. 1 1 ? } ddd ? ?? i SUMMARY OF SUBSURFACE MATERIALS ARROWOOD STATION CHARLOTTE, NORTH CAROLINA DEPTH (FT.) OF BORING FILL SOFT WR PWR AR GW NO. SOIL B-1 - - 33.0 40.0 46.0 - B-2 - - 15.0+ _ _ _ B-3 - - 15.0+ B-4 - - 15.0+ B-5 - _ _ _ B-6 2.0 - B-7 - 8.0 - - - 7.5 B-8 - - 3.0 - _ _ B-9 - - 1.0 8.0 11.0 - B-10 - _ B-11 4.0 - - B-12 - - 15.0+ _ _ _ B-13 - - 33.0 - _ _ B-14 4.0 - 9.0 - _ _ B-15 - - 2.8 - _ _ B-16 - 7.0 - - - 8.5 B-17 6.5 - 15.0+ _ _ _ B-18 6.5 - 15.0+ _ _ _ B-19 - - 15.0+ - _ _ B-20 - - 2.5 - _ _ B-21 - - 0.2 - - - B-22 - 7.0 12.5 - - 6 0 B-23 - - 3.0 - _ . _ B-24 6.0 9.5 - - - 9.0 B-25 4.0 - 9.0 - - _ SUMMARY OF SUBSURFACE MATERIALS ARROWOOD STATION CHARLOTTE, NORTH CAROLINA DEPTH (FT.) OF BORING FILL SOFT WR PWR AR NO. SOIL B-26 9.0 - - - - B-27 4.0 - 15.0 - - B-28 16.0* - 20.0+ - - B-29 4.0 - 15.0+ - - B-30 2.5# - 12.0 - - B-31 7.5 11.0 11.0 - - B-32 - - 3.5 - 8.0 B-33 3.5 - 8.5 - - B-34 - - 15.0+ 8.0 - B-35 DID NOT DRILL B-36 DID NOT DRILL B-37 - - 8.5 - - B-3 8 - - 12.0 - - B-39 15.5* - 20.0 - - B-40 DID NOT DRILL B-41 9.0* - 15.0+ - - B-42 18.5* - 20.0+ - - B-43 - - 2.5 - - *Contain Trash # Surface Dumping GW TAI JOB NO 07-121-1 APRIL, 2007 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC r)P PT14 T-) r7 Qr DiDTI nT.I BORING NO. B-1 PAGE 1 OF-2- DATE: April 2 2007 0 N-VALUE (ASTM D-1586) 0.8 - Topsoil J V 3.0 Tan brown, very stiff fine sandy SILT 15 5 5 Tan-brown, very firm silty SAND 23 . Tan-brown, firm silty SAND 16 1 12.0 Tan-brown, dense silty SAND Dry / 18 Tan-brown, very firm silty SAND 3 1 26 Tan-brown, dense silty SAND 3 Tan-brown, very dense silty fine _A0 - SAND, Weathered Rock 5 TA I inn xin n7_1 TAI and ASSOCI ATES- PLL C 5 0 5 5561 McNEELY DRIVE. SUITE 101 , RALEIGH, NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORING NO. B-1 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 2 OF 2 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 2, 2007 f1GPT-1 ® N-VALUE (ASTM D-1586) W reran m-rl.V vv I:LL V ?J 5U 9 Partially Weathered Rock or Boulders 1 46. Boring Terminated at 46.0 Feet Auger Refusal at 46.0 Feet 5( 5( TAI JOB N0. 07-121-1 1 lAi diiu f-l30Ut_ 1A 1 LN, FLLC. 5561 McNEELY DRIVE. SUITE 101, RALEIGH. NC 27612, 919-782-9525 BORING LOO PROJECT: ARROWOOD STATION BORING NO. B-2 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 2007 0 N-VALUE (ASTM D-1586) F)rPTa nccrDio-rInri n p Soil 2-9 Orange, stiff silty CLAY 2 ? P4 Tan-brown, very firm silty SAND Dr 19 19 15.0 l 2 1 Boring Terminated at 15.0 Feet TAI I n D AIn n-7 -,') , -, TAI and ASSOCI ATFS_ PTT c 5561 McNEELY DRIVE. SUITE 101. RALEIGH, NC 27612,919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORING NO. B-3 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 2, 2007 ® N-VALUE (ASTM D-1586) nr- nru nr_cOoin?,nr.I 11 V L'LGV IU SU 9 3.6 Tan-gray hard