Loading...
HomeMy WebLinkAbout20071995 Ver 1_More Info Received_20080527K STV/Ralph Whitehead Associates 1000 West Morehead Street. Suite 200 Charlotte. North Carolina 28208 (7041372-1885 fax:(704)372-3393 May 5, 2008 Via FEDERAL EXPRESS North Carolina Division of Water Quality Winston-Salem Regional Office 585 Waughtown Street Walston-Salem, NC 27107 'i MAY 0 b 2008 11 Attention: W Sue Homewood Subject- ` Res o to Request for Additional Information Dear Ms. Homewood, artley Drive Widening and Extension City of High Point, Guilford County, NC NCDWQ #07-1995 USACE Action I.D. #2006-20795 STV/RWA Project No. 3202000 ?R@ffluwgp MAY 2 7 2008 DENR - WA1 EFL QUAVn yyETLANDS AND STORMWASER BRANCH This letter has been prepared to address the request for additional information that has been received fiom the North Carolina Division of Water Quality (NCDWQ regarding the above referenced project. A response to each of the requests that were made is presented. A copy of the letter requesting the additional information that has been received is attached to this response letter. 1. Please submit a copy of your proposed stormwater management plan. The plan should include drawings to indicate the location of the proposed stormwater treatment systems. A copy of the proposed Stormwater Management Plan (SWMP) and associated drawings indicating the location of the proposed stormwater treatment systems as well as design calculations is presented in Attachment A - Stormwater Management Plan. A narrative describing the SWMP was previously included within the Supplemental Information provided as part of the Section 404 permit application. The narrative has been updated to reflect the latest drawings and is included in Attachment B, beginning on page 4 of 12. Additional engineering an enzployee-owned company providing quality service since 1912 plans indicating the location of the proposed stormwater treatment systems and the grading detail is presented in Attachment E - Engineering Plans. 2. As discussed during afield visit on January 29, 2008, please submit a detailed on- site mitigation plan. You currently proposed meeting some of your mitigation requirements with a stream relocation/restoration and wetlands creation adjacent to the project. The Division will need a detailed mitigation plan, including plan views, profiles, planting plans, and monitoring proposal, in order to complete our review. Please note that we discussed that the stream relocation will require a 50 foot protected buffer, except where it is directly adjacent to the roadway. We also discussed that the mitigation areas will need to be legally protected in perpetuity. A detailed on-site mitigation plan including plan views, profiles, planting plans, and monitoring proposal is submitted as Attachment F - Mitigation Plan. A 50- foot buffer will be been placed around the relocated stream and mitigation area, except where it is directly adjacent to the roadway. This additional protected area will be purchased by the City of High Point and the deed placed in a conservation restriction to protect the area as a stream and wetland in perpetuity. 3. As discussed during a field visit on January 29, 2008, please revise your application to include all temporary impacts that will be associated with utility relocations. A description of temporary impacts associated with utility relocations has been included in Attachment B - Supplemental Information on page 9 of 12, and in Attachment C - Figures, Figures 8 and 12. This attached Supplemental Information replaces the Supplemental Information originally designated as Attachment B in the Individual Permit application that was submitted on November 20"', 2007. Please note, that as a result of final design efforts, the overall impact numbers have been slightly revised from the initial permit application submittal and depict an increase of 0.027 acre of additional wetland impacts, and 20 linear feet of additional stream impacts. Changes in the Supplemental Information are highlighted. 4. Please provide the Division with a copy of your response to the USA CE public comments received. A copy of the response letter to the USACE public comments received is attached along with the letter from the Wildlife Resources Commission in Attachment D - Public Comment/Response. 5. Please provide a profile view and cross section of all the proposed stream culverts. A profile view and cross section for all the proposed stream culverts is attached (Attachment C - Figures 10 and 11). 6. Please note that if there is to be any additional impacts to wetlands or streams from Sediment and Erosion Control measures, those temporary impacts must be included in the permit application. The impacts to streams and wetlands resulting from the Sediment and Erosion Control measures is depicted in Attachment C - Figures 6, 7, and 8 and is quantified in Attachment B - Supplemental Information, Tables 1 and 2. This attached Supplemental Information replaces the Supplemental Information originally designated as Attachment B in the Individual Permit application that was submitted on November 20th, 2007. There are no temporary impacts. Please do not hesitate to contact either of the undersigned at 704-372-1885, if you have any questions. Sincerely, STV/RALPH WHITEHEAD ASSOCIATES, INC. Brandon Phillips, C.H.M.M. Sr. Environmental Specialist Attachment A Attachment B Attachment C Attachment D Attachment E Attachment F - Stormwater Management Plan - Supplemental Information - Figures - Public Comment/Response - Engineering Plans - Mitigation Plan i3 j Michael A. Iagnocco, P.W.S. Senior Scientist cc: Keith Pugh, P.E., City of High Point Ian McMillan, DWQ Andy Williams, USACE ATTACHMENT A STORMWATER MANAGEMENT PLAN STORMWATER MANAGEMENT DESIGN STUDY AND EROSION AND SEDIMENT CONTROL HARTLEY DRIVE WIDENING AND EXTENSION HIGH POINT, NORTH CAROLINA April 17, 2008 Prepared By: Edward Vance, P.E. Md Kamrul Huda, E.I. Heather Bryant, E.I. C A R ESSip- ?_•. olk 9 •a S A;r' 0 2 A 388 ?. %F •;? i STV/RALPH WHITEHEAD ASSOCIATES, INC. CHARLOTTE, N.C RWA No. 3202000 • • STORMWATER MANAGEMENT DESIGN STUDY AND EROSION AND SEDIMENT CONTROL HARTLEY DRIVE WIDENING AND EXTENSION HIGH POINT, NORTH CAROLINA April 17, 2008 Prepared By: Edward Vance, P.E. Md Kamrul Huda, E.I. Heather Bryant, E.I. a ;' % MPS ?, ? ,?yptfiK PAR V p?NR?9g?d? iC A R 0 'FESS16 ?•4O y•,y .a SEAL 9r 0 93 8 _- . ob 0 STV/RALPH WHITEHEAD ASSOCIATES, INC. CHARLOTTE, N.C RWA No. 3202000 • PROPOSED ROADWAY IMPROVEMENTS OF HARTLEY DRIVE TABLE OF CONTENTS Introduction ........................................................................................................................1 Existing Conditions .................................................................................................. 1 Proposed Conditions ................................................................................................ 1 Disturbed Area ......................................................................................................... 1 General Soils Description ........................................................................................ 2 Hydrology ...........................................................................................................................2 Rational Method ....................................................................................................... 2 Runoff Coefficient ................................................................................................... 2 Rainfall Intensity and Time of Concentration ......................................................... 3 Drainage Area .......................................................................................................... 3 Stormwater Quality and Quantity ............................................................................ 3 Sediment and Erosion Control .........................................................................................4 • Results .................................................................................................................................4 • i • LIST OF TABLES Table 1: Soil Description ....................................................................................................2 Table 2: Runoff Coefficients for Rational Formula ............................................................3 Figure 1: Location Map ............................ Figure 2: Soil Map .................................... Figure 3: Guilford County FEMA Map .... Figure 4: Drainage Map ............................ LIST OF FIGURES ........................................................................5 ........................................................................6 ........................................................................7 ........................................................................8 LIST OF APPENDICES Appendix A: Pre vs. Post Outfall Analysis ................................................................ • A-1 to A-32 Appendix B: Culverts ................................................................................................ B-1 to B-12 Appendix C: Roadside Channels ............................................................................... C-1 to C-3 Appendix D: Inlet/Gutter Capacity ............................................................................ D-1 to D-3 Appendix E: Storm Drainage Systems ...................................................................... E-1 to E-5 Appendix F: Bridge Deck Drainage .......................................................................... F-1 to F-2 Appendix G: Outlet Protection .................................................................................. G-1 to G-8 Appendix H: Sediment and Erosion Control Details ................................................. H-1 to H-6 • ii • Introduction STV/Ralph Whitehead Associates, Inc. (STV/RWA) entered into a contract with the City of High Point to provide professional engineering services for the proposed roadway extension of Hartley Drive. The project consists of extending the current Hartley Drive through undeveloped land to connect from Main Street to Westover Drive. The purpose of this report is to document and define the design procedures that were used to analyze the hydrology and hydraulics of the proposed roadway improvements. Design calculations were performed in accordance with the "City of High Point Storm Drainage System Design Manual" dated February 1, 1994 and the "Guidelines for Drainage Studies and Hydraulic Design" by NCDOT dated 1999. ExistinL3Conditions The project begins approximately 3 miles northwest of downtown High Point along North Main Street. The existing portion of Hartley Drive currently ends with a cul-de-sac. The surrounding land-use near the project beginning is Commercial, Institutional, and Multi-Family. The project crosses an Unnamed Tributary of Rich Fork Creek which is a FEMA regulated floodplain as shown on Figure No. 3, Flood Insurance Rate Map No. 3710689100J; Dated June 18, 2007. Proposed Conditions The project consists of widening and extending Hartley Drive from North Main Street to • Westover Drive. The length of the project is approximately 5800'. Westover Drive will be realigned to create a new "T" intersection with the new Hartley Drive, and Ingleside Drive will create a new "4-Leg" intersection with Hartley Drive. The project will provide a more convenient access route to North Main Street for the residential areas in West High Point and Davidson County. Disturbed Area Approximately 4.0 acres of land will be disturbed. This area was calculated between the cut/fill slope lines on the project not including the existing pavement that will remain. • N:\PROJ\3202\Design\Hydro\Report\Narrative.doc 1 General Soils Description • Location Map Soil Name Description Permeability Erodibility Factor (Approx. Sta. No) Symbol (in/hr) (K Value) Well drained; surface layer is 7" dark brown sandy 10+00 to 25+00 Wilkes sandy loam; subsoil is 11" mottled brownish yellow sandy 32+40 to 35+00 WkC loam 6 to loam (upper part) & yellowish brown clay loam 2.0 - 6.0 surface 0.28 37+50 to 53+50 , 10% slopes (lower part); underlying is 52" yellowish brown clay 0.2 - 0.6 subsoil 0.32 loam (upper part) & yellowish brown loamy coarse sand lower art. Well drained; surface layer is 7" dark brown sandy 25+00 to 30+00 Wiles sandy loam; subsoil is 11" mottled brownish yellow sandy 35+00 to 37+50 WkE loam, loam (upper part) & yellowish brown clay loam 2.0 - 6.0 surface 0.28 53+50 to 58+00 15 to 45% (lower part); underlying is 52" yellowish brown clay 0.2 - 0.6 subsoil 0.32 61+00 to 64+00 slopes loam (upper part) & yellowish brown loamy coarse sand (lower art). Poorly drained; surface layer is 12" brown sandy Chewacla loam(upper part) and pale brown silt loam (lower loam part); subsoil is 58" mottled brown sandy loam 30+00 to 32+40 Ch , frequently (upper part), mottled light brownish gray loam and 0.6-2.0 0.28 flooded silt loam (middle part) and mottle light brownish gray and strong brown clay loam (lower part); underlying is 90" mottled dark bluish gray clay loam. Poindexter and Zion Well drained; surface layer is 4" sandy loam and to 58+00 to 61+00 PnD sandy loams 13" of sandy clay loam; subsoil to 36" is gravelly 2.0 - 6.0 surface 0 28 64+00 to 70+51 , 8 to 15 /o sandy loam; underlying material to 80" is weathered 0.2 - 0.6 subsoil . slopes bedrock. Table 1: Soil Description (Source: USDA Soil Survey of Guilford/Davidson Counties, N.C.) Hydrology Rational Method The Rational Method was used to determine the peak runoff for all drainage areas less than 200 acres. Q=CIA Where: Q = Peak discharge of drainage basin (c.f.s.) C = Runoff Coefficient (Ratio of Runoff to Rainfall) I = Average Rainfall Intensity for a Duration Equal to the Time of Concentration (in./hr.) A = Drainage Area Contributing to the Design Location (ac.) • Runoff Coefficient The runoff coefficients are based on the characteristics of the drainage area and assuming that the area is developed based on its zoning. The coefficient values were selected based on the City of High Point's Design Manual. N:\PROJ\3202\Design\Hydro\Report\Narrative.doe 2 • Type of Development Runoff Coefficient Minimum Allowable Runoff Coefficient 0.40 Residential, one acre or larger 0.40 Residential, 1/3 acre up to 1 acre lots 0.55 Residential, less than 1/3 acre lots 0.65 Apartment, cluster, condominium, light industrial and office development 0.80 Paved areas 0.95 Table 2: Runoff Coefficients for Rational Formula Rainfall Intensity and Time of Concentration There is a direct relationship between the time of concentration and the rainfall intensity. The City of Greensboro's Intensity-Duration-Frequency Curves were used to determine the rainfall intensity for the design storm based on the calculated time of concentration. A minimum time of 10 minutes was used for small drainage basins. Drainage Area The drainage areas for the closed systems were delineated using "Micro Station" utilizing the field survey and the proposed roadway alignment. • Stormwater Quality and Quantity • To provide some level of storm water runoff quantity and quality control, three dry detention basins were designed at three drainage outfall locations: outfalls A, E&K, and I&J ( See Figure No. 4). All dry detention basins were designed for 2-, 10-, 25-, and 100-year 24-hour storm events using Urban Hydrology & Detention Pond Modeling Software "PondPACK v10.0" developed by Bentley Systems, Inc. A minimum basin side slope of 4H:1 V was used. For each basin, a minimum of 1 foot freeboard was provided between the100-year water surface elevation and the basin overflow invert. The pre- vs. post- outfall analysis was performed using the SCS Graphical Peak Discharge method for the 2-, 10-, 25- and 100-year, 24-hour storm events for each of the dry pond outfalls. The Rational Method was used to calculate the peak runoff rates for the outfalls that did not require a hydrograph for pond routing. The detailed calculations are provided in Appendix 'A' of this report and correspond to the enclosed Drainage Area Map (Figure No. 4). N: TROJ\3202\Design\Hydro\Report\Narrative. doc 3 Sediment and Erosion Control • The following NCDOT standards sediment and erosion control practices are proposed for this project: silt fence, inlet protection, and vegetative measures. The goal is to treat all sediment- laden stormwater as close to the source as possible before it reaches the drainage system. 1. Riprap Outlet Protection (NCDOT STD 876.02) will be used at the ends of the storm drain pipes to protect the receiving channel from scour by reducing the discharge velocity and dissipating the energy. 2. Silt Fence (NCDOT STD 1605.01) will be placed along the perimeter of the disturbed area where runoff is in sheet flow or concentrated flow less than 1.0 cfs. Silt Fence will act as a sediment filter by retarding flow and promoting deposition. 3. Inlet Protection (NCDOT STD 1632.03) will be placed around drop inlets and catch basins to help prevent sediment from entering the storm drain system. 4. Rock Silt Checks (NCDOT STD 1633.02) will be placed in roadside ditches and are intended to reduce erosion in the channel by restricting the velocity. 5. Rock Sediment Dams (NCDOT STD 1634.01) will be placed at the outfall locations as shown on the Erosion Control Plans and are used to remove sediment from construction runoff where the total drainage area is less than 5 acres. 6. Construction Entrance (NCDOT STD 1607.01) will be placed near the beginning of the project to minimize the spread of sediment to off site areas. 7. A level spreader will be placed at Outfall `A' below the detention basin in order to convert the concentrated pipe flow to sheet flow. • Sediment and erosion control devices should be inspected weekly and after each storm event. Any damage to devices should be repaired immediately, and any silt accumulated should be removed. All disturbed areas should be covered with temporary or permanent vegetation as soon as practical. All devices should be properly maintained during all phases of construction and be removed once the area has been stabilized. Results Specific design criteria and calculations for pre- and post-construction outfall analysis, culverts, roadside channels, inlet/gutter capacity, storm drainage systems, bridge deck drainage, outlet protection, and sediment and erosion control details appear in the following appendices. Pre- and Post- Outfall Analysis .................................. Culverts ...................................................................... Roadside Channels ..................................................... Inlet/Gutter Capacity ................................................. Storm Drainage Systems ............................................ Bridge Deck Drainage ................................................ Outlet Protection ........................................................ Sediment and Erosion Control Details ....................... • .......................... Appendix A .......................... Appendix B .......................... Appendix C .......................... Appendix D .......................... Appendix E ...........................Appendix F .......................... Appendix G .......................... Appendix H N:\PROJ\3202\Design\Hydro\Report\Narrative. doc 4 • 0 • • • Soil Map-Davidson County, North Carolina, and Guilford County, North Carolina V\ X68 F?- N Meters A 0 250 500 1,000 1,500 Feet 0 1,000 2,000 4,000 6,000 1_ `O Natural Resources Web Soil Survey 2.0 Conservation service National Cooperative Soil Survey 4/17/2008 Page 1 of 3 0 0 0 S? --LIMIT OF STUDY F ZONE AE ohs V, Nh ? "V GRID NORTH LE 1" = 500'(1 : 6,000) 250 500 750 1,000 FEET METERS PANEL 6891J FIRM FLOOD INSURANCE RATE MAP NORTH CAROLINA PANEL 6891 (SEE LOCATOR DIAGRAM OR MAP INDEX. FOR FIRM PANEL LAYOUT) CONTAINS: COMMUNITY CID No. PANEL SUFFIX DAVIDSON COUNTY 370307 0691 J GU ILFORD COUNTY 370111 6,91 1 HIGH POINT. CITY OF 3-0113 6691 1 z 0 W Z Z 0 Notice to User'. Tne Map Number shwrn below 11cu11 be used when placing map orders the Community Number crown above should be used on insurance aoplicatons for tie subject community EFFECTIVE DATE MAP NUMBER JUNE 18, 2007 3710689100J aT`! ? ?? ? y a `? "fie I? "? 1 •, nel ?' State of North Carolina Federal Emergency' Management Agency This is an official copy of a portion of the above referenced flood map. It was extracted using F-MIT On-Line. This map does not reflect changes or amendments which may have been made subsequent to the date on the title block. For the latest product information about National Flood Insurance Program flood maps check the FEMA Flood Map Store at www.msc.fema.gov APPENDIX A PRE VS POST OUTFALL ANALYSIS 0 • • • Pre vs. Post Outfall Analysis Watershed `A' Description Watershed `A' currently flows from Main Street across the private commercial property to the north of Hartley Drive and then to an Unnamed Tributary of Rich Fork Creek. The proposed improvement to Hartley Drive includes curb & gutter and a closed drainage system. This proposed drainage system will convey the storm water runoff to a new detention pond located on the YMCA site near the existing cul-de-sac at the end of Hartley Drive. The new pond will then discharge to the 100-year floodplain of the same Unnamed Tributary of Rich Fork Creek. Watershed Characteristics Data Watershed No. Area (acres) Time of Curve Number Concentration (min) Pre-dev. Post-dev. A 9.8 15 91 93 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 2-Year 24-Hour 25 26 10-Year 24-Hour 42 44 25-Year 24-Hour 52 53 100-Year 24-Hour 66 68 Post-Development Routed Basin Peak Discharge Rates, Maximum Water Surface Elevations, and Free Board Storm Event Routed Discharge Rate (cfs) Max. Water Surface Elevation (ft) Free Board (ft) 2-Year 24-Hour 24 841.5 2.1 10-Year 24-Hour 43 842.0 1.6 25-Year 24-Hour 53 842.2 1.4 100-Year 24-Hour 66 842.6 1.0 Outfall A_Summary.doc A-1 STV • STV / RWA JOB: 3202-000 1 Consulting Engineers SUBJECT: Watershed No. 'A' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28208 (704) 372-1885 CHECK•D BY: EJV DATE: 14-Feb-08 3 TIME OF CONCENTRATION (Tc) Check One: Q Present ? Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. • Sheet flow Path #1 Path #2 Path #3 Segment ID 1. Surface Description (table 3-1) ........................................ Smooth 2. Manning 's roughness coefficient, n (table 3-1) ............. 0.011 3. Flow length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, PZ ........................................... in. 3.04 5. Land slope, s ................................................................. ft./ft. 0.0040 6. Tt = .007 (nL)o-8 Compute Tt ....................... hr. 0.0394 0.0000 0.0000 P2 0.5 50.4 Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) ........................ Paved 8. Flow length, L ...................................................................... ft. 600 9. Watercourse slope, s ................................................... ft. /ft. 0.0040 10. Average velocity, V (figure 3-1) ........................ ft. /sec. 1.29 11 Tt = L Compute Tt ....................... hr. 0.1296 0.0000 0.0000 3600 V Channel flow Segment ID 12. Cross sectional flow area, a .............................................. ft.2 13. Wetted perimeter, PW ......................................................... ft. 14. Hydraulic Radius, r = a / pW Compute r ......................... ft. 15. Channel slope, s ........................................................... ft. /ft. 16. Manning's roughness coefficient, n .................................. 17a. V = 1.49r 213S1/2 Compute V ft. /sec. n 17b. Input Velocity, FPS ............................................... ft. /sec. 5.00 18. Flow length, L ...................................................................... ft. 1500 4019. Tt = L Compute Tt ..................................................... hr. 0.0833 3600 V 20. Total, T, (add Ttin steps 6, 11, and 19) ......................... hr. 0.2524 21. Watershed Total, Tc (maximum, Path #1, #2, or #3) ............................................................... 0.25 Hour 15 min A-2 _ STV • • • TV/ RWA JOB: 3202-000 2 :onsulting Engineers SUBJECT: Watershed No. 'A' SHEET 1000 West Morehead Street, Suite 200 CALCD BY: HSB DATE: 14-Feb-08 of :harlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE:, 14-Feb-08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: 0 Present ? Developed Runoff Curve Number Soil name over description CN' Area Product and hydrologic of CN x area group (appendix A) (cover type, treatment, and hydrologic condition; percent impervious; N M N N unconnected /connected impervious area ratio) v ,/ acres v L L mi 2 ? on on % F- ii U- B Paved Road 98 2.3 225.4 B Commerical Business 92 5.7 524.4 B Medium Residential 85 1.2 102.0 B Open Space' 69 0.6 41.4 Totals =_> 9.8 893.2 ' Use only one CN source per line CN (weighted) = total product = 893.2 91.1 Use CN =___> 91 total area 9.8 Runoff Frequency ........................................................... yr Rainfall, P (24-hour) ........................................ it Runoff, Q ............................................................ in (Use P and CN with table 2-1, figure 2-1, or equations 2-3 and 2-4) Storm # 1 Storm # 2 Storm # 3 Storm # 2 10 25 100 3.04 4.72 5.63 7.04 2.11 3.71 4.60 5.98 A-3 STV • STV / RWA JOB: 3202-000 3 'onsulting Engineers SUBJECT: Watershed No. 'A' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of :harlotte, NC 28208 (704) 372-1885 CHECK•D BY: EJV DATE: 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD Check one: E] Present ? Developed • is 1. Data Drainage area .......................... A. Runoff curve number ........................... CN = Time of concentration ........................ Tc _ Rainfall distribution .................................... _ Pond and swamp areas spread thoroughout watershed ............................. _ 0.015 mil (acres/640) 91 (From CN Et Runoff worksheet) 0.25 hr (From T, worksheet) II (I, IA, 11, III) 0.0 percent of AR, ( 0 ) acres or mil covered) 2. Frequency .............................................................. yr 3. Rainfall, P (24-hour) ............................................... in Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 2 10 25 100 3.04 4.72 5.63 7.04 4. Initial abstraction, la ................................................ in 0.198 0.198 0.198 0.198 (Use CN with table 4-1) 5. Compute la/P ............................................................. 0.07 0.04 0.04 0.03 6. Unit peak discharge, q .. ..................................am/in 730 748 748 750 (Use Tc and la/P with exhibit 4-II) 7. Runoff, Q .................................................................. in 2.11 3.71 4.60 5.98 (From CN & Runoff worksheet) 8. Pond and swamp adjustment factor, Fp .................... 1.00 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) 9. Peak discharge, qp ............................................ ft3/s 25 42 52 66 (Where qp = q„AmQFp) A-4 STV STV / RWA JoB: 3202-000 1 Consulting Engineers SUBJECT: Watershed 'A' SHEET • 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 TIME OF CONCENTRATION (Tc) Check One: E] Present Q Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow Path #1 Path #2 Path #3 Segment ID 1. Surface Description (table 3-1) ........................................ Smooth 2. Manning 's roughness coefficient, n (table 3-1) ............. 0.011 3. Flow length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, P2 ........................................... in. 3.04 5. Land slope, s ................................................................. ft. /ft. 0.0040 6. Tt = .007 (nL)0-8 Compute Tt P20.5 S0.4 ....................... hr. 0.0394 0.0000 0.0000 • Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) . ....................... Paved 8. Flow length, L ............................................... ....................... ft. 600 9. Watercourse slope, s ................................... ................ ft. /ft. 0.0040 10. Average velocity, V (figure 3-1) ................ 1.29 ........ ft. /sec. 11 Tt = L Compute Tt ....................... hr. 0.1296 0.0000 0.0000 3600 V Channel flow Segment ID 12. Cross sectional flow area, a .............................................. ft.2 13. Wetted perimeter, P„ . ......................................................... ft. 14. Hydraulic Radius, r = a / pW Compute r ......................... ft. 15. Channel slope, s ........................................................... ft. /ft. 16. Manning's roughness coefficient, n .................................. 