Loading...
HomeMy WebLinkAbout20160941 Ver 1_401 Application_20160916Curr ENGINEERING TRANSMITTAL FORM TO: Ms. Karen Higgins NCDENR - Division of Water Resources 512 N. Salisbury St. Raleigh, NC 27604 919-807-6464 SUBJECT: Richmond Road Subdivision DATE: September 29, 2016 Orange County, NC SENT BY: Don Curry CURRY PROJECT NO: 2016-025 We are sending you the following items: TEM -ument PCN Application 'tans Richmond Road Plans - Full Size 'tans Richmond Road Plans - 11x17 ;heck Review Fee Check $240 I These are transmitted as checked below: 2 p 1 60 94 1 DESCRIPTION For Information Approved as Noted - Revise and Resubmit As Requested _ Not Approved - Revise and Resubmit For Review and Comments For Record and File For Revision Submittal x For Approval For Recording Approved For Signature, then return to: REMARKS: Enclosed is a PCN application, fee, and plans outlining the work to be done for a small project in Orange County. Please let us know if you have any questions or concerns. T 19191 552 0849 205 b I uquay Avenue F 19191 5522043 Fuquay Varina, NC 2 E �J��Y N G14\ F� EST � Un Z 10 \ti CARO% O�0F VYA�- t ILJ_�J\.7 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes X❑ No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Richmond Road Tract 2b. County: Orange 2c. Nearest municipality / town: Cheeks Township 2d. Subdivision name: Richmond Road Subdivision 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: NC Land Investments, LLC 3b. Deed Book and Page No. 6069/670 3c. Responsible Party (for LLC if applicable): Mr. Keith Brouillard IM i 3d. Street address: 105 High Slope Dr. ti F P 3 0 2016 3e. City, state, zip: Cary, NC 27518 3f. 3g. Telephone no.: Fax no.: DEQ -WATER RE OURCES 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 W 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent Q Other, specify: Developer of Subdivision 4b. Name: Mr. Keith Brouillard 4c. Business name (if applicable): Carolina Forestry 4d. Street address: 314 W. Millbrook Rd., Suite 121 4e. City, state, zip: Raleigh, NC 27609 4f. Telephone no.: 919-510-4663 4g. Fax no.: 866-557-3064 4h. Email address: info@carolinaforestry.com 5. Agent/Consultant Information (if applicable) 5a. Name: Don Curry 5b. Business name (if applicable): The Curry Engineering Group, PLLC 5c. Street address: 205 S. Fuquay Ave. 5d. City, state, zip: Fuquay-Varina, NC 27526 5e. Telephone no.: 919-552-0849 5f. Fax no.: 919-552-2043 5g. Email address: don@curryeng.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 9845346277 1b. Site coordinates (in decimal degrees): Latitude: 36.096539 Longitude: 79.191381 1 c. Property size: 81.81 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: McGowan Creek 2b. Water Quality Classification of nearest receiving water: Creek 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Residential Use: The culvert under the existing roadway is being upgraded to serve a rural subdivision (10ac+ lots). This application is associated with creek impacts to this new culvert. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: New culvert to replace existing, smaller culvert to provide access to subdivision lots. 3e. Describe the overall project in detail, including the type of equipment to be used: The existing culvert will be removed and replaced with a larger culvert and the existing gravel road will be replaced and resurfaced. Proposed equipmer 0 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project(including all priorphases) in thepast? ❑ Yes ❑ No ® Unknown Comments: The County has performed a determination. 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): orange County Agency/Consultant Company: orange County Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. August 16, 2016 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No ❑X Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert UT to McGowan Creek INT Corps 5.5 76 S2 T Excavation UT to McGowan Creek INT Corps 5.5 10 S3 Choose one S4 Choose one S5 - Choose one S6 Choose one 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indiv" ually list all open water impacts below. 4a. Open water impact number Permanent (P) or —Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require miti ation, then vou MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number – Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 P Stream UT to McGowan Cr. No 5,071 2,172 B2 T Stream UT to McGowan Cr. No 757 452 B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 5,828 2,624 6i. Comments: Temporary impact is for installation only. Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Minimal cut/fill along roadway to minimize impacts. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Contractor will access site via existing gravel roadway and work outward from the roadway. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes ❑X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑X Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 3.82% 2b. Does this project require a Stormwater Management Plan? ❑x Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The stormwater plan incorporates Low Impact Development (LID) techniques. 2e. Who will be responsible for the review of the Stormwater Management Plan? Orange County 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? Orange ❑ Phase II ❑X NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): E] Session Law 2006-246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes Q No attached. 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑X No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered 'yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4.Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. On-site septic Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Previous crossing did not impact endangered species or critical habitat. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Previous crossing did not impact fish habitat. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation E] Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Previous crossing did not impact cultural resources. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA Map 3710984500J Keith Brouillard �— 9/27/2016 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 RICHMOND ROAD TRACT SITE INFORMATION: SITE PLAN AND GRAD/NG PLAN LOCATION: 700 RICHMOND ROAD D-01 M:BANE. NC 27302 COUNTY: ORANGE COUNTY PARENT PIN'. 9615341462 DBrPO 6069070 ZONING RI ACREAGE 1216 AC ROADWAY IMPERVIOUS. 12.300 SF(0239N .� ` PER LOT IMPERVIOUS (10 LOTS): 19.000 SF (3.5994 ''...1 PER LOT PERVIOUS- 427 734 SF (80.71N TOWNSHIP OF CHEEKS ORANGE COUNTY, NORTH CAROLINA DRAWING INDEX C-00 COVER SHEET C-01 EX/STING CONDITIONS PLAN C-02 SITE PLAN AND GRAD/NG PLAN C-03 EROSION CONTROL PLAN D-01 SITE DETAILS D-02 EROSION CONTROL DETAILS 1 D-03 EROSION CONTROL DETAILS 2 GOVERNING AGENCIES ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT 131 W. MARGARET UNE. SUITE 201 RD BOX 8181 HILLSBOROUGH. NC 27278 9192/52575 TRA/19PORATIIN NORTH CAROUNA DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION 7, DISTRICT 1 127 EAST CRESCENT SQUARE DR. PO Box 766 GRAHAM, NC 27253 336-5708633 CONTACT: C N. (CHUCK) EDWARDS. RE UTILITY AGENCIES ORANGE COUNTY PUNNING & INSPECTIONS DEPARTMENT 131 W. MARGARET UNE, SUITE 201 PO BOX 8181 HILLSBOROUGH, NO 27278 9192/52587 CONTACT: WESLEY POOLE Civil Enoineer.