fine sandy SILT 8 2 S Tan brown, very stiff fine sandy SILT r 24 2 15.0 Tan-gray hard fine sandy SILT 3 Boring Terminated at 15.0 Feet TA i inR \in n 7 -1 9 1 -1 TAI and ASSOCI ATES. Pi .t .C 5561 McNEELY DRIVE.., SUITE 101, RALEIGH, NC 27612, 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC nrnTu nr-crain-nnni nur CI cV BORINGNO. B-4 PAGE 1 OF 1 DATE: April 3, 2007 0 N-VALUE (ASTM D-1586) Topsoil 4.0 Gray-tan, firm clayey SILT \ 7 11 Orange, stiff silty CLAY Dr ? 13 Tan brown, very stiff fine sandy 19 SILT 15.0 Tan-brown, dense silty SAND 3 Boring Terminated at 15.0 Feet TA, TIIn *,I, „-,-, ')1 -1 TAI and ASSOCI ATES- PTJ .C 90 5561 WNEELY DRIVE, SUITF 101, RALEIGH, NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC DFPTH ncc?n?nr?.-„ BORING N0. B-5 PAGE I OF I DATE: April 3 2007 ® N-VALUE (ASTM D-1586) 8 To il uw tLLV 10 50 9 . so 2.-S Reddish brown, very stiff CLAY 2 r 2 Tan brown, very stiff fine sandy SILT Dr- 2 0 15.0 I 1 2 Boring Terminated at 15.0 Feet TAI JOB Nn_ 07-121-1 TAI a nd A SSOCI ATFS. P1.1 C 5561 McNEELY DRIVE. SUITE 101. RALEIGH, NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC nF o-ru BORING N0. B-6 PAGE 1 OF -1 DATE: April 2 2007 ® N-VALUE (ASTM D-1586) .0 To soil J V Y 2,0 FILL--CLAY and Gravel 6 Orange, stiff silty CLAY ? 11 Dry 11 Reddish brown, stiff clayey SILT 9 5.0 14 Boring Terminated at 15.0 Feet 'rA 1 intl rin n -7 -1 ?, _., TAI and ASSOCI ATES. PLL C 5561 WNEELY DRIVE. SUITE 101. RALEIGH, NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC r)PPT14 nuornylvr 1 BORING NO. B-7 PAGE 1 OF -1 DATE: April 3 2007 ® N-VALUE (ASTM D-1586) Topsoil ,7 Tan-gray, stiff to firm silty CLAY, wet 10 Brown soft sand micaceous 4 , y SILT, wet 7. 5 Tan, stiff clayey SILT 11 12.0 15.0 Tan-gray, very stiff fine sandy SILT 20 Boring Terminated at 15.0 Feet TAI 10P KI ) n7-1 91 -i TAI and ASSOCI ATES. Pi.f .C 5561 WNEELY DRIVE. SUITE 101. RALEIGH. NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD S'T'ATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC F) P PT fJ F-1 L7 c(' D I DT I r) X i nu; cr r_'i BORING N0. B-8 PAGE 1 OF 1 DATE: April 4 2007 ® N-VALUE (ASTM D-1586) To soil Tan-brown, very firm silty SAND 20 7 Tan-brown, very dense silty fine SAND, Weathered Rock Dr 1 15.0 1 7: Boring Terminated at 15.0 Feet )0 5 TAI JOB NO. 07-121-1 1 Al an(I XSti )UU1A I LS, YLLU 5561 MCNEELY DRIVE. SUITE 101. RALEIGH. NC 27612,919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC nrPTH BORING NIO. B-9 PAGE 1_ OF 1 DATE: April 2 2007 ® N-VALUE (ASTM D-1586) 0 8 T il VW LLCV IO 50 ?. . o so Tan-brown, very dense silty fine SAND, Weathered Rock Dr 1 .0 Partially Weathered Rock 11.0 Boring Terminated at 11.0 Feet Auger Refusal at 11.0 Feet 41 L Li - TAI JOR NO 07-121-1 TAI a nd A SSOCI ATFS_ PT.f. C 5( .4 5( 5C .1 SC C 5561 MCNEELY DRIVE, SUITE 