17a. V = 1.49r"'s'1Z Compute V ft. /sec. n 17b. Input Velocity, FPS ............................................... ft./sec. 5.00 18. Flow length, L ...................................................................... ft. 1500 19. Tt = L Compute Tt ..................................................... hr. 0.0833 • 3600 V 20, Total, Tc (add Ttin steps 6, 11, and 19) ......................... hr. 0.2524 21. Watershed Total, Tc (maximum, Path #1, #2, or #3) ............................................................... 0.25 Hour 15 min A-5 STV • • • >TV/ RWA JOB: 3202-000 2 :onsulting Engineers SUBJECT: Watershed 'A' SHEE' 1000 West Morehead Street, Suite 200 CALC'D Br: HSB DATE: 14-Feb-08 of :harlotte, NC 28208 (704) 372-1885 CHECK•D BY: EJV _ DATE: 14-Feb-08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: ? Present 7 Developed Runoff Curve Number of name Cover description CN* Area Product and hydrologic of CN x area group (cover type, treatment, and hydrologic condition; percent impervious; N M IT (appendix A) unconnected /connected impervious area ratio) N N N acres miA 2 v m > an > on % H u- u- B Paved Road 98 3.6 352.8 B Commerical Business 92 5.4 496.8 B Medium Residential 85 0.5 42.5 B Open Space 69 0.3 20.7 Totals == 9.8 912.8 * Use only one CN source per line CN (weighted) = total product = 912.8 93.1 Use CN =___> 93 total area 9.8 Runoff Frequency ........................................................... yi Rainfall, P (24-hour) ........................................ it Runoff, Q ............................................................ it (Use P and CN with table 2-1, figure 2-1, or equations 2-3 and 2-4) Storm # 1 Storm # 2 Storm # 3 Storm # 5 2 10 25 100 3.04 4.72 5.63 7.04 2.29 3.92 4.82 6.21 A-6 STV • STV / RWA JOB: 3202-000 3 'onsulting Engineers suBJEcr: watershed 'A' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of Z-harlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD Check one: ? Present E Developed • • 1. Data Drainage area ........................................AR, _ 0.015 mi2 (acres/640) Runoff curve number ........................... CN = Time of concentration ........................ Tc = Rainfall distribution .................................... = Pond and swamp areas spread thoroughout watershed ............................. _ 2. Frequency .............................................................. yr 3. Rainfall, P (24-hour) ............................................... in 93 (From CN Et Runoff worksheet) 0.25 hr (From T, worksheet) II (I, IA, II, III) 0.0 percent of Am ( 0 ) acres or mil covered) Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 2 10 25 100 3.04 4.72 5.63 7.04 4. Initial abstraction, la ................................................ in 0.151 0.151 0.151 0.151 (Use CN with table 4-1) 5. Compute la/P ............................................................. 0.05 0.03 0.03 0.02 6. Unit peak discharge, q .. .................................. tsm/in 730 748 748 750 (Use T, and la/P with exhibit 4-II) 7. Runoff, Q .................................................................. in 2.29 3.92 4.82 6.21 (From CN & Runoff worksheet) 8. Pond and swamp adjustment factor, Fp .................... 1.00 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) 9. Peak discharge, qp ............................................ ft3/s 26 44 53 68 (Where qp = quAmQFp) A-7 Type.... Master Network Summary Page 2.01 Name.... Watershed File.... N:\PROJ\3202\Design\Hydro\PondPack\Pond 1\Project_Postdev_Watershed A -Pond l.ppw • MASTER DESIGN STORM SUMMARY Network Storm Collection: Highpoint Total Depth Return Event in 2 3.0400 10 4.7200 25 5.6300 100 7.0400 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) • Return HYG Vol Node ID -- ----- Type ---- Event ------ cu.ft Trun ---------- -- -------- *OUTFALL -- A JCT 2 81545 *OUTFALL A JCT 10 139564 *OUTFALL A JCT 25 171384 *OUTFALL A JCT 100 220947 POND 1 IN POND 2 81548 POND 1 IN POND 10 139567 POND 1 IN POND 25 171387 POND 1 IN POND 100 220950 POND 1 OUT POND 2 81545 POND 1 OUT POND 10 139564 POND 1 OUT POND 25 171384 POND 1 OUT POND 100 220947 0 S/N: Bentley PondPack (10.00.027.00) Max Qpeak Qpeak Max WSEL Pond Storage hrs --------- cfs -------- ft -------- cu.ft ------------ 12.1000 24.41 12.0500 43.42 12.0500 52.74 12.0500 66.06 12.0250 26.33 12.0250 43.84 12.0250 53.22 12.0250 67.66 12.1000 24.41 841.52 6155 12.0500 43.42 842.03 7607 12.0500 52.74 842.23 8271 12.0500 66.06 842.58 9456 Bentley Systems, Inc. 2:36 PM 4/16/2008 k-8 • • • Pre vs. Post Outfall Analysis Watershed `B' Description Watershed `B' is currently undeveloped and sheet flows directly into an Unnamed Tributary to Rich Fork Creek. The proposed roadway drainage will be picked up in a closed drainage system and will outfall into the same tributary near the northwest corner of the proposed bridge. Increased concentrated flows will be attenuated by using a riprap apron at the end of the outfall pipe. Watershed Characteristics Data Watershed No. Area (acres) Time of C-Value Concentration (min) Pre-dev. Post-dev. B 0.18 10 0.55 0.95 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 10-Year 0.56 0.97 Outfall B_Summary.doc A-9 i • RALPH WHITEHEAD ASSOCIATES, INC. Jos: Hartley Drive 3202-000 1 IN Consulting Engineers SUBJECT: Pre vs. Post Evaluation SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 1 PRE VS. POST OUTFALL EVALUATION GIVEN: Outfall Location: Road Name Hartley Drive Sta. 30+65 (RT) Basin I. D. Outfall'B` Weighted C-value (PRE) Landuse Sub-area C Minimum 0.00 0.40 Residential (>lac) 0.00 0.40 Residential (<lac) 0.18 0.55 Commercial, etc. 0.00 0.80 Paved 0.00 0.95 Weighted C-value (PRE) = 0.55 Time of Concentration= 10 min. Rainfall Intensity (10 yr.) = 5.70 in. /hr Drainage Area = 0.18 ac. SOLUTION: Peak Runoff (QY) = C " I ' A Where: Percent Change (0) = 100 ` IQPOST - QPREI / QPRE Q10(PRE) = 0.56 c.f.s. 0 = 0.41 c.f.s. • Pre Post Rational Method Weighted C-value (POST) Landuse Sub-area C Minimum 0.00 0.40 Residential (>lac) 0.00 0.40 Residential (<l ac) 0.00 0.55 Commercial, etc. 0.00 0.80 Paved 0.18 0.95 Weighted C-value (POST) = 0.95 Time of Concentration= 10 min. Rainfall Intensity (10 yr.) = 5.70 in. /hr. Drainage Area = 0.18 ac. Q = Peak Discharge (cfs) Y = Storm Event (Year) C = Runoff Coefficient I = Rainfall Intensity (in/hr) - Based on time of concentration A = Drainage Area (Acre) Where: 4 = Change (%) - (10 Year Storm) QPosT = Post-construction Discharge (cfs) QPRE = Pre-construction Discharge (cfs) Q10(POST) = 0.97 c.f.s. A-10 • • • Pre vs. Post Outfall Analysis Watershed `C' Description Watershed `C' is currently undeveloped and sheet flows directly into an Unnamed Tributary to Rich Fork Creek. The proposed roadway drainage will be picked up in a closed drainage system and will outfall into the same tributary near the southwest corner of the proposed bridge. Increased concentrated flows will be attenuated by using a riprap apron at the end of the outfall pipe. Watershed Characteristics Data Watershed No. Area (acres) Time of C-Value Concentration (min) Pre-dev. Post-dev. C 0.5 10 0.55 0.95 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 10-Year 1.57 2.71 Outfall C_Summary.doc A-11 • RALPH WHITEHEAD ASSOCIATES, INC. JoB: Hartley Drive 3202-000 1 Consulting Engineers SUBJECT: Pre vs. Post Evaluation SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 1 PRE VS. POST OUTFALL EVALUATION GIVEN: Outfall Location: Road Name Hartley Drive Sta. 31+50 (LT) Basin I. D. Outfall 'C' Weighted C-value (PRE) Landuse Sub-area C Minimum 0.00 0.40 Residential(>lac) 0.00 0.40 Residential(<1ac) 0.50 0.55 Commercial, etc. 0.00 0.80 Paved 0.00 0.95 Weighted C-value (PRE) = 0.55 Time of Concentration= 10 min. Rainfall Intensity (10 yr.) = 5.70 in./hr Drainage Area = 0.50 ac. • SOLUTION: Peak Runoff (Qy) = C ' I ' A Where: Percent Change (0) = 100 * 1QPOST - QPREI / QPRE Q10(PRE) = 1.57 c.f.s. 0 = 1.14 c.f.s. • Pre-Post Rational Method Weighted C-value (POST) Landuse Sub-area C Minimum 0.00 0.40 Residential(>lac) 0.00 0.40 Residential (<1ac) 0.00 0.55 Commercial, etc. 0.00 0.80 Paved 0.50 0.95 Weighted C-val ue (POST) = 0.95 Time of Concentration= 10 min. Rainfall Intensity (10 yr.) = 5.70 in./hr. Drainage Area = 0.50 ac. Q = Peak Discharge (cfs) Y = Storm Event (Year) C = Runoff Coefficient I = Rainfall Intensity (in/hr) - Based on time of concentration A = Drainage Area (Acre) Where: A = Change (%) - (10 Year Storm) QPOST = Post-construction Discharge (cfs) QPRE = Pre-construction Discharge (cfs) Q10(POST) = 2.71 c.f.s. A-12 0 • • Pre vs. Post Outfall Analysis Watershed `D' Description Watershed `D' is currently undeveloped and sheet flows directly into an Unnamed Tributary to Rich Fork Creek. The proposed roadway drainage will be picked up in a closed drainage system and will outfall into the same tributary near the southeast corner of the proposed bridge. Increased concentrated flows will be attenuated by using a riprap apron at the end of the outfall pipe. Watershed Characteristics Data Watershed No. Area (acres) Time of C-Value Concentration (min) Pre-dev. Post-dev. D 2.52 10 0.55 0.92 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 10-Year 7.90 13.21 Outfall D_Summary.doc A-13 • • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive 3202-000 1 IN Consulting Engineers SUBJECT: Pre vs. Post Evaluation SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 1 PRE VS. POST OUTFALL EVALUATION GIVEN: Outfall Location: Road Name Hartley Drive Sta. 35+00 (LT) Basin I. D. Outfall'D` Weighted C-value (PRE) Landuse Sub-area C Minimum 0.00 0.40 Residential (>lac) 0.00 0.40 Residential (<lac) 2.52 0.55 Commercial, etc. 0.00 0.80 Paved 0.00 0.95 Weighted C-value (PRE) = 0.55 Time of Concentration= 10 min. Rainfall Intensity (10 yr.) = 5.70 in./hr Drainage Area = 2.52 ac. SOLUTION: Peak Runoff (Qy) = C ' I ` A Where: Percent Change (A) = 100 " 1QPOST - QPREI / Q PRE Q10(PRE) = 7.90 c.f.s. A = 5.31 c.f.s. • Pre-Post Rational Method Weighted C-value (POST) Landuse Sub-area C Minimum 0.00 0.40 Residential (>1ac) 0.00 0.40 Residential (<lac) 0.18 0.55 Commercial, etc. 0.00 0.80 Paved 2.34 0.95 Weighted C-va lue (POST) = 0.92 Time of Concentration= 10 min. Rainfall Intensity (10 yr.) = 5.70 in. /hr. Drainage Area = 2.52 ac. Q = Peak Discharge (cfs) Y = Storm Event (Year) C = Runoff Coefficient I = Rainfall Intensity (in/hr) - Based on time of concentration A = Drainage Area (Acre) Where: 0 = Change (%) (10 Year Storm) QPOST = Post-construction Discharge (cfs) QPRE = Pre-construction Discharge (cfs) Q10(POST) = 13.21 c.f.s. A-14 • • • Pre vs. Post Outfall Analysis Watershed IV & `K' Description Watershed `E' & `K' currently outfalls on the east side of Ingleside Drive. There is an existing detention basin located in the path of the proposed alignment of Hartley Drive which will be relocated to the northeast quadrant of the new 4-way intersection. The pre- and post- flows will generally remain the same. Watershed Characteristics Data Watershed No. Area (acres) Time of Curve Number Concentration (min) Pre-dev. Post-dev. E & K 6.1 12 75 76 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 2-Year 24-Hour 7 8 10-Year 24-Hour 17 18 25-Year 24-Hour 23 24 100-Year 24-Hour 33 34 Post-Development Routed Basin Peak Discharge Rates, Maximum Water Surface Elevations, and Free Board Storm Event Routed Discharge Rate (cfs) Max. Water Surface Elevation (ft) Free Board (ft) 2-Year 24-Hour 8 838.7 2.8 10-Year 24-Hour 17 839.4 2.1 25-Year 24-Hour 23 839.8 1.7 100-Year 24-Hour 32 840.2 1.3 Outfall E_K_Summary.doc A-15 STV • ;TV / RWA JOB: 3202-000 1 :onsulting Engineers SUBJECT: Watershed No. 'E Et K' SHEE 000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of :harlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 TIME OF CONCENTRATION (Tj Check One: Q Present ? Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow Path #1 Segment ID 1. Surface Description (table 3-1) ........................................ Woods 2. Manning's roughness coefficient, n (table 3-1) ............. 0.400 3. Flow Length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, Pz ........................................... in. 3.04 5. Land slope, s ................................................................. ft. /ft. 0.1100 • Path #2 6. Tt = .007 (nL)°'8 Compute Tt ....................... hr. 0.1857 0.0000 0.0000 Pz 0.5 s0.4 Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) ........................ Unpaved 8. Flow length, L ...................................................................... ft. 110 9. Watercourse slope, s ................................................... ft. /ft. 0.3700 10. Average velocity, V (figure 3-1) ........................ ft. /sec. 9.81 11. Tt = L Compute Tt ....................... hr. 0.0031 0.0000 0.0000 3600 V Channel flow Segment ID 12. Cross sectional flow area, a .......................................... ....ft.z 13. Wetted perimeter, pW ......................................................... ft. 14. Hydraulic Radius, r = a / pW Compute r ......................... ft. 15. Channel slope, s ........................................................... ft. /ft. 16. Manning 's roughness coefficient, n .................................. 17a. V = 1.49rz13S1i2 Compute V ............................... ft. /sec. n 17b. Input Velocity, FPS ............................................... ft./sec. 5.00 18. Flow length, L ...................................................................... ft. 250 • 19. Tt = L Compute Tt ..................................................... hr. 0.0139 3600 V 20. Total, T, (add Ttin steps 6, 11, and 19) ......................... hr. 0.2027 21. Watershed Total, T, (maximum, Path #1, #2, or #3) ............................................................... 2-07-1 Hour 12 min A-16 STV • • • >TV/ RWA JOB: 3202-000 2 Zonsulting Engineers SUBJECT: Watershed No. 'E Et K' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of :harlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: 0 Present ? Developed Runoff Curve Number of name over description CN' Area Product and hydrologic of CN x area group (appendix A) (cover type, treatment, and hydrologic condition; percent impervious; cv M N N unconnected /connected impervious area ratio) N v a, acres a, 8 mi^2 ? on on F- U- U- B Paved 98 1.1 107.8 B Commerical Business 92 B Low Residential 70 5.0 350.0 B Institutional 88 Totals == 6.1 457.8 Use only one CN source per line CN (weighted) = total product = 457.8 75.0 Use CN =___> 75 total area 6.1 I Runoff Frequency .......................................................... . yl Rainfall, P (24-hour) ........................................ it Runoff, Q ............................................................ in (Use P and CN with table 2-1, figure 2-1, or equations 2-3 and 2-4) Storm # 1 Storm # 2 Storm # 3 Storm # 4 Storm # 5 2 10 25 100 3.04 4.72 5.63 7.04 0.99 2.22 2.97 4.18 A-17 STV • • iTV / RWA JOB: Project Name 3 :onsulting Engineers SUBJECT: Watershed No. 'E Et K' SHEET 000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 OF :harlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD 1. Data Drainage area ........................................Am = 0.010 Runoff curve number ........................... CN = 75 Time of concentration ........................ Tc = Rainfall distribution .................................... = Pond and swamp areas spread thoroughout watershed ............................. _ 2. Frequency .............................................................. yr 3. Rainfall, P (24-hour) ............................................... in Check one: El Present ? Developed mi2 (acres/640) (From CN £t Runoff worksheet) 0.2 hr (From T, worksheet) II (I, IA, II, III) 0.0 percent of Am ( 0 ) acres or mil covered) Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 2 10 25 ! 00 3.04 4.72 5.63 7.04 4. Initial abstraction, la ................................................ in 0.667 0.667 0.667 0.667 (Use CN with table 4-1) 5. Compute la/P ............................................................. 0.22 0.14 0.12 0.09 6. Unit peak discharge, q .. ........ .......................... csm/in 750 780 790 805 (Use Tc and la/P with exhibit 4-11) 7. Runoff, Q .................................................................. in 0.99 2.22 2.97 4.18 (From CN a Runoff worksheet) 8. Pond and swamp adjustment factor, FP .................... Ei,oo 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) 9. Peak discharge, qp ............................................ ft3/s 7 17 23 33 (Where qp = q,,AmQFp) A-18 • STV STV / RWA JOB: 3202-000 1 Consulting Engineers SUBJECT: Watershed No. 'E & K' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 TIME OF CONCENTRATION (Tc) Check One: ? Present Q Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow Path #1 Path #2 Segment ID 1. Surface Description (table 3-1) ........................................ Woods 2. Manning's roughness coefficient, n (table 3-1) ............. 0.400 3. Flow length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, PZ ........................................... in. 3.04 5. Land slope, s ................................................................. ft. /ft. 0.1100 • • 6. Tt = .007 (nL) 0.8 Compute Tt ....................... hr. 0.1857 0.0000 0.0000 P2 0.5 S0.4 Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) ........................ Unpaved 8. Flow length, L ...................................................................... ft. 110 9. Watercourse slope, s ................................................... ft. /ft. 0.3700 10. Average velocity, V (figure 3-1) ........................ ft. /sec. 9.81 11 Tt = L Compute Tt ....................... hr. 0.0031 0.0000 0.0000 3600 V nnel flow Segment ID 12. Cross sectional flow area, a .............................................. ft.2 13. Wetted perimeter, p„ . ......................................................... ft. 14. Hydraulic Radius, r = a / pW Compute r ......................... ft. 15. Channel slope, s ........................................................... ft. /ft. 16. Manning's roughness coefficient, n .................................. 17a. V = 1.49r 2/3S112 Compute V ft./sec. n 17b. Input Velocity, FPS ............................................... ft. /sec. 5.00 18. Flow length, L ...................................................................... ft. 250 19. Tt = L Compute Tt ..................................................... hr. 0.0139 3600 V 20. Total, Tc (add Tt in steps 6, 11, and 19) ......................... hr. 0.2027 l - 21. Watershed Total, T, (maximum, Path #1, #2, or #3) ............................................................... 0.20 Hour 12 min A-19 STV • • • STV/ RWA JOB: 3202-000 2 :onsulting Engineers SUBJECT: Watershed No. 'E £x K' SHED 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of :harlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: ? Present 0 Developed Runoff Curve Number Soil name over description CN` Area Product and hydrologic of CN x area group (appendix A) (cover type, treatment, and hydrologic condition; percent impervious; N M N N unconnected/connected impervious area ratio) C-4 v acres v 2 L mi 2 on on % it ii B Paved 98 1.4 137.2 B Commerical Business 92` B Low Residential 70 4.7 329.0 B Institutional, 88 Totals == 6.1 466.2 - Use only one (-N source per line CN (weighted) = total product = 466.2 = 76.4 Use CN =___> 76 total area 6.1 I Runoff Frequency .......................................................... .yi Rainfall, P (24-hour)....., .................................. it Runoff, Q ............................................................ it (Use P and CN with table 2-1, figure 2-1, or equations 2-3 and 2-4) Storm # 1 Storm # 2 Storm # 3 Storm # 4 Storm # 5 2 10 25 100 3.04 4.72 5.63 7.04 1.04 2.31 3.06 4.29 A-20 STV • STV / RWA JOB: Project Name 3 Consulting Engineers SUBJECT: Watershed No. 'E Et K' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28208 (704) 372-1885 CHECK•D Br EJV DATE: 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD Check one: ? Present R Developed • 1. Data Drainage area ........................................ Am = Runoff curve number ........................... CN = Time of concentration ........................ Tc = Rainfall distribution .................................... = Pond and swamp areas spread thoroughout watershed ............................. _ 2. Frequency .............................................................. yr 3. Rainfall, P (24-hour) ............................. ......... in 0.010 mil (acres/640) 76 (From CN Et Runoff worksheet) 0.2 hr (From Tc worksheet) II (I, IA, Ii, III) 0.0 percent of Am ( 0 ) acres or miZ covered) Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 2 10 25 100 3.04 4.72 5.63 7.04 .. in 0.632 0.632 0.632 0.632 5. Compute UP ............................................................. 0.21 0.13 0.11 0.09 4. Initial abstraction, la ................................. (Use CN with table 4-1) 6. Unit peak discharge, q .. ....... ........................... csm/in 750 780 790 805 (Use T, and la/P with exhibit 4-II) 7. Runoff, Q .................................................................. in 1.04 2.31 3.06 4.29 (From CN Et Runoff worksheet) 8. Pond and swamp adjustment factor, FP .................... 1.00 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) • 9. Peak discharge, qp ............................................ ft3/s 8 18 24 34 (Where qp = q„AmQFP) A-21 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\PROJ\3202\Design\Hydro\PondPack\Pond 2\Project_Postdev_Watershed E_Pond 2.ppw • MASTER DESIGN STORM SUMMARY Network Storm Collection: Highpoint Total Depth Return Event in ------------ 2 ------ 3.0400 10 4.7200 25 5.6300 100 7.0400 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) • Return HYG Vol Node ID --- Type ---- Event ------ - cu.ft Trun --------- -- --------- *OUTFALL --- E -- JCT 2 23085 *OUTFALL E JCT 10 51100 *OUTFALL E JCT 25 67857 *OUTFALL E JCT 100 95100 POND 2 IN POND 2 23085 POND 2 IN POND 10 51100 POND 2 IN POND 25 67858 POND 2 IN POND 100 95100 POND 2 OUT POND 2 23085 POND 2 OUT POND 10 51100 POND 2 OUT POND 25 67857 POND 2 OUT POND 100 95100 0 SIN: Bentley PondPack (10.00.027.00) Max Qpeak Qpeak Max WSEL Pond Storage hrs ----- cfs -------- ft -------- cu.ft ------------- ---- 12.0750 7.63 12.0500 17.32 12.0500 22.87 12.0500 31.56 12.0250 8.14 12.0250 18.41 12.0250 24.38 12.0000 34.00 12.0750 7.63 838.72 1375 12.0500 17.32 839.44 3115 12.0500 22.87 839.76 4159 12.0500 31.56 840.24 5989 Bentley Systems, Inc. 3:03 PM 4/16/2008 P. Z.2. • • 0 Pre vs. Post Outfall Analysis Watershed `G' Description Watershed `G' is currently undeveloped and is located at the confluence of two small perennial streams. There is a proposed 60" diameter concrete pipe culvert at this outfall which will be buried 1.0' below the existing ground line. Watershed Characteristics Data Watershed No. Area (acres) Time of C-Value Concentration (min) Pre-dev. Post-dev. G 36.96 25 0.40 0.45 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 10-Year 58.34 66.03 Outfall G_Summary.doc A-23 RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive 3202-000 1 ?f Consulting Engineers SUBJECT: Pre vs. Post Evaluation SHEET ?/ 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 1 • PRE VS. POST OUTFALL EVALUATION GIVEN: Outfall Location: Road Name Hartley Drive Sta. 52+85 (LT) Basin I. D. Outfall 'G' Weighted C-value (PRE) Landuse Sub area C Minimum 36.96 0.40 Residential (>lac) 0.00 0.40 Residential (<lac) 0.00 0.55 Commercial, etc. 0.00 0.80 Paved 0.00 0.95 Weighted C-value (PRE) = 0.40 Time of Concentration= 25 min. Rainfall Intensity (10 yr.) = 3.97 in. /hr Drainage Area = 36.96 ac. SOLUTION: Peak Runoff (QY) = C " I * A Where: Percent Change (A) = 100 * 1QPOST - QPREI / QPRE Q10(PRE) = 58.69 c.f.s. A = 7.34 c.f.s. • Pre-Post Rational Method Weighted C-value (POST) Landuse Sub-area C Minimum 33.56 0.40 Residential (>lac) 0.00 0.40 Residential (<lac) 0.00 0.55 Commercial, etc. 0.00 0.80 Paved 3.40 0.95 Weighted C-va lue (POST) = 0.45 Time of Concentration= 25 min. Rainfall Intensity (10 yr.) = 3.97 in./hr. Drainage Area = 36.96 ac. Q = Peak Discharge (cfs) Y = Storm Event (Year) C = Runoff Coefficient I = Rainfall Intensity (in/hr) - Based on time of concentration A = Drainage Area (Acre) Where: 0 = Change (%) - (10 Year Storm) QPOsT = Post-construction Discharge (cfs) QPRE = Pre-construction Discharge (cfs) Q10(POST) = 66.03 c.f.s. A-24 • • • Pre vs. Post Outfall Analysis Watershed `I' & `J' Description Watershed `I' & `J' is located at the tie-in point realigned to form a new "T" intersection with located in the abandoned roadway right-of-way. the existing roadside ditch along Westover Drive. with Westover Drive. Westover Drive will be Hartley Drive. A new detention pond will be The outfall from the proposed pond will flow to Watershed Characteristics Data Watershed No. Area (acres) Time of Curve Number Concentration (min) Pre-dev. Post-dev. I & J 1.3 10 70 76 Pre-Development and Post-Development Watershed Peak Flow Rates Storm Event Pre-development Peak Flow Rates (cfs) Post-development Peak Flow Rates (cfs) 2-Year 24-Hour 1 2 10-Year 24-Hour 3 4 25-Year 24-Hour 4 5 100-Year 24-Hour 5 7 Post-Development Routed Basin Peak Discharge Rates, Maximum Water Surface Elevations, and Free Board Storm Event Routed Discharge Rate (cfs Max. Water Surface Elevation (ft) Free Board (ft) 2-Year 24-Hour 1 846.1 5.9 10-Year 24-Hour 3 846.5 5.5 25-Year 24-Hour 4 846.7 5.3 100-Year 24-Hour 5 846.9 5.1 Outfall I_J_Summary.doc A-25 STV • ;TV / RWA JOB: 3202-000 1 :onsulting Engineers SUBJECT: Watershed No. 'I' a 'J' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of :harlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 TIME OF CONCENTRATION (TC) Check One: E Present ? Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. flow Path #1 1 1 Path #2 Segment ID 1. Surface Description (table 3-1) ........................................ Grass 2. Manning 's roughness coefficient, n (table 3-1) ............. 0.240 3. Flow length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, P2 ........................................... in. 3.04 5. Land slope, s ................................................................. ft. /ft. 0.0600 • 6. Tt = .007 (nL)°'a Compute Tt ....................... hr. 0.1572 0.0000 0.0000 P2 0.5 50.4 Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) ........................ Unpaved 8. Flow length, L ...................................................................... ft. 100 9. Watercourse slope, s ................................................... ft. /ft. 0.0600 10. Average velocity, V (figure 3-1) ........................ ft. /sec. 3.95 11. Tt = L Compute Tt ....................... hr. 0.0070 0.0000 0.0000 3600 V nnel flow Segment ID 12. Cross sectional flow area, a .............................................. ft.2 13. Wetted perimeter, PW ......................................................... ft. 14. Hydraulic Radius, r = a / pW Compute r ......................... ft. 15. Channel slope, s ........................................................... ft. /ft. 16. Manning's roughness coefficient, n .................................. 17a. V = 1.49r2/3s'/2 Compute V ft. /sec. n 17b. Input Velocity, FPS ............................................... ft. /sec. 18. Flow length, L ...................................................................... ft. . 19. t = L Compute Tt ..................................................... hr. 0.0000 3600 V 20. Total, Tc (add Ttin steps 6, 11, and 19) ......................... hr. 0.1643 21. Watershed Total, T, (maximum, Path #1, #2, or #3) ............................................................... 0.16 Hour 10 min A-26 STV • • • STV/ RWA JOB: 3202-000 2 Consulting Engineers SUBJECT: Watershed No. '1' Et 'J' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: 0 Present ? Developed Runoff Curve Number of name over description CN` Area Product and hydrologic of CN x area group (appendix A) (cover type, treatment, and hydrologic condition; percent impervious; N M N V N unconnected /connected impervious area ratio) N J acres a, v v mi^2 fa °n on % U_ LL_ B Paved 98 B Commerical Business 92 B Low Residential 70 1.3 91.0 B Institutional 88 Totals 1.3 91.0 Use only one CN source per line CN (weighted) = total product = 91.0 total area 1.3 70.0 Use CN ====> F77071 I Runoff Frequency .......................................................... .yi Rainfall, P (24-hour) ........................................ it Runoff, Q ............................................................ it (Use P and CN with table 2-1, figure 2-1, or equations 2.3 and 2-4) Storm # 1 Storm # 2 Storm # 3 Storm # 4 Storm # 5 2 10 25 100 3.04 4.72 5.63 7.04 0.74 1.83 2.51 3.65 A-27 STV • STV / RWA JOB: Project Name 3 Zonsutting Engineers SUBJECT: Watershed No. T Et 'J' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of :harlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD Check one: 0 Present ? Developed • 1. Data Drainage area ........................................ Am = Runoff curve number ........................... CN = Time of concentration ........................ Tc = Rainfall distribution .................................... = Pond and swamp areas spread thoroughout watershed ............................. _ 2. Frequency ................................ 3. Rainfall, P (24-hour) ................. .................. yr ..................... in 0.002 miz (acres/640) 70 (From CN Et Runoff worksheet) 0.2 hr (From Tc worksheet) II (I, IA, II, III) 0.0 percent of Am ( 0 ) acres or mi2 covered) Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 2 10 25 100 3.04 4.72 5.63 7.04 4. Initial abstraction, la ................................................ in 0.857 0.857--? 0.857 FO. (Use CN with table 4-1) 5. Compute la/P ............................................................. 0.28 0.18 0.15 0.12 6. Unit peak discharge, q . .................................."m/in 600 635 650 665 (Use Tc and la/P with exhibit 4-II) 7. Runoff, Q .................................................................. in 0.74 1.83 2.51 3.65 (From CN Et Runoff worksheet) 8. Pond and swamp adjustment factor, Fp .................... 1.00 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) • 9. Peak discharge, qp ............................................ ft3/s 1 3 4 5 (Where qp = q„AmQFp) A-28 • STV STV / RWA JOB: 3202-000 1 Consulting Engineers SUBJECT: Watershed No. 'I' Et 'J' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 of Charlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 TIME OF CONCENTRATION (Tc) Check One: El Present E Developed Note: Space for as many as three segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow Path #1 1 1 Path #2 Segment ID 1. Surface Description (table 3-1) ........................................ Grass 2. Manning's roughness coefficient, n (table 3-1) ............. 0.240 3. Flow length, L (total L < 300 ft) ....................................... ft. 100 4. Two-year 24-hour rainfall, P2 ........................................... in. 3.04 5. Land slope, s ................................................................. ft. /ft. 0.0600 • 6. Tt = .007 (nL)°'a Compute Tt ....................... hr. 0.1572 0.0000 0.0000 P2 0.5 S0.4 Shallow concentrated flow Segment ID 7. Surface description (Paved or Unpaved) ........................ Unpaved 8. Flow length, L ...................................................................... ft. 100 9. Watercourse slope, s ................................................... ft. /ft. 0.0600 10. Average velocity, V (figure 3-1) ........................ ft. /sec. 3.95 11. Tt = L Compute Tt ..................••••• hr. 0.0070 0.0000 0.0000 3600 V Channel flow Segment ID 12. Cross sectional flow area, a z 13. Wetted perimeter, PW ......................................................... ft. 14. Hydraulic Radius, r = a / pW Compute r ......................... ft. 15. Channel slope, s ........................................................... ft. /ft. 16. Manning's roughness coefficient, n .................................. 17a. V = 1.49r213S'n Compute V ft. /sec. n 17b. Input Velocity, FPS ............................................... ft. /sec. 18. Flow length, L ...................................................................... ft. 19. Tt = L Compute Tt ..................................................... hr. 0.0000 • 3600 V 20. Total, Tc (add Ttin steps 6, 11, and 19) ......................... hr. 0.1643 21. Watershed Total, T, (maximum, Path #1, #2, or #3) ............................................................... 0.16 Hour 10 min A-29 STV 0 • STV/ RWA JOB: 3202-000 2 Consulting Engineers SUBJECT: Watershed No. 'I' Et 'J' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 OF Charlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE: 14-Feb-08 3 RUNOFF CURVE NUMBER AND RUNOFF Check one: ? Present 0 Developed Runoff Curve Number Soil name over description CN' Area Product and hydrologic of CN x area group (appendix A) (cover type, treatment, and hydrologic condition; percent impervious; N N N unconnected /connected impervious area ratio) N a, a, acres a, mi 2 ? > on > on % F- U- U- B Paved 98 0.3 29.4 B Commerical Business 92 B Low Residential 70 1.0 70.0 B Institutional 88 Totals == 1.3 99.4 - use only one L.N source per Line CN (weighted) = total product = 99.4 = 76.5 Use CN ====> 76 -1 total area 1.3 I Runoff Frequency .......................................................... .yi Rainfall, P (24-hour) ........................................ it Runoff, Q ............................................................ it (Use P and CN with table 2-1, figure 2.1, or equations 2-3 and 2.4) Storm # 1 Storm # 2 Storm # 3 Storm # 4 Storm # 5 2 10 25 100 3.04 4.72 5.63 7,04 1.04 2.31 3.06 4.29 A-30 STV • • STV / RWA JOB: Project Name 3 Consulting Engineers SUBJECT: Watershed No. 'I' & 'J' SHEET 1000 West Morehead Street, Suite 200 CALC'D BY: HSB DATE: 14-Feb-08 or Charlotte, NC 28208 (704) 372-1885 CHECK'D BY: EJV DATE. 14-Feb-08 3 GRAPHICAL PEAK DISCHARGE METHOD 1. Data Drainage area ........................................Am = Check one: ? Present E Developed 0.002 mi2 (acres/640) Runoff curve number ........................... CN = Time of concentration ........................ Tc = Rainfall distribution .................................... = Pond and swamp areas spread thoroughout watershed ............................. _ 2. Frequency .............................................................. yr 3. Rainfall, P (24-hour) ............................................... in 76 (From CN Et Runoff worksheet) 0.2 hr (From T, worksheet) II (I, IA, II, III) 0.0 percent of Am ( 0 ) acres or miz covered) Storm #1 Storm #2 Storm #3 Storm #4 Storm #5 2 10 25 100 3.04 4.72 5.63 7.04 4. Initial abstraction, la ................................................ in 0.632 0.632 0.632 0.632 (Use CN with table 4-1) 5. Compute la/P ............................................................. 0.21 0.13 0.11 0.09 6. Unit peak discharge, q .. ........ .......................... csm/in 625 660 670 680 (Use Tc and la/P with exhibit 4-II) 7. Runoff, Q .................................................................. in 1.04 2.31 3.06 4.29 (From CN lr Runoff worksheet) 8. Pond and swamp adjustment factor, Fp .................... E 1.00 1.00 1.00 1.00 (Use percent pond and swamp area with table 4-2. Factor is 1.0 for zero percent pond and swamp area.) • 9. Peak discharge, qp ............................................ ft3/s 2 4 5 7 (Where qp = q„AmQFp) A-31 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\PROJ\3202\Design\Hydro\PondPack\Pond 3\Project_Postdev_Watershed I_Pond 3.ppw is MASTER DESIGN STORM SUMMARY Network Storm Collection: Highpoint Total Depth Return Event in ------------ 2 ------ 3.0400 10 4.7200 25 5.6300 100 7.0400 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) • Return HYG Vol Node ID --------- --- ----- Type ---- Event ------ - cu.ft Trun --------- -- *OUTFALL I JCT 2 4916 *OUTFALL I JCT 10 10884 *OUTFALL I JCT 25 14454 *OUTFALL I JCT 100 20257 POND 3 IN POND 2 4917 POND 3 IN POND 10 10885 POND 3 IN POND 25 14455 POND 3 IN POND 100 20259 POND 3 OUT POND 2 4916 POND 3 OUT POND 10 10884 POND 3 OUT POND 25 14454 POND 3 OUT POND 100 20258 • Max Qpeak Qpeak Max WSEL Pond Storage hrs --------- cfs -------- ft -------- cu.ft ----- ----- 12.1500 1.19 - - 12.1500 2.71 12.1500 3.64 12.1500 5.13 12.0500 1.55 12.0500 3.56 12.0500 4.73 12.0500 6.60 12.1500 1.19 846.10 577 12.1500 2.71 846.47 1485 12.1500 3.64 846.66 1984 12.1500 5.13 846.94 2821 S/N: Bentley PondPack (10.00.027.00) 3:07 PM Bentley Systems, Inc. 4/16/2008 A-3z • APPENDIX B CULVERTS 0 0 CULVERTS DESIGN CRITERIA: • Secondary Routes (Major, City Thoroughfares) ..................................................................... 50-Year storm Secondary Routes ................................................................................................................... 25-year storm Headwater Elevation ............................................................................... 24" freeboard at low point in road Allowable HW/D Ratio ................................................................................................................. 1.2 or less Culvert Calculations The FHWA computer program HY-8 was used to perform the hydraulic analysis to size and analyze the proposed culverts. For thoroughfare roads, the culverts were designed for the 50-year storm, and checked using the 100-year event for road and structure flooding. Tailwater For culverts that discharged to a defined channel, the tailwater depth was the normal depth for the design storm. The downstream channel cross section was entered into HY-8 for open channel calculations. • Buried Pipe For environmental considerations, all culvert pipes were upsized one pipe diameter in order to bury the inverts below the existing stream bed. B-1 RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive (3202) 1 Consulting Engineers SUBJECT: Culvert Summary SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 6-Jun-07 OF Charlotte, NC 28235 (704) 372-1885 CHEK'D BY: EVJ DATE: 6-Jun-07 1 PRELIMINARY CULVERT SUMMARY SHEET RUNOFF Rational Method: Q = C*I*A*Cf - (Cfzs = 1.1, Cfso = 1.2, Cf,oo = 1.25) SITE DATA OR PIPE DATA RESULTS NCDOT Highway Drainage Chart C200.3 on c c o ^ + L) V N L N L C L N L C L N L C\ .•.. ^ ?. ^ i••. Vf w N N W 0 ^ 7 s to N 4J 0) cu . ,,.., w E c >, w Q v '-c-- 5 5 c :. c c c `u E an 3 v 3 3 '> o 0 to rn ?- L -- L L - L O L L o `m _ m c n ° o o CL x = O^ U 0 Ry H> ^ c o c C r r- r c} N ?o `° ro N ^ ^ ." v v v >- >- L n > - 7 c o n o ' o o ' L to E E ,oo rt? mo o mo .? oo ,. ouf ' ,? o 00 }, ac ca. > > d' o o o o m J W .... Q . V 0 N Q' Q' _ N [l L C C E. If1 t- N _ om.. ?. W W 47 53+85 N/A 839.0 36.96 v C200.3 Chart 50 68 93 108 RCP 54 200 817.40 809.00 0.042 821.69 0.95 17.94 822.18 >100 30 40+67 N/A 841.0 10.64 C200.3 Chart 25 34 46 54 RCP 36 130 834.00 830.00 0.031 836.57 0.86 13.31 836.90 >100 Notes: (1) Design year = 50 year storm and checked for the 100 year. (2) Assumed minimum slope 0.5%. (3) Invert elevations are estimates from High Point topo and prelimi nary al ignment. Elevations will be determined from survey. (4) Roadway elevation was not known at time of preliminary sizing. Minimum cover should be T to base. (4) Headwater elevations were calculated using HY8. (5) Based upon 404 Permitting, culverts will be buried V for 48" or larger and 20% for culverts less than 48". Structure #47 was analyzed as a 54" RCP. Structure # 47 should be constructed as a 60" RCP with inverts buried 1.0' Structure #30 was analyzed as --a 36" RCP. Structure #30 should be constructed as a 42" RCP with inverts buried 0.6' n ;„eN C"--' o,e;; ,tee A; B-2 G?ve-c+ -*- H-7 APPENDIX C SHEET 3 OF 8 • • t :Yfrt.l PL E 61VEN HYDROLDiTIC CONTOUR 5.0 ORRINRGF RRER 35 RC SMRL L RRER FUL L BU5/NE 55 AN5WER 010 39 x l•4 = 54.0 Cf5, j v ? 2 4 0 3 2, o00 iaoo e00 600 400 =L-200 Jos /00 $ O -?`cXA?1p Q16 5? 1 0 20 t l5 !D ?!0 -- 0 u1 cs1 ? v 4i ?W W W w ??W 2 ?v >W hV gzz c411 vE GORR?F?ON s FD DEVELo NT U O c? /000 6 00 ago 1 -? 200 t • 100 50 V) ,4 0 Lk" .30 crl- 20 Q lp 5 o ,ORCTOR5 FOR FREQUENCIES 1 ?Q 0 CURVE VRGUE z 1.75 60C 25 11 rr x 1.35 Qb A 2.3 0 it a x 8 Q? - 50 C 135 J= (og CA Q It x : !5 Qb = 5o (185) = G 3 C-6 Q c , = 60(a.15)= 108 r-As RUNOFF FROM URBAN RR585 NORTN CAROLINA 57T5 NIGHwRY CohjNr1551aN URN, / ?3 C 200.3 • CHART C 200.3 B- 3 BASIN I.D.: Culvert #47 (PROPOSED) LOCATION: Hartley Drive - STA. 53+85 1 OF 3 • CURRENT DATE: 04-14-2008 FILE DATE: 4/14/2008 CURRENT TIME: 14:46:39 FILE NAME: 47 FHWA CULVERT ANALYSIS HY-8, VERSION 6.1 3 C 3 SITE DATA 3 CULVERT SHAPE, M ATERIAL, INLET 3 3 U ... .. .. .. .. .. ... .. ... ... .. .. .. .. .. .. .. .. .. .. ... .. e .. .. .. .. .. .. .. .. ... .. .. .. .. .. .. . .. .. .. .. .. .. ... .. .. .. .. .. ... .. .. .. .. .. ... .. .. . . .. .. .. , 3 L 3 INLET OUTLET CULVERT 3 BARRELS 3 3 V 3 ELEV. ELEV. LENGTH 3 SHAPE SPAN RISE MANNING INLET 3 3 NO.3 (ft) (ft) (ft) 3 MATER IAL (ft) (ft) n TYPE 3 3 1 3 817.40 809.00 200.18 3 1 RCP 4.50 4.50 .012 CONVENTIONAL 3 3 2 3 3 3 3 3 3 3 3 3 4 3 3 3 3 5 3 3 3 3 6 3 3 3 iJ SUMMARY OF CULVERT FLOWS (cfs) FILE: 47 DATE: 4/14/2008 ELEV (ft) TOTAL 1 2 3 4 5 6 ROADWAY ITR 820.28 50.0 50.0 0.0 0.0 0.0 0.0 0.0 0.00 1 820.48 55.8 55.8 0.0 0.0 0.0 0.0 0.0 0.00 1 • 820.68 820.87 61.6 67.4 61.6 67.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.00 1 1 821.06 73.2 73.2 0.0 0.0 0.0 0.0 0.0 0.00 1 821.24 79.0 79.0 0.0 0.0 0.0 0.0 0.0 0.00 1 821.42 84.8 84.8 0.0 0.0 0.0 0.0 0.0 0.00 1 821.61 90.6 90.6 0.0 0.0 0.0 0.0 0.0 0.00 1 821.69 93.0 93.0 0.0 0.0 0.0 0.0 0.0 0.00 1 821.99 102.2 102.2 0.0 0.0 0.0 0.0 0.0 0.00 1 822.18 108.0 108.0 0.0 0.0 0.0 0.0 0.0 0.00 1 839.00 344.9 344.9 0.0 0.0 0.0 0.0 0.0 OVERTOPPING SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: 47 DATE: 4/14/2008 HEAD HEAD TOTAL FLOW % FLOW ELEV ( ft) ERROR (ft ) FLOW (cf s) ERROR (cfs) ERROR 820.28 0.000 50.00 0.00 0.00 820.48 0.000 55.80 0.00 0.00 820.68 0.000 61.60 0.00 0.00 820.87 0.000 67.40 0.00 0.00 821.06 0.000 73.20 0.00 0.00 821.24 0.000 79.00 0.00 0.00 821.42 0.000 84.80 0.00 0.00 821.61 0.000 90.60 0.00 0.00 821.69 0.000 93.00 0.00 0.00 821.99 0.000 102.20 0.00 0.00 . 822.18 0.000 108.00 0.00 0.00 <1> TOLERANCE (ft) = 0.010 <2> TOLERANCE ($) = 1.000 B-4 BASIN I.D.: Culvert #47 (PROPOSED) LOCATION: Hartley Drive - STA. 53+85 • • • 2 OF 3 CURRENT DATE: 04-14-2008 CURRENT TIME: 14:46:39 A.A,AA.A.AAA.A,AAADAAZillbziiibbriririribriririri???riri?BSarXXh PERFORMANCE CURVE FOR CULVERT 1 - 1( AAAAAAAAAAAA.AAAAAAAtiiiaa???riribriririri????riri??TTT DIS- HEAD- INLET OUTLET CHARGE WATER CONTROL CONTROL FLOW NORMAL FLOW ELEV. DEPTH DEPTH TYPE DEPTH (cfs) (ft) (ft) (ft) <F4> (ft) ?.A,A.AAAAA.A.A,AAA.AAAAAAAiizaziiiribbriria?S?riririri?ririribba 50.00 820.28 2.88 2.88 1-S2n 1.01 55.80 820.48 3.08 3.08 1-S2n 1.07 61.60 820.68 3.28 3.28 1-S2n 1.12 67.40 820.87 3.47 3.47 1-S2n 1.18 73.20 821.06 3.66 3.66 1-S2n 1.23 79.00 821.24 3.84 3.84 1-S2n 1.29 84.80 821.42 4.02 4.02 1-S2n 1.34 90.60 821.61 4.21 4.21 1-S2n 1.39 93.00 821.69 4.29 4.29 1-S2n 1.40 102.20 821.99 4.59 4.59 5-S2n 1.47 108.00 822.18 4.78 4.78 5-S2n 1.51 El. inlet face invert 817.40 ft E1. inlet throat invert 0.00 ft FILE DATE: 4/14/2008 FILE NAME: 47 AAAAAA.A.AAAAAAkizizizitin?riririri?briririri?srinT 4.50 (ft) BY 4.50 (ft)) RCP .. ... .. .. .. .. ... .. .. . . . . . A AAAAAAAAAAAAAA?iAAriria????rinri?ri?8rir CRIT. OUTLET TW OUTLET TW DEPTH DEPTH DEPTH VEL. VEL. (ft) (ft) (ft) (fps) (fps) 2.03 1.03 1.83 17.94 4.69 2.16 1.11 1.94 18.12 4.84 2.28 1.08 2.05 20.81 4.97 2.38 1.23 2.15 18.93 5.09 2.49 1.29 2.25 19.41 5.20 2.59 1.35 2.34 19.65 5.31 2.70 1.42 2.43 19.73 5.41 2.79 1.47 2.56 20.10 5.55 2.82 1.48 2.61 20.32 5.60 2.96 1.56 2.69 20.77 5.68 3.05 1.62 2.77 20.89 5.77 El. outlet invert 809.00 ft E1. inlet crest 817.40 ft ***** SITE DATA ***** CULVERT INVERT ************** INLET STATION 0.00 ft INLET ELEVATION 817.40 ft OUTLET STATION 200.00 ft OUTLET ELEVATION 809.00 ft NUMBER OF BARRELS 1 SLOPE (V/H) 0.042 0 CULVERT LENGTH ALONG SLOPE 200.18 ft ***** CULVERT DATA SUMMARY ************************ BARREL SHAPE CIRCULAR BARREL DIAMETER 4.50 ft BARREL MATERIAL CONCRETE BARREL MANNING'S n 0.012 INLET TYPE CONVENTIONAL INLET EDGE AND WALL SQUARE EDGE WITH HEADWALL INLET DEPRESSION NONE B-5 BASIN I.D.: Culvert #47 (PROPOSED) LOCATION: Hartley Drive - STA. 53+85 • • CURRENT DATE: 04-14-2008 CURRENT TIME: 14:46:39 FILE DATE: 4/14/2008 FILE NAME: 47 3 OF 3 .................................................. AAAAAb.?.IAAAAAAAAAA?lht1Z1Z1Z1?Z?I?Z1???Z1Zn?Za???a?t?tiTTTT?TrrhrrrXfirXXTt?TTS? ??HHHHHHHHHHHHHHH? .. ............................................. TAILWATER .. .. .. .......................................... ............................................................... AAAAAAAAAA?AAAAAA?pAAklt??n?Z1?b??????nnnnnnntinrrrrTTrrrirTrS?rTrT?xrrr •• •• ••fi •• •• •• •? •• •• •• ?? •? •• H H H H H H H H H H H H H H Hyy ******* REGULAR CHANNEL CROSS SECTION **************** BOTTOM WIDTH 4.00 ft SIDE SLOPE H/V (X:1) 1.0 CHANNEL SLOPE V/H (ft/ft) 0.010 MANNING'S n (.01-0.1) 0.035 CHANNEL INVERT ELEVATION 809.00 ft CULVERT NO.1 OUTLET INVERT ELEVATION 809.00 ft ******* UNIFORM FLOW RATING CURVE FOR DOWNSTREAM CHANNEL FLOW W.S.E. FROUDE DEPTH VEL. SHEAR (cfs) (ft) NUMBER (ft) (f/s) (psf) 50.00 810.83 0.701 1.83 4.69 1.14 55.80 810.94 0.704 1.94 4.84 1.21 61.60 811.05 0.707 2.05 4.97 1.28 67.40 811.15 0.710 2.15 5.09 1.34 73.20 811.25 0.713 2.25 5.20 1.40 79.00 811.34 0.715 2.34 5.31 1.46 84.80 811.43 0.718 2.43 5.41 1.52 90.60 811.56 0.720 2.56 5.55 1.60 93.00 811.61 0.722 2.61 5.60 1.63 102.20 811.69 0.724 2.69 5.68 1.68 108.00 811.77 0.725 2.77 5.77 1.73 .................................................... AXa?A?,AAA?AAk1?1AAAAAh1a21?1X1Z1Z1AZ1???21Z1I.1Z1?h?a?Z???b??ziziz??briririTi?rXTTTXXrrS?RTXXxxrrrr5?.. ..N? ROADWAY OVERTOPPING DATA ................................................. ? AAAAAAAAb.?X??AAA?bbtaAbAAb11t?A??????nn??nriririri??anririririt?rTri?xhTTT?fiTTTTTTTxrr;;;;rte ROADWAY SURFACE PAVED EMBANKMENT TOP WIDTH 40.00 ft CREST LENGTH 100.00 ft OVERTOPPING CREST ELEVATION 839.00 ft • B-6 • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley; Drive (3202) 1 Consulting Engineers SUBJECT: #47 - Buried Pipe SHEET 1000W. Morehead Street P.O. Box 35624 CA!_cD BY: AMA DATE: 14-Mar-06 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: DATE: 1 Area of Buried Pipe Structure No. #47 Road Name Hartley Dr. Sta. 53+85 Determine the area of a buried pipe to the area of the designed pipe. GIVEN: Design Pipe Diameter (in) = 54 Buried Pipe: D = Pipe Diameter (in) 60 r= Pipe radius (ft) 2.5 d = Depth Buried (ft) 1.0 SOLUTION: Determine the area of the buried pipe. • 0 (radians) = 2 (arccos [ (r-d)/r ]) _ Atot., (ft i Area of the Segment = Asp (ft) _ [ r2(0 - sin 0)] / 2 = Area of the buried pipe = Aburied = Apipe - Aseg = i CHECK: Diameter of area buried (in) = (4 * Aburied CONCLUSION: • Buried Pipe Area.xls 1.85 19.63 2.80 16.84 55.6 > 54 = Ddesign (in) B-7 cu I vim- -44-- 30 • • APPENDIX C SHEET 3 OF 8 E XRld PL G I YEN 1000 NYDROLC3GIC CONTOUR 5. D 2, ao? ORAINRGF AREA 35 RC. 5AM L RRER FULL B41511VE 55 00 AN5 wER /, 000 Q 14 = 39 x 4 = 54. ?o CF .9. eoo 400 600 j 400 .1. > e -? 200 o ? 20o z v ? . _ExA X80 !oo 0 4 ?O 3 50 Z 140 Qia aS ~ 30 Qt? 1'S !p O 20 1.0 0 0.5 4 !o w CLW WW :zs Stz = v ?? ?? o zzi ¢v >w O CU,YE N 'S FMVEORONWNjT FRCTORS FOR FREQUENCIES 1 t ?Q 5 CURVE MUF X % 75 /0 if N 9 25 irl a x 1:35 Qua' a5 C,?'s a/00 tr 50 it 5 Qsty- a5 (i 35 It x 05cr= a5 (1•ft) = y(o a? Q,vo Q5 (a.15)= 54-1 C£'s RUNOFF FROM UR 5RN RRE85 NORTH CAROLINA STVTE HIGHWRY COMh115510N URN, / 7.9 C 200.3 • CHART C 200.3 S- S BASIN I.D.: Culvert #30 (PROPOSED) LOCATION: Hartley Drive - STA. 40+67 1 OF 3 • CURRENT DATE: 04-14-2008 FILE DATE: 4/14/2008 CURRENT TIME: 14:50:45 FILE NAME: 30 FHWA CULVERT ANALYSIS HY-8, VERSION 6.1 UAAAAAAAAAAAA AAAAAAAA AAAAAAA7? 7?AAAAXi2i AA1aAA11AI 1I1X\I1Z1b Z1Ab3ititiriri ??n?bri??? 8?briri?? ???? 3 C 3 SITE DATA 3 CULVERT SHAPE, MATERIAL, INLET ? 3 3 U P?AAAAAA AAtabk?XlbA AAAAAAAA ZIAAZiA bAAibz izitiAAA tiSif\AAZ1ii ri??riri?ri?ri riririririri8 88riri 3 L 3 INLET OUTLET CULVERT 3 BARRELS 3 V 3 ELEV. ELEV. LENGTH 3 SHAPE SPAN RISE MANNING INLET 3 3NO.3 (ft) (ft) (ft) 3 MATERIAL (ft) (ft) n TYPE 3 3 1 3 834.00 830.00 119.06 3 1 RCP 3.00 3.00 .012 IMPR SDT REC 3 3 2 3 3 3 3 3 3 3 3 3 4 3 3 3 3 5 3 3 3 3 6 3 3 3 P,AAA,A,A,?,?,?k?AAA A.A,A.?,A.P.AA bZ1?1A.A 31?AAtl AbbtiA??A ??tiAtlt?? 3i?zari? ???b?b?n ?b?b??ririS ri??brinriri ??Si U SUMMARY OF CULVERT FLOWS (cfs) FILE: 30 DATE: 4/14/2008 r ELEV (ft) TOTAL 1 2 3 4 5 6 ROADWAY ITR 835.59 25.0 25.0 0.0 0.0 0.0 0.0 0.0 0.00 1 835.73 27.9 27.9 0.0 0.0 0.0 0.0 0.0 0.00 1 835.88 30.8 30.8 0.0 0.0 0.0 0.0 0.0 0.00 1 836.02 33.7 33.7 0.0 0.0 0.0 0.0 0.0 0.00 1 • 836.15 36.6 36.6 0.0 0.0 0.0 0.0 0.0 0.00 1 836.28 39.5 39.5 0.0 0.0 0.0 0.0 0.0 0.00 1 836.41 42.4 42.4 0.0 0.0 0.0 0.0 0.0 0.00 1 836.54 45.3 45.3 0.0 0.0 0.0 0.0 0.0 0.00 1 836.57 46.0 46.0 0.0 0.0 0.0 0.0 0.0 0.00 1 836.78 51.1 51.1 0.0 0.0 0.0 0.0 0.0 0.00 1 836.90 54.0 54.0 0.0 0.0 0.0 0.0 0.0 0.00 1 841.00 AP,?AA?A,?,A.A,?,Ab 110.5 b.AAX1A?Ab 110.5 AA.?b?b?lA?ta 0.0 tl??Ata?zlzi 0.0 tiri??ri?ri 0.0 ?bff?ri 0.0 ?ribriribb? 0.0 OVERTOPPING nri?rii????riri??fi?;hrirXhh r SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: 30 DATE: 4/14/2008 HEAD HEAD TOTAL FLOW o FLOW ELEV ( ft) ERROR (ft ) FLOW (cf s) ERROR (cfs) ERROR 835.59 0.000 25.00 0.00 0.00 835.73 0.000 27.90 0.00 0.00 835.88 0.000 30.80 0.00 0.00 836.02 0.000 33.70 0.00 0.00 836.15 0.000 36.60 0.00 0.00 836.28 0.000 39.50 0.00 0.00 836.41 0.000 42.40 0.00 0.00 836.54 0.000 45.30 0.00 0.00 836.57 0.000 46.00 0.00 0.00 836.78 0.000 51.10 0.00 0.00 836.90 0.000 54.00 0.00 0.00 .......................... <1> TOLERANCE (ft) ............ = 0.010 ......... .......... ........................... <2> TOLERANCE ($) ......... = 1.000 ..... . B-9 BASIN I.D.: Culvert #30 (PROPOSED) LOCATION: Hartley Drive - STA. 40+67 • CURRENT DATE: 04-14-2008 CURRENT TIME: 14:50:45 PERFORMANCE CURVE FOR CULVERT 1 - 1( DIS- HEAD- INLET OUTLET CHARGE WATER CONTROL CONTROL FLOW NORMAL FLOW ELEV. DEPTH DEPTH TYPE DEPTH (cfs) (ft) (ft) (ft) <F4> (ft) 25.00 835.59 1.59 1.59 1-S2n 0.90 27.90 835.73 1.73 1.73 1-S2n 0.95 30.80 835.88 1.88 1.88 1-S2n 1.00 33.70 836.02 2.02 2.02 1-S2n 1.05 36.60 836.15 2.15 2.15 1-S2n 1.10 39.50 836.28 2.28 2.28 1-S2n 1.14 42.40 836.41 2.41 2.41 1-S2n 1.19 45.30 836.54 2.54 2.54 1-S2n 1.24 46.00 836.57 2.57 2.57 1-S2n 1.25 51.10 836.78 2.78 2.78 1-S2n 1.32 54.00 836.90 2.90 2.90 1-S2n 1.36 El. inlet face invert 834.00 ft El. inlet throat invert 833.66 ft 2 OF 3 FILE DATE: 4/14/2008 FILE NAME: 30 3.00 (ft) BY 3.00 (ft)) RCP CRIT. OUTLET TW OUTLET TW DEPTH DEPTH DEPTH VEL. VEL. (ft) (ft) (ft) (fps) (fps) 1.61 0.94 1.43 13.31 3.95 1.70 0.99 1.52 13.62 4.07 1.80 1.05 1.60 13.95 4.18 1.88 1.11 1.68 14.14 4.29 1.96 1.16 1.76 14.47 4.38 2.04 1.22 1.83 14.61 4.47 2.12 1.27 1.90 14.90 4.56 2.19 1.33 1.98 15.03 4.65 2.20 1.34 2.03 15.03 4.71 2.32 1.42 2.10 15.53 4.78 2.38 1.47 2.16 15.61 4.85 El. outlet invert 830.00 ft El. inlet crest 834.00 ft ***** SITE DATA ***** CULVERT INVERT ************** • INLET STATION 0.00 ft INLET ELEVATION 834.00 ft OUTLET STATION 130.00 ft OUTLET ELEVATION 830.00 ft NUMBER OF BARRELS 1 SLOPE (V/H) 0.0308 CULVERT LENGTH ALONG SLOPE 119.06 ft ***** CULVERT DATA SUMMARY BARREL SHAPE BARREL DIAMETER BARREL MATERIAL BARREL MANNING'S n INLET TYPE INLET EDGE AND WALL INLET DEPRESSION ************************ CIRCULAR 3.00 ft CONCRETE 0.012 IMPR SDT RECT BEVELED EDGE TOP (15-26 DEG WINGWALL) NONE ***** SIDE-TAPERED RECTANGULAR IMPROVED INLET *** FACE WIDTH 8.50 ft SIDE TAPER (4:1 TO 6:1) (X:1) 4.00 • B-10 BASIN I.D.: Culvert #30 (PROPOSED) LOCATION: Hartley Drive - STA. 40+67 • • CURRENT DATE: 04-14-2008 CURRENT TIME: 14:50:45 FILE DATE: 4/14/2008 FILE NAME: 30 3 OF 3 .......................................................... . AAA,AX?AAAAAAAAAAAAAbAAAAAAAAAAAAAAAAt1t?????riZi?bZi???????ii???ri?ririnririririiiRrrirrS?TrTt?x .......................... . . ..................... TAILWATER ******* REGULAR CHANNEL CROSS SECTION **************** BOTTOM WIDTH 3.00 ft SIDE SLOPE H/V (X:1) 1.0 CHANNEL SLOPE V/H (ft/ft) 0.010 MANNING'S n (.01-0.1) 0.035 CHANNEL INVERT ELEVATION 830.00 ft CULVERT NO.1 OUTLET INVERT ELEVATION 830.00 ft ******* UNIFORM FLOW RATING CURVE FOR DOWNSTREAM CHANNEL FLOW W.S.E. FROUDE DEPTH VEL. SHEAR (cfs) (ft) NUMBER (ft) (f/s) (psf) 25.00 831.43 0.670 1.43 3.95 0.89 27.90 831.52 0.674 1.52 4.07 0.95 30.80 831.60 0.677 1.60 4.18 1.00 33.70 831.68 0.679 1.68 4.29 1.05 36.60 831.76 0.682 1.76 4.38 1.10 39.50 831.83 0.684 1.83 4.47 1.14 42.40 831.90 0.686 1.90 4.56 1.19 45.30 831.98 0.689 1.98 4.65 1.24 46.00 832.03 0.690 2.03 4.71 1.27 51.10 832.10 0.692 2.10 4.78 1.31 54.00 832.16 0.694 2.16 4.85 1.35 AA,?,A?,AAA,A,?,????AAAAA,A.AAA,??.X?At?AA.AAbti?ibbt?AAZiAA2i?Abtiti?iAA????bri??riririri?ririb?rinririaS?iiTrr AAAAAAAAAAAAAAAAAAAAAAAAAA ROADWAY OVERTOPPING DATA .. .. ............................................ AAA.AA.AAA.AAAA,A,?,AA.AAAAAAA.AA,P.AAAAAA?AAAA.AAAAAAA??I?AAAA,AbAtiAzi2iririri??ririri?riririri?riS?aririari ROADWAY SURFACE PAVED EMBANKMENT TOP WIDTH 40.00 ft CREST LENGTH 100.00 ft OVERTOPPING CREST ELEVATION 841.00 ft • B-11 • RALPH WHITEHEAD ASSOCIATES, INC. Job: Hartley Drive (3202) 1 Consulting Engineers SUBJECT: #30 - Buried Pipe SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: AMA DATE: 14-Mar-06 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: DATE: 1 Area of Buried Pipe Structure No. #30 Road Name Hartley Dr. Sta. 40+67 Determine the area of a buried pipe to the area of the designed pipe. GIVEN: Design Pipe Diameter (in) = 36 Buried Pipe: D = Pipe Diameter (in) 42 r= Pipe radius (ft) 1.75 d = Depth Buried (ft) 0.6 SOLUTION: Determine the area of the buried pipe. • 0 (radians) = 2 (arccos [ (r-d)/r ]) _ Atotal (ft z) ° 1[ r2 _ Area of the Segment = ASeg (ft') _ [ rZ(0 - sin 0)] / 2 = Area of the buried pipe = Aburied = Apipe - ASeg = CHECK: Diameter of area buried (in) _ (4 * Aburied / 700.s = CONCLUSION: • Buried Pipe AreaAs 1.71 9.62 1.10 8.52 39.5 > 36 = Ddesign (in) B-12 • APPENDIX C ROADSIDE CHANNELS 0 0 ROADSIDE CHANNELS • DESIGN CRITERIA: Discharge ....................................................................................................................................10-yr storm Minimum Slope ................................................................................ 0.5 % (desirable), 0.30% (acceptable) Permissible Shear Stress (for Class `C' Vegetation) .................................................................... 1.00 lb/ft2 Permissible Shear Stress (for Class I Riprap) ............................................................................... 3.00 lb/ft2 Permissible Shear Stress (for Class II Riprap) .............................................................................. 4.00 lb/ft2 Flow Depth Flow depth is an iterative process using the Manning's equation combined with the continuity equation: Q = [1.486 A Rai' Slit] / n Where: Q = discharge (cfs) n = Manning's roughness coefficient A = cross-sectional area (ft) R = hydraulic radius (ft) S = slope (ft/ft) • Shear Stress Shear stress is calculated from the following equation from HEC 15: Td: Where: Td v= d= S= v d S shear stress (lb/ ft2) unit weight of water (62.4 lb/ ft3 flow depth (ft) slope (ft/ft) The permissible shear stress approach was used to analyze the proposed channels. If the computed shear stress is less than the permissible for the particular lining, then the channel is assumed to be stable. The initial calculation assumes a class `C' vegetative lining with a permissible shear stress of 1.00 lb/ ft2 as indicated in Table 2, page 36 of HEC 15. If the "shear comment" column on the following spreadsheets indicates "FIX," then an alternate lining was used. • C-1 0 0 RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive 1 Consulting Engineers SUBJECT: Riprap Ditch Analysis SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE 14-Jun-07 or Charlotte, NC 28235 (704) 372-1885 CHEK'D BY: DATE 2 DITCH ANALYSIS USING MANNINGS OPEN CHANNEL FOR RIPRAP LININGS For 6 Inch Riprap (Enter 6, 9, 12, or 14) From Station: 63+00 To Station: 64+50 Road Name: Hartley Drive (RT) SL= 6.00 SR= 4.00 B= 0.00 From Ditch Ditch To Ditch Ditch Q(Actual) Depth Mannings Slope Area Wetted Hyd. Rad. Velocity Q(Cal.) Depth Shear Depth Shear ct. Flov n-th Cta Flav Denth r_f_a. ft. n ft. /ft. so. ft. Perim. ft. f. D. S. c.f.S. ft. P.S.f. Comment Comment 63+00 854.77 2.0 63+50 854.08 2.0 3.6 0.75 0.069 0.0138 2.78 7.61 0.37 1.30 3.6 0.75 0.64 GOOD GOOD 63+50 854.08 2.0 64+00 853.00 1.0 3.6 0.69 0.069 0.0216 2.35 7.00 0.34 1.53 3.6 0.69 0.92 GOOD GOOD 64+00 853.00 1.0 64+50 850.50 1.2 3.6 0.59 0.069 0.0500 1.71 5.98 0.29 2.10 3.6 0.59 1.83 GOOD GOOD Roadside Channels Riorao.xls C-2 • • • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive 2 Consulting Engineers SUBJECT: Riprap Ditch Analysis SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE 14-Jun-07 OF Charlotte, NC 28235 (704) 372-1885 CHEK'D BY: EJV DATE 14-Jun-07 2 DITCH ANALYSIS USING MANNINGS OPEN CHANNEL FOR RIPRAP LININGS For 6 Inch Riprap (Enter 6, 9, 12, or 14) From Station: 67+00 To Station: 69+50 Road Name: Hartley (LT) SL= 4.00 SR= 6.00 B= 0.00 From Ditch Ditch To Ditch Ditch Q(Actual) Depth Manning's Slope Area Wetted Hyd. Rad. Velocity Q(Cal.) Depth Shear Depth Shear «k , f e ft n ft /ft cn ft PPrim_ ft- f.D.S. c.f.s. ft. p.s.f. Comment Comment 67+00 847.82 1.5 67+50 845.86 1.5 2.7 0.55 0.069 0.0392 1.51 5.62 0.27 1.78 2.7 0.55 1.35 GOOD GOOD 67+50 845.86 1.5 68+00 843.74 1.0 2.7 0.54 0.069 0.0424 1.47 5.53 0.27 1.84 2.7 0.54 1.43 GOOD GOOD 68+00 843.74 1.0 68+50 841.68 0.8 2.7 0.55 0.069 0.0412 1.49 5.56 0.27 1.82 2.7 0.55 1.40 GOOD GOOD 68+50 841.68 0.8 69+00 838.70 1.0 2.7 0.51 0.069 0.0596 1.29 5.19 0.25 2.09 2.7 0.51 1.89 GOOD GOOD 69+00 838.70 1.0 69+50 837.24 1.0 2.7 0.58 0.069 0.0292 1.69 5.93 0.28 1.60 2.7 0.58 1.06 GOOD GOOD C-3 P-i,id. fh.