September 26, 2016
RECEIVEDINGDEQ1 WR
Ms. Stephanie Scheringer, Division Manager OCT 0 4 2016
Two Rivers Utilities Water Quality
P.O. Box 1748 -Section
Permitting
Gastonia, NC 28053
Subject: Compliance Sampling Inspection
Crowders Creek WWTP
NPDES Permit No. NCO074268
Gaston County
Dear Ms. Scheringer:
Enclosed is a copy of the Compliance Sampling Inspection for the inspection conducted at
the subject facility September 20,2016 by Ori Tuvia. Kevin Morgan's and Charlie Graham's
cooperation during the site visit was much appreciated. Please advise the staff involved with this ,
NPDES Permit by forwarding a copy of the enclosed report.
Split samples were taken during the inspection. Results of the split sampling will be sent at a
later date.
The report should be self-explanatory; however, should you have any questions concerning
this report, please do not hesitate to contact Ori Tuvia at (704) 235-2190,,or at
ori.tuvia@ncdenr.gov.
Cc: NPDES Unit
MRO Files
Sincerely,
Ori Tuvia, Environmental Engineer
Mooresville Regional Office
Division of Water Resources, DEQ
Mooresville Regional Office
Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115
Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires a-31-98
Section A: National Data System Coding (i.e., PCS) '
Transaction Code NPDES yr/nio/day Inspection Type Inspector Fac Type
2 15 1 3'1 NCO074268 I11 12 I 16/09/20 I17 181 c I 19 I G I 20I I
21111111 1111111111111111 11111111 11111111111 166
I
Inspection Work Days Facility Self -Monitoring Evaluation Rating 61 QA Reserved
67 1.0 701a 1 71 Iti I 72 1 N 1 731 I 174 75III 80
l_1 LJ I I I
Section B: FacilityData
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also -include
Entry Time/Date
Permit Effective Date
POTW name and NPDES hermit Number)
10:10AM 16/09/20
11/05/01
Crowders Creek WWfP
5642 S York Rd
Exit Time/Date
permit Expiration Date
Gastonia NC 28052
12:55PM 16/09/20
15/08/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Charlie Graham/l/
Kevin Morgan Graves/ORC/704-214-9153/
Name, Address of Responsible OfficiatiTitle/Phone and Fax Number
Contacted
Stephanie B Scheringer,PO Box 1748 Gastonia NC 280531748/Division Manager
W WT/704-866-6726/ No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
r
Ori A Ttivia � MRO WQ/I704-663-1699!
�lz 6 //
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger MRO WQ//704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
�"-r:;?A16 .
Page#
NPDES yr/mo/day Inspection Type
31 NU074268 12 16 9/20 17 181
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Sampling inspection (collected samples for BOD, TSS, Fecal Coliform, Nutrients and metals)
I
9
Page# 2
f
Permit: NCO074268 Owner -Facility: Crowders Creek WWTP
Inspection Date: 09/20/2016 Inspection Type: Compliance Sampling
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
0
❑
❑
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
❑
❑
❑
Comment: The Division received the permit renewal package on 3/2/2015. The subject permit expired
on 8/31/2015.
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
M
❑
❑
❑
Is all required information readily available, complete and current?
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
❑
❑
❑
0
Are analytical results consistent with data reported on DMRs?
M
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
0
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
-.
Name of person performing analyses
.
Transported CDCs
Are MRS complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
M
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
M
❑
❑
❑
on each shift?_
Is the ORC visitation log available and current?
M
❑
❑
❑
Is the ORC certified, at grade equal to or higher than the facility classification?
M
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
M
❑
❑
❑
Comment The records reviewed during the inspection were organized and well maintained.
bMRs.
COCs ORC lops Calibration logs and' Bench sheets were reviewed for the period October
2015 through July 2016.
Laboratory Yes No NA NE •
Page# 3
Permit: NCO074268 Owner-Facility: Crowders Creek WWTP
Inspection Date: 09/20/2016 Inspection Type: Compliance Sampling
Laboratory
Yes No NA NE
Are field parameters performed by certified personnel or laboratory? .
M
❑
❑
❑
Are all other parameters(excluding field parameters) performed by a certified lab?
'M
❑
❑
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)? .