101. RALFIGFI. NC 27612, 919-752-9525 BORING LOG PROJECT: ARROWOOD STATION BORING N0. B-10 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 3, 2007 0 N-VALUE (ASTM D-1586) DFPTI-I rWQ0D!o-r?r1 1 ----- - cv i v ?U y Orange, stiff silty CLAY t 1 1 2 2 8.0 14 Tan-gray hard fine sandy SILT Dr 3 Ij-- 5.0 Tan brown, very stiff fine sandy SILT I 2 Boring Terminated at 15.0 Feet TAI MR NC) n7-1 ?l -l TAI and ASSOCI ATES. PT.i .C 5561 MCNEELY DRIVE. SUITE 101, RALEIGH, NC 27612 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC nr-vru BORING NO. B-11 PAGE 1 OF 1 DATE: April 5, 2007 ® N-VALUE (ASTM D-1586) Asphalt and Base Course Vvv ULCV IU ? O 4.0 FILL--Reddish brown silty CLAY ?1 2 Brown-orange, very stiff fine sandy-silty CLAY Dry 2 2 5.0 l 2 Boring Terminated at 15.0 Feet TAI JOBNO. 07-121-1 itil nilu IA33 k.1AILi, FLL(. 5561 McNEELY DRIVE. SUITE 101. RALEIGH. NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC I)FPT14 flc c rr o In- nTI BORINGNO. B-12 PAGE 1 OF 1 DATE: April 4,2007 ® N-VALUE (ASTM D-1586) Dv 9 .8 To soil Orange, stiff silty CLAY • 1 12 14 8.0 14 Dr 4 10 15.0 Reddish brown, stiff clayey SILT a 9 Boring Terminated at 15.0 Feet TA I inR rin n,7 - i ? 1 - TAI and ASSOCI ATES. PI .T C 5561 McNEELY DRIVE. SUITE 101, RALEIGH. NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORING NO. B-13 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF -2 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 5 2007 N F) FP 0. 6 it Brown-orange, very stiff fine sandy-silty CLAY 17 7 6.5 2 17 1 Dr I 19 Tan brown, very stiff fine sandy I 17 SILT, some mica, moist I 1 2 33. 40. Tan-gray, very hard sandy SILT, Weathered Rock TA n-7_, 7, _, TAI and ASSOCI ATES- PLL T1-I nrcr•oinrinri nw c, "1 C 90 i0 5 i0 5 -V u V 5561 WNEELY DRIVE. SUITE 101, RALEIGH, NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC nrp,ri-i BORING NO. B-13 PAGE OF 2 DATE: April 5 2007 ® N-VALUE (ASTM D-1586) V Vv CLC V I U 5 0 9 I 54.5 Tan-brown, very dense silty fine SAND, Weathered Rock Boring Terminated at 54.5 Feet TA I InR Tin n 7 - T ? T - T TAI and ASSOCI ATES. Pf.f .r 5( 5561 McNEELY DRIVL. SUITE 101. RALf=1GH. NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC r)PPT-1 r"COOD, DTI-I BORING NO. B-14 PAGE 1 OF 1 DATE: April - 4, 2007 ® N-VALUE (ASTM D-1586) iU JU y FILL--Reddish brown silty CLAY 20 23 9.0 Tan brown, very stiff fine sandy SILT Dr 2 6 Tan-gray, very hard sandy SILT, Weathered Rock Boring Terminated at 15.0 Feet TA I inD MCI n'7-, 7, _, TAI and ASSOCI ATES. PLL C i0 5 5561 WNEELY DRIVE. SUITE 101. RALEIGH. NC 27612 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC r r PTU r,CC! n, -- BORING NO. B-15 PAGE 1 OF 1 DATE: April 3, 2007 ® N-VALUE (ASTM D-1586) 0.9 Topsoil 2. Tan brown, very stiff fine sandy SILT 16 55 Tan-gray, very hard sandy SILT, Weathered Rock