-I, Pin- As • APPENDIX D INLET/GUTTER CAPACITY • INLET/GUTTER CAPACITY DESIGN CRITERIA: • Storm Event .......................................................................................................................................10 year Maximum Gutter Spread .......................................................................................................................... 8 ft Gutter Spread The "City of High Point Storm Drainage System Design Manual" set two limits for the gutter spread. The flow shall not encroach within 8 feet of the street centerline and the width of the flow shall not exceed 10-feet from the face of curb. Based on these limits the allowable spread on Hartley Drive is 8 feet. Flow Depth Using the maximum flow width and various slopes for the road, the flow depth and capacity can be determined. To determine capacity, the Manning's equation combined with the continuity equation is used: Q = [1.486 A R"3 SL 112, / n Where: Q = discharge (c.f.s.) n = Manning's roughness coefficient A = cross-sectional area (ft.2) R = hydraulic radius (ft.) • SL= Longitudinal slope (ft./ft.) To determine the maximum spacing to contain the flow within the allowable spread, the Rational Method and the maximum Q is used to solve for the spacing length. Curb Inlet Capacity All inlets are spaced to catch the 10-year storm event and so that the flow does not exceed the maximum allowable gutter flow. Furthermore, the spacing should be set so the flow is within the maximum allowable volume to curb inlets. Drop Inlet Capacity The capacity of rectangular grates for drop inlets is determined from an equation that relates the flow to head and opening area. Q = CA(2gh)'/2 x (2/3) Q = Capacity (cfs) C = Orifice Coefficient (0.6 for square edges / 0.8 for rounded edges) A = Net area of opening (ft2) g = 32.2 ft/sec2 h =allowable head (ft) Yard Inlet Capacity The capacity for the yard inlet is determined using the Chart for "Yard Inlet Capacity"(page 17-18, • "City of High Point Storm Drainage System Design Manual"). D-1 • • r RALPH WHITEHEAD ASSOCIATES, INC. JOB: 3202000 Hartley Drive 1 Consulting Engineers SUBJECT: Inlet Capacity SHEET 1000 W. Morehead Street P.O. Box 35624 CALCD BY: HS13 DATE: 14-Apr-08 OF Charlotte, NC 28235 704 372-1885 CHEK'D BY: EJy DATE: 14-Apr-08 2 Inlet/Gutter Capacity Chart (4'-10" Curb Opening) Rainfall Intensity (in/hr): 4.00 Pavement n-Value: 0.012 Inlet Drainage Surface Q (c.f.s.) Slope (ft/ft) Inlet Bypass # Area (ac.) Sub. Total Long. Trans. Eff. Qcap Spread Q (cfs) To Inlet # Remarks 2 0.16 0.61 0.61 0.0330 0.0200 0.91 0.56 4.29 0.05 4 4 0.17 0.65 0.70 0.0330 0.0200 0.87 0.61 4.52 0.09 7 7 0.26 0.99 1.08 0.0058 0.0200 ' 0.91 0.98 7.37 0.09 10 10 0.29 1.10 1.28 0.0058 0.0300 0.94 1.20 6.10 0.08 12 12 0.38 1.44 1.52 0.0058 0.0300 0.89 1.36 6.51 0.16 13 14 0.22 0.84 1.00 0.0075 0.0300 0.98 0.97 5.29 0.02 14 15 0.33 1.25 1.31 0.0075 0.0300 0.91 1.19 5.86 0.12 16 16 0.33 1.25 1.37 0.0075 0.0300 0.90 1.23 5.97 0.14 17 17 0.29 1.10 1.24 0.0075 0.0300 0.93 1.15 5.75 0.09 18 18 0.23 0.87 0.97 0.0498 0.0300 0.81 0.78 3.67 0.18 20 20 0.18 0.68 0.87 0.0498 0.0300 0.85 0.73 3.52 0.13 22 22 0.27 1.03 1.16 0.0498 0.0300 ` 0.75 0.87 3.93 0.29 24 24 0.18 0.68 0.97 0.0498 0.0300 0.81 0.79 3.68 0.18 End 3 0.15 0.57 0.57 0.0330 0.0200 0.93 0.53 4.19 0.04 6 6 0.13 0.49 0.53 0.0330 0.0200 0.95 0.51 4.09 0.03 8 9 0.27 1.03 1.05 0.0058 ' 0.0200 0.92 0.97 7.31 0.09 10 5 0.13 0.49 0.49 0.0330 0.0300 1.00 0.49 3.08 0.00 7 13 0.27 1.03 1.03 0.0075 0.0300 0.97 1.00 5.35 0.03 15 19 0.36 1.37 1.37 0.0498 0.0200 0.62 0.85 5.39 0.52 21 21 0.14 0.53 1.05 0.0498 0.0200 0.70 0.74 4.89 0.32 23 23 0.40 1.52 1.84 0.0498 0.0200 0.53 0.98 6.02 0.86 End 28 0.42 1.60 1.60 0.0350 0.0300 0.69 1.10 4.73 0.50 26 26 0.30 1.14 1.64 0.0350 0.0200 0.60 0.98 6.15 0.66 23 23 0.40 1.52 2.18 0.0350 0.0200 0.52 1.13 6.85 1.05 End D-2 0 0 & RALPH WHITEHEAD ASSOCIATES, INC. 1 JOB: 3202000 Hartley Drive 2 Consulting Engineers w SUBJECT: Inlet Capacity SHEET 1000 W. Morehead Street P.O. Box 35624 CALCD BY: HSB DATE: 14-Apr-08 OF Charlotte, NC 28235 704 372-1885 CHEWD BY: EJV DATE: 14-Apr-08 2 Inlet/Gutter Capacity Chart (4'-10" Curb Opening) Rainfall Intensity (in/hr): 4.00 Pavement n-Value: 0.012 Mnvimi im Iz--l• 0. Inlet Drainage Surface Q (c.f.s.) Slope (ft/ft) Inlet Bypass 4 Area (ac.) Sub. Total Long. Trans. Eff. Qcap Spread Q (cfs) To Inlet # Remarks 29 0.48 1.82 1.82 0.0350 0.0300 0.65 1.18 4.98 0.64 27 27 0.29 1.10 1.74 0.0350 0.0200 " 0.58 1.01 6.30 0.73 24 24 0.18 0.68 1.42 0.0350 0.0200 0.64 0.91 5.83 0.51 End 31 0.08 0.30 0.30 0.0075 0.0200 0.99 0.30 4.37 0.00 38 38 0.26 0.99 0.99 0.0075 0.0200 0.91 0.90 6.81 0.09 40 40 0.23 0.87 0.96 0.0075 0.0200 0.92 0.88 6.73 0.08 42 43 0.29 1.10 1.18 0.0075 0.0200 0.86 1.02 7.26 0.16 45 45 0.18 0.68 0.85 0.0075 0.0200 0.95 0.81 6.42 0.04 End 32 0.10 0.38 0.38 0.0075 0.0200 1.00 0.38 4.75 0.00 39 39 0.22 0.84 0.84 0.0075 0.0200 0.96 0.80 6.39 0.04 41 41 0.18 0.68 0.72 0.0075 0.0200 0.98 0.71 6.04 0.01 42 42 0.15 0.57 0.58 0.0075 0.0200 0.99 0.58 5.57 0.01 44 44 0.13 0.49 0.50 0.0075 0.0200 1.00 0.50 5.27 0.00 46 46 0.18 0.68 0.68 0.0075 0.0200 0.99 0.68 5.92 0.01 End 0.00 52 0.36 1.37 1.37 0.0360 0.0200 0.65 0.89 5.72 0.48 50 50 0.24 0.91 1.39 0.0360 0.0200 0.65 0.90 5.76 0.49 48 48 0.20 0.76 1.25 0.0360 0.0200 0.68 0.85 5.54 0.40 45 45 0.18 0.68 1.09 0.0360 0.0200 0.72 0.79 5.25 0.30 End 53 0.36 1.37 1.37 0.0360 0.0200 0.65 0.89 5.72 0.48 51 51 0.23 0.87 1.35 0.0360 0.0200 0.65 0.88 5.70 0.47 49 49 0.20 0.76 1.23 0.0360 0.0200 0.68 0.84 5.50 0.39 46 46 0.18 0.68 1.07 0.0360 0.0200 0.73 0.78 5.22 0.29 End D-3 • APPENDIX E STORM DRAINAGE SYSTEMS 0 0 STORM DRAINS • DESIGN CRITERIA: Storm Event ................................................................................................................................10 yr storm Minimum Time of Concentration ................................................................................................10 minutes Minimum Rainfall Intensity ........................................................................................................... 5.70 in/hr Minimum Slope ..........................................................................................1.0 % (for 24" dia. and smaller) Minimum Slope ............................................ meet full flow velocity of 6 ft/sec (for pipes larger than 24") Minimum Pipe Size ........................................................................................................................15-inches Minimum Cover ......................................................................................................2.0'(1.0' for yard inlets) Time of Concentration If the water path to the inlet was less than 500-feet, the minimum time of concentration, 10 minutes, was used. If the length of the water path exceeded 500-feet, the time of concentration to the inlet was calculated based on the "City of High Point Storm Drainage System Design Manual". Rainfall Intensity • Rainfall intensities for storm drainage calculations came from the "City of High Point Storm Drainage System Design Manual," (Pages 9). Rainfall Runoff The Rational Method was used to estimate the rainfall runoff to each storm drainage system. Pipe Capacity The pipe capacity can be calculated using the Manning's equation combined with the continuity equation: Q (cfs) _ [1.486 A R" S"'] / n Where: R = Hydraulic Radius (ft) = A / P P (ft) = Wetted Perimeter of Flow A (ft) = Flow Area S = Slope (ft/ft) n = Manning's Roughness Coefficient Hydraulic software, Geopak Drainage, was used to analyze and determine pipe sizes for the closed . systems. The software uses the Manning formula to determine the hydraulic characteristics of the storm drain. The computer program's internal design preferences and drainage library were set to the City of High Point design standards. E-1 RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive 3202000 1 Consulting Engineers SUBJECT: Storm Drainage Design SHEET 71MV 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 10-Mar-08 OF Charlotte, NC 28235 (704) 372-1885 CHEWD BY: EJV DATE: 10-Mar-08' 2 Construction Storm Drainage Schedule Structures From Structure Elevations To Structure Elevations Pipe Diameter Pipe Length Slope From To Top Invert Top Invert (m) A Remarks SYST EM -A CB-100 GI-101 874.42 870.96 874.00 87&84 15 14 0.86 GI-101 CB-102 874,00 87D,64 874.42 B69,60 15 155 0,80 CB-102 CB-103 674.42 869.60 872.96 868.60 15 „ 123 0.81 CB-103 MH-1 872,96 868.60 873.00 867,90 15 87 0,80 MH-1 CB-2 873.00 867.90 869.94 866.86 15 > 130 0.30 CB-2 CB-4 869,94 866,61 863,55 B60.22 18 > 192 3,33 CB-3 ! C8-6 870.10 867.02 864.97 861.97 15 181 2.79 CB-4 CB -7 863,55 86Q 12 860.30 >856,97 1 B 223 1.41 CB-5 CB-6 864.97 > 861.89 a64.97 `861.52 15 37 1.00 CB-6' CB-9 864.97 861,32 860.06 856,84 15 231 1,94 ; CB-7 CB-9 860.30 855.47 860.06 855.09 ' 36 76 0.50 OP-8A MH-8 855.10 86D.84 865.56 859.11 15 24 7,21 MH-8 CB-7 865.56 857.85 860.30 855.97 30 ' 24 7.83 S CB-9 CB-10 860.06 855.09 858 42 853.09 36 218 0,92 EX-9A MH-8 867.45 861.96 865.561. 858.36 24 51 7.06 ; CB-10 CB-12 858,42 853.09 858,34 852,33! 36 ! 133 0,57 GI-111. CB-10 858.42 854.59 858.42 854.09 24 92 0.54 CB-12 CB-14 858.34 852.33 857.33 851.28 36 210 0,50 CB-13 CB-14 856.78 , 853.70 857.33 853 03 15 43 1.56 CB-14' CB-15 857.33 > 851.28 855,62 850,50 36 156 0,50` CB-15 CB-16 855.62 850.40 854.41 849.58 36 158 0.52 CB-16 CS-17 854.41 849.48 853.51 847.00 36 ' 149 1.66 GI-16A CB-16 852.93 850.72 854,41; 850.54 15 18 1!00 CB-17 C13-18 853.51 ' 847.DD 845.19 ,840 36 36 220 3:02 GI-17A CB-17 852,00 848,92 853.51 848.75 15' ` 17 1100 CB-18 P0-21 84519 839L7 838,50 837,00 36 44 4,70 SYST EM - B CB-20 P0-72 633.47 83039 1 810.75 809.5D 15 96 21.76 SYST EM - C CB-19 CB-21 839.43 ' 836.35 830.60 827.52 15 155 5.70 CB-21 PO-22 830,60 827.42 813.25 812.00 15 ' 80 19.27 SYST EM - D CB-22 CB-24 828,16 823 91 826.11 819.79 15; 106 3,89 CB-23 PO-56 826.74 818.44 B05,00 803,00 24 73 21.15 C6 24 CB-23 826.11 81904 826,74 818.44 24 59 1.02 GI-25 38-26 CB-24 CB-27 839.00 826.90 835.92 82332 826.11 826.93 819.92 82&85 15 15 40 34 40.00 8.74 CB-27 C8-24 4 P3 . 820.60 826.11 819.54 18 106 1.00 E-2 RALPH WHITEHEAD ASSOCIATES, INC. JOB: :Hartley Drive 3202000 2 Consulting Engineers SUBJECT: Storm Drainage Design SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 10-Mar-08 OF Charlotte, NC 28235 (704) 372-1885 CHEWD BY: EJV DATE: 10-Mar-08; 2 Construction Storm Drainage Schedule Structures From Structure Elevations To Structure Elevations Pipe Diameter Pipe Length Slope From To Top Invert Top Invert (m) (ft) Remarks CB-28 CB-29 834.21 ?831 13 834.21 >830,70 15 ' 43.::: 1,00 CB-29- CB-27 $34 21 830 50 826-93 820,85 15 ' 289 3.34 SYST EM - E C B-31 >> CB-32 845.33 842.33 844,70 ' 841.70 , 15 41 1.54 CB-32 CB-34 84470 841.60 844,17 840,78 > 95 57 1,44 CB-34 CB-36 844.17 $40.68 843.88 B40.Q0 15 49 1.39- CB-36 P0-55 84188 840.39 <842 25 840 QO' 15 29 1.34 SYST EM - F CB-38 CB-39 842.80 840.06 841,96 838,88 15 ' 28 4,21 CB-39 CB-41 841,96 838.68 840.77 836.68 15 198 1,01 CB-40 CB-41 841.00 837.92 &4077 836.78 15 32 356 CB-41 CB-42 840.77 836.58 840,02 835.08 15 , 150 1:00 CB 42 PO-58 840.02 834.98 835,25 833,50 ' 15 148 1,00 SYST EM - G CB-43 CB-45 83&09 835 01 837.94 832.18 15 99 286 CB-44 C B-46 838.94 835B6 838.79 834.86 15 I D1 0.99 CB-45 PO-47 837.94 ' 831.98 810.25 809.00 15 72 31.921 CB-46 CB-45 838,79 834.66 837-94 832.18 15 30 8,27 CB-48 CB-45 838,90 835.82 837 94 ! 83216 ; 15 99 3.68 CB-49 CB-48 839.30 83622 838.79 834.86 15 1X 1.36 SYST EM - H CB-50 CB-51 843.68 840.60 844.17 839.98 15';. 62 1.00 CB-51 PO-50 844.17 839.78 840.25 838 251 15 ' 66 2,32 CB-52 CB-53 852.60 849.52 852.37 848.82 15 7D 1.00 CB-5-3 C B-51 852.37 848.72 844,17 839.98 15 242 3,61 SYST EM-1 GI-54 CB-55 850.00 846.92 859.95 846.53 15 38 1:03 CB-55 PO-73 859.95 846.43 846.93 845,68 15 102 0,74 SYSTEM - J CB-56 PO-80 85524 85215 851,25 850.00 15 ! 77 2;79 SYSTEM - K CB-33 EX-75 843 04 836.89 843,48 835.89 24 36 2,78 CB-35 CB-33 84104 83896 843.04 837,64 15 32 4,13 EX-75< PO-76 843.48 835.89 830.55 830,55 36 37 14.43 i E-3 4 RALPH WHITEHEAD ASSOCIATES, INC. Consulting Engineers JOB: 'Hartley Drive 3202000 SUBJECT: Storm Drainage Design Data 1 SHEET 1000 W. Morehead Street P.O. Box 35624 Charlotte, NC 28235 (704) 372-1885 CALC'D BY: H5@ DATE: ` 10-Mar-08 CHEWD BY: EJV DATE: >10-Mar-08 OF 2 Engineering Storm Drainage Schedule-1 Structures Drainage Basins Basin 10-Year Flow Full Pipe Full Pipe From To Inlet (ac) Pipe (ac) C Length (ft) Tc (min) Intensity O Inlet (cfs) Pipe (cfs) Capacity (cfs) Velocity (ft/sec) Remarks SYSTEM - A CB-100 GI-101 0.08 aA8 0,95 81 10 S.7 0.43 0.43rr 6.41 5.22 GI-101 CB-102 0.11 fl 19 'a 95 81 10 5,7 0.60 1,03 6.28 5.11 CB-102 CB-103 0.26 0.45 0.95 157 10 5-7 1.41 2,38 6.32 5.15 CB-103 MH-1 0.19 064 ` 0.95 125 10 5.7 1.03 3.35 6.28 5.12 MH-1' CB-2 n/a 0,64 nia n/a 10 5.7 < n/a 3.35 6.28 5.12 CB-2 CB-4 0.16` 0 .80 0.95 125 10 5,7 0.87 4.10 ' 20.81 11.78 CB-3 ! CB-6 0.15 a.15 0.95 125 10 5.7 0.81 0.81 12.22 9.96 C8-4 CB-7 0,17 0.97 0.95 180 10 5.7 0.92 4.92-:. 13.57 7.68 CB-5 C6-6 0.13 a.13 )0.95 350 10 57 0.70 0.70 < 7.03 5.73 CB -6 CB-9 0.13 0.41 0.95 180 10 51 0.70 2.19 9.78 7.97 CB-7 CB-9 0.26 6.05 0.95 240 10 5.7 1.41 28.93 51.33 7.26 OP-8A MH 8 0.02 0 02 0.95 60 10 5.7 0,11 0 .11 18.57 15.13 MH-8 C6-7' n/a' 4,82 Wa Wa 10 57 n/a 24.87 39.85 8.12 B-9 CB-10 0.27 6.73 O95 240 10 5.7 1.46 32 15 69.45 9.83 EX 9A MH-3 4,80 4,80 0,90 450 10 5.7 24.62 24.62 65.02 20.70 CB-10` CB-12 0.29 7,43 0-95 210 10 5.7 1.57 34.58'. 54.70 7.74 G1-11 CB-10 fl.41' 0.41 13.65 54 - 10 5-7 1.52 1,52 18.11 5.76 CB-12 CB-14 0.38 781 0,95 140 10 5,7 2.06 36,13 51.23 7.25 CS-13' CB 14 0,27> 0,27 0.95 210 10 5.7 1.46 1.46 8.78 7.15 CB-14 CB-15 0.22 8,30 0,95 280 10 5.7 1.19 37.97 51.23 7.25 CB-15' CB-16 033` 8.63 0395 170 10 5.7 1.79 39,13 52.19 7.38 CB-16 CB-17 0.33 912, 0.95 150 10 5.7 1.79 40.70 93.40 13.21 GI-16A CB-16 0.16 0.16 0.55 150 10 5.7 0.50 0.50 7.08 5.77 CB-17 CB-18 0.29 958 0.95 150 10 5.7 1.57 42.25 125.86 17.81 Gl-17A, CB-17 0,17` 0.17 D,55 145 10 5.7 0.53 0.53 P 7.02 5.72 CB-18 PO-21 0.23 9.81 a 95 220 1a 5,7 1.25 43 09 157.00 22.21 Outlet into Pond 1 SYSTEM - B CB-20; P0-72 0.18 fl 18 0.95 254 10 5.7 0.97 0,97 ` 16.38 13.35 Energy Dissapator: Riprap d50=6", L=7ft, W=8.3ft SYSTEM - C CB-19 CB-21 0.36 0 36 a 95 300 10 5.7 1.95 1,95`° 16.74 13.64 CB-21> PO-22 0-141 0.50 D 95 153 10 5.7 0.76 2.69 r 15.41 12.56 Energy Dissapator: Riprap d50=6", L=6ft, W=3.7ft SYSTEM -D CB 22 CB-24 0.27- 0,27 0.95 266 10 5 7 1.46 1.46 13.84 11.28 C8 23 PO-56 0.40'' 2 52 0.95 112 , 10 5.7 2.17 12,86_ 56.39 17.95 Energy Dissapator: Riprap d50=8", L=17ft, W=19ft CB-24 CB-23 0,18';, 2,12 >0 95 112 10 5.7 0.97 10.79:: 24.68 7.86 GI-25 CB-24 0.18; 0,18 0-55 230 10 5.7 0.56 0.56 22.16 18.05 CB-26 CB-27 0.30 0.30 0 95 300 10 5.7 1.62 : 1,62- 20.68 16.85 CB-27: CB-24 0.29' 1,49 &95 300 10 5.7 1.57 7.92 11.44 6.47 ' 6-28 ' CB-29 0.42 a.d2 a 95 300 10 5,7 2.27 ; 2.27 7.04 5.74 CB-29 ; CB-27 0.48 0,90 0,95 450 10 5.7 2.60 ' 4.85 12.82 10.45 E-4 4 RALPH WHITEHEAD ASSOCIATES, INC. Consulting Engineers JOB: Hartley Drive 3202000 SUBJECT: Storm Drainage Design Data 2 SHEET 1000 W. Morehead Street P.O. Box 35624 Charlotte, NC 28235 (704) 372-1885 CALC'D BY: H5B DATE: 10-Mar-08 CHEK'D BY: UV DATE: ;10-Mar-08 OF 2 Engineering Storm Drainage Schedule-1 Structures Drainage Basins Basin 10-Year Flow Full Pipe Full Pipe From To Inlet (ac) Pipe (ac) C Length (ft) Tc (min) Intensity (in/hr) Lcfs) nlet Pipe i(cfs) Capacity (cfs) Velocity (ft/sec) emarks SYSTEM - E CB-31 CB-32 0.085, 0.08 0.95 700 10 5.7 0.43 0.43 8.70 7.09 CB-32' CB-34 0.10` 0.18 >a 95 1'DO 10 5.7 0.54 0.97» 8.39 6.84 CB-349 CB-36 0,69 0.87 0.95 100 10 5.7 3.74 4.66 ` 8.29 6.76 CB-36' PO-55 0.48 1.35 0.95 100 10 5.7 2.60 7.20 8.17 6.66 Outlet into Pond 2 SYSTEM - F CB-38 CB-39 0.26 0.26 x0.95 280 10 5.7 1.41 1,41 14.33 11.67 CB-39' CB-41 0.22'r 0.48 0.95 280 10 5.7 1.19 2.50 7.05 5.75 CB-40' CB-41 0.23 0.23 0.95 200 10 5.7 1.25 1,25 13.35 10.88 CB-41 CB-42 0.18 0.89 0.95 200 10 5.7 0.97 4.70 7.01 5.71 C6-42 PO-58 0.15 1.04 x0.95 150 10 5.7 0.81 5.43 a 7.02 5.72 Energy Dissapator. Riprap d50=6", L=16ft, W=7.7ft SYSTEM - G CB-43 CB-45 0.29 0.29 0 .95 138 10 5.7 1.57 1.57 11.85 9.66 CB-44 CB-46 0.13 0.13 0.95 288 10 5.7 0.70 0.70 6.99 5.70 ICB-45 PO-47 0.18 1.18 0.95 70 10 5.7 0.97 630 19.85 16.18 Energy Dissapator: Riprap d50=6", L=18ft, W=8.5ft CB-46 CB-45 0.18 &51 0.95 70 10 5.7 0.97 2.72 r,l 20.10 16.38 CB-48' CB-45 0.20 0.20 , 0 95 252 10 5.7 1.08 1.08 13.48 10.99 CB-49 CS-46 0,20 0.20 0,95 252 10 57 1.08 1.08 8.18 6.67 SYSTEM - H CB-50> CB-51' 0-24 0.24 0.95 240 = 10 5.7 1.30 1.30 ' 7.03 5.73 C6-51 PO-50 0-23 1.18 0 95 240 10 5,7 1.25 6.32 10.66 8.68 Energy Dissapator. Riprap d50=6", L=10ft, W=11.3ft CB-52 CB-53 0.36 0,36 0.95 240 10 5.7 1.95 1.95 ` 7.04 5.74 CB-53' CB-51 0.35 0.71 0.95 350 10 5.7 1.90 3,87 13.34 10.87 SYSTEM - I GI-54 ; CS-55 0.961 0.96 0 55 140 10 57 3.01 3,01 7.09 5.78 CB-55 PO-73 0.09 1.05 0.95 35Q 10 5 7 0.49 r 3.49 6.04 4.92 Outlet into Pond 3 SYSTEM - J CB-56 PO-80 0.3 0.3 0.95 300 10 5.7 1.62 1,62 11.74 9.57 Outlet into Pond 3 SYSTEM - K CB-33 £X-75 0.20 0-44 ' 0.95 53 10 5 7 1.08 2.38 11.66 9.50 CB-35 CB-33 0.24 0.24 95 50 10 5.7 1.30 1.30 50.23 15.99 EX-75' PO-76 n/a 0-44 n/a n/a 10 5.7 n/a 2.38 -' 593.56 47.23 Energy Dissapator: Riprap d5O=6", L=6ft, W=4.4ft 1 E-5 • APPENDIX F BRIDGE DECK DRAINAGE 0 0 • • • BRIDGE DECK DRAINAGE DESIGN CRITERIA: Rainfall Intensity ............................................................................................ 4.0 in/hr (maximum drivable) Design Spread .......................................................................................................... 8.5 ft from face of curb Spread Spread calculations from the following equations from HEC-21: Q = (0.56 / n) SX1.67 S0.5 T2.67 & L. = (43560 Q) / (C I WO Where: Q = Full Gutter Flow (c.f.s.) Lo = Maximum Distance to First Drain (ft.) L = Length of Bridge (ft.) Wp = Width of Pavement (ft.) n = Manning's Roughness Coefficient C = Runoff Coefficient i = Rainfall Intensity (in./hr.) SX = Cross Slope (ft./ft.) S = Longitudinal Slope (ft./ft.) T = Design Spread (ft.) For deck drainage 6-inch scupper drains at 12-foot centers will be included to help maintain the gutter spread. The scuppers will be eliminated in areas directly over channel. F-1 • RALPH WHITEHEAD ASSOCIATES, INC. JOB: Hartley Drive 1 Consulting Engineers SUBJECT: Bridge Deck Drainage/Spread SHEET 1000 W. Morehead Street P.O. Box 35624 CALC'D BY: HSB DATE: 19-,Jun-07 of Charlotte, NC 28235 (704) 372-1885 CHECK'D BY: DATE: 1 DETERMINE IF BRIDGE SCUPPERS ARE REQUIRED GIVEN: Length of Bridge Including Approach Slabs (L) = 200 ft. Width of Pavement Contributing to Gutter Flow (WP) = 30 ft. Manning's Roughness Coefficient (n) = 0.016 Bridge Deck Cross Slope (S,,) = 0.0208 ft./ft. Rational Runoff Coefficient (C) = 0.95 Allowable Width of Flow, Spread (T) = 8 ft. Design Rainfall Intensity (1) _ ' 5.50 in./hr. Longitudinal Bridge Deck Slope (S) = 0.0490 ft. /ft. Proposed Posted Speed Limit = mph Average Daily Traffic (ADT) = vehicles SOLUTION: Calculate the Maximum Allowable Distance to the First Scupper (Lj. • Lo 24393.6 * S„1'67 * So.S * T2.67 _ 862 ft. - C*n*I*WP Calculate Actual Gutter Spread (TS) at End of Bridge. 2.67 C*n*I*Wp"L TS 24393.6 * Sx1.67 * So.s TS = 4.63 ft. = 59.816 TS < T =_____> SCUPPERS ARE NOT REQUIRED • BridgeGutterSpread. AS F-2 • APPENDIX G OUTLET PROTECTION • 0 ?[:)--7a 6+vc?foyi 3b+tj5 -ZT • TO SHEETFLOW CONDITIONS oe iar'etar ( ? of Es 93 + 1 • • 20 10 0 3 c . :) 71 a ? r, ?3 a ''F u `V ds -.MD Q., ,- - :fA-?Dn .3 1 + (,a I-T ENERGY DISSIPATOR TO A WELL-DEFINED CHANNEL -zc 7' 0 Outlet + rw° `----- ----. -? f { 90 ti3 70 - oa LL j , «. - y.. . f .,.n... a z i 0C8? iaao C4 - i1 J ? i00 ZJV .'wd • ENERGY DISSlPATOR TO SHEETFLQW CONDITIONS }} ti V.iiOt $ i W 4. ? ?. pic)Q ` :arr??ter (?? I La - -' 4^_ . L -?- ?.G=17 • a 1 210 .L -.. C` t .•i '. St '_. ?-'? . :'Ve-1 :,=7, _")..s ._: e e vn ..F • .N § ?V C4 -3 SS art 5 1-4- crp r T' ENERGY DISSIPATOR TO A EWELL-DEFINED CHANNEL diarrseper :ctj La 110 i I i f 7j7? 130 ? x c f? £?e 1 {f ...i wF_ 4, P, fir,,- t 60 01,11 ?? ?. v . ? 1 ..:1 ` Y.. ? ?? ? rv ?? ? ?•- is ;.? { , - l .. T ITT T . ..... rot. 30 4-1 4 _ } ?'_? rF' '?--... j... J... 7 ?:,.? ??•? .. ?` .Y ?.7jMif Jjj,'[ _,*'sjs } ,fin 3 s 5 10 22 5? 11114 M Sv}0 lwov ENsc arge t4sei) • 7W:V-s may not le ?x;:lpKated' ',ma Yf rvii i (:::-, -4 • ENERGY DISSIPATOR TO WELL-DEFINED NN T ?? gat Y ?`?? -? L?, -=w - 'Harr C-4) • Eischarg= "` ec) _na m SO _-, _lp Q =e .ha_:. _, 6' not - m.. ".j. ::mi,s of tn:s Owl. ?Q 71: ,.. `. _ 60 -2?_ v 130,u (f, .$5 Outlet ?amter tai ??? ! y4 ?, ..?.y-.. R . 7- i W_ X1.3' V. l r ;5? 4 ? ? _. ._ J {.? `f^ • ? b .1 ? .,ter ? . _.... v ? k A . _ . 3 ^ il ? A 4' il j4 Z Aw yll Fix .. ?'/ ? 9 . u .". : ' .'. ^ ?. ice-.+•w•? ,a y J .? 13 ?L3 r.r 133 zoo Soo 1003 COscharge it 1 The ninimum J, .........a __ _.._s .77.57_. 0 snur:e, v3sh.saj: ?a%crw Aarylawi Q - V DISSIPATOR 0 ENERGY TO SHEETFLOW CONDITIONS f Outlet - n? ` La t Poe v:aar?i?r t ? fo o b _= = W A ?` • • The minimum 153 ri P ZIP ao:v shall ce E" __ _ , :s may . , e7 -n - _t ions ___ a5 =_ s 0: _.__ 7 :her:. G _-I 3_ _ 1J ?y «" M 200, ?C7 --I Ca i0-1-30 YET t ENERGY DISSIPATOR TO A LL-DEFINED CHANNEL Outlet ppipe (00)i---?-?_s vj = Lj.tjI 50 o 60 sc . F ---- I I • .;r i .Caw _.':?'4 ..._ ... '"?? w. .-.su r M'f: -1 _g 3 J_ a i7 .0 • APPENDIX H SEDIMENT AND EROSION CONTROL DETAILS LIST OF DETAILS 1. Standard Pipe Outlet Erosion Control Device 2. Standard Silt Fence Detail 3. Standard Stormwater Inlet Protection Measures 4. Standard Temporary Stone Ditch Check 5. Standard Temporary Silt Check Dam 6. Temporary Construction Entrance Detail • 0 0 0 0 m 4 X D OUTLET W/DITCH OUTLET W/0 DITCH z z AoQ D FAgB YIC ° Z TCn 12" 2 5 5 2 5 1 4 2 1 4 H O J?UM ~ z ?U U m --1 U- J C) C)l O G) o CA O -------?j zHv5? n o 30" 8 21 21 11 22 5 16 11 7 t-=~zw • p0? co H- LOJ ?H v ° 1 HN 0 UZ ' ° ------- ' LV? NOTE: 4 X D V1 C FOR CALCULATION PURPOSES F- ~ - - - - CLASS 'B' RIP RAP = 100 LBS./FT3 W m - - - - CLASS I RIP RAP = 105 LBS./FT3 ?1 Z 2XD ° 00 O O c ? cs ?? B B 10 ° N H ? A? a z PLAN o H a > C3 D SLOPE 112:1 OR FLATTER d. . >o a? o o N a i•,l ? vl D R1 G) H 1 2 p T PLAN m O 0O o C FILTER FABRIC w m LL m SECTION A-A ° T N PIPE OUTLET WITH DITCH H= RIP RAP TO TOP OF PIPE (MAX. H = D + T) FILTER FABRIC T= 15" CLASS I RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS SECTION B-B SHEET 1 OF 1 T= 12" CLASS 'B' RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS SHEET 1 OF 1 876.02 PIPE OUTLET WITHOUT DITCH 876.02 z 0 CLASS RIP RAP CLASS I RIP RAP CLASS 'B' RIP RAP CLASS I RIP RAP TONS ?Y ? S.Y. TONS 8•Y•° TONS _Y=? S.Y. TONS 15" 2 7 7 3 7 1 5 3 2 6 18" 3 10 9 4 10 2 7 4 2 8 24 5 14 15 7 15 3 11 7 4 12 17 36" 11 28 29 15 30 7 22 i6 10 23 42" 15 37 39 20 39 10 28 22 13 30 48" - - 49 26 50 - - 28 17 38 54" - - 60 33 62 - - 36 21 47 60" - - 73 40 75 - - 44 26 56 66" - - 87 48 89 - - 54 32 67 72" - - 102 57 04 1 - - 64 38 Q 78 0 0 & v z o? C" D?o? 8' MAX. WITH WIRE (6' MAX. WITHOUT WIRE) ¢ .I 0 in U) L.L z Nz = oo? ? D =-ny>m °C z F--V< o? =zoo MIDDLE AND VERTICAL WIRES Fx? zW ??ar-n SHALL BE 121/2 GAUGE MIN. cn¢o°Q (7=mz ?yD o HQ ?] DG -? w ° o o z TOP AND BOTTOM STRAND ° SHALL BE 10 GAUGE MIN. 44 1--- -- _ - =m== Z -- WIRE FILTER FABRIC O UJ ILL V 3 r z Z C z " LL F- D NOTES ° J z USE WIRE A MINIMUM OF 32" FILTER FABRIC -?? 0 1.4 N D IN WIDTH AND WITH A MINIMUM Q N v OF 6 LINE WIRES WITH 12" STAY COMPACTED FILL z ? r v SPACING. Q USE FILTER FABRIC A MINIMUM U) OC -n :E OF 36" IN WIDTH AND FASTEN - - _ = O M z ADEQUATELY TO THE WIRE AS - -_ T C. UJ Z M DIRECTED BY THE ENGINEER. _ „ -I II S I I I 118 I II - I I I " ' III ? m o - -I STEEL POST OF THE - -0 PROVIDE 5 - z m SELF-FASTENER ANGLE STEEL TYPE. 1 u ANGLE STEEL TYPE. L STEEL POST - 2'-0" DEPTH EXTENSION OF FABRIC AND WIRE INTO TRENCH SHEET 1 OF 1 SHEET 1 O q? 1605.01 l 1605 s N • 1/4" WIRE MESH v vm H ? H' Z 7ocn°O F n:0(n rmii=-1=D =-nn>>m =cnoo ZHOr-1 D D D 1 cn H 0 Z e O n N Z Z O r ? mcn -i = mD v z N p M> Z p Al, z -G ? m 0 o o? o oa o o? o o. A °o A 4 0. ° .: b Q . ? C. O ? O o. oo. o. ..oo. o.: oo. o. MAXIMUM POST SPACING 4 FT.? 2' 2' ulf?uE?IIdII811Qne ` SEDIMENT J = If CONTROL STONE 1'-6" II?II USE 24 GAUGE MINIMUM WIRE MESH HARDWARE CLOTH WITH SEDIMENT 2' WIRE MESH 1/4 INCH MESH OPENINGS. CONTROL STONE PLACE TOP OF WIRE MESH 1'-6" 0 ol 1/4" WIRE MESH -I ..n .' Y 1/4" WIRE MESH SEE NOTE FOR POST DESCRIPTION 2' 12" NOTE USE NO. 5 OR NO. 57 STONE FLOW--..2' FOR SEDIMENT CONTROL. * A MINIMUM OF ONE FOOT BELOW THE SHOULDER OR ANY DIVERSION POINT. INSTALL WIRE MESH UNDER AVERAGE BOX SEDIMENT CONTROL STONE. DIMENSION VARIABLE USE 5' STEEL POST, INSTALLED FILTERED 1.5' DEEP MINIMUM, AND WATER OF THE SELF-FASTENER SECTION A-A ANGLE STEEL TYPE. SPACE POST A MAXIMUM OF 4'. MULTI-DIRECTIONAL FLOW 11632.03 z co oH } as H Q ? U LLJ?Hz OOcnm W<= F-owoH F- m, co F- LL OJ o°c~na H CL 0 , W V W a O ? lt. Za a F- O ? oZ it UJ z N D N W J J O Z w H Y V O 1632. FLOW --- AVERAGE BOX DIMENSION VARIABLE FILTERED WATER CCf`TTnU V _ V SINGLE-DIRECTIONAL FLOW w • • • v v ^1 N ? 70U00 r O _n a) HZ-i=D ==Zym o Z=o NcnOr'71 ?DDD 0 z m 3 O ?o m .? r N O A z N D H m ? v v 0 7D N m* n z X O ?o .0 m O SHEET 1 OF 1 1633.0; TEMP. DITCH 01,?ooQ?c 5 STRUCTURAL STONE ISOMETRIC VIEW EDGE OF PAVEMENT NOTES: USE CLASS 'B' EROSION CONTROL STONE FOR STRUCTURAL STONE. THE ENGINEER MAY DIRECT THE OPTION OF CLASS "A" STONE FOR SITES HAVING LESS THAN ONE (1) ACRE DRAINAGE AREA AND A DITCH GRADE LESS THAN 3%. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL. PLACE SEDIMENT CONTROL STONE AS DIRECTED BY THE ENGINEER. -f 1' MIN. NATURAL GROUND CROSS SECTION VEE DITCH NATURAL GROUND m (gyp 1' MIN. 111 v o FLOW - BASE OF DITCH SEDIMENT f 12" MIN. SILTOPTIOBASINNAL " I 4'-6" CROSS SECTION ------ 12" THICK SEDIMENT TRAPEZOIDAL DITCH CONTROL STONE ELEVATION VIEW z co o~ Q} Q H Q ? U U- 1NZ O O O = °C M a V Q ° 0 tnF-?yOJ Q o°coaC z , > N a w 0 0o W a o ? w cv ? V Q = x v o ? J Q ~ o N z F- v v J } Za w O CL FE W H 1633.0 Z ,P S tl 1 = ' O' N `H0131VU W 24 SAVMHJIH JO NOISIAIO A- NOIiVIHOdSN` UI d0 ' 1d3O 6 T d, 3dA1 Wda 1N3WI(13S )130H AHVHOdW31 VNIIOUVO HiUON BOA ONIM` UO OUVONVIS HSIlON3 p.1 30 31VIS • D cn cn z m ? o 0 o° 0 c Z M < m m m m m z m Ozz n --1 -? o r ? D ??O O mrocn cn 0-zio • m m m O ?o CD rz m O v N ? 3 CA D m .i -o z ? O m -1 o v o m m cn N -7 m z O C 7D 0 1 C S D r • N a c n -i c s D • j = ENGLISH STANDARD DRAWING FOR f-Ub STATE OF m j TEMPORARY ROCK SEDIMENT DAM TYPE 'A' NORTH CAROLINA DEPT. OF TRANSPORTATION C °n DIVISION OF HIGHWAYS L RALEIGH, N.C. T O r z m 0 r • • s v v mu z O ? D 0 ? Q U ?T?U Hm =D Ho?? LL -j C, C-) i =T O O m ir LL- ? ?mo NO TES: 3 HvC z H a or m 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE _?-= • ? ° ?-+ - TRUCKS. Lu cl) 0 U- _j - I D 2. LOCATE ENTRANCE (S) TO PROVIDE FOR UTILIZATION o O U) "CC D > BY ALL CONSTRUCTION VEHICLES. z . 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT F H z /- TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. o ° PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. / / 4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE / CLEANED UP IMMEDIATELY. / 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT / ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED . PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY W MAINTENANCE. v m 6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO Z m // 110 BE DETERMINED BY THE ENGINEER. p r•' r / °o° °° , 7. USE CLASS A STONE OR OTHER COARSE AGGREGATE APPROVED BY THE ENG c') g I llo INEER. Z / ° oy ° ?o fflo z W co D ° " -q O z D ° N C 7 loc v ° CC Z o? z I-- c ° ° n M z CLASS "A" STONE oo? ??' 