• The Curry Engineering Group, PLLC NC License M P-0799 PO Box 2018 205 S. Fuquey Ave Fuquay-Varina, NC 27526 919.552.0849 (o) Contact: Don Curry, PE don@curryerVCDnn SUBMITTED TO ORANGE COUNTY - DATE: 2016-04-28 G_W N.I r I TOPOGRAPHICAL DATA PERFORMED BY STEPHEN M. PUCKETT. PLS SITE BENCHMARK IS AVAILABLE FROM SURVEYOR. CONTOURS SHOWN HEREON ARE FROM AN ACTUAL FIELD SURVEY. BOUNDARY INFORMATION SUPPLIED BY OWNER AND SHOWN FOR REFERENCE ONLY. CONSULT PLS FOR ACTUAL BOUNDARY DATA. 2. THE CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OF FIRMS HAVING FACILITIES ON OR ADJACENT TO THE SITE BEFORE pSTLURBR/G. ALTERING. REMOVING, RELOCATING. ADJUSTING OR CONNECTING TO SAID FAGLIIES. THE OWNER SHALL PAY ALL COSTS IN CONNECTION WITH ALTERATION OF OR RELOCATION OF ANY EXISTING FACILITIES. 3 ALL EXCAVATION IS UNCLASSIFIED AND SHALL INCLUDE ALL MATERIALS ENCOUNTERED. 4. ALL STRUCTURAL FILL MATERIAL SHALL BE FREE OF ALL STICKS, ROCKS. AND CLUMPS OF MUD 5 UNUSABLE EXCAVATED MATERIALS AND ALL WASTE RESULTING FROM CLEARING AND GRUBBING SHALL BE DISPOSED OF OFFSTE BY THE CONTRACTOR IN AN APPROVED WILD WASTE LANDFILL. 6. THERE IS EXISTING UNDERGROUND WATER. SEWER. ELECTRICAL. AND FIBER OPTIC ON-SITE OR WTHIN CLOSE PROXIMITY CONTRACTORS SHALL DIG NTH EXTREME CAUTION. 8 CONCRETE SUB SHALL BE RESPONSIBLE FOR ALL SCORE JOINTS AND EXPANSION JOINTS. SHOULD A QUESTION ARISE ABOUT THE PROPOSED PATTERN CONSULT WITH THE ENGINEER PRIOR TO POURING 9. CONTRACTORTOFURNI$H ALL PAVEMENT MARKINGS AS SHOWN. 10. LOCATION OF UNDERGROUND UTILITIES ARE APPROXIMATE AND MUST BE FIELD VERIFIED. CONTACT THE NC ONE CALL CENTER AT LEAST 48 HOURS PRIOR TO DIGGING B 1.800.632.4949. STEPHEN M. PUCKETT SURVEYING HAS ONLY LOCATED THE UTILITIES THAT ARE ABOVE GROUND AT THE TIME OF FIELD SURVEY UNDERGROUND LINES SHOWN HEREON ARE APPROXIMATE OR AS REPORTED By VARIOUS RESPONSIBLE PARTIES. THE SURVEYOR DOES NOT GUARANTEE THAT ANY UNDERGROUND STRUCTURES SUCH AS UTILITIES. TANKS AND PIPES ARE LOCATED HEREON. 11. ALL PIPE LENGTHS ARE HORIZONTAL DISTANCES AND ARE APPROXIMATE. 12. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL STANDARDS IMPOSED BY LOCAL UTILITY, ORANGE COUNTY. 13, ALL CONSTRUCTION AND MATERIALS SHALL MEET ORANGE COUNTY SPECIFICATIONS AND STANDARDS. LATESTEDITION ALL WORK WITHIN NCDOT RIGHT OF -WAY SHALL MEET THE SPECIFICATIONS AND STANDARDS OF NCDOT. 14. ALL CONCRETE PIPE ISM BE ASTM C-76, CUSS III NTH RANINEK 16THIS PROPERTY IS NOT LOCATED IN A FLOOD HAZARD ZONE PER FEMA MAP. FEMA COMMUNITY MAP t3710964500J, DATED 21277 16. ALL LOT DIMENSKNIS SHOWN ARE APPROXIMATE. CONSULT THE BOUNDARY SURVEY OF ACTUAL SITE BOUNDARY INFORMATION. 17. WETLANDS AND PONDS ARE NOT PRESENT WITHIN PROJECT SITE. 16 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK ZONE TRAFFIC CONTROL W OR ADJACENT TO NCDOT RIGHTOF-WAV. ALL SIGNS, PAVEMENT MARKINGS AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL 7EVICES (MUTCD), LATEST EDITION. 19 PRIOR TO PLACING CABC STONE BASE. THE CONTRACTOR SHOULD NOTIFY THE PROJECT ENGINEER TO INSPECT AND PROOF ROLL THE SUBGRADE. ANY STONE RACE WITHOUT PRIOR APPROVAL WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR 20. DESIGN/FIE LD CONDITIONS QUITE EASILY MAY VARY FROM THAT REPRESENTED IN THE INITIAL SOILS REPORT AND/OR TOPOGRAPHICAL REPORT. ISOLATED AREAS MAY SHOW UP WEAK AND ADVERSE SOILS OR GROUNDWATER CONDITIONS MAYBE DISCOVERED THAT WERE NOT REVEALED DURING THE INITIAL SOILS INVESTIGATION. THEREFORE. THE OWNEWCUENT IS TO BE AWARE THAT CURRY ENGINEERING GROUP, PLLC WILL NOT AND CANNOT BE HELD RESPONSIBLE FOR ANY FAILURES TO EITHER A STREET OR PARKING LOT PAVEMENT DESIGN UNLESS WE CAN BE FULLY AND TOTALLY INVOLVED IN THE CONSTRUCTION PROCESS WHICH MAY INCLUDE, BUT MAY NOT NECESSARILY BE LIMITEDDENSITY. TO, TESTING SUBGRADE AND BASE ENGAGING THE DESIGN ENGINEER FOR THE EVALUATION OF THE SUBGRADE AND FOR THE OBSERVATION OF PROOF ROLLING SUSGRADE AND BASE AT VARIOUS STEPS OF CONSTRUCTION. OPPORTUNITY FOR THE DESIGN ENGINEER TO CALL IN A SOILS ENGINEER FOR CONSULTATION AND ADVICE. ETC. - STEPS WHICH TAKEN ALTOGETHER WITH THE INITIAL DESIGN SHOWN ON THE NNS. CONSTITUTE THE COMPLETE DESIGN OF THE ROAD, STREET OF PARKING AREA (PRIVATE OR PUBLIC) THE DESIGN ENGINEER MUST BE GIVEN THE FULL LATITUDE AND OPPORTUNITY TO COMPLETE THE DESIGN BY FULLY PARTICIPATING IN THE CONSTRUCTION PROCESS. RAN DESIGN IS A SMALL PORTION OF THE DESIGN AND CANNOT BE SEPARATED FROM THE CONSTRUCTION PROCESS IF THE OWNER'SICUENTS DESIRE IS TO HAVE THE DESIGN ENGINEER STAND BEHIND THE COMPLETED DESIGNED PROJECT. 21. ALL UTILITY SERVICES. (POWER, TELEPHONE, CABLE, ETC.) ARE PROPOSED TO BE UNDERGROUND. DO NOT SEED OR MULCH DISTURBED AREAS UNTIL ALL UNDERGROUND UTILITIES HAVE BEEN INSTALLED. 22. REGULATORY SIGNS, STOPS SIGNS AND STREET NAME SIGNS SHALL BE MANUFACTURED FROM HIGH INTENSITY REFLECTIVE MATERIALS. 23. ALL EXCESS TOPSOIL AND UNCLASSIFIED EXCAVATION IS TO BE HAULED OFFSITE. UNLESS OTHERWISE DIRECTED BY THE OWNER. 24 ALL SITE CONSTRUCTION MUST BE INSPECTED BY THE PROJECT ENGINEER AT THE FOLLOWING STAGES: A. COMPLETION OF GRADING SUBGRADE PRIOR TO PLACING STONE BASE B.COMPLETION OF STONE PLACEMENT PRIOR TO PAVING. C. FINAL INSPECTION WHEN ALL WORK IS COMPLETE. 25. THE SURVEYOR DID NOT VISIBLY SEE ANY CEMETERIES IN ANY OPEN AREAS UNLESS OTHERWISE NOTED. 26. THIS PROPERTY DOES NOT DEPICT ENCUMBRANCES THAT ARE FOUND DURING A THOROUGH TITLE SEARCH. 27. ALL DIMENSIONS ARE TO FACE OF CURB UNLESS INDICATED OTHERWISE 28. ALL AREAS NOT COVERED BY BUILDING OR PARKING SHALL BE COVERED WITH 4- MINIMUM OF TOPSOIL. FREE OF ROOT MATTER AND ROCKS AND GRASSED Surveyor. Stephen M. Puckett, PLS 1555 NC 56, Suite 2 Creedmoor, NC 27522 Phone:919-528-6900 Contact: Stephen M. Puckett Email: pI&3991@gma1ODm Owner/Deve%per. NC Land Investments, LLC 314 West Millbrook Road, Suite 121 Raleigh, NC 27609 29. INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS AND FIELD CONDITIONS WHEN POSSIBLE. BUT THE CONTRACTOR MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL EXISTING UTILITIES BY DIGGING TEST PITS BY HAND AT ALL UTILITY CROSSINGS WELL IN ADVANCE OF TRENCHING. IF THE CLEARANCES ARE LESS THAN SPECIFIED ON THE PLANS OR 12 INCHES. WHICH EVER IS LESS, CONTACT THE PROJECT ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION 30 THE CONTRACTOR SIULL INCLUDE IN HIS CONTRACT PRICE THE REMOVAL AND DISPOSAL OF ANY EXCESS TOPSOIL HE DETERMINES IS NOT REWIRED TO PERFORM THE FINAL GRADING AND LANDSCAPING OPERATION. 31 THE CONTRACTOR W RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL REOUIREDMECESSARY SHEETING SHORING. AND SPECIAL EXCAVATION MEASURES REWIRED ON THE PROJECT TO MEET OSHA. FEDERAL. STATE AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF THE WORK INDICATED ON THE DRAWINGS ORANGE COUNTY. 6 CURRY ENGINEERING ACCEPT NO RESPONSIBILITY FOR THE DESIGN TO INSTALLSAID ITEMS 32. THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE DAILY RECORD KEEPING OF THE AS -BUILT CONDITION OF ALL OF THE UNDERGROUND UTILITIES. CONSTRUCTION STAKEOUTASSOCIATED NTH THE PROJECT. 