Dry 5 15.0 Boring Terminated at 15.0 Feet 50 .5 50 .5 'IAI JOB NO. 07-121-1 irsL auU HJJVI to IhN, FLLU 5561 McNI=[:I_Y DRIVE.. SUITE 101. RALEIGH. NC27612.919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC n F PTia BORING N0. B-16 PAGE 1 OF 1 DATE: April 3,2007 * N-VALUE (ASTM D-1586) .5 Topsoil U W LLL V 10 50 9 Tan-gray, soft to firm silty CLAY, wet 5 6 7.0 8 Orange, stiff silty CLAY 8.5 2 Tan brown, very stiff fine sandy SILT, some mica 1 25 Boring Terminated at 15.0 Feet i ------------- - ------- TAI JnR Nn 07-1 ?1 -1 TAI and ASSOCI ATES- PT.i .C 5561 WNEELY DRIVE.. SUITE 101. RALEIGH, NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC nr-n•rN nGCrDIDTIrlr[ n- ci r BORING NO. B-17 PAGE l OF -1 DATE: April 5, 2007 ® N-VALUE (ASTM D-1586) FILL--Reddish brown silty CLAY 1 1 15 Tan-brown, firm silty SAND, Dr 13 14 some loose sand 9 Boring Terminated at 15.0 Feet TA inn „,-. 0-7-1 _, TAI and ASSOCI ATES- PLF C 90 v 5561 McNEELY DRIVE. SUITE 101. RALEIGH. NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORING NO. B-18 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 5, 2007 ® N-VALUE (ASTM D-1586) nFPTH ncc onvr ni -- and Base Course Vvv LLL.V f U )U 9 FILL--Reddish brown silty CLAY 20 18 Tan-brown, firm silty SAND, Dry 6 7 some mica I 20 Boring Terminated at 15.0 Feet TAI InR Nin A7-1 ?1 -1 TAI and ASSOCI ATF5 5561 MCNEEI Y DRIVE, SUITE 101.. RALEIGH, NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC f)PPTI-1 nccnnio'rInn BORING N0. B-19 PAGE 1 OF -1 DATE: April; 4, 2007 0 N-VALUE (ASTM D-1586) 0.5 Topsoil 1 10 3 Reddish brown, stiff silty CLAY 11 13 15.0 11 Boring Terminated at 15.0 Feet TA i inR nn 07-1 ')l _, TAI and ASSOCI ATES. PLL C 5561 McNEELY DRIVE, SUITE 101. RALEIGH. NC' 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORING NO. B-20 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 4,2007 DEPTH 0 N-VALUE (ASTM D-1586) DESCRIPTION GW ELEV 10 50 90 0.2 Topsoil Tan-brown, firm silty SAND 2 2. S 1 Dry Tan-brown, very dense silty fine SAND, Weathered Rock 15.0 Boring Terminated at 15.0 Feet TAI JOB NO. 07-121-1 TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE. .SUITE 101, RALEIGH. NC 27612, 919-782-9525 5C C 3C 5C BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC nF-PTLJ n co?n?nm,?w? BORING NO. B-21 PAGE 1 OF 1 DATE: April 4, 2007 ® N-VALUE (ASTM D-1586) To soil Tan-brown, very dense silty fine SAND, Weathered Rock Dry Boring Terminated at 15.0 Feet TA i inR t in TAI and ASSOCI ATE,';- PI.I .C 0 5C r 5C r 5C 5C G 50 .5 5561 McNEELY DRIVE. .SUITE 101, RALEIGH, NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORING NO. B-22 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 3 2007 DEPTH 0 N-VALUE (ASTM D-1586) 0.8 Topsoil DESCRIPTION GW ELEV 10 50 90 Tan-gray, soft to firm silty 1 CLAY, wet 7.0 21 Tan-gray, very stiff fine sandy SILT 2 Tan-gray, very hard sandy SILT, 15.0 Weathered Rock Boring Terminated at 15.0 Feet TAI JOB N0. 