Incubator.(Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
❑
❑
❑
M
Incubator (BOD) set to 20.0 degrees Celsius +/-1.0 degrees?
❑
❑
❑
M
Comment: Influent and effluent analyses (including field) are performed under the on-site laboratory
certification #210. Meritech Labs inc., laboratory certification_ 4165, has been contracted to
provide analytical support.
Influent Sampling
Yes' No NA NE
# Is composite sampling flow proportional?
M
❑
❑
❑
Is sample collected above side streams?
0
❑
❑
❑
Is proper volume collected?
0
❑
❑'
❑
Is the tubing clean?
, ❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
❑
, ❑
❑
Celsius)?
Is sampling performed according to the permit?
N
. ❑
❑
, ❑
Comment: The subiect permit requires composite BOD and TSS influent sampling. Monthly
aliquot'
verifications are performed and documented. At the time of the inspection the influent
.
sampler pulled 190 ml.
Effluent Sampling
Yes No NA NE
Is composite sampling flow proportional?
N
❑
❑
❑
Is sample collected below all treatment units?
N
❑
❑
❑
Is proper volume collected?
❑
❑
❑
Is the tubing clean?
❑
❑
❑
# Is proper. temperature set for sample storage (kept at less than or equal to 6.0 degrees
❑
El
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
N
❑
❑
❑
representative)?
Comment:
Upstream / Downstream Sampling
Yes No NA NE
Page# 4
J
J
Permit: NCO074268 Owner -Facility: Crowders Creek WWTP
Inspection Date: 09/20/2016 Inspection Type: Compliance Sampling
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, and " N ❑ ❑ ❑
sampling location)?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable M_ ❑ ❑ ❑
Solids, pH; DO, Sludge Judge, and other that are applicable?
Comment: The wastewater facility appeared to be properly operated and well maintained. The ORC
and staff incorporate a comprehensive process control program (including Chem-Sban'Unit)
"with -all measurements being properly documented and maintained on-site.The facility is
equipped with a SCADA system to assist the staff with the operation of the treatment
units/processes. Selected plant alarms are also connected to a plant -wide audible -system
to notify operators out in the plant of alarm conditions.
Bar Screens
Yes No NA NE
Type of bar screen
-
a.Manual
❑
b.Mechanical
Are the bars adequately screening debris?
❑
❑
❑
Is the screen free of excessiveAebris?
❑
❑
❑
Is disposal of screening in compliance?
M.
❑
El
❑
Is the unit in good condition?
❑
❑
❑
Comment:
Flow Measurement - Influent
Yes No NA NE
# Is flow meter used for reporting?
❑
EY
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
❑
Comment: New influent sampler installed on 7/29/206.
Grit Removal
Yes No NA NE .
Type of grit removal
a.Manual
❑
b.Mechanical
Page#
5
d
Permit: NC0074268
Owner -Facility: Crowders Creek WWTP
Is the pump wet well free'of bypass lines or structures?
❑
Inspection Date: 09/20/2016
Inspection Type: Compliance Sampling
Is the wet well free of excessive grease?
N
❑
Grit Removal
Yes • No NA NE
Is the grit free of excessive organic matter?
❑
❑
❑
❑
Is the grit free of excessive odor?
❑
❑
M
❑
# Is disposal of grit in compliance?.
❑
❑
0
❑
Comment: At the time of the inspection the grit removal was out for repairs.
Pump Station - Influent
Yes No NA NE
Is the pump wet well free'of bypass lines or structures?
❑
Q
❑
Is the wet well free of excessive grease?
N
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all. pumps operable?,
N
❑
❑
❑
Are float controls. operable? -
0
❑
❑
❑
Is SCADA telemetry available and operational?
0
❑
❑
❑
Is audible and visual alarm available and operational?
❑
❑
❑
M
Comment: All four pumps were operational.
Primary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater'?
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
N
❑
.,❑
❑
Are weirs -level?
M
❑
❑
❑ -
Is the site free of weir blockage?
❑
❑
❑
Is the site free of evidence of'short-circuiting?
❑
❑
❑
Is scum removal adequate?
M
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
N ~
❑
❑
❑
Is the sludge.blanket level acceptable?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately/ of the sidewall depth)
0
El,
❑
❑
Comment: Both primaries were operational and in service.