33. THE LAND DISTURBANCE PERMIT MUST BE KEPT ON THE WORK SITE AND SHOWN UPON REQUEST 34. THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ANY DEWATERING NECESSARY TO CONSTRUCT THE PROJECT AS SHOWN ON THE PUNS. 35 TESTING BY CONTRACTOR: CONTRACTOR SHALL EMPLOY AT HIS EXPENSE AN OUTSIDE INDEPENDENT SOIL TESTING SERVICE (APPROVED BY THE ARCHITECT) TO PERFORM SOIL TESTING AND INSPECTION SERVICE FOR QUALITY CONTROL TESTING DURING EARTHWORK OPERATIONS. COPIES OF RESULTS OF TESTS SHALL BE SUBMITTED BY THE TESTING SERVICE DIRECTLY TO THE CONTRACTOR, THE ARCHITECT. AND THE STRUCTURAL ENGINEER -THE TESTING SERVICE WILL CLASSIFY PROPOSED ONSITE AND BORROW SOILS TO VERIFY THAT SOILS COMPLY NTH SPECIFIED REQUIREMENTS AND TO PERFORM REQUIRED FIELD AND LABORATORY TESTING. NIMUM REWIRED SOIL BEARING CAPACITY IS NOTED ON THE STRUCTURAL DRAWINGS . - IN PAVED AN (M ) EO D BUILDING SLAB AREAS, THE TESTING SERVICE SHALL MAKE AT LEAST ONE FIELD DENSITY TEST FOR EACH 2000 SQUARE FEET OF FILL IN EACH COMPACTED FILL LAYER. IF A TEST SHOULD FAIL TO MEET REWIRED DENSITY, THE CONTRACTOR SHALL RECOM PACT THAT LAYER. THE SOIL TESTING SERVICE SHALL PERFORM ADDITIONAL TESTS AT THE CONTRACTORS EXPENSE TO SHOW THAT THE FAILED LAYER HAS REACHED THE REWIRED COMPACTION. AN FOUNDATION WALL AREAS. THE TESTING SERVICE STALLMAKE AT LEAST ONE FIELD DENSITY TEST FOR EACH 100 FEET OR LESS OF WALL LENGTH OF FILL IN EACH COMPACTED FILL LAYER, WITH NO LESS THAN TWO TESTS ALONG A WALL FACE. IF A TEST SHOULD FAIL TO MEET REQUIRED DENSITY. THE CONTRACTOR SHALL RE -COMPACT THAT LAYER. THE SOIL TESTING SERVICE SHALL PERFORM ADDITIONAL TESTS AT THE CONTRACTORS EXPENSE TO SHOW THAT THE FAILED LAYER HAS REACHED THE REWIRED COMPACTION. 36 COMPACTION COMPACT EACH LAYER OF BACKFILL AND FILL SOIL MATERIALS AND THE TOP 12' OF SUBGRADE IN CUT AREAS TO 96% OF MAXIMUM DENSITY AS DETERMINED BY ASTM DM FOR STRUCTURES, SUBS, AND PAVEMENTS AND 95% OF MAXIMUM DENSITY FOR LAWNS OR UNPAVED AREAS. 37 ANY RELOCATION OF EXISTING UTILITIES WILL BE AT THE COST OF THE DEVELOPERIONNER THE COUNTY WILL NOT ACCEPT RESPONSIBILITY FOR DAMAGES TO CURB AND GUTTER OR STREET IMPROVEMENTS INSTALLED PRIOR TO UNDERGROUND SER.' LS, NOR WILL THE COUNTY ABSORB THE COST FOR BORINGS TO INSTALL UNDERGROUND SERVICE. PAVEMENT PATCHING OR DAMAGE TO LANDSCAPING. THESE WILL BE THE RESPONSIBILITY OF THE DEVELOPER/OWNER. 38EN . FIRE DEPARTMENT VEHICULAR ACCESS TO ALL STRUCTURES UNDER CONSTRUCTION SHALL BE PROVIDED AT ALL TIMES. IN AREAS WHERE GROUND SURFACES ARE SOFT OR LIKELY TO BECOME SOFT, WARD ALL WEATHER SURFACE ROADS SMALL BE PROVIDED 00 AAINT4INK - 39 10,0 . DISTURBED AREA IS IN EXCESS OF00SFAND F6"BEDIMENTATTON&EROSION CONTROLPW!APPROVAL WAS REWIRED ASA CONDITION OF CONSTRUCTION PUN APPROVAL A COPY OF THE APPROVED EROSION CONTROL PLAN MUST BE KEPT ON SIZE AT ALL TIMES. THE APPROVED SEDIMENTATION 6 EROSION CONTROL PIAN SHOULD BE REGARDED AS MINIMUM REQUIREM NTS. ADDITIONAL MEASURES SHALL BE PUT IN PLACE AS NEEDED TO ENSURE THAT NO SEDIMENT IS RELEASED FROM THE SITE. 40. COPIES OF ALL PEHMI IS AND APFRQED-PLANS MUSI BE kEt"ION'Bi1'EiN APEHMITSJR'TRAT 15 CUNSPK U'%SLY LOC AT ED AND EASILY ACCESSIBLE DURING CONSTRUCTION. THIS INCLUDES APPROVED CONSTRUCTION PUNS. APPROVED EROSION CONTROL PUNS. ENCROACHMENT AGREEMENTS. DRIVEWAY PERMITS, WATEWSENER PERMITS, ETC. 41. ALL CONSTRUCTION SHALL BE IN ACCORDANCE NTH ALL ORANGE COUNTY. NCDOT AND NCDENR STANDARDS AND SPECIFICATIONS DGC�CaM(� D 10 2016 DEO-WATER RE OUR S 401 & BUFFER P RM NOT FOR CONSTRUCTION ,'4l 0.A•,. V Z w Z O �W V Z O O cc Z O Z '2 _V Cz I I I I I I I I I I S 01°09'58" W 19.47' BILLY R. SHEPHERD Ln JUDY G. SHEPHERD Cj DB 5014/500 PB 24/73, TRACT 4 0 cn I I I LARRY F. WARREN DB 4492/571 I N PB 91/137, LOT 7 Ln \<� ( 1 0 �� ( 24" CMP _�-----�, o 24" RCP \ \ 1 INV.=637.94' \1 Y cn INV. -666.09' \ \ JAMES BRUCE RICHMOND PHILLIS B. RICHMOND DB 4168/209 PB 100/191, LOT 2 y o� 0 \! \ O \ C) O �O 24" RCP NV.=664.25' ----------------------- MATTHEW --------------- MATTHEW C. ROBERTS PATRICIA D. ROBERTS DB 1491/212 j PB 20/141, LOTS 7&8, BLK C I X24" CMP\ INV.=t37.4A' ll 1 -Io \ \1\ AREA=10.88 AC 10.01 NET \ VD, \ o \ \ I \ \I cf) I PAUL NICHOLAS PALOMBO LOT 3 \ \ I i DB 5907/457 493,763 SF \ \ I \ PB 72/46, TRACT 1 11.3352 ACRES 451.25' S 89°29'50" E I S 89'30'46" E 1124.89' AREA UNDER CONSIDERATION MAP KEV r ( N 20°26'28" W 1 \ 184.35' --f 673.39 1 I \ 78716'37"_ 1 O \ \ \ 6 \ 1 437,668 SF I 10.0475 \ \ I 5 474,287 SF 1 ACRES I I <� 10.8881 ACRES 1 626,413 SF 14.3805 ACRES \ 4 ( 1 1,013,517 SF \\ 23.2671 ACRES 1 I I I I I I I I I I S 01°09'58" W 19.47' BILLY R. SHEPHERD Ln JUDY G. SHEPHERD Cj DB 5014/500 PB 24/73, TRACT 4 0 cn I I I LARRY F. WARREN DB 4492/571 I N PB 91/137, LOT 7 Ln \<� ( 1 0 �� ( 24" CMP _�-----�, o 24" RCP \ \ 1 INV.=637.94' \1 Y cn INV. -666.09' \ \ JAMES BRUCE RICHMOND PHILLIS B. RICHMOND DB 4168/209 PB 100/191, LOT 2 y o� 0 \! \ O \ C) O �O 24" RCP NV.=664.25' ----------------------- MATTHEW --------------- MATTHEW C. ROBERTS PATRICIA D. ROBERTS DB 1491/212 j PB 20/141, LOTS 7&8, BLK C I X24" CMP\ INV.=t37.4A' ll 1 -Io \ \1\ AREA=10.88 AC 10.01 NET \ VD, 593.04' — — AREA=2.0 AC. M N 89'03'56" W 624.38' 3/4" ROD TARA CHARLEEN LAUGHTER IRREVOCABLE TRUST DB 2213/39 I 1 I � 1 \ I \ 1 \ I \ � I I 8 \ 458.516 SF 1 \ 10.5261 ACRES I 1 \ 1 1 I \ I 1 \ I I \ 1 9 I I I 459,027 SF \ I \ 10.5378 ACRES \ I II 1 \ \ L I \ \ �N I N 88'3329" W \ In 1\,\37.0� I I I III 89'32'27"W 316.64' cn li \'219.79' N 88'59'57" W 1 1\ CAPPED REBAR ROBERT HSIEN—CHIN LIN \ YU YEN LIN �� \ i ZN6u i \ \I 593.04' — — AREA=2.0 AC. M N 89'03'56" W 624.38' 3/4" ROD TARA CHARLEEN LAUGHTER IRREVOCABLE TRUST DB 2213/39 I 1 I � 1 \ I \ 1 \ I \ � I I 8 \ 458.516 SF 1 \ 10.5261 ACRES I 1 \ 1 1 I \ I 1 \ I I \ 1 9 I I I 459,027 SF \ I \ 10.5378 ACRES \ I II 1 \ \ L I \ \ �N I N 88'3329" W \ In 1\,\37.0� I I I III 89'32'27"W 316.64' cn li \'219.79' N 88'59'57" W 1 1\ CAPPED REBAR ROBERT HSIEN—CHIN LIN \ YU YEN LIN �� \ �tw y W N �/.�.�� ��+ {y. /q� SCALE I IN = 120 FT = VIV whaftbelo R 120' 60' 0 170' 240' /all befom you dig, SCALE IN FEET W HORIZONTAL NOT FOR CONSTRUCTION C'V1 i ZN6u i AREA UNDER CONSIDERATION MAP KEV SCALE -1 700' �tw y W N �/.�.�� ��+ {y. /q� SCALE I IN = 120 FT = VIV whaftbelo R 120' 60' 0 170' 240' /all befom you dig, SCALE IN FEET W HORIZONTAL NOT FOR CONSTRUCTION C'V1 I 1 Sa RICHMOND ROAD ROW II 1 1 j � R=IS I C C 1 1 I I I TR=I!PIE EXISTING 24- RCP ( 1 INTO SOUTH DITCH I I I I I I I I 660 675 670 665 m 650 645 635 9+75 10+00 RANGE. 10-WSAG _ T 3rCONIC FES - INV. OUT ELEV-M 00 INSTALL CLASS 2 RIP RAP OUTLET PROTECTION , MN 37 THICK OVER MRAFl 140 N UNER MN DIMENSIONS: A' WI . ITW2. 25LONG 17 EDGE OF GRAVEL TO EDGE OF GRAVE SEE SHEET D-01 FOR ROADWAY SECTION 57 ROW PROPOSED PROPERTY UNEJ PROPOSED GRAVEL ROAD PLAN VIEW STATION 9+755-17+50 C. -o2 SCALE: 1-=40 V -DITCH WITH 3'.1 SIDES UTILIZE STRAWWTHNETAS TEMPORARY LINER. NO PERMANENT LINER NEEDED STATION RANGE SAG -17.22 AND AROUND C -SAC i i 1 �PROPOSBDPROPERTYUE / R217 RW ROW V V-0ITCH WITH 3.1 / SIDES UTAUZE STRAW \ MATH NET AS A TEWPORMY LINER PROPOSED PROPERTY LNE \ \ r/ PROPOSED PROPERTY LINE N 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15400 f � PROPOSED GRAVEL ROAD PROFILE VIEW X r3 \ STATION 9+7517+50 C-02 SCALE: H-1-•40' V 1'=1' SCALE, W • 40 Fr D la 2a 0 10' Aa SCALE N FEET SCALE IN FEET VERTICAL HORIZONTAL IR RA STREAM �7 17)ALE BUFFER (SFFF TE 11j PERM. NRB ZONE 1 NO PRY. STREAM BUFFERIAPACT= TEMP. NR8 ZONE 1 AWPACT•76. 