07-121-1 TAI and ASSOCIATES, PLLC 5561 McNECLY DRIVE. SUITE IOI, RALEIGH, NC 27611 919-782-9521 3C .G BORING LOG PROJECT: ARROWOOD STATION BORINGNO. B-23 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: Aprii 3, 2007 ® N-VALUE (ASTM D-1586) f1FPTla T1F CrDIDTIn I 3.0 Tan-gray hard fine sandy SILT 4 Tan-gray, very hard sandy SILT, Weathered Rock Dry 15.0 Boring Terminated at 15.0 Feet TAI InQ Aic? n-7 -, '79 -, TAI and ASSOCI ATF,S. PI.i ,C 50 .5 50 .4 50 .4 50 .3 5561 MCNEELY DRIVE. SUITE- 101. RALEIGH. N('27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORING N0. B-24 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 5 2007 DEPTH ® N-VALUE (ASTM D-1586) DESCRIPTION GW ELEV 10 50 90 -T;F - nd ase Course FILL--Reddish brown silty CLAY, some plastic clay 7 6.0 Brown, soft sandy micaceous 3 SILT, wet 9.0 9.5 13 Tan, stiff clayey SILT 12.0 Tan-gray hard fine sandy SILT 4 19, Boring Terminated at 15.0 Feet TAI JOBNO. 07-121-1 TAI and ASSOCIATES, PLLC 5561 MNENEELY DRIVE. SUITE 101. RALEIGH, NC 27612, 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORING NO. B-25 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF -1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 5, 2007 f1F PTI-1 nccnI - - 0 N-VALUE (ASTM D- 1586) 0.5 4.0 FILL--Reddish brown silty CLAY ol /' 16 Gray-tan, firm clayey SILT 8 6.0 9.0 Tan, stiff clayey SILT Dry 1 Tan-brown, very dense silty fine SAND, Weathered Rock Boring Terminated at 15.0 Feet TAI IOa rin (17-1 91 -1 TAI and ASSOCI ATFS_ PT J ,C i0 5 0 5 5561 McNEELY DRIVE, SUITE 101. RALEIGH. NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC BORING NO. B-26 PAGE 1 OF 1 DATE: April 5, 2007 ® N-VALUE (ASTM D-1586) ELEV 10 SU 4^ I I I 1 4.I I TAI JOB NO. 07-121-1 TAI and ASSOCIATES, PLLC 5561 WNEELY DRIVE:. SUITE 101. RALEIGH, NC' 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORING NO. B-27 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 5, 2007 ® N-VALUE (ASTM D-1586) nFPTI-4 hccr'D IDTT-I ----"""•"• halt and Base Course Vvv L;LLV fU ? ? [? 4. FILL--Asphalt and Concrete 14 Tan-brown, firm silty SAND Dry 17 16 12.5 15.0 Tan, stiff clayey SILT 1 2 Boring Terminated at 15.0 Feet TA 110P kin n 7 -1 ? 1 -1 TAI a nd A SSOCI ATES. PT I C 5561 WNEEL.Y DRIVE, SUITE 101. RALEIGH, NC27612, 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORING N0. B-28 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 4 2007 ® N-VALUE (ASTM D-1586) ?Ev f1FPT14 r?cc?omT,nw. O sol.l 1 3 FILL--Reddish brown silty CLAY, some organic matter, plastic clay and trash, soft 6 7 ry I 8 16.0 20.0 Tan, stiff clayey SILT \ 14 Boring Terminated at 20.0 Feet TAI JORNn n7-1 91 -1 TAI a nd A SSOCI ATFS_ PT I .C 5561 WNEELY DRIVE..SU11 E 101. RALEIGH. NC 27612.919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC n1-PTW nccr DroTi nXi n111 r., "I BORINGNO. B-29 PAGE 1 OF -1 DATE: April 4, 2007 ® N-VALUE (ASTM D-1586) 10 50 qn .5 Topsoil .0 FILL--Reddish brown silty CLAY soft 5 11 9.0 Tan, stiff clayey SILT ry 14 19 15.0 Tan brown, very stiff fine sandy SILT ? 