0 Z O ° 8 IN. MIN. DEPTH ? m -J J m Lij D w > z O a m NOTE: PLACE FILTER FABRIC BENEATH STONE SHEET 1 OF 1 SHEET 1 OF 1 1607.01 1607.01 6 ATTACHMENT B SUPPLEMENTAL INFORMATION Hartley Drive Extension and Widening, Guilford County Individual Permit Application Supplemental Information - 5/08 18. Nature of Activity. The project corridor is approximately 20.661 acres in size and is located in the northwest portion of the City of High Point. The project corridor is largely located within the existing city-owned Hartley Drive right-of-way (R/W) (Attachment C, Figures 1 through 4). Existing RJW widths vary from 90 feet to 110 feet across a majority of the proposed corridor. Additional R/W has been acquired in the western portion of the project corridor, at an approximate length of 1000 feet and approximate width of 100 feet. Preliminary engineering plans for the proposed Hartley Drive Widening and Extension are located in Attachment E. The project site extends from Station 10+45.16 which is located at the intersection of Hartley Drive and US 311 (North Main Street) in the eastern portion of the project area, to Station 70+51.79 in the western portion of the project area (Attachment E - Sheet 1). The entire project length is approximately 6,000 feet. The existing portion of Hartley Drive located within the project corridor will be widened from station 10+45.16 east to approximately the beginning of the proposed span bridge at station 31+43.17, for a total of 2,098.01 feet. New roadway will be constructed from the beginning of the span bridge at station 31+43.17 to the existing intersection of Westover Drive and Calloway Farm Road at approximately station 66+77.31, for a total length of 3,534.14 feet. The remaining 374.48 feet of the western end of the project corridor roadway will taper down to two lanes to match the existing Westover Drive. The pavement on a portion of the existing Westover Drive will be removed (Attachment E - Sheet 8) and a new intersection for Hartley Drive and Westover Drive will be constructed. The rolling hills and valleys in the project area that will be crossed by the proposed extension of Hartley Drive present a challenging topography. This topography will require extensive cutting and/or filling to achieve the required grades for the roadway. New construction easements will be required in areas where the proposed cut and fill limits exceed the existing R/W. Existing 15 feet wide utility easements along the existing portion of Hartley Drive will be maintained. A new four-lane roadway, span bridge, and roadway stormwater collection and treatment systems are proposed for the extension portion of this project. The existing two-lane portion of Hartley Dive extending west from US 311 will be widened to four lanes. A portion of Westover Drive in the eastern portion of the project area will need to be relocated in order to create a new intersection of Hartley Drive and Westover Drive. A five foot wide sidewalk will be constructed in many portions of the proposed roadway, and curb and gutters will direct stormwater runoff into the proposed stormwater management system. Ten typical cross-sections of the proposed roadway are presented in Sheet numbers 2, 2A, 2B, and 2C (Attachment E). Sheets 4 through 8 provide a plan view of the proposed facility, including the left hand turn lanes, medians, sidewalks, and stormwater management basins. Page 1 of 10 Hartley Drive Extension and Widening, Guilford County Individual Permit Application Supplemental Information - 5/08 The type of construction work that will be required for this project includes: clearing, grading, drainage, paving, signing, and marking. There will also be the construction of guardrails, sidewalks, culverts and the span bridge structure. A portion of an existing sanitary sewer that crossed the project R/W will be relocated. A raised median will be constructed in portions of the proposed roadway, and will vary from 4 feet wide to 22.5 feet wide. A painted median will be used in other areas and will vary from 0 to 22 feet wide. The median strip will be minimized in areas that impact jurisdictional wetlands and streams. Construction easements will be used in areas located outside of the existing R/W for some of the required slope work. Three stream channels and two freshwater wetlands are located within the R/W, and total approximately 656 linear feet (If) of streams and 0.368 acre (16,034 sq. ft.) of freshwater wetlands. Stream channel impacts that would result from the construction of the proposed roadway will be minimized to the greatest extent practicable by building a bridge approximately 250 feet long and 70 wide over the largest stream, an unnamed tributary (UT) of Rich Fork that is located within the R/W. The remaining stream and wetland crossings and associated impacts are unavoidable (described below) in order to extend the roadway to the intersection of Westover Drive and Shadow Valley Road while staying within the Hartley Drive R/W and minimizing disturbance to existing residences bordering the R/W. The project corridor R/W extends from the City of High Point in Guilford County, into Davidson County. The Council on Environmental Quality (CEQ) has defined mitigation in 40 CFR Part 1508.20 to include: avoiding impacts, minimizing impacts, rectifying impacts, reducing impacts over time, and compensating for impacts. Three general types of mitigation include avoidance, minimization and compensatory mitigation. Mitigation efforts for this project included avoidance and minimization of impacts to jurisdictional waters of the U.S., stream relocation, and proposed payments to the Ecosystem Enhancement Program (EEP). Avoidance and Minimization In an effort to avoid and minimize impacts to jurisdictional stream crossings (Streams 1, 2, and 4) and wetlands, measures and strategies have been considered and utilized throughout the project planning process. These strategies and reduction measures include the following: • Utilizing a span bridge at an approximate cost of $1.92 million, as opposed to the original plan to pipe Stream 4. • Maintaining a minimum of 3 to 1 slopes when grading the sides of the roadways within the wetlands (steeper slopes in these areas are not recommended based on geotechnical findings). • Increasing slopes to 2:1 at the proposed bridge and in cut areas to minimize footprint of disturbance. • Utilizing a retaining wall at the span bridge. Page 2 of 10 Hartley Drive Extension and Widening, Guilford County Individual Permit Application Supplemental Information - 5/08 • Utilizing a headwall at the piped discharge point for Stream 2 and Wetland F (up- gradient of Stream 3). • Reducing median widths at the bridge and Stream 1 and Stream 2 crossings to 4 feet. Compensatory Mitigation The project will include the creation of approximately 10,000 square feet of wetland area in the area of the sanitary sewer relocation and the stream channel relocation. Additional mitigation will include the relocation of approximately 140 if of Stream 1 channel to an area outside of the proposed construction limits. The relocation of the existing sanitary sewer is proposed to make the relocation of the stream feasible. This stream relocation will reduce fill impacts to Stream 1 from the proposed crossing, and would allow for the continued conveyance of water into Stream 2. The relocation is made feasible by the corresponding relocation of the existing sanitary sewer.* The created wetland will be constructed in the immediate vicinity of the confluence of Stream 1 and Stream 2. The wetland plantings will include saplings of American sycamore (Platanus occidentalis), sweetgum (Liquidambar styraciflua), and red maple (Acer rubrum) to mimic the native species found in the surrounding forest. Additional herbaceous wetland plugs and seeds will be used to promote the quick spread of groundcover. Details on the wetland mitigation are depicted in the Mitigation Plan included as Attachment E - Sheet 17, and Attachment F. The relocated Stream 1 charnel will be constructed to closely mimic stable reference conditions along the existing channel. The new channel would be designed to provide stable dimension, pattern, and profile along with riffle and pool habitat. The approximate area to be used for the relocation of the upper portion of the Stream 1 channel is shown on Attachment C - Figure 8. Details on the stream relocation are depicted in Attachment E - Sheet 17. *This relocation strategy is the result of discussions with the U.S. Army Corps of Engineers Regulatory Specialist during the on-site field review of jurisdictional boundaries. It is the applicant's desire to utilize the NCDENR EEP to meet the remaining compensatory mitigation obligations of the project. During the field review of jurisdictional boundaries, the USACE regulatory representative stated that the EEP could be utilized for mitigation for project impacts. A letter has been sent to the EEP requesting acceptance of an In-Lieu Fee Payment to the EEP as the method to provide compensatory mitigation for the proposed impacts to the wetlands, and stream channels. The EEP has provided a letter stating that they were willing to accept payment for impacts associated with the project. The fee for one acre of non-riparian wetland impacts purchased from the EEP is $14,676 (valid from 7/1/07 until 7/1/08). Mitigation credits are sold by the EEP in one-quarter acre increments. Therefore, the compensatory wetland impact fee for the project is 0.376 acre minus 0.23 (for the created wetland) for a Page 3 of 10 Hartley Drive Extension and Widening, Guilford County Individual Permit Application Supplemental Information - 5/08 total of 0.146 acre of wetland impacts (at a 1 to 1 mitigation to impacts ratio) would be $3,669.00 (0.25 acre). The fee for a linear foot of stream impacts purchased from the EEP is $245 (valid from 7/1/07 until 7/1/08). Therefore, the compensatory stream impact fee for the projects 398 if of net stream impact (538 if minus the 140 if of stream relocation) would be $97,510.00. The combined fee for both wetland and stream impacts would be $101,179.00. Stormwater Management A Stormwater Management Plan has been prepared for this project to document the design process and to develop the stormwater management system for the roadway development (Attachment A - Stormwater Management Plan and Attachment E - Engineering Plans). STV/RWA and the City of High Point understand and are committed to providing a stormwater management plan that achieves erosion and sediment control during construction and provides treatment of stormwater runoff. A stormwater diversion ditch will be excavated on the south side of the toe of the slope created for the bridge abutment. Approximately 264 square feet (0.006 acre) of this excavation will impact the palustrine forested wetlands identified as Wetland GG. This vegetated ditch will intercept the stormwater runoff from the adjacent apartment complex, and direct it around the toe of the slope towards Stream 4 (Attachment C, Figure 6). Two new detention basins and one existing detention basin (to be relocated) are proposed for the collection and treatment of stormwater runoff from the proposed roadway and bridge (Attachment A, Figure 4 and Attachment E - Sheet 2D). The first proposed detention basin will be constructed on the northeastern side of the project corridor, on the YMCA property near the existing terminus of Hartley Drive. This detention basin will collect roadway stormwater in catch basins that are proposed to be placed in the newly widened portions of the existing roadway. The outlet of the detention basin will use a level-spreader at the discharge point to allow the treated stormwater to sheet flow west, towards Stream 4 (Attachment E - Sheet 5). The existing small detention basin that is located on the west side of Ingleside Drive, within the Hartley Drive R/W, will be impacted by the proposed project. The current location of this detention basin within the project R/W will necessitate the relocation of the detention basin to an area outside of the proposed construction limits. The stormwater management plan proposes to relocate this detention basin to the north, outside of the proposed limits of construction. New catch basins will be constructed around the proposed intersection of Hartley Drive and Ingleside Drive to collect roadway stormwater. The relocated detention basin will continue to drain to an existing outfall basin that is located adjacent to Ingleside Drive to the southeast, by extending the existing piping that connects the existing basins (Attachment E - Sheet 6). A third detention basin will be constructed at the western end of the project corridor, in an area now used as the Westover Drive R/W. The relocation of a portion of Westover Page 4 of 10 Hartley Drive Extension and Widening, Guilford County Individual Permit Application Supplemental Information - 5/08 Drive is proposed as part of this project, in order to create the new intersection of Hartley Drive and Westover Drive. This relocation of Westover Drive and the removal of a portion of the former Westover Drive roadway will allow the third detention basin to be built on the northeast corner of the proposed Hartley Drive-Westover Drive intersection. New catch basins will be constructed around the proposed intersection of Hartley Drive and Westover Drive, as well as the proposed intersection of Hartley Drive and Shadow Valley Road to collect roadway stormwater (Attachment E - Sheet 8). The outlet of the detention basin will discharge the treated stormwater to sheet flow north, into an existing field currently used as pasture adjacent to the existing portion of Westover Drive. Stormwater runoff from the bridge deck will be handled by two catch basins that will be located on either side of the roadway on the downslope end of the bridge (Attachment E - Sheet 5). There will also be two catch basins on the upslope end of the bridge to intercept stormwater runoff before it reaches the bridge. There will be no direct discharge to the stream from the bridge deck. The NCDOT "Guidelines for Drainage Studies and Hydraulic Design" was used for the design criteria. 19. Project Purpose. The purpose of the project is to provide much needed improved access to US 311 (North Main Street) and the City of High Point from the rapidly expanding residential areas located to the west of the city. The goal is to also reduce the traffic on Westover Drive, which currently navigates through a large, long-established residential area located along that roadway. Safety concerns regarding the large volume of traffic that currently travel on Westover Drive are also a concern that would be alleviated by the proposed extension of Hartley Drive. If serviceable today, traffic projections for the Hartley Drive Extension estimate a volume of about 9,000 vehicles per day (vpd). By 2030, daily volumes are expected to exceed 17,500 vpd. The existing R/W for Hartley Drive crosses streams and wetlands, and construction of the roadway will require the crossing of these natural land features. The proposed roadway would connect the residential developments located in Davidson County, located to the west of the City of High Point, to the City of High Point at US 311 (North Main Street). The estimated costs for design, R/W acquisition and construction, is $9,000,000. These costs would be covered by a bond previously approved by the citizens of High Point. 20. Reason(s) for Discharge The proposed project consists of the construction of a roadway, bridge and stormwater management systems. The proposed roadway would connect the residential developments located to the west of the City of High Point, to the City's North Main Street (US 311). Waters of the U.S. are situated perpendicular to the existing R/W corridor previously dedicated to accommodate this project. Despite project planning and design efforts to avoid and minimize impacts to waters of the U.S. to the maximum extent practicable, impacts to waters and wetlands are unavoidable. The minor fill Page 5 of 10 Hartley Drive Extension and Widening, Guilford County Individual Permit Application Supplemental Information - 5/08 proposed at Wetland GG is required to achieve the bridge crossing over Stream 4. Fill is required to achieve the proposed grade of the roadway at Wetland F and fill is also required to achieve the proposed grade of the roadway at Streams 1 and 2. The project as currently proposed represents the least environmentally damaging practical alternative the achieves the purpose and need of the project and thereby meets the 404(b)l guidelines. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards Clean fill will be trucked into the site to be used to level areas, or shore up slopes in the graded portions on either side of the proposed roadway. The use of imported clean fill will be minimized to the greatest extent practicable by using it only in areas where there is a deficit in the amount of soil remaining from the cut and fill operations. Wetland GG will be impacted by approximately 9,700 cubic yards of fill that is required to achieve the bridge crossing over Stream 4 (Attachment C - Figures 6 and 9). Wetland F will be impacted by approximately 709 cubic yards of fill that is required to achieve the proposed grade of the roadway (Attachment C - Figures 7 and 10). Rip-rap will be used to stabilize the portion of the proposed culvert at the outlet of the pipe. Approximately 8.5 cubic yards of rip-rap is proposed for the outlet discharge point. Streams 1 and 2 will be impacted by approximately 2,531 cubic yards of fill that is required to achieve that proposed grade of the roadway (Attachment C - Figures 8 and 11). Approximately 27.78 cubic yards of material will be excavated from the lower portion of Stream 2, where the culvert discharge point is proposed. Rip-rap will be used to stabilize the portion of the proposed culvert at the outlet of the pipe. Approximately 16 cubic yards of rip-rap is proposed for the outlet discharge point. 22. Surface Area in Acres of Wetlands or Other Waters Filled The wetlands within the project corridor were delineated in March, 2006. The request for a Jurisdictional Determination (JD) was submitted to the USACE on April 24, 2006. The field review was conducted on May 8th, 2006 with Todd Tugwell, then of the USACE and Daryl Lamb of the North Carolina Division of Water Quality (NCDWQ). The boundaries of the delineated wetlands were confirmed and the subsequent survey of the wetland delineation was submitted in September, 2006. Since the request for JD was submitted and the USACE field verified the jurisdictional boundaries prior to June 5, 2007 (i.e., pre-Rapanos guidance), it is the applicant's understanding that the USACE will sign off on this JD with the applicant's approval; the applicant's approval is hereby given. The results of the on-site field review conducted by STV/RWA indicate two jurisdictional wetland areas (Wetlands F and GG) and three stream channels located Page 6 of 10 Hartley Drive Extension and Widening, Guilford County Individual Permit Application Supplemental Information - 5/08 within the project corridor (Streams 1, 2,. and 4). See Attachment C - Figures 5 through 8 for the approximate size and location of each of these features. Jurisdictional Wetland Areas Wetland GG is a palustrine forested wetland area located west of the existing terminus of Hartley Drive in the eastern portion of the project corridor (Attachment C - Figure 6). This is the largest of the wetland areas delineated in the project corridor encompassing 0.201 acre, and is located adjacent to the YMCA picnic area, at the existing terminus of Hartley Drive. This wetland receives stormwater runoff from Hartley Drive, which is conveyed from the roadway through ditches and culverts, down the hill to the wetland. Other hydrological sources include runoff from properties located to the north of the wetland, and the occasional overflow from the stream channel located to the west. A small palustrine emergent wetland comprises a small portion of this wetland area in the portion disturbed by a sanitary sewer line. The wetland drains from the emergent portion, through a culvert located underneath the picnic areas dirt road, directly into the stream channel. The overstory of Wetland GG is dominated by sweetgum (Liquidambar styraciflua), red maple (Acer rubrum), American sycamore (Platanus occidentalis) with some American elm (Ulmus americana). The understory vegetation includes ironwood (Carpinus caroliniana), American holly (Ilex opaca), Easter redcedar (Juniperus virginiana) and highbush blueberry (Vaccinium corymbosum). Vines of Japanese honeysuckle (Lonicera japonica) and poison ivy (Toxicodendron radicans) are found throughout the forested portion of the wetland. The emergent portion of Wetland GG is dominated by reed canarygrass (Phalaris arundinacea), woolgrass (Scirpus cyperinus) and tearthumb (Polygonum sp.). Wetland F is a palustrine forested wetland located in and around the ephemeral (non- jurisdictional) and intermittent stream channels located between Hartley Drive and Ingleside Drive in the central portion of the project corridor, and south of the apartment complex located north of the project corridor and east of Ingleside Drive (See Attachment C, Figure 7). Wetland F, encompassing 0.042 acre, has an overstory dominated by red maple and American sycamore. The understory is mostly absent with an occasional smooth blackhaw (Viburnum prunifolium) and groundcover is mostly absent. Vines of Japanese honeysuckle and briars (Smilax sp.) are prevalent. Jurisdictional Streams Three stream channels are located within the project corridor. Two of the streams would be classified as perennial, and one included intermittent and perennial reaches according to the NCDWQ Stream Identification Forms and regulatory field review. All are unnamed tributaries to Rich Fork in the Yadkin-Pee Dee drainage basin. Stream 1 (Sl) is a jurisdictional channel located in the western portion of the project corridor between Ingleside Drive and Westover Drive (Attachment C - Figure 8). This Page 7 of 10 Hartley Drive Extension and Widening, Guilford County Individual Permit Application Supplemental Information - 5/08 stream begins at the Westgate Road residential development located to the north and flows to the southwest into the project corridor. This first order stream received a score of 52 on the USACE Stream Quality Assessment Worksheet. This stream has been categorized as intermittent with unimportant aquatic function north (upstream) of the proposed construction limits, and perennial important for the remaining portion located within the project corridor. Stream 2 (S2) is a jurisdictional channel located in the western portion of the project corridor between Ingleside Drive and Westover Drive (Attachment C - Figure 8). This stream begins at the Embers Road and Westgate Road residential development located to the north and flows to the southwest where it is joined by an intermittent tributary north of the project corridor, and then flows south into the project corridor where is joined by Stream 1. Stream 4 (S4) is a perennial important stream located in the eastern portion of the project site, west of Wetland GG near the existing terminus of Hartley Drive (Attachment C, Figure 6). This stream begins near US 311, north of Westover Drive and flows to the southwest where it is joined by other tributaries before flowing south into the project corridor. Note: The final Hartley Drive Widening and Extension project corridor differs slightly from the project corridor defined by the wetland survey prepared for the initial jurisdictional determination request. The final design determined that a slightly larger project corridor was needed for the Hartley Drive Extension and Widening to accommodate the proposed construction. The wetland delineation that was completed for the jurisdictional determination was conducted in a project corridor larger than the final construction limits, and all of the on-site wetlands were confirmed as accurately delineated by the USACE. The proposed project consists of the construction of a roadway, bridge and the associated stormwater management systems. Proposed plans for the roadway will result in impacts to approximately 538 if of two jurisdictional perennial streams. Approximately 514 if of streams will be impacted by filling and piping, and approximately 24 if of stream will be impacted by excavation. In addition, impacts to wetlands potentially resulting from site grading (fill and excavation), stormwater management, mechanized vegetation clearing and utility installation will encompass 0.375 acre (16,335 sq. ft.). The stream crossing in the eastern portion of the project site (Stream 4) will be bridged and will not result in any fill impacts to this perennial important stream channel. Construction impacts to Stream 4 are also not anticipated. Minor shading impacts to portions of Stream 4 would occur, but are not anticipated to be detrimental to the water quality and/or biota. The second area of stream crossings (Streams 1 and 2) will require the relocation of the Stream 1 channel, and the installation of 200 linear feet (If) of 60" diameter reinforced Page 8 of 10 Hartley Drive Extension and Widening, Guilford County Individual Permit Application Supplemental Information - 5/08 concrete pipe (RCP) underneath the proposed roadway to provide continued conveyance of the stream flow (Attachment C - Figures 8 and 11). The bottom portion of the pipe will be buried 12 inches below the existing steam bed to ensure continued stream flow and passage of aquatic organisms in periods of low flow conditions. Stabilization of the pipe outlet will require that 0.005 acre (204 sq. ft.) of stream channel bottom be excavated and backfilled with rip-rap resulting in 24 if of stream channel excavation impacts. Approximately 165 if of Stream 1 and 349 if of Stream 2 will be impacted at this crossing by the fill required to achieve the proposed grade of the roadway for a total permanent fill impact of 514 if (Attachment C - Figures 8 and 11). Stream 1 will also have approximately 23 linear feet of temporary impacts due to the relocation of the sanitary sewer which will require an open cut to the channel. The stream channel will be restored to its original conditions upon completion of the sewer relocation. Approximately 140 if of Stream 1 will be relocated outside of the proposed limits of construction as mitigation. Note: Crossing the two streams at the determined location is required to connect the proposed Hartley Drive to the existing Westover Drive within the R/W that was dedicated by the City. Shifting the alignment of the proposed Hartley Drive from the existing R/W is not feasible due to the design constraints imposed by the proximity of adjacent residential developments and the topography of the project corridor. The wetland area designated as Wetland GG would be impacted by the fill needed for the bridge. The crossing of Wetland GG will impact a total of approximately 0.317 acre (13,809 sq. ft.) of wetlands. Approximately 0.301 acre (13,095 sq. ft.) of the wetland would be impacted by the fill required to achieve the proposed grade for the roadway approach and bridge abutment (Attachment C - Figures 6 and 9). An approximately 0.006 acre (264 sq. ft.) portion of Wetland GG would be impacted by the excavation of the drainage ditch on the south side of the toe of the slope created for the bridge abutment. Approximately 0.010 acre (444 sq. ft.) of Wetland GG will experience mechanized clearing impacts required for construction. The wetland area designated at Wetland F (See Attachment C - Figures 7 and 10) would be impacted by the fill and excavation that is required to achieve the proposed grade of the roadway, and the installation of 120 if of 42" RCP that is required for the continued conveyance of the waters that drain from the upland areas to the north. The crossing of Wetland F will impact a total of approximately 0.059 acre (2,565 sq. ft.) of wetland. Fill impacts are proposed for 0.055 acre (2,394 sq. ft.) of wetlands, while 0.004 acre (171 sq. ft.) of wetland will be impacted by the excavation that is required for the drainage pipe outlet. Upon completion of the excavation, approximately 8.56 cubic yards of rip-rap will be placed at the drainage pipe outlet. Proposed stream impacts are summarized in Table 1 below. Reference Attachment C, Figures 6 and 8 for locations of stream impacts. Reference Attachment C, Figures 9 and 11 for cross sections of the stream crossing areas. Page 9 of 10 Hartley Drive Extension and Widening, Guilford County Individual Permit Application Supplemental Information - 5/08 Table 1 Summary of Estimated Stream Impacts Jurisdictional Type of Permanent Length of Area of Area Jurisdictional Area Impact (Y/N) Impact (If) Im act (ft) Stream 1 Intermittent Stream Yes - Fill 165 3060 Stream 1 Intermittent Stream No - 23 359 Excavation Stream 2 Perennial Stream Yes - Fill 349 737 Stream 2 Perennial Stream Yes- 24 131 Excavation Permanent Impact Totals: 0.70. ll J,7lrV AL Wetland impacts will result from site grading, culvert installation, drainage ditch excavation, roadway construction, and clearing. Two palustrine forested wetland areas are within the proposed roadway footprint and will be impacted by the proposed project. Proposed fill impacts are summarized in Table 2 below. Reference Attachment C, Figures 6 and 7 for locations of wetland impacts. Reference Attachment C, Figures 9 and 10 for cross sections of the wetland crossing areas. Table 2 Summary of Estimated Wetland Impacts Jurisdictional Area Type of Jurisdictional Area Permanent Impact (Y/N) Area of Impact Wetland F Forested Wetland Yes - Fill 0.055 acre (2,394 s q. ft.) Wetland F Forested Wetland Yes - Excavation 0.004 acre (171 s q. ft.) Wetland GG Forested Wetland Yes - Fill 0.301 acre (13,095 sq. ft.) Wetland GG Forested Wetland Yes - Excavation - 0.006 acre (264 sq. ft.) Wetland GG Forested Wetland Yes - Clearing 0.010 acre (444 s . ft.) 1 q? Permanent Impact Totals: U...5 io acre kloOoo sq. iL.) Activities on the project site involving impacts to waters of the U.S. will be required to follow the conditions of the Individual Permit, and applicable State consistency conditions. Page 10 of 10 ATTACHMENT C FIGURES 'w o- Old Plank Rd VVeStoverLAY i, 0; N Naf¢ ?P f m Ladfurd Ln z C St Anse 0. 