Loading...
HomeMy WebLinkAbout20061376 Ver 1_More Info Received_20080523M u L1 EY Po Box 331 27 RALEIGH, NC 27636 PHONE: 919-B51-1912 FAx: 919-B51-1918 LETTER OF TRANSMITTAL To: Cyndi Karoly NC DENR/Division of Water Quality, Wetlands Unit 1650 Mail Service Center, Raleigh, NC 27699-1650 From: Harold Brady (919) 858-1804 Re: Reinforced Earthen Slope Inspection Report I am sending you the following item(s): Job No Date Oto - 1$1to May 23, 2008 "HAND DELIVERY" 2007169.00 COPIES DATE NO. DESCRIPTION 1 5/23/08 Reinforced Earthen Slope Inspection Report with 3 figures, engineer approval letter, and digital photos. These are transmitted as checked below: ® As requested ? For approval ? For review and comment Remarks: ? For your use ? For Signatures 0 r=1 (7- MAY 2 3 2008 u DENR - WATER QUAU1?' WETLANDS AND STORMWATER BRANCH Ms. Karoly, Enclosed is the Reinforced Earthen Slope Inspection Report for the past year. This represents the first annual report of the required three. Harold Brady RR@99W[RR DENR • WATER QUAD 1'w WETLANDS AND STORMWATER BRANCH MuLKEY May 23, 2008 Ms. Cyndi Karoly NCDENR/Division of Water Quality Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Re: Annual Inspection of the Reinforced Earthen Slope on the Novartis V&D campus in Holly Springs, Wake County, North Carolina (DWQ Project # EXP 06-1376) Dear Ms. Karoly: Mulkey Engineers & Consultants, Inc. (Mulkey) has been retained by Novartis Vaccines and Diagnostics (Novartis) to prepare an annual report summarizing the inspection and maintenance events associated with the south reinforced earthen slope structure from April 17, 2007 to May 12, 2008. The annual inspection reports are required by the North Carolina Division of Water Quality (NCDWQ) Section 401 water quality certificate (DWQ Project # EXP 06-1376) issued for the Novartis project on September 29, 2006. This report is meant to summarize observations, issues, and maintenance conducted on a weekly basis since construction. Photos of the reinforced slope are attached to this letter report. A. Project Description The south reinforced earthen slope is located on the southern side of the Novartis campus in Holly Springs, North Carolina (Figures 1 and C JSK-8). It was built to minimize jurisdictional stream impacts on the subject property where a vaccines manufacturing plant is currently under construction. According to Qore Property Services (Qore), the slope was constructed utilizing approved fill material placed in 9-inch lifts, with two rows of lifts comprising each row of metal baskets (Figure 00-C-60-99-2). At the completion of each row, the top was dressed with topsoil to ensure acceptable root growth from the sowed grass seed. This reinforced earthen slope was completed and approved by Qore on April 3, 2007 (attached). Weekly inspections of the reinforced earthen slope were conducted by Jacobs Engineering Qacobs) beginning the week of April 16, 2007 and continuing to the present. These annual inspection reports are required by the NCDWQ per special condition #8 in the water quality certificate issued on September 29, 2006. This special condition requires that the structure be built per manufacturer's guidelines and that inspections will occur (at a minimum) monthly for the first 6 six months and quarterly thereafter for three years. Documentation during each inspection includes any structural