27 Boring Terminated at 15.0 Feet TAI JOBN0. 07-121-1 1,u anCl E'l??lJl 1A It,), YLLU 5561 WNEELY DRIVE. SUIT F 101. RALEIGH. NC' 27612 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORINGNO. B-30 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 4, 2007 ® N-VALUE (ASTM D-]586) nFPTI i nccr?inTn?i .4 Topsoil 2.5 FILL--Reddish brown silty CLAY 9 Orange, stiff silty CLAY \ 4 Dry 15 Tan-brown, firm silty SAND 16 12.0 15.0 Tan-brown, very dense silty fine SAND, Weathered Rock Boring Terminated at 15.0 Feet -.q, ,,,o X,f-N n-, - , -„ -, TAI and ASSOCI ATES. PI.I ,C 90 6 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA r)PPT I r r_c?nmr ?BORING NO. B-31 CLIENT: HARRIS, MURR AND VERMILLION, LLC PACE 1 OF -1 DATE: April ,2, 2007 0 N-VALUE (ASTM D-1586) ---..... .._... Topso , .. i.??.. i V III ?i FILL--Reddish brown silty CLAY, with trash, cinder, wood 6 9 7.5 Dry 16 T Tan-gray, soft to firm silty CLAY, wet 6 11.0 15.0 Tan-brown, very dense silty fine SAND, Weathered Rock 1 Boring Terminated at 15.0 Feet TA IinRr,n n7-1') i - i TAI andASSOCI ATF.S_PT.[ .CC 8 5561 MCNEELY DRIVE, SUITE 101. RALEIGH, NC 27612.919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC nFPTP BORING NO. B-32 PAGE I OF 1 DATE: April 3,2007 * N-VALUE (ASTM D-1586) To soil Vw L"LI:V lU 5 0 9 3.5 Tan-gray, very stiff fine sandy SILT 18 Tan-gray, very hard sandy SILT, Dr y 7 .0 Weathered Rock Boring Terminated at 8.0 Feet Auger Refusal at 8.0 Feet TAI.10RNn 07-121-1 TAI and A SSOCI ATES- PLI .C 7 50 .5 i0 0 5561 MCNEELY DRIVE. SUITE 101. RALEIGH, NC27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC DFPTIN nccr ID1o-nnni BORING NO. B-33 PAGE 1 OF 1 DATE: April, 5, 2007 0 N-VALUE (ASTM D-1586) TQp s o i 1 3.5 FILL--Reddish brown silty CLAY 1 \ 8 0 .5 Tan-brown, dense silty SAND 3 0 15.0 Tan-brown, very dense silty fine SAND, Weathered Rock Dry Boring Terminated at 15.0 Feet _ T 1 TAI Inpmn n7-1*)l -1 TAI and ASSOCI ATES. PT.( .C 5_ 5561 McNEELY DRIVE, SUITE 101. RALEIGH, NC 27612 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORINGNO. B-34 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 5, 2007 hGPTIa N-VALUE (ASTM D-1586) nccnn mT?..r ____._.. ..._... Asphalt and Base Course v.. . .vv IU -) U ) 2.7 Tan-gray, very stiff fine sandy SII,T 1 11 Tan brown, very stiff fine sandy SILT, some mica Dry 4 10 13 15.0 4 0 10 Boring Terminated at 15.0 Feet 'rAl InR t in n-7-i ) i --i TAI and ASSOCI ATF,S_ PT.T .C, 5561 McNLELY DRIVE. SUITE 101, RALEIGH, NC 27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC n F PT-I BORING NO. B-37 PAGE 1 OF 1 DATE: April 3, 2007 0 N-VALUE (ASTM D-1586) 0 4 uw tLr_V 10 50 C apaQi_1 Tan-gray hard fine sandy SILT 3 3 .5 Dr 6 15.0 Tan-gray, very hard sandy SILT, Weathered Rock - Boring Terminated at 15.0 Feet 0 3) 0 .5 i0 5 )_)bi McNLL-LY DRIVE. SUITE 101. RALEIGH, NC 27612, 919-782-9525 IAlJOBNO. 