'b J, ro ? o ?tr V =I o T O( ? I V4ay weo rA 1 o A? G3' ? G U ? faVg, a br z? Qi Project Vicinity Davidson Rd? DaAdsoil Ct Caro""doh Or C, 2006 Pd apQuest, Inc. 300m 0 ?400tt n \!yestir d g e Dr -- 0 Ra - a?\ Home!Aesdl4 02406 N74VTEQ North Carolina Vicinity Map 7- 7. STV/Ralph Whitehead ( 1? Associates, Inc. Scale as shown Hartley Drive Widening and Extension Site Location Map Davidson and Guilford Counties, NC FIGURE 1 North Carolina Vicinity Map N e -w - _ STV/Ralph Whitehead Associates, Inc. Not to Scale Hartley Drive Widening and Extension U.S.G.S. Location Map Davidson and Guilford Counties, NC FIGURE 2 r Q O r M U z 0 U L W V 4.. O T L 7 O 4. Mapped Soil Units in Project Area Wilkes sandy loam, 6 to 10 percent slopes (WkQ Wilkes sandy loam, 15 to 45 percent slopes (WkE) Chewacla sandy loam (Ch) Enon-Urban Land complex, 2 to 10 percent slopes (EuB) A. STV/Ralph Whitehead Associates, Inc. Hartley Drive Widening and Extension Soil Survey Guilford County, NC Davidson and Guilford Counties, NC FIGURE 4 N Not to Scale a, a Q O M U z 0 U 0 ca D w 0 L O 4. C? Mapped Soil Units in Project Area N Poindexter and Zion sandy loams, 2 to 8 percent slopes (PnB) Poindexter and Zion sandy loans, 8 to 15 percent slopes (PnD) Poindexter and Zion sandy loams, 15 to 25 percent slopes (PnE) STV/Ralph Whitehead Associates, Inc. Hartley Drive Widening and Extension Soil Survey Davidson County, NC Davidson and Guilford Counties, NC FIGURE 3 Not to Scale APPLICANT:CITY OF HIGH POINT LOCATION:HARTLEY DRIVE ACTIVITY: ROADWAY EXTENSION COUNTY: GUILFORD/DAVIDSON ROUTE: HARTLEY DRIVE STATE: NORTH CAROLINA PROJECT": 3202000, TASK 400 DATE: 03/20/08 SCALE: I` = GOO, 0 x o o? s s? N SEE IGUR n9? -- 6 ?o h SEE FIGURE 7 GU .o p A? 04 STV/RALPH WHITEHEAD ASSOCIATES 1000 W. MOREHEAD ST. SUITE 200 CHARLOTTE, NORTH CAROLINA 28208 HARTLEY DRIVE EXTENSION 0 ft 600 fit CITY OF HIGH POINT, NC PROJECT OVERVIEW SCALE FIGURE 5 PHONE *:(704)372-1885 FAX *:(704) 372-3393 L LEGEND PERMANENT PALUSTRINE FORESTED WETLAND FILL IMPACT (0.301 AC) PERMANENT PALUSTRINE FORESTED WETLAND CLEARING IMPACT (0.010 AC) PERMANENT PALUSTRINE FORESTED WETLAND EXCAVATION (0.006 AC) STREAM FILL IMPACT (0 AC; 0 LF) WETLAND BOUNDARY: STREAM BOUNDARY: EROSION CONTROL FENCING LINE: CONSTRUCTION }LIMITS: J LP p v\ P ?? D OE ?LJ Ls BEGIN 8 Sd ?? 11 ps 08 tiVO HN AG E / 8v I EROSION CONTRI nL/ o o I II FENCING LINE? PL APPLICANT:CITY OF HIGH POINT LOCATION: HARTLEY DRIVE IIZZA ACTIVITY: ROADWAY EXTENSION COUNTY: GUILFORD/DAVIDSON STATE: NORTH CAROLINA ROUTE: HARTLEY DRIVE DATE: 06/14/07 PROJECT": 3202000, TASK 400 SCALE: 111 = 80' AND GG 30 78* I PSTQ I ? II NET i FEN 1I PERMANENT F I PST Q) / I J CONTROL-' y" LINE TRINE FORESTED-] \NO FILL IMPACT )5 SF = 0.301 AC PERMANENT PALUSTRINE WETLAND CLEARIN +/- 444 SF = AC PERMANENT PALUSTRINE FORESTED I I W/TL?64 SF = 0.006 AC PACT i 35 A c C Rots / C F wpcy,` xfStl R/W E ,T BER ? ? ,( pRIVE r / C xlstIn9 R? F? Y /// la I ( 1 / I ? I ? I ? ,1 1 l' I `w/ I 1 1 I 'COT I RIDG I . I ol) PROPOSED BRIDGE ABUTMENT /. STREAM 4 STV/RALPH WHITEHEAD ASSOCIATES 1000 W. MOREHEAD ST. SUITE 200 CHARLOTTE, NORTH CAROLINA 28208 HARTLEY DRIVE EXTENSION ?S CITY OF HIGH POINT, NC ..0 ft 80 ft SITE PLAN (FIGURE 6) 1 SCALE PHONE -: (704) 372-1885 FAX *: (704) 372-3393 I- LEGEND APPLICANT:CITY OF HIGH POINT PERMANENT PALUSTRINE FORESTED ACTIVITY: ROADWAY EXTENSION WETLAND FILL IMPACT (0.055 AC) PERMANENT PALUSTRINE FORESTED ROUTE: HARTLEY DRIVE WETLAND CLEARING IMPACT (0 AC) PROJECT#: 3202000, TASK 400 PERMANENT PALUSTRINE FORESTED WETLAND EXCAVATION (0.004 AC) STREAM FILL IMPACT ( O AC; O LF) RIPRAP APRON 231 SF WETLAND BOUNDARY: 8.56 Cy STREAM BOUNDARY: --- EROSION CONTROL FENCING LINE: PERMANENT PALUSTRINE FORESTED WETLAND EXCAVATION IMPACT CONSTRUCTION LIMITS: - - - - - +/- 171 SF = 0,004 AC t ______ PROP. END WALE w STREAM 3 BEGINS T '' 40 r - F 5 N SEES N• ET A FOR OD A S ~ 4' IL I B Por W. H, 120 LF X42' RCP S rA 4 ?'. '' r' I F\ - 5 / ( SrA le-fa LOCATION: HARTLEY DR I VE COUNTY: GUILFORD/DAVIDSON STATE: NORTH CAROLINA DATE: 06/14/07 SCALE: ill = 80' EROSION CONTROL FENCING LINE INSET A AFL HARTLEY DRIVE 71 HAR Ttf Y X 6 ngURI V f S ENANENT'.PAL? RINE FORESTED WETLAND FILL IMPACT -• C R? 2,394 SF = 0.055 AC EROSION. CONTROL k" v 4. •.. ?! C F' FENCING; LINE PRO' C END WALL ` _ r v r Q fit 80 t r., 5 -n SCALE F\? ' ` 45 f I ?r STV/RALPH WHITEHEAD ASSOCIATES 1000 W.MOREHEAD ST. SUITE 200 CHARLOTTE, NORTH CAROLINA 282D8 HARTLEY DRIVE EXTENSION CITY OF HIGH POINT, NC SITE PLAN (FIGURE 7) PHONE 0.1704)372-1885 FAX 0.(704)372-3393 LEGEND APPLICANT:CITY OF HIGH POINT LOCATION:HARTLEY DRIVE PERMANENT PALUSTRINE FORESTED ACTIVITY: ROADWAY EXTENSION COUNTY: GUILFORD/DAVIDSON WETLAND FILL IMPACT (0 AC) STATE: NORTH CAROLINA PERMANENT STREAM ROUTE: HARTLEY DRIVE DATE: 03/20/08 EXCAVATION IMPACT (0.005 AC; 24 LF) PROJECT": 3202000, TASK 400 SCALE: 1" = 80' PERMANENT STREAM FILL IMPACT (0.087 AC; 514 LF) TEMPORARY STREAM HVAC \N? DECK N \ ' EXCAVATION IMPACT (0.008 AC; 23 LF) 2SFD MD WETLAND BOUNDARY: ----me---- lb ST RAE WALL // STREAM BOUNDARY: - G LINE SEE INSET A ?° FOR DETAILS : EROSION CONTROL FENCIN 55 HVAC 2SFD ?j Mo i ° CONSTRUCTION LIMITS: WALL sO c NR ` IISfIM C ?7 DECK LP\ lV WAS` CONC Q \ E . DR??E Y 'rte / ?' \ GT_? 'O zsFo 0 PATIO ?X/Sf O PEANENT STREAM FILL I ACT isF \ R \ 3060 SF = fd:07 AC HYAC ///-,A ORAGE IZ ? PILE? ?. GR1U 350 + \ ? SHED L/D Wa -17 SO INSET A "'?'S/ 3? . TLEY DRIVE PERMANENT STREAM 200 LF 60'RCP } EXCAVATION IMPACT I +/- 204 SF = 0.005 AC ' / GT_ RIPRAP APRON EROSION CONTROL I / 433 SF FENCING LINE 16.04 CY =__? \ F EROSION CONTROLS FENCING LINE \ TEMPORARY STREAM EXCAVATION IMPACT +/- 359 SF = 0.008 AC F\ ' STREA RELOCATION D STV/RALPH WHITEHEAD ASSOCIATES ? ?-- \ D / 1000 W. MOREHEAD ST. SUITE 200 _- PE RMANENT STREAM 2 FILL IMPACT 017 AC \ +/- 737 SF = 0 CHARLOTTE, NORTH CAROLINA 28208 . PROP. SEWER LINE HARTLEY DRIVE EXTENSION CITY OF HIGH POINT, NC 0 ft 80 ft SITE PLAN (FIGURE 8) -? SCALE PHONE -z (704) 372-1885 FAX •:1704) 372-3393 F - ------- - ------------------- VOLUME OF FILL IN WETLAND CALCULATION AREA OF WETLAND FILL IMPACT = 13,095 SF AVERAGE FILL HEIGHT = 20 FT VOLUME OF FILL = 13,095 SF X 20 FT = 261,900 CF = 9,700 CY 19.25' 86.68' 3' PROPOSED GROUND 830 ft 825 ft 820 ft 815 fit 810 ft 805 ft 800 ft -WETLAND EXCAVATION IMPACT PROPOSED TOE OF FILL DITCH CROSS SECTION A-A -HARTLEY- STA. 31+50 PROPOSED CENTERLINE 26.75' 26.75' T PROPOSED GRADE EXISTING GROUND VOLUME OF EXCAVATION IN WETLAND CALCULATION AREA OF WETLAND EXCAVATION IMPACT = 264 SF AVERAGE EXCAVATION DEPTH = 3 FT VOLUME OF EXCAVATION = 264 SF X 3 FT = 792 CF = 29.33 CY WETLAND FILL IMPACT WETLAND CLEARING IMPACT Oft 20 ft SCALE L- 18.63' 1 3T2-3393 ?-- -- --------------- ---- -- --? CROSS SECTION VOLUME OF FILL IN WETLAND CALCULATION AREA OF WETLAND FILL IMPACT = 2,394 SF AVERAGE FILL HEIGHT = 8 FT VOLUME OF FILL = 2,394 SF X 8 FT = 19,152 CF = 709.33 CY PROPOSED GROUND 16.91' 32.48' 840 fit 835 ft INVERT 830 fit 825 ft 820 ft = 829.10 CROSS SECTION B-B -HARTLEY- PROPOSED CENTERLINE 35.14' EXISTING GROUND WETLAND EXCAVATION IMPACT WETLAND FILL IMPACT VOLUME OF EXCAVATION IN WETLAND CALCULATION AREA OF WETLAND EXCAVATION IMPACT = 171 SF AVERAGE EXCAVATION DEPTH = 2 FT VOLUME OF EXCAVATION = 171 SF X 2 FT = 342 CF = 12.67 CY PROPOSED 42"RCP W/NCDOT STD. 838.80 ENDWALLS 0 ft 20 ft SCALE INVERT = 833.60 35.08' PROPOSED GRADE 27.62' ------------------------ VOLUME OF FILL IN STREAM CALCULATION AREA OF STREAM FILL IMPACT = 0.087 AC = 3,797 SF AVERAGE FILL HEIGHT = 18 FT VOLUME OF FILL = 3,797 SF X 18 FT = 68,346 CF = 2,531.33 CY CROSS SECTION C-C -HARTLEY- 820 ft 815 ft 810 ft 805 ft 800 ft VOLUME OF EXCAVATION IN STREAM CALCULATION AREA OF STREAM EXCAVATION IMPACT = 150 SF AVERAGE EXCAVATION DEPTH = 5 FT VOLUME OF EXCAVATION z:150 SF X 5 FT = 750 CF = 27.78 CY 0 ft 25 ft SCALE = 16.^50' I_ CROSS SECTION CROSS SECTION D-D -SANITARY SEWER- 828 EXISTING GROUND 824 820 ?- 816 812 - EX. 12' SANITARY SEWER VOLUME OF TEMPORARY STREAM EXCAVATION CALCULATION AREA OF STREAM EXCAVATION IMPACT = 100 SF AVERAGE DEPTH OF SANITARY SEWER = 5.7 FT VOLUME OF TEMPORARY EXCAVATION = 100 SF x 5.7 FT = 570 CF = 21.11 CY co m J J 3 3 i V --------------- PROP. 132 LF OF 12' DIP c 2.42% TEMPORARY STREAM EXCAVAION IMPACT AREA =100 SF AVERAGE DEPTH = 5.7 FT STV/RALPH WHITEHEAD ASSOCIATES 1000 W.MOREHEAD ST. SUITE 200 CHARLOTTE, NORTH CAROLINA 28208 HORTLEY DRIVE EXTENSION CITY OF HIGH POINT. NC 0 ft 80 ft SITE PLAN (FIGURE 12) SCALE PHONE °:(704) 372-1885 FAX ':17041372-3393 ATTACHMENT D PUBLIC COMMENT/RESPONSE North Carolina Wildlife. Resources Commission Fred A. Director MEMORANDUM TO: Mr. Andrew E. Williams, U.S. Army Corps of Engineers Raleigh Regulatory Field Office FROM: Shari L. Bryant, Piedmont Region Coordinator Habitat Conservation Program ' Vie`-?`-?f DATE: 7 January 2008' b SUBJECT: "Public Notice for. the City, of High Point, iIartley Drive Widening and Extension, Guilford County, North Carolina. Corps Action ID -9: 2007-03968 Biologists with the North Carolina Wildlife Resources Commission (NCWRC) have reviewed the subject document.., Our comments are provided-in accordance with provisions of the Clean Water Act of 1977 (as amended); Fish and Wildlife Coordination Act (48 5tat. 401, as amended, 16 U.S.C. 661-667d), and North Carolina General Statutes (G.S. 113-131 et seq.). The City of High Point proposes to impact 0.349 acres of wetlands and 518 linear feet of perennial stream. channel.The impacts are associated with the widening of the existing Hartley Drive and nbw road construction from the Hartley Road termini to. the existing Westover drive. The purpose of the project is to improve access to US 311 and the City of High Point and to reduce traffic on Westover Drive. The proposed project includes construction of roadway, bridge and associated stormwater management systems. The applicant proposes mitigation for wetland and stream channel impacts at a 1:1 ratio by providing payment into the North Carolina Ecosystem Enhancement Program. The U.S. Army Corps of-Engineers may require a-2:i ratio for some stream channel and all wetland impacts. Proposed construction would impact two unnamed tributaries to Rich Fork in the Yadkin-Pee Dee River basin. One stream would be bridged and impacts to another stream on site are not anticipated. Impacts to wetlands would result from site grading, stormwater management, mechanized vegetation clearing and utility installation. The second area of stream crossings would require relocation of the stream channel, and installation of 200 linear feet of 60-inch diameter reinforced concrete pipe (RCP) underneath the proposed roadway, to provide continued conveyance of the stream flow. The bottom portion of the pipe would be buried 12-inches below the existing stream bed to insure continued stream flow and passage of aquatic organisms in periods of low flow conditions. We hesitate to concur with the piping of any stream due to the potential negative impacts to downstream areas and the elimination of aquatic and terrestrial wildlife habitat. Generally, we prefer spanning structures (bridges). Spanning structures usually do not require work within the stream or stream channel realignment. The horizontal and vertical clearances provided by bridges allows for human Mailing Address: Division of Inland Fisheries 1721 Mail Service Center'- Raleigh; NC= 27699-1721 Teiephoiie: (9I9) 733-3633 Fax: (919) 715-7643 Z"d SZ9L'6trb"9EE queRua iuegg eSE:11 BO LO Uer Page 2 7 January 2008 Hartley Drive Widening and Extension Corps Action 1D#: 2007-03968 and wildlife passage beneath the structure, does not block fish passage, and does not block navigation by canoeists and boaters. Additionally, we are concerned about impacts to wetlands due to their wildlife habitat value and the well-known beneficial functions these areas provide for flood control and water quality protection. Should the permit be issued, we recommend the following conditions be incorporated into the permit to further minimize impacts to aquatic and terrestrial wildlife resources. 1. Bridge deck drains should be directed to buffer areas or retention basins and not discharged directly into the stream. 2. Live concrete should not be allowed to contact the water in or entering into the stream. 3. If possible, bridge supports (bents) should not be placed in the stream. 4. A clear bank (rprap free) area of at least 10 feet should remain on each side of the stream underneath the bridge. 5. Culverts must be designed to allow for aquatic life and fish passage. Generally, the culvert or pipe invert should be buried at least 1 foot below the natural streambed (measured from the natural thalweg depth). If multiple barrels are required, barrels other than the base flow barrel(s) should be placed on or neat stream bankfull or tloodplain bench elevation (similar to Lyonsfield design). These should be reconnected to floodplain benches as appropriate. This may be accomplished by using sills on the upstream and downstream ends.to restrict or divert flow to the base flow barrel(s). Silled barrels should be filled with sediment so as not to cause noxious or mosquito breeding conditions. Sufficient water depth should be provided in the base flow barrel(s) during low flows to accommodate fish movement. If culverts are longer than 40-50 linear feet, alternating or notched baffles should be installed in a manner that mimics existing stream pattern. This should enhance aquatic. life passage: 1) by depositing sediments in the barrel, 2) by maintaining channel depth and flow regimes, and 3) by providing resting places-for fish and other aquatic organisms. In essence, base flow barrel(s) should provide a continuum of water depth and channel width without substantial modifications of velocity. 6. If multiple pipes or cells are used, at least one pipe or box should be designed to remain dry during normal flows to allow for wildlife passage. 7. Culverts or pipes should be situated along the existing channel alignment whenever possible to avoid channel realignment. Widening the stream channel must be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage, 8. Riprap should not be placed in the active thalweg channel or placed in -the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be professionally designed, sized, and installed- 9. Sedimentation and erosion control measures sufficient to protect aquatic resources must be implemented prior to any ground disturbing activities. Structures should be maintained regularly, especially following rainfall events. 10. Temporary or permanent herbaceous vegetation should be planted on all bare soil within 15 days of ground disturbing activities to provide long-term erosion control. 6 'd S29L IG-Hr 1 96E queRUg Tieys e9E = T T BO LO Uer Page 3 7 January 2008 Hartley Drive Widening and Extension Corps Action ID#: 2007-03968 11. All work in or adjacent to stream waters should be conducted in a dry work area. Sandbags, rock berms,. cofferdams, or other diversion structures should be used where possible to prevent excavation in flowing water. 12. Heavy equipment should be operated from the bank rather than in stream channels to minimize sedimentation and reduce introducing other pollutants into streams. All-mechanized equipment operated near. surface waters should be inspected aiid. maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids or other toxic materials- 13. Natural channel design methods should be used for any relocated portions of stremn,channel. 14. If temporary access roads or detours are constructed, they should be removed back to original ground elevations immediately upon the completion of the project. Disturbed areas should be seeded or mulched to stabilize the soil and native tree species should be planted with a spacing of not more than 10-feet x10 feet If possible, when using temporary structures the area should be cleared but not grubbed Clearing the area with chain saws, mowers, bush-hogs, or other mechanized equipment and leaving the stumps and root mat intact, allows the area to revegetate naturally and minimizes disturbed soil. I S. Only clean, sediment-free rock should be used as temporary fill (causeways), and should be removed without excessive disturbance of the natural.stream bottom when construction is completed. Thank you for the opportunity to comment on this project. If we can provide further assistance, please contact our office at (336) 449-7625. cc: Cyndi Karoly, DWQ ec: Mark Sowers, USFWS it -al Sa9G'6frft'9EE queRua Tie4s e96:11 so GO ueC K STV/Ralph Whitehead Associates 1000 West Morehead Street. Suite 200 Charlotte. North Carolina 28208 (704)372-1885 fax: (704)372-3393 May 5, 2008 Via FEDERAL EXPRESS North Carolina Division of Water Quality Winston-Salem Regional Office 585 Waughtown Street Winton-Salem, NC 27107 Attention: Ms. Sue Homewood Subject: Response to Public Comments Hartley Drive Widening and Extension City of High Point, Guilford County, NC NCDWQ #07-1995 USACE Action I.D. #2006-20795 STV/RWA Project No. 3202000 Dear Ms. Homewood, This letter has been prepared to address the public comments that have been received regarding the above referenced project. A response to each of the comments that were made is presented. A copy of the one comment letter that has been received is attached to this response letter. The North Carolina Wildlife Resources Commission (NCWRC) was the only entity to comment on this proposed project. Comment: The NCWRC hesitates to concur with the piping of Stream 2, due to the potential negative impacts to downstream areas and the elimination of aquatic and terrestrial habitat. The NCWRC would prefer a spanning structure such as a bridge to avoid working within the stream, and avoid channel realignment. Bridges also provide clear passage for humans and wildlife, does not block fish passage, and does not block navigation by canoeists and boaters. Response: The largest of the streams on site (Stream 4) will be spanned by a bridge. Stream 2 (which will be piped) does not have a fish population in the impacted area, and is not navigable. The high cost of span bridges makes it impractical to use them at minor crossings. The bottom of the culvert that has been proposed for Stream 2 will be buried below the stream bed to allow for wildlife passage at low flow events, which will be the majority of the time. 1 an employee-owned company providing quality service since 1912 Comment: The NCWRC is concerned about impacts to wetlands due to their wildlife habitat value and the well-known beneficial functions wetland areas provide for flood control and water quality protection. Response: The impacts to wetland areas within the project corridor are anticipated to be minimal (0.376 acre). These impacts will be mitigated in part by creating wetlands on site and purchasing the remaining wetland mitigation credits from the North Carolina Ecosystem Enhancement Program. Wetland ratings worksheets prepared for the project indicate that Wetland F has a wetland rating of 64 and Wetland GG has a wetland rating of 58, which indicates that these areas are not considered to be high value systems. Comment: The NCWRC would like the bridge drains directed to buffer areas or retention basins and not discharged directly to the stream. Response: The collected stormwater will be either treated in a retention basin, or discharged to buffer areas as shown in Attachment A - Stormwater Management Plan, Hartley Drive Roadway Drainage Map. There will be no direct discharges to streams. Comment: The NCWRC does not want live concrete to contact in or entering the stream. Response: Precautions will be taken during construction to prevent concrete from coming into contact with the stream or with the runoff entering the stream until the concrete has hardened. The construction contractor will be advised of this requirement on the construction documents. Comment: The NCWRC does not want any of the bridge bents to be placed within the stream. Response: As the construction plans show for the crossing of Stream 4, no bridge bents will be located within the stream (Attachment C - Figure 6). Comment: The NCWRC would like to see a clear bank (riprap free) area of at least 10 feet on each side of the stream under the bridge. Response: The stream at the bridge crossing (Stream 4) will have no riprap on either bank. Riprap will be placed on the slopes at the abutments, but will be typically be 25 feet or more from the stream bank and will not be within 10 feet of the stream bank. Comment: The NCWRC would like to see the culverts designed to allow for aquatic life and fish passage with the pipe invert buried at least I foot below the natural stream bed, the use of silled barrels, and alternating or notched baffles. Response: As the construction plans show, the culverts will be buried approximately one foot below the elevation of the natural stream bed. It is anticipated that the size of the proposed culverts will afford the opportunity for natural meanders to form within the pipe over time. There are no fish populations in the areas where the culverts are to be used, and the passage of other aquatic species will not be blocked. Comment: If multiple pipes or cells are used, at least one pipe should be designed to remain dry during normal flows to allow for wildlife passage. Response: A single pipe has been proposed for each of the culvert crossings; multiple pipes or cells are not proposed. 2 Comment: The NCWRC would like the culverts placed along the existing channel alignment when possible to avoid channel realignment. Response: The proposed culvert at Wetland F will be placed along the existing alignment of the headwater channel. The proposed culvert at Streams 1 and 2 will not be placed along the existing channel alignment due to the meandering nature of the streams in this portion of the project corridor, but will follow the general alignment to the greatest extent practicable. Comment: The NCWRC does not want riprap placed within the thalweg of the stream, and wants bioengineered boulders or structures professionally designed, sized and installed. Response: The proposed relocated stream will have no rocks or other materials placed within the thalweg. The proposed rock vane will not impact the thalweg. No obstruction to aquatic life passage will be placed within the thalweg. Boulders that are unearthed during preliminary grading activities will be stockpiled for use along designated stream bank areas. Boulders will be sized and placed accordingly along these stream bank areas to form a boulder revetment under the supervision of the wetland scientist in charge. If an insufficient amount of boulders is unearthed, or if the boulders are inadequately sized, coir logs will be installed along the stream bank instead for the stream bank protection. Comment: Sedimentation and erosion control measures sufficient to protect aquatic resources must be implemented prior to any ground disturbing activities. Structures shall be maintained regularly, especially following rainfall events. Response: A NCDENR-approved erosion and sedimentation control plan will be implemented prior to ground disturbing activities and will be maintained regularly. Comment: Temporary or permanent herbaceous vegetation should be planted on all bare soil within 15 days of ground disturbing activities to provide long term erosion control. Response: Stockpiled soils may be temporarily seeded with an annual ryegrass or equivalent herbaceous species. All exposed soils will be seeded appropriately within 15 days of grading and/or project completion at that location. Comment: All work in or adjacent to stream waters should be conducted in a dry work area. Diversion structures should be used where possible to prevent excavation in flowing water. Response: The existing Stream 1 flow will be maintained until after the construction of the culvert and relocated stream channel has been completed. After the relocated channel is completed and stabilized, water will be diverted from the existing stream channel into the relocated stream channel. There are no other culverts being installed in flowing streams as part of this project. Comment: Heavy equipment should be operated from the bank rather than in the stream channels. All mechanical equipment shall be inspected and maintained regularly to 3 prevent contamination of surface waters from fuels, lubricants, hydraulic fluids or other toxic materials. Response: The project corridor streams are typically <3 feet wide and therefore it will not be necessary to impact the streams with heavy equipment. All mechanical equipment shall be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids or other toxic materials. Comment: Natural channel design methods should be used for any relocated portions of the stream channel. Response: The relocated stream channel has been designed to mimic the pattern, profile and dimensions of the existing channel to be impacted. Comment: If temporary access roads or detours are constructed, they should be removed back to original ground elevations immediately upon completion of the project. Disturbed areas should be seeded or mulched to stabilize the soil and native tree species should be planted with a spacing of no more than 10 feet x 10 feet. Response: No temporary access roads or detours are proposed. Disturbed areas within the project corridor will be vegetated (seeded and mulched) upon completion of project activities in a given area. Native tree species will be planted within the wetland mitigation area. Comment: Only clean, sediment free rock should be used as temporary fill (causeways), and should be removed without excessive disturbance of the natural stream bottom when construction is completed. Response: No temporary causeways are proposed. Please do not hesitate to contact either of the undersigned at 704-372-1885, if you have any questions. Sincerely, STV/RALPH WHITEHEAD ASSOCIATES, INC. n r?J to ?? Brandon Phillips, /.H.M.M. Michael A. lagnocco, P.W.S. Sr. Environmental Specialist Senior Scientist cc: Keith Pugh, P.E., City of High Point Ian McMillan, DWQ 4 ATTACHMENT E ENGINEERING PLANS CITY OF HIGH POINT DAVIDSON AND GUILFORD COUNTIES LOCATION. HARTLEY DRIVE FROM US 311(N. MAIN STREET) TO WESTOVER DRIVE TYPE OF WORK GRADING, DRAINAGE, PAVING, WIDENING, SIGNING, PAVEMENT MARKING, GUARDRAIL, CULVERTS, SIGNALS, UTILITIES, AND STRUCTURE Z D O Gmi z n Gt a 0 C 0 U Y 3 D K N 0 M 0 L a i 0 3 v 0 i c a L i N 0 C?N N00 L ? Q4- N/0 STA. 8+05.00 i;C e0k - -L- J I N. JI*4J.11 ?A0 w u'„ < z; _ 10+46.00 F. N • ? Oa guy.. , g w 3H BEGIN 1 .? PROJECT ERM.W I?a.d $ ;a END ' PROJECT d VICINITY MAP A. p ?'3?kT; SAY ?? 7 200 END CONSTRUCTION N. MAIN STREET sTA.li+44.33 _????SAN?S??? A. STA. 12+52.17 l 1*9 I - I BEGIN CONSTRUCT GALLOWAY FARM 1 I ! a STA. 10+00.00 _ s - I ?