failings, significant mortality of cover vegetation, and descriptions of any repairs. NCDWQ has also requested that photos taken at regular intervals be provided, along with the dates of all inspections. B. Inspections Below is an outline of minor issues that were observed and noted during the inspection events for the past year according to inspection documentation provided by Jacobs. No issues were observed and no significant rain events occurred during the weeks that are not referenced below. May 21, 2007 - Additional matting was placed along the edges of the reinforced slope up to the adjacent rip-rap channel. June 3, 2007 - No issues were reported with the reinforced south slope following 1 MULKEY INC. 6750 TRYON ROAD CARY. NC 27511 PO BOX 33127 RALEIGH. NC 27636 PH: 919-051-1912 FAX: 919-851-1916 WWW.MULKEYINC.COM May 23, 2008 Page 2 '/2 inches of rain. • The site received 3 1/4 -inches of rain on June 28 and 29, 2007 with no issues concerning the reinforced slope reported. • July 18, 2007 - The berm at the top of the slope washed out resulting in an erosion rut down the side of the slope. These issues were the result of a 2 5/8-inch rain event (measured onsite) on July 17. As a result the berm was immediately repaired, the rut was filled and the area reseeded. • July 31, 2007 - Rip rap was placed along both sides of the reinforced slope after a 1 1/4-inch rain event on July 30 created a few areas of erosion. • September 17, 2007 - The site received a 2'/4 -inch rain event with no issues on the reinforced south slope. • Over four days between September 24 through 27, 2007 the site received 4 1/4 - inches of rain; however, no issues were reported for the reinforced slope on September 27 from these large rain events. • December 17, 2007 - The site received 1 '/z-inches of rain with no issues concerning the reinforced slope reported. • December 31, 2007 - The site received 2-inches of rain with no issues concerning the reinforced slope reported. • March 4, 2008 - The site received 1 inch of rain with no issues concerning the reinforced slope reported. • The site received 1 '/2-inch of rain on March 7 and 8, 2008 with no issues concerning the reinforced slope reported. • April 7, 2008 - Repairs (including the placement of rip-rap and matting) were made to an eroded area immediately east of the reinforced south slope. This area of erosion was caused by the 1-inch of rain received on April 5 and 6. • The site received 2-inches of rain on April 20 through 22, 2008 with no issues concerning the reinforced'slope reported. • 1-inch of rain was reported for both weeks beginning April 5 and April 12, 2008 with no issues concerning the reinforced slope reported. Due to the severe drought conditions experienced throughout 2007, achieving adequate grass seed growth for the purposes of erosion control was extremely difficult. Major conventional reseeding efforts on the south reinforced slope occurred on July 27 and September 21. These were unsuccessful in generating enough grass to adequately avoid potential erosion issues due to the combination of a lack of rain and hot conditions. Therefore, Novartis employed the use of a cotton fiber mulch placed atop the ungermanated grass seed to help hold the moist content longer. This seeding occurred on October 8, 2007 and was successful; thereby, avoiding any additional