5071 SF BUFFERIMPACT= 1E11P SiRF.A11 366 SIF ALPACT•ta TEMP. NRB mME 2 BUFFER IMPACT • TEMP. NRB ZONE Z 100 SF ` BUFFER IMPACT= M � 120 SF F PERM NRB ZONE 2 \ BUFFER IMAP�CT= 1068 SF SF PERM NRB ZONE , BUFFER IMPACT= \ / 11015E \\� / \ TEMP. NRB ZONE 2 TEMP NRB ZONE 2 BUFFER IMPACT = BUFFER IMPACT= TEMP. NRB ZONE 1 100 SF 132 SF BUFFER IMPACT= 391 SF STREAM • MFUS[ RNFR RUffER IMPAR SUMMARY NMv PERM roTu STREAM LIFI 10 ]6 R6 Nmi l(NI 757 5071 6B2A Np7DNA1(SFj 453 3172 3624 2� STREAM & NEUSE RIVER BUFFER IMPACTS GRADING & DRAINAGE NOTES: seo 675 670 685 680 655 650 645 640 635 15+50 16+00 16+50 17400 17+50 1 BEFORE YOU DIG, STOP. CALL THE NC ONECALL CENTER AT BUFFER (SEE 1d0041324919. IT'S THE LAW. EXISTING UTIUTIES ARE SHOWN FROM SECTION (FES) tE 111 - gUFFTE�R PROPOSED CONTOUR V -DITCH NTH 31 SIDES. NOTE j1j_ -- PROPOSED UTIUZE NORTH AMERICAN - UTIUTY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST M HORS PROPERTY UNE GREEN (NAG) ERONET P3DO 2 ALL UTILITY WORK WITHIN THE PUBLIC RIGHT OF WAY OR PUBIC PERMANENT EROSION EASEMENTS SMALL BE TO NCOOT A ORANGE COUNTY STANDARDS AND CONTROL BLANKET 3 ALL PIPE LENGTHS ARE HORIZONTAL DISTANCES MEASURED CENTER (ALLOWABLE SHEAR OF STRUCTURE TO CENTER 6 STRUCTURE AND SHOULD BE STRESS=A.DpA OR EQUIVALENT 1 , AS PERMANENT DITCH NOTED ALL RPE SHALL BE INSTALLED HATH JOINT SEALANT SUCH AS 30- GONG. FES STA81LIZATION. STATION 5 INV. IN ELEV=637.32 RANGE. 10-WSAG _ T 3rCONIC FES - INV. OUT ELEV-M 00 INSTALL CLASS 2 RIP RAP OUTLET PROTECTION , MN 37 THICK OVER MRAFl 140 N UNER MN DIMENSIONS: A' WI . ITW2. 25LONG 17 EDGE OF GRAVEL TO EDGE OF GRAVE SEE SHEET D-01 FOR ROADWAY SECTION 57 ROW PROPOSED PROPERTY UNEJ PROPOSED GRAVEL ROAD PLAN VIEW STATION 9+755-17+50 C. -o2 SCALE: 1-=40 V -DITCH WITH 3'.1 SIDES UTILIZE STRAWWTHNETAS TEMPORARY LINER. NO PERMANENT LINER NEEDED STATION RANGE SAG -17.22 AND AROUND C -SAC i i 1 �PROPOSBDPROPERTYUE / R217 RW ROW V V-0ITCH WITH 3.1 / SIDES UTAUZE STRAW \ MATH NET AS A TEWPORMY LINER PROPOSED PROPERTY LNE \ \ r/ PROPOSED PROPERTY LINE N 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15400 f � PROPOSED GRAVEL ROAD PROFILE VIEW X r3 \ STATION 9+7517+50 C-02 SCALE: H-1-•40' V 1'=1' SCALE, W • 40 Fr D la 2a 0 10' Aa SCALE N FEET SCALE IN FEET VERTICAL HORIZONTAL IR RA STREAM �7 17)ALE BUFFER (SFFF TE 11j PERM. NRB ZONE 1 NO PRY. STREAM BUFFERIAPACT= TEMP. NR8 ZONE 1 AWPACT•76. 5071 SF BUFFERIMPACT= 1E11P SiRF.A11 366 SIF ALPACT•ta TEMP. NRB mME 2 BUFFER IMPACT • TEMP. NRB ZONE Z 100 SF ` BUFFER IMPACT= M � 120 SF F PERM NRB ZONE 2 \ BUFFER IMAP�CT= 1068 SF SF PERM NRB ZONE , BUFFER IMPACT= \ / 11015E \\� / \ TEMP. NRB ZONE 2 TEMP NRB ZONE 2 BUFFER IMPACT = BUFFER IMPACT= TEMP. NRB ZONE 1 100 SF 132 SF BUFFER IMPACT= 391 SF STREAM • MFUS[ RNFR RUffER IMPAR SUMMARY NMv PERM roTu STREAM LIFI 10 ]6 R6 Nmi l(NI 757 5071 6B2A Np7DNA1(SFj 453 3172 3624 2� STREAM & NEUSE RIVER BUFFER IMPACTS GRADING & DRAINAGE NOTES: seo 675 670 685 680 655 650 645 640 635 15+50 16+00 16+50 17400 17+50 1 BEFORE YOU DIG, STOP. CALL THE NC ONECALL CENTER AT PROPOSEDLFIARED END 1d0041324919. IT'S THE LAW. EXISTING UTIUTIES ARE SHOWN FROM SECTION (FES) THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THE EASTINGCONTOUR CONTRACTORS RESPONSIBILITY TO VERIFY THESE AND OTHER PROPOSED CONTOUR UTAITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY PROPOKEDD SPOT LOCATING COMPANY (ONE CALL @ IMM324949) OR INDIVIDUAL ELEVATN UTIUTY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST M HORS IN ADVANCE. 2 ALL UTILITY WORK WITHIN THE PUBLIC RIGHT OF WAY OR PUBIC EASEMENTS SMALL BE TO NCOOT A ORANGE COUNTY STANDARDS AND SPECIFICATIONS. 3 ALL PIPE LENGTHS ARE HORIZONTAL DISTANCES MEASURED CENTER OF STRUCTURE TO CENTER 6 STRUCTURE AND SHOULD BE CONSIDERED APPROXIMATE. 1 STORM DRAINAGE PIPING SMALL BE CUSS IN RCP UNLESS OTHERWISE NOTED ALL RPE SHALL BE INSTALLED HATH JOINT SEALANT SUCH AS RAM -NEN. 5 INVERT ELEVATIONS SHOWN ARE TO THE FLOW UNE OF THE PIPE UNLESS OTHERWISE NOTED. e PRE -CAST CONCRETE DRAINAGE STRUCTURES ARE ACCEPTABLE PROVIDED THE ARE IN ACCORDANCE YOUTH NCDOT STANDARDS. 7 CONTRACTOR SHALL RAISE ALL STRUCTURES TO FINISHED GRADE ELEVATIONS M ALL STORM DRAIN STRUCTURES AND PIPE SHALL BE CLEANED OF SEDIMENT AND DEBRIS PRIOR TO ACCEPTANCE BY ORANGE COUNTY. 9 ALL RIP -AP IS TO BE INSTALLED NTH NON -WOVEN FILTER FABRIC BENEATH (MIRAFI 14ON OR APPROVED EQUAL). 10 WHERE PROPOSED EDGE OF PAVEMENT CONNECTS TO EXISTING, CONTRACTOR SHALL MATCH EXISTING ELEVATION AND CREATE A SMOOTH TRANSLPFMI.. 11 PER A STREAM DETERMINATION PERFORMED BY ORANGE COUNTY STAFF ON AUGUST 16. 2016, THIS STREW IS SUBJECT TO THE BUFFER RULES. BASED ON CALCULATIONS PRESCRIBED BY ORANGE COUNTY LIDO FIGURE $.13.138. MS SECTION OF STREAM REWIRES AN Aa BUFFBL, EA 9DE. CALCULATED SLOPE VALUE -11% SITE I DRAINAGE LEGEND PROPOSED STORM DRAM LAE ® PROPOSEDLFIARED END SECTION (FES) EASTINGCONTOUR -176- PROPOSED CONTOUR ® PROPOKEDD SPOT ELEVATN NOT FOR CONSTRUCTION �w I . THE TEMPORARY DIVERSION DITCHES, SILT FENCE, AND UMTS OF DISTURBANCE SHOWN ON THIS PUN ARE GRAPHICAL REPRESENTATIONS OF THE ACTUAL EROSION CONTROL MEASURES THAT WILL BE INSTALLED UNDER THIS PROJECT. 00 TO THE SCALE OF THIS DRAVANG, THESE MEASURES ARE GRAPHICALLY DEPICTED BEYOND ME RE THEY WALL ACTUALLY BE INSTALLED IN THE FIELD. 2 DIST AREA = 1.73 AC 1 ANY GRADING BEYOND THE DENUDED UMTS SHOWN IN THE PUN S A VIOLATION OF THE ORANGE COUNTY EROSION CONTROL ORDINANCE 81S SUBJECT TO A 4 GRADING MORE THAN 13.000 SF WITHOUT AN APPROVED EROSION CONTROL RAN IS A VIOLATION OF THE ORANGE COUNTY EROSION CONTROL ORDINANCE & S SUBJECT TO A FINE. D . . REFER 5. ALL AREAS MUST BE SEEDED 8 MULCHED WITHIN 7 v 11 CALENDAR DAYS. REFER TO EROSION CONTROL DETAILS AND EROSION CONTROL ORDINANCE FOR ADDITIONAL REOUIREMENTS. 0, SILT FENCE IS TO BE INSTALLED A "'OF S FROM FILL SLOPES 7. A PUMP -AROUND IS REOUIRED PRIOR TO WORKING M THE ACRVE STREAM. SEE DETAILS FOR ADDITIONAL INFORMATION. 1 INSTALL CLEAN DITCH BYPASS To AVOID DRAINING TO SED I / 1 BASIN. THESE MUST BE REMOVED AT THE END OF THE I PROJECT NTH DISTURBED 1 INSTALL CLEAN DITCH BYPASS INSTALL HORSESHOE INLET PROTECTION. AREA REGRADED AND SEEDED / SILT FENCE TYP / BASINOID DIVINING TO SED O I SEE SHEET D02 FOR DETAIL (TVP. ALL CLEAN DITCH BYPASS IBR UTILIZE PROPOSED DRAINAGE SWAIES). 3 DITCH FOR EROSION CONTROL ' CUT PROPOSED DRAINAGE DITCH � ` i►N » �. » / ��F 1f�� AROUND CUL-0ESAC AND TIE INTO _ %ISRNG DRAINAGE DITCH T Tm� ...� ...:�o ( -oma ,Z ;, CONSTRUCTION ENTRANCE / I 1 INSTALL CLEAN DITCH BYPASS) INSTALL STRAW � \ ' TO AVOID DRAINING TO SED WATTLES EVERY NA . ` O `LIMTS OF DISTURBANCE I BASIN ASSHOWN 1 I INSTALL SILT FENCE \ OUTLINE IN STREAM AT I J INITIAL PHASE OF II CONSTRUCTION REMOVE \ S) WITH INSTALLATION of PIPE AND OUTLET I PROTECTION, TEMP. SEDIMENT BASIN SCHEDULE BASIN TYPE MIN. LkNJO' WOR LENGTH NOTES STMW wmE —FMMF�i IOa3DYi S SEE EC DETAILS FOR ADDITIONAL I SEDIMENT BASIN (SEE PUN FOR f INFORMATION ACTUAL "RE) 101301/5 SEE EC DETAILS FOR ADDITIONAL 3 SEDIMENT BASIN (SEE RAN FOR IT INFORMATION ACTUAL SUPE( 17,3311.5 SEE EC DETAILS FOR ADDITIONAL 1 SEDIMENTBASIN IE (SEE PLAN FCR f INFORMATION ACTUAL SHAPE) ISA10q.S SEE EC DETAILS FOR ADDITIONAL 1 SEDIMENT BASIN (SEE RAN FOR f INFORMATION II ACTUAL WARE) LEGEND: NOT FOR CONSTRUCTION IC'O3 )NSTMIC11G11ENTPNICEE%Il .