- END CONSTRUCT _ 6 CALLOWAY FAR IA. 11+70.25 j UO M_ BEGIN CONSTRUCTION 8 ° o WESTOVER DRIVE -' S p a STAJ2+54.68 TRUCTION ND N i E CO S SHADOW VALLEY ROAD END CONS STA. 15+09.23 W. HARTLE' STA.10+45.16 -L- STA. 70+51.79 STV(RRlph Whitehead Associates RIGHT OF WAY PLANS FOR REVIEW 3/2" BOX E35624 , NC CLEARING ON THIS PROJECT ESUALL D BY RE PREFORMED CHARLOTTE, NC 28235-5624 TO THE LIMITS ESTABLISHED BY METHOD H INCOMPLETE PLANS W NOT USE FOR R/W ACONStEION GRAPHIC SCALES DESIGN DATA PROJECT LENGTH 50 0 50 100 ADT 2006 = 5,400 ADT 2030 =17,500 LENGTH OF ROADWAY PROJECT PLANS DHV = 13 % 50 0 50 100 D = 55 % LENGTH OF STRUCTURES, PROJECT 0 t PROFILE (HORIZONTAL) V = 50 MPH TOTAL LENGTH OF PROJECT 10 0 10 20 W.1 I ? PROFILE (VERTICAL) « TIST DUAL Prepared in the Office of, HYDRAULICS ENGINEER STV / RALPH WHITEHEAD ASSOCIATES for Phe City of High Point L465 AH mas srARnARD srECmrCAnoxs P.R 0."8 MI RIGHT OF WAY DATE. KEN HERRING, P.E. Ems" PROJECT ERGnM&R ROADWAY DESIGN 1.513 M! ENGINEER LE777NG DATE. _ KIT PERSIANI, P.E. PROJECT DRUM ERGLmBR P.E. SI&VATtmE: x ^' Inelge'lliff" I Norm CAToutmllmawntomLCrre- N.?, 2287 ? P P ' N o ®STV/ Mph Whitehead Associates PROJECT REFERENCE NO. SHEET NO. 2287 2 t o P.O. BOX 35624 CHARLOTTE, NC 28235-5624 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLF E PLANS DO NOT USE FOA U. ACQUISITION VARIES 26.75'- 44.75' VARIES 26.75'- 44.75' RAISED MEDIAN VARIES 4' TO 28' R2 VARIES 7.5'-10' VARIES 11.5'- 12' VARIES 11.5'-12' VARIES VARIES VARIES 11.5'-12' VARIES 11.5'-12' VARIES 7.5'-10' VARIES 0.5'- 3' 2'- 8' 2 - 20 VARIES 0.5'- 3' EXISTING 5'-6' 2' SIDEWALK 0.75' 2' 0.75 5'-6' V-2' , SIDEWALK 10 1 GROUND - 0.02 FM _ 0.02 FOFf 1 0.02 FTFT 0.02 F6FT 0_02 FT?fT -4 I,$_ 1 00 ,02 FFW1 t0 1 ,? .. EXISTING ?•\ t . GROUND JP? S T El pl Ci GRADE Rl t' POINT 1' Rl 1' - C1 Dl 1' S C2 -.TRAFFIC _ TYPICAL SECTION NO. 1 El 16+10 20 16 TO STA L STA 45 L 10 T - --------------- ------------ --- VARIABLE . - + . - - - . . W - - -L- STA. 19+14.56 TO STA.-L- 22+00.00 /U MILLING -L- STA. 28+78.93 TO STA.-L- 31+43.17 (BEGIN BRIDGE) ETRAFFIC _ -L- STA. 33+96.83 (END BRIDGE) TO STA. -L- 65+02.00 ---------------------- - ------------------- ------------ --- L -)'ABLE A , DET I MILLING U (N.T.S.) VAR. MILLING ? ? USE AT TIE-IN LOCATIONS AND AS DIRECTED BY ENGINEER ' ' ' ' (TY PICAL DETAIL FOR ALL TYPICAL SECTIONS) 10 VARIES 3T - 32.75 VARIES 31'- 39' _ VARIES 14' TO 23.75' 10 PAINTED MEDIAN 5' 12' 12' VARIES VARIES 12' 12' 5' 2' SIDEWALK 7'-8.75' 7'-15' SIDEWALK EXISTING 2' L I ?•1 O GROUND I 1 GRADE W T T PO INT JPS"A,g 0.02 Fr/FT 0.02 FTfT 0.02 Fr/Fr 0.02 FPFT EXISTING J?A` GROUND S 13 1 Cl 6U C1 Dl S T El ? El EXISTING PAVEMENT T VARIES 24' TO 30' TYPICAL SECTION NO. 2 -L- STA. 16+10.20 TO STA. -L- 19+14.56 -L- STA. 22+00.00 TO STA. -L- 28+78.93 SURVEY C1 3 a r O D1 E2 o PAVEMENT SCHEDULE N PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE 2 W„ U 212 m N C1 58.58, AT AN AVERAGE RATE OF 168 LBS. PER SD. YD. IN EACH Ft PROP. APPROX. B" GRADED AGGREGATE BASE SURVEY 4 EXISTING 3„ MIN. MIN. 3" i r OF TWO LAYERS. MIN. MIN 00 C2 PROP. APPROX. 1,5" ASPHALT CONCRETE SURFACE COURSE TYPE Al 1'-6" CONCRETE CURB AND GUTTER 59.56, AT AN AVERAGE RATE OF 168 LBS. PER 80. YD. C1 Detail Showing Method of Wedging V AR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE 59.58 GRAOR 3 06INT2 E2 D2 2 C1 C3 AT AN AVERAGE PATE OF 112 LBS. PER SD. Y0. PER 1" DEPTH, R2 2'•6" CONCRETE CURB ANO GUTTER " DI EZ TO BE PLACED IN LAYERS NOT TO EXCEED 2.0 IN DEPTH. PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE * Di TYPE I19.OB, AT AN AVERAGE RATE OF 456 LBS. PER SOYS 4" CONCRETE SIDEWALK 1I VAR. DEPTH INTERMEDIATE COURSE, TYPE I19.OB, AT AN AVERAGE 214" D2 RATE OF 114 LBS. PER S0. YD. PER 1" DEPTH, TO BE PLACED T EARTH MATERIAL " V MI MIN. = IN LAYERS NOT TO EXCEED 4.0 IN DEPTH. MIN 2 l2" ' a PROP. APPROX. 6" ASPHALT CONCRETE BASE COURSE, TYPE MIN. 3" MIN m E1 EA , AT AN AVERAGE PATE OF 942 LBS. PER S0. YD. IN U EXISTING PAVEMENT EA Detail Showing Method Of Wedging . MI" Wedging Detail For Resurfacin 9 a? m CH O TWO CH OF LAYERS. oT VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.OB, AT \°'ro AN F W SEE WEDGING DETAIL E2 TO BEEPLACEDAIN LAYERS NOT TOEEXCEED Y5:5, IN DEPTH. TYPICAL DETAILS FOR ALL TYPICAL SECTIONS) MEo P N m L 10' VARIES 12'- 20.75' VARIES 12'- 20.75' 8' 2' 12' VARIES 0' TO 17.5' 12' PS PAINTED MEDIAN GRADE W POINT 0.0FFWT 0.02 FThT 0.02 FM 50 Z•) EXISTING NPR Al T El DI Cl U Cl GROUND EXISTING PAVEMENT VARIES 0' TO 24.5' TYPICAL SECTION NO. 3 -L- STA. 65+02.00 TO STA.-L- 70+51.79 0.08 FiF'T --E-----`.4:1 A:1 10' 1 EXISTING GROUND C m v N a x i m 00 vau PAVEMENT SCHEDULE PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE Cl $9.58, AT AN AVERAGE RATE OF 188 LBS. PER SO. YD. IN EACH F1 PROP. APPROX. 6" GRADED AGGREGATE BASE OF TWO LAYERS. 02 PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE ' " 59.58, AT AN AVERAGE RATE OF 168 LOS. PER SQ. YD. R1 1 -6 CONCRETE CURB AND GUTTER VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE 39.58 C3 AT AN AVERAGE RATE OF 112 LBS. PER SO. YD. PER 1" DEPTH, " fl2 2'•S" CONCRETE CURB AND GUTTER TO BE PLACED IN LAYERS NOT TO EXCEED 2.0 IN DEPTH. PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, D1 TYPE I19.OB, AT AN AVERAGE RATE OF 456 LBS. PER SQ. Y0. S 4" CONCRETE SIDEWALK VAR. DEPTH INTERMEDIATE COURSE, TYPE I19.OB, AT AN AVERAGE D2 RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH, TO BE PLACED T EARTH MATERIAL IN LAYERS NOT TO EXCEED 4.0" IN DEPTH. PROP. APPROX. 6" ASPHALT CONCRETE BASE COURSE, TYPE El B25.OB, AT AN AVERAGE RATE OF 342 LBS. PER SO. YD. IN U EXISTING PAVEMENT EACH OF TWO LAYERS. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.OB, AT E2 AN AVERAGE RATE OF 114 LBS. PER SO. YD. PER 1" DEPTH, W SEE WEDGING DETAIL TO BE PLACED IN LAYERS NOT TO EXCEED 5.5" IN DEPTH. PROJECT REFERENCE N0. NO. NO. STV/Ra1pbR'hite6eadAssociate s 2287 2-A P,O. BOX 35624 CHARLOiiE NC 28235-5624 ® ROADWAY DESIGN P AVEMENT DESIGN , ENGINEER ENGINEER INCOMPLE E PLANS W NOT U9e FOR /W ACQUISITION VARIES 13' TO 16' VARIES 13' TO 16' 2' Cl 1 PoIRADNT i Cl 0.02 FT/FT 0.02 FGFT El Dl U DI El T L_ EXISTING PAVEMENT VARIES 0' TO 32' TYPICAL SECTION NO. 4 -Yl- (INGLESIDE DRIVE) STA. 10+48.00 TO STA. 13+07.74 EXISTING GROUND EXISTING GROUND PROJECT REFERENCE NO. SHEET NO. ®s Ralph Whitehead Associates 2287 2-8 P.O. BOX 3562 35624 CHARLOTTE, NC 28235-5624 ROADWAY DESIGN PAVEMENT ENGINEER EE0. ENGINEER INCOMPLE E PLANS W NOT USE FOR /W Awue1TION TYPICAL SLCIIUN NU. 5 -Y2- (WESTOVER DRIVE) STA. 12+54.68 TO STA. 16+08.81 rL 6' 10' 10' 6' 8' 1 i- GRADE POINT 0.06 FT/FT 0.02 FLFT 0.02 FDFT 0.0_8,Fw7 EXISTING GROUND 4•,1 4. T F1 C2 C2 F1 T TYPICAL SECTION NO. 7 N d Y 0 N m M -Y4- (CALLOWAY FARM ROAD) STA. 10+00.00 TO STA. 11+70.25 PAVEMENT SCHEDULE PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE C1 89.5B, AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. IN EACH F1 PROP. APPROX. S" GRADED AGGREGATE BASE OF TWO LAYERS. PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE C2 S9.SB, AT AN AVERAGE RATE OF 168 LBS. PER S0. YD. R1 1'-8" CONCRETE CURB AND GUTTER VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9-6B C3 AT AN AVERAGE RATE OF 112 LBS. PER 80. YD. PER 1" DEPTH, R2 2'-8" CONCRETE CURB AND GUTTER TO BE PLACED IN LAYERS NOT TO EXCEED 2.0" IN DEPTH. PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, 01 TYPE 119.08, AT AN AVERAGE RATE OF 456 LBS. PER SO. Y0. S 4" CONCRETE SIDEWALK VAR. DEPTH INTERMEDIATE COURSE, TYPE 119.08, AT AN AVERAGE D2 RATE OF 114 LBS. PER S0. YD, PER 1" DEPTH, TO BE PLACED T EARTH MATERIAL IN LAYERS NOT TO EXCEED 4.0" IN DEPTH. PROP. APPROX. 8" ASPHALT CONCRETE BASE COURSE, TYPE E1 B25.06, AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD. IN U EXISTING PAVEMENT EACH OF TWO LAYERS. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.OB, AT E2 AN AVERAGE RATE OF 114 LBS. PER S0. YD. PER 1" DEPTH, W SEE WEDGING DETAIL TO BE PLACED IN LAYERS NOT TO EXCEED 5.5" IN DEPTH. CE 40' 16' 12' 1 GRADE POINT 0.02 Fr/FT 0.02 FLFf U U EXISTING PAVEMENT 32' TYPICAL SECTION NO. 6 10, 12' 3' 5' SIDEWALK 0.02 FT/FT EXISTING GROUND -Y3- (SHADOW VALLEY ROAD) STA. 12+52.17 TO STA. 15+09.23 EXISTING GROUND EXISTING GROUND m a N a r 0 N m m a 0 i a x 0 0 m w? 0 o! mC EXISTING GROUND EXISTING GROUND 7.5' 6' 12 SIDEWALK 2' 1 VARIES 0.02 FLFI 0' TO 6.1; VARIES 7.5'- 9.5' 0' TO 12' VARIES 0.5'- 3.5' 1 5'- 6 SIDEWALK 2' VARIES 0,02 FL}T 0' TO 11.08' VARIES 0'' I[ VARIES 0' TO 11; e! 1 -Y- (N. MAIN ST.) STA. 10+65.26 TO STA. 15+00.00 D 57' VARIES 5.3' TO 5.7' 12' 12' 12' 2.5' 1 L 3 1 TYPICAL SECTION NO. 10 -Y- (N. MAIN ST,) STA. 15+00.00 TO STA. 17+44.33 PAVEMENT SCHEDULE PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE C1 S9.5B, AT AN AVERAGE HATE OF 168 LBS. PER $0. YD. IN EACH F1 PROP. APPROX. B" GRADED AGGREGATE BASE OF TWO LAYERS. C2 PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE ' " S9.5B, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. Ri 1 •6 CONCRETE CURB AND GUTTER VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE 89.5B C3 AT AN AVERAGE RATE OF 112 LBS. PER SO. YD. PER 1" DEPTH, " R2 2'-S" CONCRETE CURB AND GUTTER PLACED IN LAYERS NOT TO EXCEED 2.0 IN DEPTH. PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, D1 TYPE I19.OB, AT AN AVERAGE RATE OF 456 LBS. PER SO. YD. J CONCRETE SIDEWALK VAR. DEPTH INTERMEDIATE COURSE, TYPE I19.OB, AT AN AVERAGE D2 RATE OF 114 LBS. PER SO. YD. PER 1" DEPTH, TO BE PLACED " RTH MATERIAL IN LAYERS NOT TO EXCEED 4.0 IN DEPTH. PROP. APPROX. 6" ASPHALT CONCRETE BASE COURSE, TYPE E1 625.08, AT AN AVERAGE RATE OF 342 LBS. PER 3Q. YD. IN U EXISTING PAVEMENT EACH OF TWO LAYERS. VAR, DEPTH ASPHALT CONCRETE BASE COURSE, TYPE S25.OB, AT E2 AN AVERAGE RATE OF 114 LBS. PER SO. YD. PER 1" DEPTH, W SEE WEDGING DETAIL TO BE PLACED IN LAYERS NOT TO EXCEED 5.5" IN DEPTH. PROJECT REFERENCE NO . SHEET NO. S TV Ralph Mtikhead Associates P.O. BOX 35624 2287 2-C CHARLOTTE, NC 24235-5624 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER - INCO %p LE E LLANS DO NOT FOR /W ACbU151ilON 1 1 1 MILL TO 1.5" BELOW (L EXISTING PAVEMENT RESURFACE WITH -SURFACE Y APPROX. 1.5" S9.5C C2 ----- U STEP 1 STEP 2 DETAIL 'B' 6u (N.T.S.) USE MILLING DETAIL ALONG N. MAIN STREET LEFT SIDE : FROM -Y- STA. 8+05.00 TO STA. 17+44.33 RIGHT SIDE: FROM -Y- STA. 9+85.00 TO STA. 15+95.00 TO 39.78' 12 VARIES 10' TO 15.78' 1 0 1 U C2 TYPICAL SECTION NO. 8 -Y- (N. MAIN ST.) STA. 8+05.00 TO STA. 10+65.26 VARIES 39.78' TO 54.32' 12' VARIES 0' TO 12' 12' 12 1 75' .7 '7ERIES L 2.5' TO 10.09' W E1 Dl Cl TYPICAL SECTION NO. 9 i THROAT ELEVATION 840.V Lw, INSTALL ON PACE OF BOX THAT FACES CENTER OF POND. POND BOTTOM ELEVATIOIk83<i.0' E?.BOIW I 7 7/; (.SEE D AIL I( GRAPHIC SCALE ---85 BOTTOM OF POND = 845.0 ? -? _ 2•_6 -- TOP O -- ' )-Y,' F POND - 843 _ f NART2fY Dilly-€-` ?-_ - 4 0 1. q 893 r - I? m 0 N N ty, r Q) Oj - _- a 0 N m N M 0 a / A 0 0 a r m o? a m/ GRAPHIC SCALE (SEE CROSS SECTION STA. 46+00.00) ? (SEE CROSS SECTION STA. 63+00.00 - 64+00.00) c c POND NO. L N0. SHEET NO. \ PROTECT REFERENCE 2287 2-D m BOTTOM OF POND = 835D ' I I \ ? \1 I I RNr SHEET No. I f TOP OF POND = 892.0 OR 843.0 I ROADWAY DESIGN HYDRAULICS FREE BOARD FROM 100 YR STORM = 1.31 FT ENGINEER ENGINEER - J INCOMPLE E PLANS (? I I W. Eil#RTLEY RI,?E IP STD. W NOT USE FOR /W ACQUISITION 8TO.840.16 FRAME &.GRADE \ I / lip ? ?v 40 •00 ??1 I I / / / BRICK COPING (INCIDENTAL v ? I 8 I / I / / ? • • _- __ _ ?I'FIYy ?A ?5? V A A ? ? A A 6"CONCRETE BLOCK ' ? o ? o A 36'R.C. DISCHARGE PIPE OR PRECASTCONC. LENGTH-?de,d', INV.00T=835.8' V \? v V > t-?? 11" 1( 1 INV. IN. 5329 a DOWEL (L=craw=9•xnBAR) 9CE TO THE BASE n A•, INVERT ELEV.=53520' G ? • \W ??r./ / / /l I 1` / • C.L. ELEV.=835.49 • ? / / ? / / / • ? I / / o / l l 1 l?s? ( ( 1 // ? // / / ? . A , , ? a / / / / 11 11 l I 8'CONC , SLAB WITH %5?12'E.W. l ° PERMANENT OUTLET STRUCTURE DETAIL N0 1 1 / l R : E u ?YIS /? sTVru3ipewnroEnE5aa3so?Ble.S DETENTION BASIN 1 GRADING DETAIL o ro ? w ks? ® P.O. BOX 35624 (SEE CROSS SECTION STA. 29+00.00) CHARLOTTE, HC 25235?624 POND NO. 2: POND NO 3: OT ---- BOTTOM OF POND = 839.0 1 W l????dTLEY ?JRl . TOP OF POND = 852:0 - - ='- -- -- --- / . 1 BOARD FROM 100 YR STORM = 126 FT FREE // v 1 NQtiQT 06 I 1 862 ? I c° l FREE BOARD FROM l00 YR ---- ---- STORM = 5.51 FT -- \ `?. I'}, 1 TD . ? I T i l l " I ., I f 1 I I I ; ? I 1 I W. /? 1 1 1 1114 ?1J1 1 I / I ' 1 I i I I? / ? -' < , I I III 1 3,, I ? / / / f I I? ! / \ _ / F ?` S, HP ST ? I I I 534 ? ?, : v, ? 36 ? ? ? ?f I I ? I l l ? I 1 I ? J 1 l/ / /., I (I I H ? " ? /'855 _ I I ' X40 ???` r ? l / / 01 1 . E 850 1,850.00 / J I t) ?„/ /•,r \ ?_ (. / / /i j ?1 I 1 / I iV.= 845.0. 1 q rte' 1 I ,-,rV1/ ,_v `v v v x / / J I I I J l J l / ? ? '? ? ' -- J? I+r j ItL. ?? , / \\ ? \ I I ? I I I I I I / :,? ? v ,/ ;;; ? A ,1?0 I I I? I II V I I I 1 1 1 1 v , ? .?, I ??^ri 1 / (t ? j I INV 839 0 i . . o DETENTION BASIN 2 GRADING DETAIL o ,a ? 40 DETENTION BASIN 3 GRADING DETAIL % nwA=ruc scue PROJECT REFERENCE NO. SHEET NO. STVI ®F.0.OX356Whihhe9dAsmciate6 2287 2-E aa. Box ' CHARLOTTE, NC 28235,5624 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER 98' 12' INC®ILP& E E PLANS W NOT USE POE /W ACOUI9TMJN 3 0 0 m APPROX. TOP OF CURB ACK SIDE WALL Z m + o Z y m ) .5+ (B V TOP OF WALL TOP OF SIDEWALK ?v (STREET SIDE WALL) 0 0 + + N 3 Z < r m ___-------_"--- _ P P... W Z N NV~1 ___ ------ ---- --_---_--_ N _--_-_-------------_-_-_-_-_-_-_-_-_-___-_-_-_ ----_-_-_-_-_-_-_-_---_---- -__- --_-- - - ?--- - - _ - -- - - _ -- _ _ _ _ _ _ _ _ _ _ ---- - ._- _------------ ----------- -------------- -?.------_ - ELEVATION SEGMENTAL BLOCK RETAINING WALL NO.1 SEE SHEET 4 FOR LOCATION SEE WALL DETAIL 'A', THIS SHEET SIDEWALK MAINTAIN EXISTING SIDEWALK GRADE I SEGMENTAL --------- M1 WALL UNITS T SEGMENTAL MAINTAIN EXISTING WALL UNITS GRADE __--__- ---- 6" CRUSHED STONE LEVELING PAD 6" CRUSHED STONE DETAIL 'A' DETAIL 'B' LEVELING PAD USE DETAIL FOR RETAINING WALLS NO.2 & 4 USE DETAIL FOR RETAINING WALLS NO.1 & 3 NOTES: 1. MINIMUM WALL EMBEDMENT IS 6". 2. SEE SPECIAL PROVISIONS FOR MATERIAL SPECIFICATIONS. 3. CONTRACTOR SHALL PROVIDE CUT SHEETS AS DIRECTED IN THE SPECIAL PROVISIONS FOR APPROVAL BY ENGINEER PRIOR TO ORDERING MATERIALS. 4. HANDRAILS SHALL BE PROVIDED WHEN SIDEWALK IS ABOVE WALL AND HEIGHT OF WALL EXCEEDS 30 INCHES. SEGMENTAL BLOCK RETAINING WALL DETAILS (N.TS.) 3 2 u e W I N 3 on, ? M n i n ? N APPROX. FINISH GRADE °< v Z ^ v (BACK SIDE WALL) ++ W a0 FaF N F vl TOP OF WALL ` N Q N I'R TOP OF SIDEWALK (STREET SIDE WALL) M ELEVATION SEGMENTAL BLOCK RETAINING WALL NO.2 SEE SHEET 4 FOR LOCATION SEE WALL DETAIL 'B', THIS SHEET + N N + F TOP OF WALL p r a TOP OF SIDEWALK Z Q (STREET SIDE WALL) m ?n --- ----------------------------------- - ------- ------ - - ---- - --- - - - ------- f z d N APPROX. FINISH GRADE h w (BACK SIDE WALL) SEGMENTAL BLOCK RETAINING WALL NO.3 SEE SHEET 5 FOR LOCATION SEE WALL DETAIL 'A', THIS SHEET G COMPUTED BY: DATE: P0.0JECf REFERENCE NO. SHEET N0. CHECKED BY: DATE: STATE OF NORTH CAROLINA nee 3-A DIVISION OF HIGHWAYS LIST OF PIPES, ENDWALLS, ETC. ENDWAl15 u f. vu 0 c 0 a 0 o STATION ? p 0 Z , Z O z 0 CLASS III RC. PIPE WINLESS NOTED OTHERWISE) C.S. PIPE TYPE B IU LESS NOTED OTHRWISE) CUSS RI R. C. PIPE Olt C5. PIPE, TYPE R ALUMINIZED OR HDPE PIPE, TYPE 5 OR 0 y?Djp 8 38.01, OR STD. 938.8 0 (UNLESS NOTED Z E3? O x 3 c 00 Y S + 0 n ? FRAME, GRATES AND N000 STANDARD 840.03 p Z = 0 V o F F n u pp 0 O Z a z s 0 Z 0 z {u ° r5 $ Z > Z p Z ^ ^ z 0 o e 0 B Z o ° Z ° ABBAkYVSI0N5 C.B. CATCH BASIN N.D.J. NARROW DROP INLET D.I. DROP INLET G.D.I. GRATED DROP INLET d z 0 < i 6 OTHERWISE) Fr: e $ p z p 4 6 6 3 17 z n ° , u F z O ?1 o n 6 ? G.D.J. (N.SJ PJGRATED ARRO DROP INLET 191.6)61004 stot) SIZE F 4 § > > W Q 0 9 12' 15' 18" 24' 30' 36" 41' 60' 12' 15' 18' 2P 30' 36' I2' 48' 12' 15' IV 24' 90' 36" 41" 48" s w CU. YDS. c a ' A B '^ ° O F o Q u C+ ° 3 0 0 Z p F b m `s 0 - o i G G 0 o Z J2. JUNCTION BOX M.H. MANHOLE THICID4E55 OR GAUGE p $ o a e z ?. z 0 z 0 d o H o x ? d O c YPE OF GRATE °o, g { °o g e 6 r 5 'v u a y W g W O _ 0 T.BA.I, TPAFFlC BEARI NG DROP INLET T.B1.B. iRAFNC BEARING JUNCTION BOX G Il E F G U Li i o o f f V °4U p S D u REMARKS -Y-10+80 IT 100 101 874A2 670.96 870.84 0.86 14 1 1 7 -Y- 10+80 LT 101 102 874.00 870.84 869.60 0.80 155 1 1 i 1 -Y-12+85 LT 102 103 874.42 869.60 866.60 0.81 123 1 1 1 Y-13+58.20 LT 103 1 872.% 868.60 867.90 0.80 87 4-11+98.64 RT 3 6 870.10 867.02 861.52 3.04 161 1 I 1 4413+79.98 CL 5 6 864.97 861.89 861.52 1.00 37 7 1 4-13+80 RT 6 9 864.97 861.32 856A4 1.94 231 1 1 L 10+69.14 LT 1 2 873.00 869.92 666.86 2.35 130 1 7 1 L 11+96.79 LT 2 4 869.94 866.61 960.22 3.33 192 7 1 1 -413+88.87 LT 4 7 86355 860.12 856.97 1.41 223 1 1 -L-16+27.16 IT 8 7 86556 857.86 855.97 7.87 24 1 2,70 i 7 L 16+11.44 IT 7 9 860.30 955.47 855.09 0.50 [ 1 7 1 1-16+10.82 RT 9 10 860.06 855.09 853.09 0.92 218 1 -Y4 71+18.32 RT 37 835.00 831.99 829.38 2.07 1 -YI-10+71.69 RT 33 75 943.04 83689 835.89 278 36 1 1.15 -Y410+37.11 RT 75 843.48 835.89 830.55 15.26 4-18+30 RT 10 12 85642 853A9 852.33 0.57 133 1 083 7 1 4418+30.80 IT 11 10 858.42 854.59 844.09 054 92 1 7 4-19+65.88 AT 12 14 858.34 85233 851.28 0.50 310 7 1,07 1 I 4421+79.66 CL 13 14 856.78 &53.70 853.03 1.56 43 7 I 1 4421+79.74 RT 14 15 857.33 851.28 850.50 0.50 156 1 1,05 1 7 4-23+38.78 RT 15 16 855.62 850.40 849.58 0.52 158 t 0.22 7 7 1- 24+99.71 RT 16 17 854AI 849.48 847.00 1.66 149 1 1 1 4-26+50 RT 17 18 853.51 847.00 940.36 3.01 220 1 151 1 1 1- 28+70 RT 18 845.19 840.26 835.00 11.43 46 1 1 1 4-29+98.40 LT 19 21 839.43 83685 827.52 5.70 155 1 1 1 -4 34+97.86 RT 25 24 826.11 819.04 818.44 1.50 40 1 207 1 L 36+04.28 RT 27 24 826.93 820.60 81954 1.00 106 1 1.33 1 1 L 36+04.60 CL 26 27 826,90 823.8E 820.95 6.74 34 1 1 1 4-39+00.25 CL 27 29 894.21 831.13 830.70 1.00 43 1 1 1 4-39+00.13 RT 29 27 83491 830.50 820.85 3.34 289 1 1 1 4-44+30.38 CL 31 32 84533 842.33 841.70 1.54 41 1 1 -1- 44+26.56 RT 32 34 W70 841.60 810.78 1,44 57 1 1 1 L 44+74.82 RT 34 36 844.17 840.68 840.49 0,39 49 1 1 1 4445+23.28 RT 36 843.04 840.39 840.00 180 30 1 1 1 -1- 34+98.66 RT 24 23 826.11 819.04 818,44 1.02 59 1 2.07 1 1 -YI-10+7755 LT 35 33 843.04 838.96 837,64 4.13 32 1 1 1 L 45+99.95 RT 74 37 841.00 839.00 831.99 4.49 156 1 L 47+00.35 CL 38 39 842.80 839.72 838.88 3.00 28 1 7 4-47+00.61 ITT 39 41 841.96 838.78 837.60 0.60 198 1 1 1 L 48+98.43 CL 40 41 841.00 937.92 837.60 1.00 32 1 1 4-49+01 RT 41 42 840.77 937AO 835.89 1.01 150 1 1 1 L 50+51.30 RT 42 940.02 875.79 834.00 197 146 1 1 1 L 51+88 CL 44 46 938.94 835.86 834.86 0.99 101 i 7 4-53+88.70 CL 49 46 839.30 93622 834.86 1,36 100 1 1 L S2+88.70 CL 46 45 938.79 83.666 832.18 897 30 1 1 L 51+88 LT 43 45 838.09 935.01 832.18 2.86 99 1 1 1 1 0 T611, 521, 187 24 68 0 0 0 40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . 0 0 0 ds 73.14 31 s1 3 1 0 1 1 2 0 o 0 0 0 7 0 0 C 0 a m a r7 2 3 N a N ro o' a 0 v 0 0 g5! O" I NSI1 l SI x! x! m N m 0 COMPUTED BY: DATE: PROJECT REFERENCE NO. SHEET NO. 2267 3-B CHECKED BY: DATE: STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS LIST OF PIPES, ENAWALLS, ETC. ENDWALLS 6 S m p w4 0 € Q p F 0 F O STATION 0 ` O Z 2 62 N 0 0 CLASS 1110.C. PIPE IUNIESS NOTED OTHERWISE( CS. PIPE TYPE 8 IUNLE55 NOTED OTHKWISE7 CUSS III R.C. PIPE C.S. PIPE, TYPE IR ALUMINIZED O8 HOPE PIP(1YPE S OR D STD.838A1, STD.838D 1t STD. 83 880 ? ? E Q % p j m c, I D I + ' Q< S RATES FAND?XOOD STANDARD 840.03 Q x = 0 o € Q Z Z O x Z Q I p E 9 ; n o pp Z e o _ o gg Z d p G ABBREVIATIONS C.B. CATCH BASIN .D.I. NA0.0W DROP INLET NARROW D.I. DROP INLET G.D.I. GRATED DROP INLET L z - 0 < < a oiHE0.Vltlfl UN. ? pp i $ pp x p = V x ^ u 5 G z 0 ° Z d = G.D.I. (N.S.( GRATED DROP INLET (NARROW SLOT) SIZE 0 g > > 7 0 12' 15' IV 24' 30' 36' 42' 60' 12' 15' 18' 24' 30' 36' 42' 48' 12' IS' 1V 24' 30' 36' 42' 48' s s 4 CU. YDS. S n A , 8 G O 0 u F O F O k O p 55KK 3 ` m z 8 p F Di 7 Z `0 p Z J.B. JUNCTION BOK M.H. MANHOLE iHICRNE55 0R GAUGE O Q Z $ Z a o S Z O Z p Z D u o u e d s p < p 0 TYPE OF GRATE $ pg u '? u m o V e 'o, a 'o pY 0 u 'R i m N W m S g < ; p ?` g o p T.B.D.I. TRAFFIC BEARING DROP NIE7 T.BJ.B TRAFFIC BEARING (UNCTION BOX r N n u m F pp F x G x x 0 a U S R c u u F G U m tJ S d d f f 2` u u p p 0 E O EMARKS 4453+88.70 IT 4 45 838.90 835.02 832.18 3.60 99 I 7 1 -4 52+88.60 IT 45 837,94 831.98 809.00 31.92 72 1 0.96 1 1 4,58+49 LT 52 53 852.60 849.52 84.02 1.00 70 1 I 1 -L- 58+50 RT 53 51 85287 848.72 839.98 3.61 242 1 1 1 4.56+07.95 LT 50 51 84.68 840.4 839.98 1.00 62 1 1 1 1- 56+08.11 RT 51 844.17 839.78 838.25 2.32 66 1 1 1 4-62+24.33 RT 55 859.95 846.4 845.68 0.69 109 1 5A0 3.52 1 1 -L- 31+53.59 IT 21 830,60 827.42 812.00 9.27 80 1 1 I L 30+64.34 RT 20 833.47 830.39 809.50 6.98 123 1 1 I 1-33+92.78 RT 72 24 82816 823.91 819.79 3.89 106 1 1 7 1-34+98.66 IT 23 826.74 81844 803.00 21.15 38 73 1 4,90 7 1 1-16+26.05 IT EX-9 8 867A5 861.96 848.36 7.06 51 4-61+86.18 RT 54 55 850.00 846.92 846.53 1.03 38 1 1 1- 64+93.90 RT 56 855.24 852.15 850.00 2.79 77 1 I 4.26+49.91 RT 17A 17 852.00 948.92 848.75 1.00 17 1 7 1- 34+97.86 KT 25 24 839.00 835.92 819.91 40.00 4 1 1 k 25+00.43 RT 1" 16 852.93 850.63 850.54 0.50 18 1 1 4.16+49.15 IT 81 8 865.56 860.84 859.11 721 24 1 1 -L- 40+54.72 CL 30 833.60 829.10 3.46 130 I 7 k 53+24.20 CL 47 816.50 811.30 2.60 200 1 1 4-66+77.66 IT 57 481 1 1 -I.67+97.57 LT 58 30 1 4.68+41.60 IT 59 30 1 1- 69+55.62 IT 60 26 1 -4 70+07,02 IT 61 32 1 Y4-10+75.70 IT 63 24 1 SHT. TOTAL 0 1268 0 51 0 D 130 200 0 203 0 73 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 14. B4 0 0 0 0 0 I1 11 4 0 0 0 0 0 0 1 6 1 I 1 TOTAL 0 P895 521 230 26 1 16831 130 1200 1 0 243 0 73 0 0 0 0 0 0 0 0 0 0 0 0 0 D 0 0 0 0 0 0 0 0 62 2828 0 0 0 0 0 12 4R 7 I 0 1 1 2 0 2 6 2 I B m a m a m i N 3 N B M 0 a a s a a 0 NC, ?m S' N m N N 0 COMPUTED NY: DATE: PROJECT REFERENCE NO. SHEET N0. CHECKED BY. DAM 2287 3-C SUMMARY OF EARTHWORK IN CUBIC YARDS a v u r? I 3 N B N 0 a a v a 0 LOCATION UNCLASSIFIED EXCAVATION UNDERCUT EMBT+20% BORROW WASTE HARTLEY DRIVE 148,241 97,041 51,200 INGLESIDE DRIVE 294 637 343 WESTOVER DRIVE 41 547 506 SHADOW VALLEY ROAD 624 624 CALLOWAY FARMS ROAD 534 20 514 3/27/2008 n:\proj\3202\highpoint\roadway\proj\3202_ ROW Y_SHT30.dgn O 3 8 ? ! ? ? d ? 8 3 3 ?. Q ? d P3 @ m ? ? O , 1, ?n° s X ° 77 v ?` z?sozoo o ? a w v H u ?° w w .o v o f s m m y o S o S ? Pii y .e ? t Om x O >? ? Y e v K' 8 y "' A w i? '^ O O z; 8 8 e 8 r k $ > ?oz0 ? ni?m w S O Q OT H H H ? ? ? ?? D x T, T OHO I ? ? N N ? m = ? 0 ?Oc 9 9 9 9 £o ! A r a P CH z C?? C ? ? m nn o? C I I I I I N I 1 ,1 1H Z 0 I H I M , I M i H H 1 1 ! I 0-4 ? ? € ^ QTR { ? o ~ C) 0 z a ? ! I I `1 P?q 4 b W I I I ? ? I j I I I ! i I ? I I I I I 0 N N Q 00 m V n Z A I Z O x W ? ? Z O m ENGINEERING SERVICES NO. (AC OR SP) (S.F.) AREA RT. (AC OR SF) AREA LT. (AC OR SF) TEMPORARY EASEMENT (SA PERMANENT EASEMENT IS F-) PERMANENT EASEMENT (S.F.) c m a w cn x N 3 0 tt N m N 0 a / x x 9 0 0 0 a r N m 0 o/ 00 Na n c' COMPUTED m: DALE: PROJECT REFERENCE NO. 91@T NO. cntcXED m: DATE: CITY OF HIGH POINT ?-2287 3-E RIGHT OF WAY AREA DATA PARCEL PROPERTY OWNERS NAMES ACTOTAL REAGE AREA AMEN REM4WING REMAINING CONSTRUCTION DRAINAGE IRiLIIY NOTES 1 HOLIDAY IANB WC 3.12 AC 3.12 AC 111 1 D80 INVESTMENT CORP R37 AC 237 AC 721 J NORTH MAIN PROPERTIES LLC 5.53 AC 7A90 5.36 AC 9,344 3,022 / Nm PARTNERS - HIGH POINT LlC 20,"7 SF 2,311 18,136 SF 2,045 5 qCL REAL ESTATE LLC 19,841 SF 19,841 SF 469 b NORTH POINIE MARKETPLACE 9.34 AC 1,745 9.18 AC 4,844 _ 7 FOX HOLLOW LTD. 14.89 AC 3,581 i491 AC 6,119 1,601 B YOUNG MEN6 CHRISTIAN ASSN. 35.18 AC 5,713 14,60 AC 10.56 AC 19,179 77,333 9 HCPJ SKEET CLUB MAN00. 2.4 AC 790 1.38 AC 4,990 _ 10 FRANKLIN RIDGE LlC 2.99 AC 309 2.98 AC 2,771 _ 11 A. DALE BART F JEFFERSON H. RIVES 1084 AC 808 10.11 AC 28,958 966 3,681 12 BETTY L USTON 7A0 AC 7,677 711 AL 15,939 668 1,M8 13 AYALON SUBDIVISION OWNERS ASSOC.INC. 46.46 AC 1,574 46.11 AC 23,883 9,789 3,%Z U BILLY V. HOOVER 796 AC 81,310 5.97 AC 14,811 16,451 15 CHERYL CHAIAIAN 2,69 AC 1,2d8 _ 266 AC 8,066 _ 1,190 16 HAROLD F.6 CLAUDIA WANDA MdANDL65 30A56 SF 10,945 SF 1Iµ5 ? 17 UNDALL B. iXOMPSON 11,7915E 336 11,395 3 1,910 ----- 1B RICK L. 6 11NE B. GMDY 1.33 AC 1.33 AC 2,816 19 UNDALL B. iHOMPSON 997 AC 326 396 AC 6915 20 GRACE Y. CECIL 36,810 SF 36,810 SF 337 TOTAL AREAS DIGITIZED FROM DRAWINGS d z 7�'1 Vey = ze U Q W\ W OD 7 W N ow_ ol; G tV > Uz W z8 RW v J 9 LL �t d & R O N z � CU W u Lu o 000 O O ONO U O� Q � sz¢ U woznw aN to -1 S - JzoZE � mNo O m 3 Z ¢ :16 T bb/LI/8 N!�N yam. n)tn�0. ON nlj�tntOV00� dNtV�7NOP 111111 II II 1111 440�hct:HQ p CC 0 pnP.r, w, $ / ,\p$ o sCL PN Q + r t I / J r 03 OZ s S11 f ata I ® � � � I s ���� 0•w � ml S { I gi•, o r I 7 • n YL,., i J- I I + 1' 00 o x: I I' .'y$No•at� O �?�� C � -�M' Yt�l w R mSst� iDU Z ipoa vol�I 0i� I afw { ]]IIcl d S O I • I iPm SNI li'iN�e�•oocs N� OZ +f o• as ao + oto a0 I w ♦8 �$PW I 0/$B+, F I { za wp o L b- 91'SPtL1-D/WS CR I S.Od_-_ m , o ~Z . � ' r 7 m ' 01 60+p.4 �.. t. t-sd.•y. 2,. .. iiF -•" ,., �, ',:.i. og8 m .; o ._ ,. I oWY .Aa -^y .o fI / � \'• _ _ - ' p - oommgN AN ow tI ! S1 6:1 xly I .c 1� i wII 010, o 0 _ IfuLi OO .mloNl "`I W Jew— •o :, IB Sb I t 86+ +� fln #`°. I 00. � I NO OZJW N (V10. O-� a- ao fYWw xQ 1=;P I W I I h}"+ O31r1 d gm �go-P� C! SWMI 0 00 "4+ _ Z9'58++ ti _ d W 3 I I g o w xa w - UO iov+'n I pQ 3 1; po o��K r. za Sao„ a � � _ �L� � i ,p 1--- CC Srdtl' M d I, Wxv NU+in I �N i� 3� J 63L, I _.. M. _ _i' w £5 bOiS' • .ZL'0£ 9� i• W +a J ow AM Al It TZ J � / a90+$ Z I41]x�j WZd ~ + / '� � it I �xs m .�w vOwi3N z o If�Jo3 IJ; 2131iio00 IfI O J a 8' j J:I Y W I�W3 LSI pZJ� - 9 UO � N LLLLI• I p •CafY oI, fYWWO ' 'I SZ Fa " + c z� 2f3dV1 N1101 1H01l1 ASI Y3d 1 r 'I : $ oci 3W� YOa1So NH;qi!Ldo` ¢ 146 -1 -1 �I +p �l•N V ASO � 33 --3 �/,W _+In f s� rti m +•O + ¢ �{ IM W LIP An7 O J iQk NgL _._ .SZ'i6=8 0 .701 k� Y Y f o �r--.rP- � Y .➢c O Anl`J cl I >zuz l o IS I W 1 + t/3dV1 Nl7Nl 1137,001 + � I NO15 NHNl r37ABl + +"ILF%s p � s /F%/// o= , ecec afc� 157V1NOZ1bOHALZ �! �I 1 ' 1 !1 �J` _ I�6/`w "� Zot> o� rz8 N'a � o I„ 7, w. ,w� .')y Z I JI W2y Ou OU ; W M1 I Fj i ubP'bHSd-AM021-Z02£\ford\fieMpQo2i\lurod46�H\Z0Z£\�o-'d\�iJ RO(17/RZ/f ® STVL Ralph Whitehead Associates --' -- _? P.O.BOXCHARLOTTE,35624 NC 282356624 EXISTING 15'S.S.E. PRAwrXe rrou SEE SHEET 10 FOR PROFILE EXISTING IS' S.S.E. PG = 46 DRAWN FROM PB =II6 0 E5 50 ILO 46OM CURVf ! 7 ` --- -E-AP RO. LOCATaN P! 6TA.21+59.27 GRAPHIC SCALE r xOT SllRVEYED D = 23'23'46.03' -G- ; D =2'51'53.24' FOX HOLLOW Lm ?-F'--- -- ---f---- ?` ? ,y; I ,'^ L = 816.68' PID - 180002940000100012 P APPRO w'' T = 414.!1' D8 = 3383 -mac - `POPE EXniiNGip N SE = OA PC 0986 -- `G $EWER A RO =147' j r w ... F-l._I O -? YOUNGMFNS CHRISTIAN 0 01 Assn. O ND 1800 = reooo2s4ooowoazl DX WN FROMSS.E. Og ?Ii 10 ac = Kos P8 - 116 WCRI SKEET CLUB 9A71OA FRANKLIN RIDGE LLC LOT B PG = 46 P=1800021116 0100020 PID _ re00o294000D00DO2 ?It C' 1 PB=II6 PB=116 - 4u•= i 1 ,y J 00L I i j 1 'T' 'y L t DETA`LS ON S EXISTING 15' UTILITY EASEMENT DRAWN FROM t/Ry 1 PB - 116 PG 46 ?5 CONC. SIDEA , raw a G N r? W L_ ut O C4 0 N f I ZI x Y C m a 3 0 a N m i G' a i a -0 u 0 i YOUNG MEWS CHRISTIAN ASSN. PID =180002940000100003 OB = 2733 PG = 532 83.00 Y _ _ UTILITY EASEMENT N W/2 E .w +2 A3 ` ? F PRAWN FROM u __ P8 =RIO 2.0m, 67 00' \ w2 6G& / F PG 105 { l9 - 5.2Sy`600p ,' 1C ONC. 1 F \ix' cr ri Y r / 1 .`.H 4 10 EWALK) d ?. ??o z l °v`L s R a 17l /..t1R PROJECT REFERENCE N0. SHEET N0. 2287 5 Itw SHEET NO. NGINEER ENGINEER NCOMPLE E PLANS 00 NOT Use PO& /W ACOUISM'ION 15, CSP is.OW \ Fes'/P D. \W 2 ELBOWS ! / i u x +m oa v \ F' /40 .00 ?\ 3 LEVEL F P-/ SPREADER I e PD 15' CSP + s.a W/2 ELBOWS I losaa' HP STD. D.00 PDE 401.00 HP STD. 9A0' E # i +0300 ?°'+ O l 1 Y Vt 408.00 ?- 2707APER LE 119 .00' FT o 270'TA RIGHT XM LEFT AND R f PROPOSED EX1snNO Is $sB END BRIDGE DETENTION Pe AO O W, HART LEY DR. STA 33+964 BASIN NO. Po -+sCONSTRUCT 2' BASE DITCH (SEE SHEET 20l f rour4o MEWS GxRISnAN ASSN S PID = 180002940000100024 FROM STA. 33+00 y P6 = u0 TO STA. 34+50 PLOT 106 (SEE CROSS SECTIONS) V? 1 'rt. 44. BRIDGE SKETCH ! t SHOWING THE RELATIONSHIP BETWEEN THE BRIDGE AND THE PAVEMENT BEGIN APPROACH SLAB BEGIN BRIDGE W. HARTLEY DR. STA 31+18.17 W. HARTLEY DR. J l?~ i 5' CONC. STA 31+431/ SIDEWALK) a tn? r ?',,,, ? tT' N 50' SIDEWI TAPE W. HARTLEY D STA 34+21,83 (o ' D '4r DE b fS= W W Lei o° z3 a . Q ?vj h F ..24 STA 33+96.83 6 „x„50', 50' CAT-I PG=46 LOT B 92-6 PC 46 NEW 45'Rxl4 1 ` 1; LOT A 1 l 'i 1 tear h? -? (! ROCK WALL TO BE RELOCATED BY OTHERS a ?, Y 0 CONSTRUCT 2' BASE DITCH FROM STA.31+00 TO STA.32+50 (SEE CROSS SECTIONS) IN BRIDGE DRAWNC 16'ss.E E , I J u rdys j W. HARTLEY DR. STA 31+43A 116 ,. ` 2 6 D&G }? ,AL y & t00m PC 46 Yh, J, EXISTING15 I S CONC. SID ALK UTILITY EASENEN! I_ /)ys A DRAWN FAUN S I + ?} m Y 1 H 'v 0 C 133.00' +7000001 0 I'0=116 PDE 3.34.02 1 ?. ?.ti N ?PG 46 t xr! , 7 ?_ '?` PDE C To.oo' Cp 74.00 9326 St - EXISTING 15' ?i 24'051 ..i l +90m dpS.W r.?'? 1 + RV I 1 R-6 S 7849'24 HP STD._ "'r..,. 401.00 1 E ? 5 ? 