0/-121-1 1'A'all(' /AN )U lAIES,FLLC BORING LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC n FPTF-I nCC('D1r) I)n 1 BORINGNO. B-38 PAGE 1 OF 1 DATE: April 4,2007 0 N-VALUE (ASTM D-1586) To soil Reddish brown, stiff silty CLAY 13 15 8.0 13 Tan-gray hard fine sandy SILT ry 4 3 12.0 15.0 Tan-brown, very dense silty fine SAND, Weathered Rock Boring Terminated at 15.0 Feet TAI InR Tin n7-i ?i -i TAI and ASSOCI ATES. PT.T .C 5C C 5561 McNEEI_Y DRIVE, SUITE 101. RALEIGH, NC27612. 919-782-9525 BORING LOG PROJECT: ARROWOOD STATION BORINGNO, B-39 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 3, 2007 ® N-VALUE (ASTM D-1586) nFPTI-I nccroforinni 0.5 --- Topsoil Vvv L,LLV I U 50 9 10 FILL--Reddish brown silty CLAY some topsoil and plastic clay Dry 8 16 0.0 Tan, stiff clayey SILT J 11 Boring Terminated at 20.0 Feet TAI JOR Nn 07-121-1 TAI a nd A SSOCI ATES. P1J . 5561 WNEELY DRIVE. SUITE 101. RALEIGH. NC27612. 919-782-9525 BOFTNQ LOG PROJECT: ARROWOOD STATION LOCATION: CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC r r' PTu BORING NO. B-41 PAGE 1 OF 1 DATE: April 5, 2007 ® N-VALUE (ASTM D-1586) 0.8 Asphalt and Base Course v vv CLC V J U 50 FILL--Reddish brown silty CLAY, some organic matter 10 18 9.0 Dry 4 19 .o Tan brown, very stiff fine sandy SILT I 1 17 Boring Terminated at 15.0 Feet TAI InR Nn n7-1 21 -1 TAI a nd A SSOCI ATES- PT.i .C 5561 WNEELY DRIVE. SUITE 101. RALEIGH, NC' 27612. 919-782-9525 BODING LOG PROJECT: ARROWOOD STATION LOCATION: ' CHARLOTTE, NORTH CAROLINA CLIENT: HARRIS, MURR AND VERMILLION, LLC DFPTH nGCrnia-rinn BORING NO. B-42 PAGE 1 OF 1 DATE: April 5, 2007 0 N-VALUE (ASTM D-1586) Aai2halt and Base Course iv JU / D 9 11 FILL--Reddish brown silty CLAY, some organic matter ry 20.0 Orange, stiff silty CLAY 13 Boring Terminated at 20.0 Feet To i inp mr) n"7 -1 71 -1 TAI and ASSOCI ATES_ PT.L C y y y 5561 McNEELY DRIVE, SUITE 101 RALEIGH, NC 27612, 919-7820525 BORING LOG PROJECT: ARROWOOD STATION BORINGNO. B-43 LOCATION: CHARLOTTE, NORTH CAROLINA PAGE 1 OF 1 CLIENT: HARRIS, MURR AND VERMILLION, LLC DATE: April 4,2007 ® N-VALUE (ASTM D-1586) nr-P'fFf nrc(,oI -nai 0.8 - -- "' Topsoil V vv L:LL V I U )U 2.5 Tan brown, very stiff fine sandy SILT 19 62 Tan-brown, very dense silty fine SAND, Weathered Rock ry 15.0 Boring Terminated at 15.0 Feet I i i TAI Inn Nn n7-1 ?1 -1 TAI and ASSOCI ATFS_ PLL CC 7 5( G 5( 5C ,L 5561 WNEELY DRIVE. SUITE 101, RALEIGH. NC 27612, 919-782-9525