«wjm TEAvauml>fvERsaNlsrw ` STMW wmE —FMMF�i .LT FENCE gSTWMNtE LIMITS OiEMR SED TRAP 34 ar ENCEamE NOT FOR CONSTRUCTION IC'O3 A� SCALE.I IN 40 FT Q 13 0 IV IV SCALE IN FEET HORIZONTALLU O '°�y-�f0 Z z w L GJO�•� NOT FOR CONSTRUCTION IC'O3 � � in:�•tA"E ALTERNATETEA1 walls Y ..• 1 trek. <C-1 7 Pum SLOPE T b TYPICAL ROADWAY SECTION SECTION CLASS B' PRIVATE ROAD L' d,j SCALE: NTS 4 REFER TO RIP -RAP DETAIL gS SHEET �r��II 7I END VIEW GENERAL NOTES. IL. - THE LENGTH OF THE RIP RAP APRON 2. d • 15 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN S'. 7. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF r ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. A. A FILTER BUNK ET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 5FLARED END SECTION IS OPTIONAL. SEE PUNS FOR REQUIREMENT. 8 SEE PLAN AND PROFILES FOR ACTUAL DIMENSIONS. 7. STONE SHALL BE INSPECTED AFTER EACH RAINFALL EVENT ED . DISLOCATSTONE SHALL BE REPLACED IMMEDIATELY AND ANY SCOUR OR ERODED AREAS SHALL BE REPAIRED IMMEDIATELY 3 PIPE OUTLET PROTECTION SCAE: NTS GRAM Q RADE +pFyU' G GEOBEMBRANE 'd r SINDBAGS DISTURBED AREA PUN VIEW SECTION A -A I DESCRIPTION THE WORK SHALL CONSIST OF INSTALLING A PUMP AROUND WHEN CONSTRUCTION ACTMTIES TAKE PUCE WITHIN THE STREAM CHANNEL II MATERIAL SPECIFICATKKJS SANDBAGS: SANDBAGS SHALL CONSIST OF MATERIALS WHICH ARE RESISTANT TO ULTRAVIOLET RADIATION, TEARING AND PUNCTURE. AND WOVEN TIGHTLY ENOUGH TO PREVENT LEAKAGE OF FILL MATERIAL e. SAND. FINE GLUVEL. ETC.) NI. CONSTRUCTION REOUIREMENTS I. ALL EROSION AND SEDIMENT CONTROL DEVK:ES SHALL BE INSTALLED AS THE FIRST ORDER OF WORK 2. THE HEIGHT OF THE SANDBAGS SHALL BE AS INDICATED IN SECTION MA. THE SANDBAGS SHALL BE PLACED ON A SMOOTH PREPARED SURFACE. 5 ALL EXCAVATED MATERIALS SHALL BE DISPOSED OF OUTSIDE THE 100 YEAR FLOOD PAIN UNLESS APPROVED ON THE PUNS. A. ALL DEWATERING OF THE CONSTRUCTION AREA SHALL BE PUMPED TO A DEWATERING PUMP DISCHARGE FILTER BAG OR SILT BASIN S THE PUMP SHALL BE OF SUFFICIENT SIZE TO CONVEY NORMAL STREAM FLOW S. SEDIMENT CONTROL DEVICES ARE TO REMAIN IN PUCE UNTIL ALL DISTURBED AREAS ARE STABILIZED AND THE COUNTY ENGINEERING DEPT APPROVES THEIR REMOVAL 4 \ TEMPORARY CREEK PUMP AROUND GENERAL NOTES: I SEE FORMER NCDOT STANDARD 71001 FOR DETAILS. 2 REINFORCEMENT SHALL CONFORM TO THE REQUIREMENTS OF REINFORCED CONCRETE PIPE OF LIKE DIAMETER PER AASHTO MI70. TABLE 2. WALL B. 5 ALL CONCRETE TO BE 78110 PSI COMPIR SSNE STRENGTH. A. PROVIDE TONGUE OR SPIGOT JOINT AT INLET END SECTION 5. PROVIDE GROOVE OR BELL JOINT AT OUTLET END SECTION. 8. THE DIMENSIONS FOR END SECTIONS SHALL SUBSTANTIALLY AGREE WITH THE=. MINOR VARIATIONS WALL BE PERMITTED BASED ON THE MANUFACTURERS STANDARD FORMS AND TEMPLATES. 7. NOT TO BE USED IN NCDOT MAINTAINED RIGHT OF WAY. 2 FLARED END SECTION D 01 SCALE: NTS \�' ' SCALE NTS i '� 1 i NOT FOR CONSTRUCTION v, 1• Lu 0 Lu to EROSION AND SEDIMENTATION CONTROL NARRATIVE PROJECT DESCRIPTION TM pupose ol this wi ed a for grating 6 Mapamoma. The Project a owed by NC Lid Investments. LLC. The sM a arterpJ not ocopaid Approsnhete/y, 1.73.rs ail be dsbrbed dngcunifiri t n. The msnun N ad be 2.3 fast The preped a scheduled to begin camtrutbon in summer 20% win protect carpNlon and hhal slebif7aUan by summer 2016 The erosion and sediment carkol pogrom for 0. Rioted a* include We intaletion of e -table creo-udam, esrca. 5111 fence and trot praMcbn. ADJACENT PROPERTY A*-* paperly owners aro noted on the EXerg Conditions sheet SOILS Ther wit at tib sea, we snay teem EROSION AND SEDIMENT CONTROL MEASURES AN vapeeema and structural eroson and seraent cotta pe 2ces shall be wns ted end mrteaed by the wnradw rcmbg to Owe Plans and spwf ribons and the mMamm standards ofthe Dept of EmmaneMN Mnepmert Lend Guilty Se tion and! Orange County . The contractor Yell sh , falow any edd6SW ,.q.-wb as od .it by IM Project Ergoeer. STRUCTURAL PRACTICES 1 Vehicle whset Yet be clen when h.rg Uro site to prevent the trading of mud on pavad roads. 2 Construction Road Stb1ssibm Consrudicn traffic and be traded to stabilized areas At a maamum, a temporary gravel cambsxon antrrci OW be provided as ern.- on this dnsig. 3 SlIFerhce: Sill bmm Yhsl be Wwdad vA shown ends horded n to staph. Theea brava stW he used to cite, sedaN,af d Rip ReprevY Fi11r Sediment Sum Construct besn to the shape and dnnssurs dorm in the detail. The bawls b to be placed below the nvMing di Lbw ata by 2' with the barn belt above as timereised VEGETATIVE PRACTICES Temporary Seeding Al dwvded ares shat reroie temporary seedirg wan 7 r 11 drys of cooplevV iwal am*-*. Temporary searing shai also be osed to Yeblize Mistred grade eras if the time of year is adsida the specified psmsert wed,%permits. Temporary seeding shall be in accordance with a^lory seeding speefcabore SEEDING: TYPE I SEEDING (LAWNS OR OTHER FOCAL AREAS) 100 LBS. OF ORAE 20 LBS. OF 10 -XI -2008 20 LBS. OF 10 -I0 -101N COMBINATION HATH 1 LBS OF 046-0 5 LBS. OF TALL FESCUE, CONTAINING A BLEND OF 2 OR MORE TALL FESCUES 1LB. OF KENBLUE OR KENTUCKY BLUEGRASS 1 LB OF MINTER ANNUAL RYE (NOVEMBER 1 TO MARCH 1) TYPE II SEEDING (GENERAL OR LOW MAINTENANCE AREAS) 100 LBS. OF LIME 75 LBS. OF 10-20-20 OR 15 LBS. OF 10 10,10 IN COMBINATION WITH 3 LBS. OF 0-16,0 1 USS. OF TALL FESCUE, CONTAINING A BLEND OF 2 OR MORE TALL FESCUES 1 LB. OF SERICEA LESPEDEIA NSE UNSCARIFIED SEED AUGUST 15 TO FEBRUARY 1) LB. OF GERMAN MILLET (MAY I TO AUGUST 15) 1 LB. OF RYE GRAIN (PRIOR TO MAY 1 OR AFTER AUGUST 15) SEEDING MIXTURES OTHER THAN THOSE LISTED ABOVE MUST BE APPROVED BY THE NCDENR INSPECTOR PRIOR TO SEEDING MANAGEMENT STRATEGIES 1. Perinhebr nheasues ra to be MWW prior b ad Vubbirg or grin. 2 Stodpfe emNr waYe ares mel he nu harmed sate, the nam d lbs eras prolaMdby the proposed e measurand otherwise temporarily seeded Of to be left smckpded over 7 s 11 calerdar drys. 3. Come.1bn shelf be Purred W that Fading operations M begin era sit se We ly s possible 1 Sif Farces and hes Protract- hem. shed wta also be ed prior to or as. W Yep ncoriAucdn 5. The Contractor shall be reynsbb for the iuWl.tion and mYntronea d a erosion and sadmat contra pra0b- VepNMrva Ground Cover Immdistely Atowog Wi dig, tat eras she move Nher Parmarwl or temporary seeding. as gpkc" 6 As. rswmm raparmnt all graded areas not Under pit~ and %thin the righter -way andrar statements steel be prepared, frblized and hired. sardad, and mutMd OnveadMaty,p. cmpten of comhctin as kilows (Apactahan rete PER 1.0)0 SQUARE FEET)'. MAINTENANCE: 1. Reseed and mala bare spat agar than 9 square feel OONibd to 5%memrm of Me ars.) 2 MarAYn euniform seeded ars ufil m surd a eeceplable 3. K Worth a nit established by Mel Mpd inspection, continue specWed Mention until the stand a.coephble t. Caned NOW repair N undue s*%ane rasion when, 1 year "" frld i specticn. 5. Remove from tl-siet,allar- pool fah Ira, Mw ornplMa stabdndion Y and of conshvibon period. 