reseedings. C. Conclusions The inspection data from April 2007 through April 2008 demonstrates that though there have been a few minor erosion issues there have been no major failings of the south reinforced earthen slope structure. All issues have been dealt with and attended to immediately following observation, as is protocol for all erosion issues on the Novartis project site. If you have any questions concerning this inspection report regarding the south reinforced slope structure on the Novartis campus, please do not hesitate to call me at (919) 858-1804. May 23, 2008 Page 3 Sincerely, Harold M. Brady Project Scientist cc: Lee Willmon, Novartis - Holly Springs, NC Amer Takieddine, Jacobs - Cinncinati, OH Bill Jay, Jacobs - Holly Springs, NC Attachments Figure 1 Figure C JSK-8 Figure 00-C-80-99-02 Qore Approval Letter Site Photography Vicinity Map Campus Site Plan South Reinforced Slope Plan & Section { I q P,r V ? v Y - ?tffIle aea ?, `?• ?? t ?t /?, e v? Wi, eM. z a k a r• '•.y r t r 1 r" - ?., . ' ?j f n ,:• - ovaitis Campus J Nr7 ??- - - - - :? °. 5 r, f??'l fl{` l?/1? ? C u , _? rl I? I?l ?+j. ?n' ? .4 _. ?I - r } ? <?'?!' ?. .-???,`-, ?/ ? ?' '/ - ? s• i f1 ?fp , I? :, ,? ?.?? I„ `,, t :,? _,?', i ?-rimer--??i ?% ?y ??" 4c .. i• .?-t i ?I ?? 15" ',,, J,"} 711 r v tir ? _r. • , /, l Q I qty ?'?? v ??. Item ?t 11 J? - (r o 1 r.<. ?j +l Holl3' S nn?? P 11 / t •? t4ale? _ ?i ?? ,- .. ? n .V?`_ -.,?.. ,, (?. ._;"•. ? 'r? ';? I l -/_ ,,I t, °yC. Tank ? A" v \?\ " i`. ;,.;(17 ?'i I ,i' rt -?1 / ?' i t ?Cem ?;,\J,-.. cam I r/1 i J,? /. ? i' ._f?` --c- •c ?I 1? ?' •y.• - - ?, l / I ? • ' % ? ?l r ? j? ! ? ? r, ' \ I I I V ?,J ..i /f lyt% ?t j ?, .. ,''j •I '. 1`i ' ^l.1 /'/ _ I. - /?"r` ) (;` ?i t?+(471 + 1' f -a, J l . ea_" ,? C , i •e _ R2Qio Tvw+er- j 13 : _I J t- /' 43 1. 1 -. r r?ali ` '/ (.':'/'I, t t?'%li l'`_\ ?'1 rrJ "' ;%f/a r 1 ?•'?D/< - }I L1'?' ,.,, .u 440• - Q • ' f, c.?Y ,t S I S ^ `•. 1, •\. ` / _ ?,\_. - o-v J J _ '...? •-w, ?';` \.6„ •? 1`\ 1t . ? l f ,' t _,. ^, .. ?? '% J//?, \-??Ib ?.1? / `?._...?.V/? ,:1117 '?I `--?--'- ,?.1,5 " , ?.j ?.?,\.Jt_ .lam f/;/`. ,f^ 'v l? l ? -I ??? .v ? ?`• \t. - I/ - b rf' y / 'G .< ?. ti, l/ •O .t.r-j<= ?'? _ r t l,r ,- it ? ? I,': ?,. r ?,// ?:.a? / q? /?' '; kill "-t '; d/ i? - ?i"'!•: ?? ,I r 4 i 447 -?5?? ? / I ... ?.._ .`.?- - 'ry7.. ?K?? } ...? I ?• I ?? f 1 J t /o.. I !m. ? - I f'-•\/ f .rte \5 ;., , , , .'. j. t? rr ( ?j n I ,I ? .?,,, :. ?'? i t'. r, t ? ?t- •' c• Cam`` - Q?? f115)/- J f y 1 }} Cam ; aM (, I •, ,, ?? ;.,,. ? r\:,:..-,? I,. ,,IrJ , ., ?r?-.._?`? ' ? ._'?=? f .,I,^S ',! r',??" ??..'1_' -'1• sk. ? .. / ?' ? ? t.;??' , 442 Prepared For: VICINITY MAP N 1 inch equals 2,000 feet 1,24,000 00 2 0 6 00 Figure Novartis Campus 0 00 3,000 4,000 5,000 0 1,0 , , Feet M U L K E Town of Holly Springs S h T ource: Maptec errain Navigator Pro Version 7.01 Wake County, North Carolina USGS Topographic Quads -- New Hill and Apex 1 r i a N O O yy AAA C ? ? V O Ol O O '1 1 ?j I - l fA 4. W n u ? ? r +m JACOBS D o ? O a m om N o ? m T R A ?T ?T O T tl) N cm w 01 L 1 \ 1 1\ l ? ENGINEERING to a W 4560 NORTON ST. MSZ-100 1880 WAYCROSS RD. 0 L ? N EMERYVILLE' CA 94608-2916 CINCINNATI, OW 45240 o N m S CONTACT: DEANA DEARBORN (TEL) 510-923-3569 CONTACT: AMER TAKIEDDINE a (FAX) 510-652-6059 (TEL) 513-595-7402 N A (FAX) 513-595-7909 A m ----------------------------------- > n