Nutrient Removal Yes No NA NE
# Is total nitrogen removal required? - ,❑ ❑ ❑
# Is total phosphorous removal required? ❑ ❑ ❑
Type Biological
# Is chemical feed•required to sustain process? ❑ ❑ ❑
Page# 6
rr
Permit: NCO074268 Owner - Facility: Crowders Creek WV TP
Inspection Date: 09/2012016 Inspection Type: Compliance Sampling
Nutrient Removal Yes No NA NE
Is nutrient removal process operating properly? ❑ El ❑
Comment: The subiect permit requires a 1.0 mg/L total phosphorus effluent limit and a seasonal (April 1
— October 31) 6.0 mg/L effluent total nitrogen limit Glycerin is added as a carbon source
(anoxic basin).
Aeration Basins
Mode of operation
Type of aeration system
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
r
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/1)
Yes No NA NE
Ext. Air
Diffused -
■ ❑ ❑ ❑
0,❑ M ❑
,M ❑ ❑ ❑
■ ❑ ❑ ❑
❑. ❑� ❑ M
-❑ . .❑ ❑
W ❑ 1:111
Comment: Foam was observed. No foam carry-over was observed in the secondaries:
Secondary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
❑
❑
❑
Is the site free of.excessive buildup of solids in center well of circular clarifier?
❑
❑
`❑
Are weirs level?
❑
❑
❑
Is the site free of weir blockage?
❑
❑
Is the site free of evidence of short-circuiting?
-
❑
❑
❑
Is scum removal adequate?
❑
❑
❑
Is the site free of excessive floating sludge?
❑
❑
❑
Is the drive unit operational?
M_.
❑
❑
❑
Is the return rate acceptable (low turbulence)?
�;
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
,❑
, 11,
❑
Is the sludge blanket level acceptable? (Approximately '/o of the sidewall depth)
❑
❑
❑
Comment:, ' Both secondaries were operational and in service. Alum is added on an as -needed basis to
enhance settling.
k
Pumps -RAS -WAS
Are pumps in place?
Are pumps operational?
Yes No NA NE
S ❑ •❑ ❑
■ ❑ El . ❑
Page# 7
Permit: NCO074268 Owner -Facility: Crowders Creek WWTP
Inspection Date: 09/20/2016 Inspection Type: Compliance Sampling
Pumps -RAS -WAS Yes No NA NE
Are there adequate spare parts and supplies on site? ❑ ❑ ❑
Comment:
Lagoons
Yes No NA NE
Type of lagoons?
❑
❑
❑
# Number of lagoons in operation at time of visit?
1
❑
❑
❑
Are lagoons operated in?
❑
❑
❑
# Is a re -circulation line present?
❑
❑
❑
❑
Is lagoon free of excessive floating materials?
E
❑
❑
❑
# Are baffles between ponds or effluent baffles adjustable?
❑
❑
0
❑
Are dike slopes' clear of woody vegetation?
■
❑
❑
❑
Are weeds controlled around the edge of the lagoon?
0
❑
❑
❑
Are dikes free of seepage?
0
❑
❑
❑
Are dikes free of erosion?
0
❑
❑
❑
Are dikes free of burrowing animals?
❑
❑
❑
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple
❑
❑
N
❑
locations?
# If excessive algae is present, has barley straw been used to help control the growth?
❑
❑
❑
Is the lagoon surface free of weeds?
❑
❑
❑
Is the lagoon free' of short circuiting?
❑
❑
❑
Comment: : The facility is equipped with two polishing ponds (both lined and operational): however, only
one pond was in service. The ponds are alternated approximately once every
two years.
Disinfection -Gas
Yes No NA NE
Are cylinders secured adequately?
❑
❑
❑
Are cylinders protected from direct sunlight? -
N
❑
❑
❑
Is there adequate reserve supply of disinfectant?
❑
❑
❑
Is the level of chlorine residual acceptable?
❑
❑
❑
Is the contact chamber free of growth, or sludge buildup?
N
❑
❑
❑
Is there chlorine residual prior to de -chlorination?
;N
-❑
❑
❑
Does the Stationary Source have more than 2500 lbs of Chlorine (CAS No. 7782-50-5)?
i
■
❑
❑
❑
if yes,• then is there a Risk Management Plan on site?