6. Remove sit ham sediment pits and tom ban nd dhsk ow Mnen ad a WYb Nell depth ofthe pt or spiMay, Dispose of in an was where sit carrhd ,e -soft pfhap. CALCULATIONS: The Fred" tined for the proposed site did not require l anal caloutattns. OWNER. NC Land Investments , LLC, 311 W Millbrook Road Sufe 121, Raleigh, NC 27609 EROSION CONTROL NOTES/CONSTRUCTION SEQUENCE: 1 Obtain roslon control plan approval per No beginning Isld dslubence RMaln carr.a copy d the approved rosbn crtol pan and permit n sib. CN We Carly to no* the Impeclr d • slrl data pear b lard dYubarca. Contact n trmatin a n the M -4, pram mheeeg a ropasd prior to n&" construction 2 Contrucl the corermboin"o"ce s Yawn tithe plan. MeinMih it. -*.,b. eNhtrance daily to enure that mud and sill ail not be racked orb ft paved sulecet mud a racked onto tl-rood shrfeca, t a to be removed remediably 3. Comimc r, entrance Iocetion may not wry Without prior approval h in Enges r taand! city impactor. L. Cher the arse needed to ooretrud the parnMer rose n control measures ndudig dwsiqu dlcMs and ditch cheeks. Erosion control meneus downstarn of at pp. 00 1, nemeh nVia. ulv pfnrrer ma,area ere alsbd'¢ed. 5 Baps cog, Wubbig. and topsn *W g kr mi deny. 7 Rayls pada the lie. 1 9. Comniud the stem seas system throuysW be aped Mewl Net protection darts. 10. Seed, strew eea ew and d ars bard the cub and quitter t quitter re Waded k thea hal Ab spo n. 11 Cunha Courtly Impoctr forinspection pnr to remove of rsion cr►ol nearraa 12. Upon stebdaide , of seeded arm and approve from Orange county. remove welts and any remaining erosion card daces. \ 13. Said. erserndb ImO ereavrnpemporedarees. \ I MAINTENANCE NOTES: WITHOUT APPLYING TEMPORARY SEEDING 2 MAINTAIN ALL EROSION CONTROL MEASURES DAILY AND RESEED DISTURBED AREAS AS NEEDED. 3 INSPECT ALL EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RAINFALL EVENT. REPAIR AS NEEDED. 1 AT THE END OF EACH DAY'S STORM DRAINAGE OPERATION. CONSTRUCT A TEMPORARY PPE INLET PROTECTION DEVICE UNTIL THE NEXT DAY'S OPERATION CONTINUES 5 SEDIMENT REMOVED FROM BASINS SHALL BE PERFORMED WITH TRACK HOE FROM TOP OF EMBANKMENT DO NOT PUCE EQUIPMENT AT BOTTOM OF SLOPE AND DO NOT ENCROACH UPON WETLAND OR BUFFER AREAS. z 11 NMN J GENERAL NOTES'. 1 INSTALL CONSTRUCTION ENTRANCE OVER EXISTING ASPHALT TAKING CARE TO AVOID DAMAGE AS EXISTING ASPHALT IS TO BE OVERLAYED PRIOR TO PROJECT COMPLETION 2. INSTALL A I' LAYER OF SOL OVER EXISTING ASPHALT. 3 INSTALL A GEOTEXTILE LINER OVER NEWLY PLACED SOIL. A PUCE THE GRAVEL OVER THE GEOTEXTLE LINER TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS. AND SMOOTH IT. 5. PROVIDE DRAINAGE TO CARRY WATER TO A SUITABLE OUTLET 6. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING W12 INCH STONE CONSTRUCTION ENTRANCE Q02 SCALE. NTS CUSS I RIP RAP (SEE SECTION TNRU BASIN BELONQ ` \ RW RAP HEADWALL ////////// IIIIIIIII •`^•, // / / �-0WTAt1CK. TONE HIGH MINIMUM SEDIMENT STORAGE AREA PERSPECTIVE VIEW SECTION THRU CATCH BASIN, FILTER AND CULVERT PIPE 2 HORSESHOE INLET PROTECTION D-02 SCALE NTS ///I/ /I/I /I/./I/I/l. 1 =11 II II II -11 II II 11-11-II=u II -II .II. II. II..11. II II 11..11..11 II. II. 1111=11.11=ILII=u-n-R=II=��= 9 TEMPORARY DIVERSION D O2 SCALE NTS NPDES STABILIZATION TABLE Site Arno Description SlabiuOn I Tmaker-Evcaptmn Prnetar dill s, sweles. dill es and Popes 7 days None High OsltY Wats (NON Zones 7 date None Skps YsperWn 3'.1 7days Mskpas taw ldrlann length and aro not Yespr ten 2 T 11 drys era abaad. Slops 3:1 or Misr 11 days 7 days kr Pops grants in- Sit On trglh N other eras with slopes Mr tl,n 1:1 N days Nom. a cept Ir perimeters rd NQW ZaNw 4 NPDES STABILIZATION TABLE D O2 SCALE. NTS FILTER 6' MAX. "' HIRE FABRIC MAX WITHOUT ORE)) �(e' MIDDLE AND VERTICAL VIRES COMPACTED HALL BE 12 111 GAUGE MIN. FILL ROT LIT $TEEL POST -7 DEPTH NAR.,:.:.. FILTER FABRIC TOP AND BOTTOM STRAND EXTENSION OF FABRIC AND SHALL BE 10 GAUGE MIN. ME INTO TRENCH NOTES: 1 CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED Hf ABOVE THE GROUND SURFACE. 3 INSTALL THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. MEN JOINTS ARE NECESSARY. SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH OVERLAP TO THE NEXT POST 1 SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY ME STAPLES AT LEAST 1' LONG, OR TIE WIRES. EXTEND THE NAPE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF IO APART SUPPORT POSTS SHOULD BE DRIVEN SECURELY IN TO THE GROUND TO A MINIMUM OF 24' 6 EXTRA STRENGTH FILTER FABRIC WITH B POST SPACING DOES NOT REWIRE WARE MESH SUPPORT FENCE. STAPLE OR WIRE THE FILTER FABRIC DIRECTLY TO THE POSTS. 7 EXCAVATE A TRENCH APPROXIMATELY Y'WIDE AND WDEEP ALONG THE PROPOSED LINE O POSTS AND UPSLOPE FROM THE BARRIER 8. BACKFILL THE TRENCH WITH COMPACTED SOIL OR GRAVEL PLACED OVER THE FILTER FABRIC. 9. DO NOT ATTACH THE FILTER FABRIC TO EXISTING TREES 10 LOCATION OF TEMPORARY SEDIMENT FENCE SHOW! ON THE RAINS IS NOT EXACT. CONTRACTOR SHALL FIELD LOCATE TEMP. SEDIMENT FENCE AS CLOSE TO THE DOWMSLOPE EDGE OF THE UMTS OF CLEARING 6 GRUBBING AS SPACE ALLOWS 5 SILT FENCE D 02 SCALE NTS SEDIMENT STORAGE NATURAL AREAS TOBE DISTURBED RIP RAP GRIND (CUT, FILL E\ /'ROOD STORAGE ZONE (\ HEADWALL b PLOW _T PPE w �J �✓7.�"� CS y 2 � i INVERT '... 15' "S .ITER CUSS I RIP -RAP MAXIMUM SEDIMENT (CLEAN OUT POINT) DEPTH AS WASHED STONE SECTION THRU CATCH BASIN, FILTER AND CULVERT PIPE 2 HORSESHOE INLET PROTECTION D-02 SCALE NTS ///I/ /I/I /I/./I/I/l. 1 =11 II II II -11 II II 11-11-II=u II -II .II. II. II..11. II II 11..11..11 II. II. 1111=11.11=ILII=u-n-R=II=��= 9 TEMPORARY DIVERSION D O2 SCALE NTS NPDES STABILIZATION TABLE Site Arno Description SlabiuOn I Tmaker-Evcaptmn Prnetar dill s, sweles. dill es and Popes 7 days None High OsltY Wats (NON Zones 7 date None Skps YsperWn 3'.1 7days Mskpas taw ldrlann length and aro not Yespr ten 2 T 11 drys era abaad. Slops 3:1 or Misr 11 days 7 days kr Pops grants in- Sit On trglh N other eras with slopes Mr tl,n 1:1 N days Nom. a cept Ir perimeters rd NQW ZaNw 4 NPDES STABILIZATION TABLE D O2 SCALE. NTS FILTER 6' MAX. "' HIRE FABRIC MAX WITHOUT ORE)) �(e' MIDDLE AND VERTICAL VIRES COMPACTED HALL BE 12 111 GAUGE MIN. FILL ROT LIT $TEEL POST -7 DEPTH NAR.,:.:.. FILTER FABRIC TOP AND BOTTOM STRAND EXTENSION OF FABRIC AND SHALL BE 10 GAUGE MIN. ME INTO TRENCH NOTES: 1 CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED Hf ABOVE THE GROUND SURFACE. 3 INSTALL THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. MEN JOINTS ARE NECESSARY. SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH OVERLAP TO THE NEXT POST 1 SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY ME STAPLES AT LEAST 1' LONG, OR TIE WIRES. EXTEND THE NAPE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF IO APART SUPPORT POSTS SHOULD BE DRIVEN SECURELY IN TO THE GROUND TO A MINIMUM OF 24' 6 EXTRA STRENGTH FILTER FABRIC WITH B POST SPACING DOES NOT REWIRE WARE MESH SUPPORT FENCE. STAPLE OR WIRE THE FILTER FABRIC DIRECTLY TO THE POSTS. 7 EXCAVATE A TRENCH APPROXIMATELY Y'WIDE AND WDEEP ALONG THE PROPOSED LINE O POSTS AND UPSLOPE FROM THE BARRIER 8. BACKFILL THE TRENCH WITH COMPACTED SOIL OR GRAVEL PLACED OVER THE FILTER FABRIC. 