o rrrl ' a IHI DOCUME I ONIAI OPRIEIA Y NFO MAIIONOF NOVARIIS AND 151ENUEREUSUB ECI TOII ll JAI BE RETAINED IN CONFIDENCE: IBS NOT BE REPRODUCED OR COPIED IN WHOLE OR IN PART: / ? III r ¦ 8 i m n s I IHEIN (RUMEN DEVIC AND SY IEM REPRESENIED THEREBY A UAL INFORMATION RELATING IMEREIO OR INCORPORATED M ANY PRODUCT EXCEPT UNDER EXPRESS WRITTEN AGREEMEM 11111 NOVARHS. --------------------------------- I I f . i % fFl > ?w a? a ?I ?i ?? z p FUG ? "A< z fir 2? O > b ?9i Y o I? a N? > m n o m '----------------? -----VIII.--------------VIII. ----------------- n AA 11 wi as 1 I I x . 0 E PROPERTY SCINCES April 3, 2007 Jacobs Engineering 1880 Waycross Road Cincinnati, OH 45240 Attention: Mr. Samuel Beach Subject: Report of South Reinforced Earth Slope Novartis USFCC Project Site Jacobs Project No. 22C01 15A PSA No. 22C01130-S90-0504, Task Order No. 04 Holly Springs, North Carolina GORE Job No. R-2360-04; Report No. 126630 Dear Mr. Beach, 21ftwo MAY23 !"# 2008 BRANC?j RD 8 DENR - WATER QUAUTY WETIANDS AND STORMWATER BRANCH Representatives of QORE observed the construction of the south reinforced earth slope on a full- time basis as the work progressed. Our scope of services entailed an evaluation of the soil subgrades prior to fill placement, observation of the wire-basket placements, observation of the geogrid placement, and in-place density testing of the fill materials. The structural fill materials were generally placed in 9-inch lifts (two lifts per row of baskets) and the steps formed by the baskets were topped with topsoil. Field reports were prepared on a daily basis as the work progressed and these reports are submitted under separate cover. In summary, it is our opinion that the work described above complies with the requirements of the project Drawings and Specifications based on our professional judgment from field observations, field tests, and limited laboratory tests conducted by QORE. One must not interpret our findings as a guarantee of the entire work product. Sincerely, ao, esa QORE, INC. SEAL David T. Cunningham, PE Senior Geotechnical Engineer=,% ; .G? ?`? QI ? map ??•?m CU /???/111Itfl???, Cc: Mr. Bill Jay Thomas B. Baird, PE Geotechnical Engineer 2521 Sehieffelin Road, Suite 128 1 Apex, North Carolina 27502 1919.363.9899 (p) 919.363.7916 (f) Novartis South Reinforced Earthen Slope Holly Springs, Wake County k ?? t rYY f. ?p 2.LL May 3, 2007 - Looking north from Temporary Sediment Trap 45 toward reinforced slope. Page 1 of 4 1. April 17, 2007 - Looking east toward recently constructed south reinforced slope. Novartis South Reinforced Earthen Slope Holly Springs, Wake County 3. June 7, 2007 - Looking north at the base of the reinforced slope. Page 2 of 4 4. July 3, 2007 - Looking east toward reinforced slope. Novartis South Reinforced Earthen Slope Holly Springs, Wake County . `N ar r S - c °4 pp y 1% y 's .rtyF ???? tY A: ? r,y - a 9 N h?"c ? R ff ;a.. location of the former outfall for the french drain system. Page 3 of 4 5. August 31, 2007 - Looking east toward reinforced slope. Novartis South Reinforced Earthen Slope Holly Springs, Wake County ,x rt, ? S r ? (a r dtt.?? I 5 I r -s, a= ,t , ? Y ,} .. ?3u3kvb.Iy&? ?.a. J Y 8. May 19, 2008 - Looking north toward rip-rap placed along edge of reinforced slope. Page 4 of 4 7. February 18, 2008 - Looking northwest from rip-rap channel toward reinforced slope.