0
❑
❑
❑
If yes, then what is the EPA twelve digit ID Number? (1000-_-_)
1000-0006-7321
If yes, then when was the RMP last updated?
09/13/2016
Page#
8
Permit: NCOO74268 Owner -Facility: Crowders Creek WWTP
Inspection Date: 09/2012016 Inspection Type: Compliance Sampling
Disinfection -Gas Yes'No NA NE
Comment: The chlorination and dechlorination systems are serviced annually.
De -chlorination
Type of system ?
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de -chlorination substance stored away from chloririe containers?
Comment:
Are the tablets the proper size and type?
Are tablet de -chlorinators operational?
Number of tubes in use?
Comment:
Yes No NA NE
Gas
❑ ❑ ❑
❑ ❑ E ❑
❑ ❑ M ❑
❑ ❑ ■ ❑
.Flow Measurement - Effluent
_Yes No NA NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
M'
❑
11
❑
Is the flow meter operational?
0
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
0
❑
❑
❑
Comment: The flow meter was last calibrated on 7/26/2016 by Fortech Automation Engineering..
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
M
❑
" ❑
❑
Are the_receiving water free of foam other than trace amounts and other debris?
0
❑
.❑
❑
If effluent (diffuser pipes are required) .are they operating properly?
❑
❑
0
❑
Comment: The effluent appeared clear with no floatable solids and trace foam
(entrained air).
Anaerobic Digester -
Yes No NA NE
Type of operation:
Floating cover
Is the capacity adequate?
❑
❑
❑
# Is gas, stored on site?
�
❑
0
❑
Is the digester(s) free of tilting covers?
❑
❑
❑
Is the gas burner operational?
0
❑
❑
❑
Is the digester heated?
M
❑
❑
❑
Page# 9
Permit: NCO074268 Owner -Facility: Crowders Creek WWTP
processes.
Is automatically activated standby power available?
Chemical Feed
Inspection Date: 09/20/2016 Inspection Type: Compliance sampling
Is containment adequate?
❑
❑
❑
Anaerobic Digester
Yes No NA- NE
Is the temperature maintained constantly?
❑
❑
❑
❑
Is tankage available for properly waste sludge?
Is the site free of excessive leaking?
❑
❑
❑
Comment: The facility is equipped with four digesters (1 -primary, 1 -secondary, 2 -holding tanks).
N
❑
❑
Bio -solids are land applied by a contracted company (EMA Resources) under Permit
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
E
❑
W00001793.
❑
Is the generator fuel level monitored?'
❑
Solids Handling, Equipment
-Yes No NANE
Is the equipment operational?
0
❑
❑
❑ '
Is the chemical feed equipment operational?
❑
❑
M-
❑
Is storage adequate?
❑
❑
❑
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
❑
[I'M
❑
Is the site free of sludge buildup on belts and/or rollers of filter press?
❑
❑
❑ .
Is the site free of excessive moisture in belt filter press sludge cake?
❑
❑
❑
The facility has an approved sludge management plan?
❑
❑
❑
Comment: Two DAF units: The DAF units are used to thicken the WAS Drior to digestion.- The DAF
supernate is returned to the head of the biological/nutrient removal treatment
processes.
Is automatically activated standby power available?
Chemical Feed
Yes No NA NE
Is containment adequate?
❑
❑
❑
Is storage -adequate?
0 ❑
❑
❑
Are backup pumps available?
0 ❑
❑
❑
Is the site free of excessive leaking?
❑
❑
❑
1
N
❑
❑
Comment:
Standby-PoWer
Yes No NA NE
Is automatically activated standby power available?
❑
❑
❑
Is the generator tested by -interrupting primary power source?
0 •
❑
❑
❑
Is the generator tested under load?
0
❑
❑ -
❑
Was generator tested & operational during the inspection?
❑
❑
❑
Do the generators) have'adequate capacity to operate the entire wastewater site?
N
❑
❑
❑
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
E
❑
❑
❑
Is the generator fuel level monitored?'
❑
❑
❑
Comment: Ali three standby „generators were operational. The generators are tested monthly
under
load and are serviced annually by a contracted company (CAT).
Page# 10