9. DO NOT ATTACH THE FILTER FABRIC TO EXISTING TREES 10 LOCATION OF TEMPORARY SEDIMENT FENCE SHOW! ON THE RAINS IS NOT EXACT. CONTRACTOR SHALL FIELD LOCATE TEMP. SEDIMENT FENCE AS CLOSE TO THE DOWMSLOPE EDGE OF THE UMTS OF CLEARING 6 GRUBBING AS SPACE ALLOWS 5 SILT FENCE D 02 SCALE NTS Y YW. STONE SECTION GENERAL NOTES: 1 Clear, 9mb. aha ship Na arae undeWm under We amb llmiaof all reparation and root mm at Remove ruff surhd sal -ruianirg high wrouMs of or9- mestar std saeckpile or dispose of it property Hata all ob) tiombki materal to she desgraed disposal area. 2 Emus that N me enal for me embaskmark is mss of most, woody vegetation, organic meta,. and odw objectionable nmtarisl. Plruca be fill in life not b .read 9 inches and mash nrnpd A 0." NI ON. - 8 inodas a allow M rtlbnww 3. Construct da oudet aetion n i a ambsni-t. p- fa corca tion WNnen the rprop and da sod from piping by ushg filer fabric or • keyway .00 tranrl, between are nprap serutira end dM orf. Platy Ahs filer fabric between M npres and sod. Ederd the fabric across da spillway foundation and sides to Oa tap of da dam', or Erie a byway trench akcg d- cerate ne of the apilway foundation Gidand g W to Was to da Mte height of M m. TM banch should be at least 2 R deep arid 2 R wide with 1'.1 side Yopare I. Clear fa pond erns below fa eleveaon of also rein of fa spillway as fadliee wdmsnt aear-ad 5. All rt and fillelopm, snood be 2:1 a dollar. 6 Enna that d- sten» (dmarhape) se tion of thisambsnkmant he. a minrerm bottsm width of 3 ft. and a msrirrim aide sbpera of I'.1 art estarhd No tl- bottom or In spillway seson. 7 Cnatruet tla manam Misled Ina apdWar Dotbm width. , slows n a- plans. with 21 side Mopes sending b the by of Over over Alled a yseniun, Keep d- dcb-a, of da eadwe of Ina spatwity oudet edhmsre at s n-tmam of 21 michisa. The ver hart be level and oonstrucbd m pada to asaue designppssy. 8 Maternal used n M sans s..Aon MbuM he • wwlf-predsd miter. of sten- vett a d sin o19 ind,es Idea, 8- mnaml esrr ve r.wnanrda l) and a mrs-era- size of 14 in ne. m my. The some be mhMhm Plaosd and d- snneller aeMs worked into the vada of f- tang, abros. The stem er-ld be hard. anpntsr, n,0 highly wsd--resit nt 9. Emhra that the Was 1hptNey oulat seson arlwds dowra►wn past the lie of the arreanio ant wNU stable condition are reached and outlet velocity a aocapebks M dr raosivieg stream. Keap mnedges of da Mia .= setior, dull with dr o-hrd eurdrg groand shape d- career b fins, he rAMw sdsm (Rate-, O.IW Proft aon). 10. Dead ... gwmy byes b mi -I. Mable .tea.. Lope hypes oudest so that Lbw wil not demwge she ambsMar-,w 11. Stabilize this, On bsnkm-nt and all daNbad wars above IM sdm nng pool and dowameam tern Me dap aryrn drably sites consT tion (Reianmps: Surface Stabilization), 12. Show We distance from M by of f- spilw-y No ft aadkmhamt deencul level (0-1had tM design, depth) on aha pbr-aha mark t in da field 8 TEMPORARY SEDIMENT TRAP D '2 SCALE NTS NOT FOR CONSTRUCTION V Z L�w Z O U LUZ O Q cz Z O r� ct 4 gl 3' SEE EROA'yv Ownwx PLAN FOR ACTUAL Ri DIMENSCWS CLEAN -WT STAKE I3' b w �J �✓7.�"� CS y 2 � i '... SET CLEAN -WT "S .ITER ' STAKE AT 1/2 RT VOLUME 1.1 -. FA9R/C CROSS SECT/ON EMERQWCr BY-0AA 6' BELOW OIERFTIL 6' SETTLED OESICiJ Fite S I`TUF EWT MP a DAM SET1[ED 17Aa ER090N CWiR(X. PLAN FOR ACTUAL PIT DIMOVSOVS § a' Illy. ,•. FK7ER FAdQK H��.i4 !' 1 I SLOE NA TURK .. ,3'�Ws� sae MAx ' _ 65eamn Y YW. STONE SECTION GENERAL NOTES: 1 Clear, 9mb. aha ship Na arae undeWm under We amb llmiaof all reparation and root mm at Remove ruff surhd sal -ruianirg high wrouMs of or9- mestar std saeckpile or dispose of it property Hata all ob) tiombki materal to she desgraed disposal area. 2 Emus that N me enal for me embaskmark is mss of most, woody vegetation, organic meta,. and odw objectionable nmtarisl. Plruca be fill in life not b .read 9 inches and mash nrnpd A 0." NI ON. - 8 inodas a allow M rtlbnww 3. Construct da oudet aetion n i a ambsni-t. p- fa corca tion WNnen the rprop and da sod from piping by ushg filer fabric or • keyway .00 tranrl, between are nprap serutira end dM orf. Platy Ahs filer fabric between M npres and sod. Ederd the fabric across da spillway foundation and sides to Oa tap of da dam', or Erie a byway trench akcg d- cerate ne of the apilway foundation Gidand g W to Was to da Mte height of M m. TM banch should be at least 2 R deep arid 2 R wide with 1'.1 side Yopare I. Clear fa pond erns below fa eleveaon of also rein of fa spillway as fadliee wdmsnt aear-ad 5. All rt and fillelopm, snood be 2:1 a dollar. 6 Enna that d- sten» (dmarhape) se tion of thisambsnkmant he. a minrerm bottsm width of 3 ft. and a msrirrim aide sbpera of I'.1 art estarhd No tl- bottom or In spillway seson. 7 Cnatruet tla manam Misled Ina apdWar Dotbm width. , slows n a- plans. with 21 side Mopes sending b the by of Over over Alled a yseniun, Keep d- dcb-a, of da eadwe of Ina spatwity oudet edhmsre at s n-tmam of 21 michisa. The ver hart be level and oonstrucbd m pada to asaue designppssy. 8 Maternal used n M sans s..Aon MbuM he • wwlf-predsd miter. of sten- vett a d sin o19 ind,es Idea, 8- mnaml esrr ve r.wnanrda l) and a mrs-era- size of 14 in ne. m my. The some be mhMhm Plaosd and d- snneller aeMs worked into the vada of f- tang, abros. The stem er-ld be hard. anpntsr, n,0 highly wsd--resit nt 9. Emhra that the Was 1hptNey oulat seson arlwds dowra►wn past the lie of the arreanio ant wNU stable condition are reached and outlet velocity a aocapebks M dr raosivieg stream. Keap mnedges of da Mia .= setior, dull with dr o-hrd eurdrg groand shape d- career b fins, he rAMw sdsm (Rate-, O.IW Proft aon). 10. Dead ... gwmy byes b mi -I. Mable .tea.. Lope hypes oudest so that Lbw wil not demwge she ambsMar-,w 11. Stabilize this, On bsnkm-nt and all daNbad wars above IM sdm nng pool and dowameam tern Me dap aryrn drably sites consT tion (Reianmps: Surface Stabilization), 12. Show We distance from M by of f- spilw-y No ft aadkmhamt deencul level (0-1had tM design, depth) on aha pbr-aha mark t in da field 8 TEMPORARY SEDIMENT TRAP D '2 SCALE NTS NOT FOR CONSTRUCTION V Z L�w Z O U LUZ O Q cz Z O r� ct 4 gl CIRLEJt • ERASION CONTR0. NIII,cEr IECSI WOOD STAKE AEC -EA SRMW weTnes • MAINTENANCE: INSPECT COMPOST SOCKS WEEKLY MO AFTER EACH SIGNIFICANT SECTION VIEW RAINFALL EVENT (1/2 INCH OR GREATER). REMOVE ACCUMULATED • • V . • SEDIMENT AND ANY DEBRIS. THE COMPOST SOCK MUST BE REPLACED IF CLOGGED DR TORN. IF PONDING BECOMES • EXCESSIVE, THE SOCK MAY NEED TO BE REPLACED WITH A LARGER DIAMETER OR A DIFFERENT MEASURE. THE SOCK NEEDS TO BE REINSTALLED IF UNDERMINED OR DISLODGED. THE COMPOST SOCK SHALL BE INSPECTED UNTIL LAND DISTURBANCE IS COMPLETE AND • THE AREA ABOVE THE MEASURE HAS BEEN PERMANENTLY • STABILIZED. IsoMETRIc vlEw NORTH AMERICAN GREEN EROSION CONTROL Products Guaranteed SOLUTIONS mrllla CONSTRUCTION SPECIFICATIONS: - I MATERIALS USED IN THE COMPOST SOCK MUST MEET THE SPECIFICATIONS OUTLINED ABOVE AND IN PRACTICE 8.13. C COMPOST BUNK ETS NOTA,- OTA:A. 2 COMPOST SOCKS SHOULD BE LOCATED AS INDICATED ON THE EROSION AND SEDIMENTATION CONTROL PUN. ' A.TRASLAPES Y JUNTAS 3 PRIOR TO INSTALLATION, CLEAR ALL OBSTRUCTIONS INCLUDING ROCKS. CLODS. AND OTHER DEBRIS GREATER THAN S NOTES: ONE INCH THAT MAY INTERFERE NTH PROPER FUNCTION OF THE COMPOST SOCK. !( 7 4 COMPOST SOCKS SHOULD BE INSTALLED PARALLEL TO THE TOE OF A GRADED SLOPE. A MINIMUM OF 10 FEET ) TOP OF SILT FENCE BEYOND THE TOE OF THE SLOPE. SOCKS LOCATED BELOW FLAT AREAS SHOULD BE LOCATED AT THE EDGE OF THE , MUST BE AT LEAST 1' LAND -DISTURBANCE. THE ENDS OF THE SOCKS SHOULD BE TURNED SLIGHTLY UP SLOPE TO PREVENT RUNOFF FROM ABOVE TIED GOING AROUND THE END OF THE SOCKS STONE THE WASHED S1lkE 5FILL SOCK NETTING UNIFORMLY WITH COMPOST TO THE DESIRED LENGTH SUCH THAT LOGS DO NOT DEFORM. 8 OAK OR OTHER DURABLE HARDWOOD STAKES 2"X 2' IN CROSS SECTION SHOULD BE DRIVEN VERTICALLY ASEGURAR LAS MANTAS CORRECTAMENIE. PLUMB, THROUGH THE CENTER OF THE COMPOST SOCK. STAKES SINXAD BE PLACED AT A MAXIMUM INTERVAL OF 4 F � WLEr • FEET, OR A MAXIMUM INTERVAL OF 8 FEET P THE SOCK IS ACED IN A 41NCH TRENCH. PER DETAIL. THE STAKES ET SHOULD BE DRIVEN TO A MINIMUM DEPTH OF 12 INCHES, WITH A MINIMUM OF 3INCHES PROTRUDING ABOVE THE '. COMPOSTSOCK 7 IN THE EVENT STAKING IS NOT POSSIBLE P.E., WHEN SOCKS ARE USED ON PAVEMENT) HEAVY CONCRETE BLOCKS SHALL BE USED BEHIND THE SOCK TO HOLD IT N RACE DURING RUNOFF EVENTS. Low 3 IF THE COMPOST SOCK IS TO BE LEFT AS PMT OF THE NATURAL LANDSCAPE. IT MAY BE SEEDED AT TIME OF UREACE INSTALLATION FOR ESTABLISHMENT OF PERMANENT VEGETATION USING THE SEEDING SPECIFIOA TION IN THE EROSION AND SEDIMENTATION CONTROL RAN CHANNEL INSTALLATION 14649 HIGHWAY 41 NORTH t S'•'• K4VJ EVANSVILLE, IN 47725 C PUNTOS CRMCOS NOTA,- OTA:A. o'- Oji-✓��� �- 9 COMPOST SOCKS ME NOT TO BE USED IN PERENNIAL OR INTERMITTENT STREAMS. j STRAW WATTLE (COMPOST SOCIA D, SCALE: NTS 8" 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's). INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL–O–SEED DO NOT SEED PREPARED AREA. CELL–O–SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE RECP's IN A 6" 15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30 CM) OF RECP's EXTENDED BEYOND THE UP–SLOPE PORTION OF THE TRENCH. ANCHOR THERECP's WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMAPCT THE TRENCH AFTER STAPUNG. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF RECP's BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) ACROSS THE WIDTH OF THE RECP's. 3. ROLL CENTER RECP's IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. RECP's WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP'a MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM �, STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE RECP's END OVER END (SHINGLE STYLE) WITH A 4" – 6" (10 CM –15 CM) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4' (10 CM) APART AND 4" (10 CM) ON CENTER TO SECURE RECP's. 5. FULL LENGTH EDGE OF RECP's AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6' (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT RECP's MUST BE OVERLAPPED APPROXIMATELY 2' – 5" (5 CM –12.5 CM) (DEPENDING ON RECP's TYPE) AND STAPLED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 M – 12 M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4' (10 CM) APART AND 4' (10 CM) ON CENTER OVER ENTRE WIDTH OF THE CHANNEL 8. THE TERMINAL END OF THE RECP's MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NOTE: • IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR THE RECP's. NOTE: A CRITICAL POINTS • HORIZONTAL STAPLE SPACING SHOULD BE ALTERED B C A OVERLAPS AND SEAMS IF NECESSARY TO ALLOW STAPLES TO SECURE THE B. PROJECTED WATER UNE CRITICAL POINTS ALONG THE CHANNEL SURFACE. C. CHANNEL BOTTOM/SIDE •• IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6" (15 cm) MAY q BE NECESSARY TO PROPERLY ANCHOR THE RECP's. B t S'•'• K4VJ C PUNTOS CRMCOS NOTA,- OTA:A. A.TRASLAPES Y JUNTAS • LA SEPARACION HORIZONTAL DE LAS GRAPAS SE DEBE ALTERAR NOTES: B. UNEAS DE AQUA PROYECTADA SI SE NECESITA, PARA PERMITIR DUE LAS GRAPAS ASECUREN LOS I. SLOPE STABILITY AND MATTING SHAT BE REGULARLY MONITORED, C. FONDO DEL CANAL/VERTICES PUNTOS CRITICOS A LO LARCH DE LA SUPERFICIE DEL CANAL, ESPECIALLY AFTER RAN EVENTS. ADDITIONAL SNAIL BE IN STATED TO REPLACE DAMAGED ON MI NG MATBNG MATERIAL TAS PENDIENTES LATERALES ..EN CONDICIONES DE SUELO SUELTO, PUEDE DUE SE NECESITEN UNTIL VEGETATION HAS BEEN PROPERLY ESIABUSHED AND SITE IS ACCEPTED. O GRAPAS 0 ESTACAS DE MAS DE 6' (15 CM) DE LARGO PARA ASEGURAR LAS MANTAS CORRECTAMENIE. C NORTH AMERICAN GREEN EROSION CONTROL Products G.o—t-d SOLUTIONS 14649 HIGHWAY 41 NORTH EVANSVILLE, IN 47725 SDO-772-2040 .nagrsen.com CMN - , SILT FENCE FRONT VIEW STEELBURY RE FENCE FENCE FILTERWIFABRIC, POST SETT AND HARDWARE MAX 2 CLOTH IN TRENCH APART MN IS' WTO SOLID NOTES. GROUND 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. 2 STD. SILT FENCE OUTLET Q03 SCALE. NT.S SLOPE INSTALLATION SECTION AEW 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTIUZER, AND SEED. NOTE: WHEN USING CELL-0–SEED DO NOT SEED PREPARED AREA. CELL–O–SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP's IN A 6' (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF RECP's EXTENDED BEYOND THE UP–SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP's WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPUNG. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12' (30 CM) PORTION OF RECP's BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12' (30 CM) APART ACROSS THE WIDTH OF THE RECP's. 3. ROLL THE RECP's (A) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. RECP's WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM` , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL RECP's MUST BE STAPLED WITH APPROXIMATELY 2" – 5" (5 CM – 12.5 CM) OVERLAP DEPENDING ON RECP's TYPE. 5. CONSECUTNE RECP's SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" V7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE REC '9 WID NOTE: IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE RECP's. 3 NAG P300 REINFORCEMENT MAP D-03 SCALE ITS NOT FOR CONSTRUCTION t S'•'• K4VJ >R STEEL FENCE POST I rJr WARE FENCE a \ HARDWARE CLOTH \ 9/zq(r� D-03 O FILTER OF N57 \\\ WASHED STONE 7 FILTER FABRIC 'ON GROUND / \ BURY WARE FENCE AND BURY F OF UPPER EDGE OF R HARDWARE CLOTH FILTERFABRIC IN TRENCH S i SECTION AEW 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTIUZER, AND SEED. NOTE: WHEN USING CELL-0–SEED DO NOT SEED PREPARED AREA. CELL–O–SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP's IN A 6' (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF RECP's EXTENDED BEYOND THE UP–SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP's WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPUNG. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12' (30 CM) PORTION OF RECP's BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12' (30 CM) APART ACROSS THE WIDTH OF THE RECP's. 3. ROLL THE RECP's (A) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. RECP's WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM` , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL RECP's MUST BE STAPLED WITH APPROXIMATELY 2" – 5" (5 CM – 12.5 CM) OVERLAP DEPENDING ON RECP's TYPE. 5. CONSECUTNE RECP's SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" V7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE REC '9 WID NOTE: IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE RECP's. 3 NAG P300 REINFORCEMENT MAP D-03 SCALE ITS NOT FOR CONSTRUCTION t S'•'• K4VJ I � � – O 02497 _ C7 W 9/zq(r� D-03