48 +T HP STO ? + +d0.00 +6000 ITA t _ +Q0.01 J w.w 00 ' 401 ss.ao' + EWeL WT, 52.100 +10 00 . Sdao 2 -6'C&C 1 i +40.00 52.00' 62Aa . 6 ONC. SIDEWALK HP0BS0TD 4 43.oD soap' ll + 3g se.oo' ' , +4x°94° t HP STD. 5 CONC. K x 40800 SIDEWALK + o.oo ' .a??Fr RaP TO BE RELOCATED aA.oD' C x 1' BY OTHERS CONTRACTOR SHALL ADJUST ® T o ALIGNMENT OF 5' SIDEWALK AS NEEDED TO AVOID CONFLICTS k L ,- r WITH EXISTING POLES d \. ?Wii4 o• ro CURVE 2 CURVE .5 PI STA. 39+28.21 PI STA. 47+19.21 L = 24'05111.46' & = 7'10'5218' 0 = 3'41'47.41' 0 = 2'51'5324' L = 651.60' L = 250.67' T = 330.69' T =12550' R = 1,550' R = 2,000' SE= 0.0355 SE= 0.0320 RO 162' RO = 147' CURVE YI-1 CURVE YI-2 PI STA. 11+19.27 PI STA. 12+89.49 +39.85 A = 28'05'0329' n, = 14'57'11.07' 216.4 D = 1837'02.01' D = 12'27'55.83' +27.78 L = 76.97' L =119,96' 219.69' T =150.85' T = 60.32' R = 307.76' R = 459.63' SE MATCH EXISTING SE =MATCH EXISTING RO = N/A RO = N/A .50-71 .8 50-71 O +a77 YOUNG MENS CHRISTIAN ASSN 181.17' PID - 180002940000100021 PB = q PC = 105 00 LOT 8 116.00' + +00.00 44.1 E 55.00' - - ? ±65 104.ar /C 5' CONC. SIDEWALK NCDOT 120.00' / 2'-6'C&G 40100 _-_- + . 7 106.00' 41.99' 50.001E /Ii EXIIs UTt Ap?M 105 ,.. 60.0 0' / HP STD. DRAWN FROMf . , . . 401.0%G.W 350N 128 S >?- a i 29 II R DALE BRITT & JEFFERSON H RIVES HO = 180002940000100022 ^ F9 = XO PG = 105 LOT C f 4 j PROP. SANITARY SEWER RELOCATION It... SEE SHEET UC-I FOR DETAILS !s- 1e+'?i.eT PROJECT REFERENCE NO. SHEET NO. ®STV/RBI phWhteheadAssocaus 228 6 P.O. BOX 35824 CHARLOTTE, NC 282366824 REV SHEET NO. ROADWAY DESIGN HYDRAUUCs SEE SHEET 11 FOR W. HARTLEY DR. PROFILE ENGINEER ENGINEER SEE SHEET 14 FOR INGLESIDE DR. PROFILE 0 25 50 im INCOMPLE E PLANS GRAPHIC SCALE DO NDr USE FOR /W ACQUISITION r---- 10'X 40'NON-EXCLUSIVE 5' E.U.E. TYP/ EASEMENT NORTH STATE COMMUNICATIONS DRAWN FROM PBd55 P6126 30'11 30'EXCLUSIVE EASEMENT STRUCT 2' E D C NORTH srarE coMMUrdcaTloxs 13 FROM TA. +50 DRAWN SROM O AVALON SUBDIVISION T ST , 7+00 PG,26 OWNERS ASSOCIATION N (SEE CR S S TIONS) !_ CONSTRUCTION OE DRIVE 23 47' 1 ( 7+48D0 . + 0 CONSTRUCT 2' BASE DITCH 86.86 V? ExIsrw0 5' I 0 r J s J? FROM STA. 46+00 m UTILITY EASEMENT \ 50.10' L DRAWN FROM TO STA, 47+00 '? + b9 P8 155 RELAY 24 (SEE CROSS SECTIONS) \\?, n.ro'73 PC = 26 HP STD. 47' / / j 4 r, 41.99' 1 87CONC SID(WALK POT W. HARTLEY DR. 40100 00 + fi7 r STA 45+0234= ?.?. 78.0.00' 0' .5 5 MONOLITHIC na / / 32, / +60. A NGlES1DE DR. l CDNC, SL NO REMOVE CDC?/ T r: b OOAD r, 3300' 000: STA 12+0683 + 0.10 I of v M.97 60 00 s0.00' 3 +6000 +00.00 +17.47 +259id / 3b00' J.?---?E --_ "E fl.OD' 45.60'+41,47 +6300 '? . F -67.60' 73.00' '?--- C•Z ??L ??? c +6500'\? + I II ' f- W HA H6RTl Fl'V7 , ow* r271\ \1 1 1 ?2' 6' c&G- 40 STD. j05 1.00 T C x a i a a N m N M 0 a i Q Q 8 T? HP STD. ro 32` 6744 v 5B j? N IDO' LEFT TURN TAR + Bs oD• C 401.00 C_ N y j \ ./ I?'AC ^9000 +5161 + + / 40656. 45.01' y +4 4501 I 0' 9100 78.00' 7675/+0 05 95.22' +81 TURNS HP STD. ° 10532' 77 7' 401.00 PT Sla. I +4912 1 API E PA1% B4iTAINING WALL PROP. 48' CHAIN LINK'FENCE ®/ \ \ 9 `'S`'I c MEETS SI $'x NCDOT STO b66.01 rm'? \.. S. P OP 48' CHAIN Lz FENCE NCDOT STD.866.0? v PROP ANITARY SEWER RELOCATION V 1"' S C ' r SEE, EET UC- I FOR DETAILS 'a- ` CONSTRUCT CONC. V-DITCH C! '-0 h o %r FROM STA. 35+00 TO STA. 37+00 / LISTON BETTY L I N (SEE CROSS SECTIONS AND 1 < ! 1?' PIO = 7fl000496DO 0100081 STANDARD DWG. NO. 850.01) PB - Iro 1 r! ;I MI/? ?s L t PG 105 LOT D 1' !/ It M' C 7 i f YOUNG MENS CHRISTIAN ASSN. PID = 180002940000100024 PB = 110 PC : IDS LOT A i 111 vi Q ., wa l' 7'l r, & Al r l a F17; r _ -t cT* F' aan / A ,SPD 1 A 7'A ° Y. 6;P. G 1 f1 0??' 7 i t,. % tq r 5 ? ? . 13+0774 3g?'t„ PROPOSED DETENTION BASIN, NO.2 (SEE SHEET 2DI I BILLY VHOOVER P8 = 151 1 i PG 81 AVALON SUBDIVISION PB = 151 in PC al y W h J f QU F 2'-6' C&G W. HARTLEY DR. / INGLESIDE DR. ???pp9ZW /A ? ? YFa 2006 ADT 2030 STV/ Ralph Whitehead Associates P.O. BOX 75624 \ CHARLOTTE, NC 282355624 SEE SHEET 12 FOR PROFILE / / \ ORq NR\ - „ 0 25 w ADD F AA' GRAGRAPHIC ?"e SCALE ?a P 5'EU.E. TYP `/,t;K. •-? ?) +^ -_/? ??, J ") I iyAf. < f?. I T -141 1 Y 1?' 25F' (lam L AYALON SUB%MISpN 11'3 OWNERS ASSOCIATION INC d t W N W W w O O N. Y z 0 N S. W z v ?a PROJECT REFERENCE NO. EHEET NO. 2287 7 KW SHEET NO. ROADWAY DESIGN HYDRAOUCA ENGINEER ENGINEER INCOMPLO E PLANS 00 NOT USa FOR Av ACQUISITION 00 t-u W W N O 0 z 0 w J z eZV G v a 3 f = ? ?rY ?1 A Sc? i J ? t -20'SANITARY SEWER EASEMENT APPROX. LOCATION BASED OFF EXISTING SEWER LINE DRAWN FROM P8 = 151 PG = BI CURVE 4 PI STA.53f30.86 a = 141'36.27' D = 2'51'53.24' L = 26855' T = 134.48 R = 2,000' S£ = 0.0320 RO = 147' I :,5y f 1 C1 PI P n m z u O 0 i a W. HARTLEY DR. / WESTOVER DR. a H? Tm 2006 2030 ADT Sit r?h 3 1!N n W 2'-6'C&G VI W c ? /? °a ° IQ- N 77'SY31 o H y SR 1896 z to 1 ,: 2 6 C•&G W Z CONSTRUCT VibITCH = F?@00 STtt'. 6G?+50 TO- f T, H+50 SEE T 1u- ? ' SECY ONSI / 42CONSTRUC7 W. HARTLEY DR. / SHADOW VALLEY RD. x? xiA $ y?_ 2006 2030 ADT POT W. HARTLEY DR. STA 62+46.66= WESTOVER DR. CONSTRUCT V-DITCH STA 16+29.56 FROM STA. 61+00 TO STA.62+50 (SEE CROSS SECTIONS) 1 J2 ? 1 rct f } . ? ??-t_? Pr +?J {I J 1 An - T 1 Gu ? Lt I C..J 1 J n?f _r. Y yp iOPA H 1 1 1 n M of \ o 5 CONC SIOEWAI E °• I50'(EFr TURN TAPER 3 + SA'16+0b L/? A /S ! FI C S aS\ 1 f \? j t i w r, B r %/ fns: / .? r y1? 4 0% 0 HP STD. 41.00 v, N ?i ?- ?? , 1 11 y r\ ? u ?s1' 1? .al -? qA'i 1 3.' 1 1 , l c'C 1 iA i 4? P C:C!5 \ ,,. L I BEGIN C01 SHADOW V STA. 12+5! END SH 17 I` n STAY 5 Y m !? l } 1 ?,? I A w I, OA 0 ,tiSE r J Lo, t 0 W f? 17908 W f 1 ! t / r ` I ? ? xr iv ( c ' 1 la!' '2?"?EPT r?1RN- ... •R,S {' 7 -? STORRAGF +0B 62 36.29' r ph ',: hl ov'rin`T aJ I 7; 7 1, 11 P/- se f s: / r 4 PROJECT REFERENCE N0. SHEET NO. ®STV/Ralph Whitehead Associates 2287 8 P,O. BOX 35624 CHARLOTTE NC 282355624 P'w SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER SEE SHEET 13 FOR HARTLEY DR. PROFILE SEE SHEET 14 FOR WESTOVEI DR. PROFILE SEE SHEET 14 FOR SHADOW VALLEY RD. PROFILE INCOMPI.E E PLANS SEE SHEET 14 FOR CALLOWAY FARMS RD. PROFILE DO NOT ?SE FOR /W ACOU151"ON 0 25 so I00 GRAPH ,RUCTION L Y IYUAL7 17 INSTRUCTION 1 VALLEY ROAD STRUT -F, STRUCT DITCH„ M STA. 66+00 STA. 70+50 CROSS SECTIONS) BEGIN NSTR T10N cN CALL AY FARM AD `i i6 -TA +ooDo 'LO 6 C IA WANG h,. C DlH$S CURVE 5 T ?PIO poano D004 ?p F' @ PB = 6 F P! STA. 65+88.47 ?s 931 PG.f'IOo L = 20'52'52.99' LOT'4" 0 = 334'5155' L = 583.12' tt T - 294.83' ?/ ?' ? +Vs od,- R =1;600' x : J A 20 RO 159.7' - 0.0350 & 84' J" CECIL GRACE Y 3. I" f IR PIo = Oaoeno000007 CURE Y2-I ao ! va PB - 6 PI STA.14+69.31 ORA'OY RICK L A JULIE B y- PC = 100 0 = 42'30'05.52' I'M pr = IooBA000o005 ?. k LOT 7 ' D - 19'05'54.94' SJO y ,,.) l\ Pe 6 L = 22254' r x0!':+1600 ??$r 1 I PG 100 T = 116.67' 65.00' 54 00' f .y ,/ `nJ 1 1?`? LOT 668 R - 1.600' SE =MATCH EXISTING +7500 y ? R0= N/A 48.71Y CURVE Y3-1 +7 \ N5658'384'W ; a` PI STA./1+66.50 41'03'24.14' n ?0 =12'43'56.62' 0 L -38.50' T = 450' ' boy E+ :;' r r 1 sd c 6i 1 L?„39'T ?( ¢ l { SE=MATCH EXISTING D o f RO - N/A 2'?g' ,? ?: m r? V 84.00' 3g Rqy . , 61 r + .75,•. ,,.? , CURVE Y4-1 s 1`? V + 313 35.00 J 'm ????.,x , PI STA.10+59.61 w9,bo ^ \ v - 38'03444.73' „? 4, 1 D -38'IN49bT f f- P?136. 7. ?+ F _ +4A00 F ,?,.. p L r yI 0 '• L=99.65' T = 51.74' 2'PS PGC W. HARTIEI' DR. E ? ? ? ; ]aaa s0.os b0 ? o r R =150' r / ,' - +4. P T 66+ !_ SE =MATCH EXISTING 122 Od CAILON/AY FARM + R00 E RO - N/A + STA fl, 92.00' 4Styry, ;, ' 1E o \ 'a f{' 4i 1s3 s3 ;r L 1 T FR r: -P w a END CONSTRUCT ON ?T oO.oD . r 9+ H-r C AY F ?'D 46.00' r >F , - A tits PROPOSED 'E;iSTA 11+7025 ~DETENTION 4 POCW HARTCEY DR. W 30.22 / r J BASIN NO.3 + +5 t.00 (SEE SHEET 2D) SHADON VAl1tY R@ ° 46.00' / 1 I w END CONSTRUCT\N STA 15+30D0 j W. HARTLEY DRN STA 70+5179 •1 CHAPMAN CHERYL I i PID 1008A00000328 1 DB - 1187 Pc 1207 ND IOOSAO000032C .r.. _.... 00 645 y _,?....... ;?...., \ ?1 \ ..? PG 360 / t 3 ? /a )NST TIO 468RNf f? 7 ?'1 ® THOMPSON RANDALL B 08400720 .RAC: PD = B 1086 ti PG = 1207 I _ l 1r \43 J PROPOSED PAVEMENT REMOVAL I ?? PROJECT REFERENCE NO. SHEET NO. 2287 ROADWAY DESIGN HYDRAUIICS ENGINEER ENGINEER INC®MPLE E PLANS DO NOT USE FOR /W ACQUISITION PRELIMINA RY PLANS DO NOT USE FOIL M-RUMON 50 940 940 930 930 920 920 i 910 910 900 00 BEGIN NSTRUC ON ..,. _ HARTL DRIVE _ 890 ' -l= ST 10+45.16 890 : 1= 11+2I L 88 C 150' - 44 880 PI = /47 46.00 7+1OJ121' ! J .32g EL 8 IC - 600' 0' PRO 0SED Pl 2 +0000 LU H 870 - - B7 - 9 GRA E s W 7U VC _ A .-. bu N... ... K 2 12 860 (-J 3258% -- -- r 860 EXISTING 850 GRADE y 850 840 _ 840 830 830 820 820 810 810 Y . :.. :. O M 800 80 a 790 "- 790 N Q .. .. - 80 7 0 ' i N QN ?' .. : -.. - - .. " ;% 1 11 12 13 14 15 16 17 18 19 20 21 22 23 m 940 - : PROJECT REFERENCE NO. SHEET NO. y - STV/Ralph Whitehead Associates 2 87 1 N -L- W HARTLEY DRIVE ® RO. BOX 35624 CHARLOTTE, NC 28235.5624 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER 930 INCOMPLE w NOT vsa Eaa E PLANS /w ecovwTroN _.... .. .. -. - - . '. ' . : PRELIMINA DO NOT USa FOR RY PLANS CO-RUMON 920 . . 910 - 910 900 900 890 890 880 880 870 _ N W 870 PI = 27+23.00 p PROPOSED EL = 85325, 860 w GRADE VC - 360 860 K _ es o P ----- _--? (-)0.7498/. r> -- 9 850 -_-` B 850 i EXISTING CONSTRUCT SPECIAL ?? W z n o om z ro V-DITCH (SEE CROSSo oN h 840 Q ` * SECTIONS) s < BEGIN BRIDGE STA 31+43JZ l= 31+30.00 y W 40 d ° d W \ N \ EL = 818.64' vc = 820 _ m ew w ow \ ? END BRIDGE K 96 °o 830 _ STA 33+9683 In 830 o ; 82 0 - - \ T? 820 \\, ti END DITCH RT: 3y? / i+)355A S .: STA33+00 13.1 A ?: ? Z W 810 e? ELEV.811.00 810 800 U o go J lI - - _ ??;i: 800 a ; STA.33+40.72 a S o 4 BEGIN DITCH RT. L n, 790 co W a 34+50 M ELEV.822.00 790 c CONSTRUCT SPECIAL o d w CONSTRUCT SPECIAL 2' BASE DITCH (SEE - w In w 2' BASE DITCH (SEE m 780 CROSS SECTIONS) CROSS SE(TIONS) STA32+19.55 ', . 780 m 0 770 770 a 0 t 760 760 g i 750 . 750 00 Ln 00), Lf'? 11) Q o U O r v 0). m Oi N t\ o N " 740 v m ro ?a ro ro co ro m 'o CO co ro m w ro v o m ro ro ? 740 o . : 22 23 24 25 26 27 28 29 30 31 32 33 34 35 s ...940 . N -L- W. HARTLEY DRIVE 930 PROJECT REFERENCE NO. SHEEE NO. 287 1 11 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE MR /N ACQUISITION PRELIMINA RY PLANS DO NOT QI, "I L CONSTRUCTION PI = 42+30.00 - LLJ 46 a 870 VC - 400 ... EXISTING K = 93 p o GRADE ?? ... . .. 850__ . X (-)07500% 1+13.552a? v ? / PROPOSED 650 vFi EXISTING 8° PROPOSED GRADE --1 .._8.00_ ? I SANITARY SEWER 42" RCP T f W 880._._ h END b(fCH LT: z S STA. 46+00 x w ELEV.834.00 CONSTRUCT SPECIAL ~4 $20.. 0- 2' SE DfTCN (SEE , F 820_ CROSS SECTIONS) BEGIN DITCH. LT. _ --.8.10.. STA47+Ga 800. _ -8-00.- C IT --790- 79-0- _. i 3 .__780 _ 780.... _.770-.. 0 m . ._._7.80. _ 75.0..... i ID : - ' ... >? V N N W -: t` h N N Q .? O N N l N V IO M ^'1 1`'1 0.7 O ' N M V` OQ C P Cc Uj VE p - V ti) C N tl• R R R M ? M v V.- N 7 740 41 J a W N ro co to CO N m a] N _ ro ? N N N 00 co m 740 ,z 35 36 37 38 39 40 41 42 43 44 45 46 47 PROJECT REFERENCE NO. SHEET NO. / Rati 'tehead sociates 12 HNCMEER :Y DRIVE NARLOTTE, C28238582 ROAENGINEER EDWAYDESION ENGINEER INC®MPLE E PLANS DD NOT USE FOR /W ACQUISITION PRELdMIN RY PLANS DO NOI USB CONSTRUCTION 910 790 m N I? J 780 a _ s 0 N 70 T 900 890 M 880 W P =60+59 N =:860.2 w EX! ING = 68 0 GR DE 0 / ?\ + 86 / ? ? ?. +)3f2? Z _ 54+3 OO // ? - -- -? ? _.,._ = 837. f 50 = 439 98 .. J W z J 80 )% i 13.6257% PR POSED.. v GR E 830 i i 820 ell J 810 E (STING 12 S WARY S ER 00 70 780 770 I ;' 60 50 O 740 55 56 57 58 59 60 INCOMPLE rE P ANS DO NOT USE FOR k/W ?CQUISMON PRELIMIN?4..RY PLANS DO NOT ?Z M L CONSTR-ION 60 DO NOT UM FOR k/W ACQURMON PRELIMINARY PLANS DO NOT USE FOR OOMTRUCTION 0- j j I WLhCYCdQ ARSDCIateR STV/ 56 PROJECT REFERENCE N0. SHEFE NO. 2287 .-I 1 1 b .J ?.7 ?. j 1 i ® P.0.B X 5 6D4 CHARLOTTE, NC 2B23S5524 Rw SHEET NO. I -r t ROADWAY DESIGN HYDRWOCS ENGINEER ENGINEER ?; a sr ? / o ? (J 1 r r j /jx I END -CR3- I DO NOT USE FD CONbTAUC110N '7 BEGIN -CR4- "r STA70+1694, ?STA/2+52.31 ? - r ? ? f I t v Ar - , . PT Sta. 11+67.76 ro ,.$E?1N -CR3 ` ,: - Lq 'i £ND -CR4-? STAII+OR00 a STA12+68.48 - }? PT Sfo.10+96.44 g - - - , z -L- W. HARTLEY DR. PC SIC. 11+00.00 is POT sta.l0'+0a0O BEGIN ^CR!- STAR+001)D PCC'S4o.N}TITS:' END -CR2- +70 57 STA ' ' L st R . ;i ` . , END CRL-: 4 '. SRC S7a I1t?00 n, r J " (, J a STAH496.84 r `•'- w . ` " ?'.rr 1 z, ?? Sla 1 ,n .rL %.' Zt 1 V y ?? 3GS i iQ BEGIN -t'R2 s ?..: .,,,• ? - STAjOt8420 `l? . wJ •_.,11 \ j S1.Pox ,r r: M.. Sla „ W. H RTLE DRIV NGL SIDE RIVE W. HARTL Y DRI EIN LESIDE DRIVE . HAR LEY D IVE?1N LESI E DRIV E IN . HAR LEY D IVE1N LESI E DRI E N ORTHE AST- C RNE (-CR1 ) NORTH WEST CORN R (-C -) SOU HWES COR ER ( R3-) SOU HEAS COM ER (- R4-) 1870 860 P1= 11+67.41 0 m o EC = >w d,? VC ff4355 26' cm ' . w h? m ? o ? d Pl = !! "2 EL = 052. 3.30 Nh 7 ? N Nm C + ° _ F 2(y3 £ - - G B20' ? N d L ti ? m - ? o? VC = 66' a d ? d yam. Y d r VC -. P1= +57.28 . . . ._..._ 850 o ff' R 'W ? ? 850 ? ROP05 P £ EDGE ? P = 10+42. - 4 EL = 845.37' a m T m -102200' mW 1-1 V )3.0799 J m4 582i W o a m? W m +1 20 ' o ?W F PAVE EN LL a W CC o W m m e CL w C = 44' 3 04 +1093 ' Al D W 3 .._ 1.442 Z l 1 . . w mW 0.0 0 . -116!817 7553% )2 (-)2.71 47 367 . +1 1 f- 20007. - 0: 5002 . 1 . +)2 _ P P!_ l +0500 _:. 0 VC 10' OF PAV EMENT ' PR POSED E DGE EL = 844.42 I = 12+31 21 P ROPOSED EDGE / OF PAVEM£ T VC = IcY L = 842. 1' F PAVEM NT + VC - 27` 1330 0 - ? ?J I 820 820 R20 N 810 RIO 810 -n C\ - ?-. 0 W m ?. d 1 tl d son CO cc CO Sao 11 01 ot 10 11 12 10 11 12 10 11 12 10 11 12 INC®MPLE E PLANS OO NOT Vbe FYIR /W •WN9TION PRELIMIN RY PLANS II P07, Sly/p, ' B I `-CR5 S I Sr All+1295 r ? l END -CR5 STAf2+9RJP 5, V C PROJECT REFERENCE NO. SHEET NO. ? ® STV/ Ralph VAitehead ASSDCiaws 2287 1 16 i P.0.80%35624 824 RW SHEET NO. CHARLOTTE, NC 282956 ROADWAY DESIGN HYDKAUUCS ENGINEER ENGINEER P? M NOT uss roa iw acotirsirrox P yFp ` P 1 I Y' r I -'' sr?r?.oo Si•Af0+50 ? 00 , . I0+5090" PC Sta . V PCC Sta.ll+54.58 ?. J ENO -CR6- Cjyg / ' + r I p i I k _ - Ste' - C ' . .. 1 ?t e r ` ` -? W. H RTL DRIV EST VER RIVE W. HARTL Y DRI VE/SHA DOW VALLE Y RO D NORTHEA ST C ORNER (-CR -) SO UTHEA ST CO RNER (-CR5 ) t- 03 _ 70 o' pr = II+762 a 70 _ Pl = 1 E = + 07.04 87 ' Co co VC 50' o w EL = 49 VC - 40, .? ZB L, Lo R60 m ?W 3,4713% 860 W ?? I +X1.4372' +10. 454% +1 P OPOSED DGE c 0 PAVEME T 850 PI = Et 11+12,95 556.7 7 PROP SED EDG N M i . 830 . : 30 . . k 0 :. .. - 920 - . ;. L al 0 l ... co Cc .. ... a 10 11 12 10 11 12 INC®MPLR E PLANS PRIrLIMIN NA DO NOT USE PO RY PLANS Q1N61'RVCTION -n YH 2p 8 qYn PRO P. _4 I z zz x /I I ? I nr z? BO PROP. 55 1Y OIP AT 0.78 CLASS 'O' SE00N V d00.00 ° 0+00 r I 1 FUTURE CREEK / I I 1 INV. • 817.8 /I I 1 r I I I , e / I I I / / $ mz ?3 i i II / / B r I \ V \ / II ? II r \ II, ? r _ -ti ? r / / 1 I r 261 I 1 / J ? GE 11 eN A / I _ PROP 1 ? 2 I I ?-'`?E%. 2,5% I / -AAr PROP. 20 lF OF 12" DIP AT 10.0 12' DIP A O.80R _ PROP 2 TF OF CLASS '8' BIDDING I I I I Cask 'B' BEDDING 1+00 2+00 3+00 4+00 LINE A PROFILE ?e IH a vo RU".q e m 'mmmY ? ?YUer H??i_zz \ ?a gym eaa , Ex. 12 55 eA?01P SFV/Ralph Whitehead Associates P0. Foz ;,nia G - ANI(,I F, V(; :;-h(VJ4 USI U5INFRASTRUCTURE OF CAROLINA, INC. 1047 E. MOREHEAD STREET, SUITE 203 CHARLOTTE, NORTH CAROLINA 28204 20 0' 20 40 80 PROJECT REFERENCE N0. SHEET NO. 2287 1 U _1 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER P 1NCO?ii TE PL ANS S U DO NOT R = PRELIMINA RY FLANS FOR RE W ONLY DO NOT USE FO CONSFRUCIION el PROP CONSTRUCTON DATW ZWV EASEMENT 810.00 STA. 4+78.21 ae ies PROP. SSMH EAEM n EA ENT m PB 157 PG 81 I? ?E 4 I! 0. 00 SSE EXiSINNG 37 S. E. 1NPY8/ LINE B PROFILE "? § u Pc=A1 ?/ ? 55f. m 1 ? ?? ? / \ I // 55 554'' 1 / n / PROP. 30' EK STREAM PERMANENT / s I "UTY EASEMENT I I ?/ 5E E ?55E i I° \ s7A, 0+00 sn Em em. au I / 1 PROP. SSMH K iuv e°as`' / 15 °'/ ° $ I 1 ?SGSE C ? E? 4 \?I \ I mA 1 t? m SE ?g `yx a SSE E PROP. TEMPORARY I (((??? E Vssf.\ SSF '.? m CONSTRUCTION EASEMENT FUTURE STREAM AUG \I l \ISSS I a e I ATICNMENT PU 6 LINE A = P y,--PUE- I STA.3P27.6 ° / eo \ \ \ ' ' STA. 0+00 LINE B PROP. SSMH = Eo Y STA. 0+55.14 / Ns Z PROP. 5 i I - e- P -I I I LINE A W9 e D \ e PUE-1 PU G g -- - -' SSf Zf 'fi o? PROP. 35 PERMANENT NT I - ? ? ? SSE A YI'T UTAJIY EASEMENT STA. 0+63.38 } Le T1t 1 I i W PROP. 5A01 m , 1 I,III ° ??1\ F 1 w I/? \ \ssf I ? E%. STREAM SSE .p J J ?vx,GN EEXSTNG 16 EASEMENT a I \\\?,E PB 151 PC BI ° I Q S ?m I Yur i xamcw " \ ? \? ?? ? - euw' '%/ I s uv a ens.w' ?w a1.YAm ! I \ J I LINE A AND Ll E B PLAN 841 ea 83: 821 DATUM rLVV 820.00 ,m A, 6m?? 6 wf Y 0m N NK 22 a EX ;ROUND N gu zo / PROP. OROUNO - I I Z P ! g , A. tlz / I OF PROP. 2A 1RB3x e' ? ? .. I I i?551F Of - DW -- 1100 2100 3100 LINE C PROFILE O h D o- /STA.0+00.00 STA 0+35 I STA. 2+87.98 EM. SSMH PROP. SSMN 0] u ° PROP. S-11 ?--a M. I I s xw?aw,7r a m e J ee? cm PUE-PUEr pUE e,o aamP9o0W,ooo9, m NW PD Ia. ,m PC two PROP. 20A' PERMANENT wr o P ? pUE UnUTY EASEMENT ,m ir10 2<. A? -PUE LINE C I 0 PROP. 1U TEMPORARY CONSTRUCTION EASEMENT a P\ 6 e'Rida as ---.ga 1 STA. 7+28.54 PROP. SSMH 9Nir R o4S d JEFF— . R- o ? I as ° eaaas' L/0 wU b Pd . %.!-.1-2 c1a . SUS R u? o :aua 111- 575 W I PROP. R/N . 85ii 7 0 N® I I 11.1 ?g la 1 J I ? = m LP 1 I Q I 1 I \? ? I I Er m I \ 0 NI LINE C PLAN STV/Ralph Whitehead Associates PO. HON .S?fiJ4 INI USINFR MUCTIM uw OF CAROLINA, INC. 1043 E. MOREHEAD STREET, SUITE 203 CHARLOTTE. NORTH CAROLINA 28204 20 0' 20 40 W SHEET NO. ATTACHMENT F MITIGATION PLAN HARTLEY DRIVE WIDENING AND EXTENSION MITIGATION PLAN HIGH POINT, NC Prepared for City of High Point, NC "PtVCST,_ a a$WWPMp G? fOCh. A U, Ah 101 2 HilchcecR WAY ? 711, L A ??QA `L°d`. n ? a w z Ct`?GCeyG vo?rree, Pi. rf p Y SFG ? ??qa ?gbny ky ? 4 Vo'",a v " a Rwan w 6 G,uo s a w' ?'.?ae:•d................ ro`"?? W-16 D, ?e y ?le WRiwpa `O'. ?etu?age o, ,0 `+x PM Ruro. a g Q OMUO M p tryw...k ? ? W PNr6 qro P.ak N n seonA e 7? C..lyyna Mom.se`aRM Wedchedn Dr Q T.rMerty Rtl El 1-1 Ave - 006 M Oue 1 Mc 0 Prepared by STV / Ralph Whitehead Associates 17 Michael A. Iagnocco, W.S. Senior Scientist Brandon J. Phill' s, C.H. .M. Senior Environmental Specialist STV / Ralph Whitehead Associates 1000 West Morehead Street - Suite 200 Charlotte, NC 28208 Office: 704-372-1885 Fax: 704-372-3393 www.stvinc.com E ; plan - !Construction Uonagers HARTLEY ROAD WIDENING AND EXTENSION HIGH POINT, NORTH CAROLINA MITIGATION PLAN MAY 2008 Prepared For: CITY OF HIGH POINT Mr. Keith Pugh, P.E. - Director of Engineering Services City of High Point 211 S. Hamilton Street High Point, NC 27261 (336) 883-3194 HARTLEY ROAD WIDENING AND EXTENSION HIGH POINT, NORTH CAROLINA MITIGATION PLAN May 2008 Prepared By: XSTV STV/RALPH WHITEHEAD ASSOCIATES Contact: Michael Iagnocco, P.W.S. (704) 372-1885 ='STV ii TABLE OF CONTENTS Page No. 1.0 GENERAL DESCRIPTION ..............................................................1 1.1 BRIEF OVERVIEW .................................................................1 1.2 SIMPLE DESCRIPTION ..........................................................1 2.0 BACKGROUND .............................................................................2 2.1 GENERAL PURPOSE OF PROJECT ..........................................2 2.2 EXISTING CONDITIONS .........................................................2 3.0 SITE PREPARATION ..................................................................... 4 3.1 CLEARING ............................................................................4 3.2 REGRADE ............................................................................5 3.3 PREPARE HYDROLOGY .........................................................5 3.4 PREPARE SUBSTRATE ...........................................................7 4.0 VEGETATON PLANTING PLAN ......................................................7 5.0 HYDROLOGY ESTABLISHMENT ....................................................9 6.0 MAINTENANCE AND MONITORING ..............................................10 6.1 PROJECT GOALS .................................................................10 6.2 METHODS ...........................................................................11 6.3 CONSISTENCY ....................................................................12 7.0 PRESERVATION .........................................................................13 APPENDIX A - FIGURES APPENDIX B - PHOTOGRAPHS APPENDIX C - PERSONNEL QUALIFICATIONS APPENDIX D - CORRESPONDENCE APPENDIX E - MITIGATION AND ENGINEERING PLANS STV iii 1.0 GENERAL DESCRIPTION 1.1 Brief Overview The City of High Point, NC, proposes the widening and extension of Hartley Drive across unnamed tributaries to Rich Fork Creek and freshwater wetlands in High Point, NC. Hartley Drive will be extended from the existing western terminus of Hartley Drive in Guilford County to Westover Drive (SR 1738) in Davidson County, NC (Appendix A, Figures 1 and 2). Hartley Drive will be widened to a four lane highway from the existing intersection with Main Street (US 311) to Westover Drive (SR 1738). The City of High Point, North Carolina has retained the firm of STV/Ralph Whitehead Associates (STV/RWA), of Charlotte, North Carolina, to conduct design, engineering, and Section 404 wetlands permitting services for the proposed widening and extension of Hartley Drive. As an integral part of the Section 404 permitting, we are proposing to offset a portion of the project's stream and wetland impacts through the establishment of an on-site mitigation area, which will consist of a relocated stream and a created forested/emergent wetland system. This Mitigation Plan details the stream and wetland mitigation proposal prepared by STV/RWA's environmental scientists, including site preparation, vegetation plantings, establishment of hydrology, and the maintenance and monitoring of the area. It is anticipated that approximately 140 linear feet and 10,036 square feet of wetland will be created. The final determination for the created wetland size will be made at the end of the five year maintenance and monitoring period. It is the applicant's desire to utilize the NCDENR EEP to meet the remaining compensatory mitigation obligations of the project. The EEP has provided a letter stating that they were willing to accept payment for impacts associated with the project (Appendix D - Correspondence). The responsible party for the mitigation is as follows: Mr. Keith Pugh, P.E. - Director of Engineering Services City of High Point 211 S. Hamilton Street High Point, NC 27261 (336) 883-3194 The responsible party will be responsible for the construction, monitoring, and remedial activities at the mitigation site, as well as the conservation restriction for the area. 1.2 Simple Description The proposed project involves extending Hartley Drive approximately 5800 feet through a currently undeveloped wooded area thereby connecting US 311 (Main Street) to Westover Drive (SR 1738). The project corridor is situated between US 311 and the intersection of Westover Drive and Shadow Valley Road and crosses Ingleside Drive at `7 STV 1 its approximate center point. The project further involves the widening of Hartley Drive to four lanes which will require the expansion of the roadway near the Hartley Drive/Westover Drive intersection, the Hartley Drive/Ingleside Drive intersection, and the section of Hartley Drive west of US 311 to the existing western terminus of Hartley Drive. The project will also involve the modification of the existing traffic signal located at the intersection of Hartley Drive and US 311 in order to handle the additional two lanes that will be added to Hartley Drive west of US 311. The eastern portion of the site is situated in Guilford County whereas the western portion of the site is situated in Davidson County. The proposed roadway alignment will necessitate impacts to the project area streams and wetlands. The jurisdictional boundaries of the project corridor streams and wetlands have been confirmed by the U.S. Army Corps of Engineers (USACE) and the North Carolina Department of Environment and Natural Resources, Division of Water Quality (NCDWQ) during two field inspections/confirmations. A jurisdictional determination request was submitted to the USACE on April 24, 2006. The first field confirmation was conducted on May 8"', 2006 by Mr. Todd Tugwell of the USACE and Mr. Daryl Lamb of the NCDWQ. The boundaries of the delineated streams and wetlands were confirmed, and the subsequent survey of these jurisdictional areas was submitted in September 2006. A second field confirmation of the project corridors jurisdictional areas was requested by the USACE and the NCDWQ due to the departures of the two agency personnel who conducted the initial field inspection/confirmation. The second field confirmation was conducted on January 29th, 2008 by Mr. Andy Williams of the USACE and Ms. Sue Homewood of the NCDWQ. The boundaries of the project corridor wetlands were again confirmed, and the proposed on-site mitigation plan was discussed. 2.0 BACKGROUND 2.1 General Purpose of Project The City of High Point is pursuing this project to accommodate current and future travel conditions, create a more convenient access to Main Street (US 311), particularly for on- going residential growth in west High Point and Davidson County, and to reduce traffic volumes in the long established neighborhoods along Westover Drive. The proposed new intersections at Hartley Drive/Westover Drive and Hartley Drive/Ingleside Drive will also enhance public mobility within neighboring residential areas. 2.2 Existing Conditions According to aerial photography viewed on the City of High Point Geographical Information System (GIS), the proposed project corridor is a mix of woodland with four streams in the central portion and the western portion of the site. Surrounding land use is primarily residential with a few commercial properties. Residential development abuts the project site to the north, west, and southeast. Commercial properties abut the project I STV 2 i ? ' r corridor on the eastern portion of the site. The mitigation project area is within a successional wooded area that has experienced recent impacts due to the presence of a sanitary sewer line which crosses the project corridor. Jurisdictional Streams Two stream channels are located within the proposed mitigation area. Both of the streams would be classified as perennial, according to the North Carolina Division of Water Quality-Stream Identification Form. Both channels are unnamed tributaries to Rich Fork Creek in the Yadkin-Pee Dee drainage basin. Stream 1 is an intermittent stream located in the western portion of the project corridor between Ingleside Drive and Westover Drive (Appendix B - Photo 1 and Appendix A - Figure 8). This stream begins at the Westgate Road residential development located to the north, and flows to the southwest into the project corridor. This first order stream received a score of 52 on the USACE Stream Quality Assessment Worksheet. Stream 2 is a perennial stream located in the western portion of the project corridor between Ingleside Drive and Westover Drive (Appendix B - Photo 2 and Appendix A - Figure 8). This stream begins at the Embers Road and Westgate Road residential development located to the north, and flows to the southwest where it is joined by an intermittent tributary north of the project corridor, and then flows south into the project corridor where is joined by Stream 1. This second order stream received a score of 57 on the USACE Stream Quality Assessment Worksheet. The overstory vegetation in the area surrounding Stream 1 and Stream 2 is dominated by sweetgum (Liquidambar styraciflua), red maple (Aces rubrum), and American sycamore (Platanus occidentalis). The area has been cleared recently for the installation of the sanitary sewer which crosses through the project corridor, so these tree species are limited in size to approximately 3-4 inch diameter maximum. Most of these saplings range from 1.5 to 2 inches in diameter. Site Topography and Geology In general, both surface and groundwater flow directions are controlled by the topography in the Piedmont with the flow generally occurring perpendicular to the contours from high to low elevations. Based on our review of the 1993 USGS 7.5 Minute Quadrangle Topographic Map for High Point West, NC, and the ground surface of the project area is between 820 feet to 880 feet above mean sea level (Appendix A - Figure 2). The elevation at the proposed mitigation area is approximately 820 to 822 feet above mean sea level. Based on our site visit and review of the topographic map, the majority of surface water flows by sheet drainage downslope to the east or west into one of the streams; these streams flow southwest as tributaries to Rich Fork Creek. 17 STV 3 Soils According to the USDA Soil Survey of Davidson County (1994) on-site soils consist of Poindexter and Zion sandy loam 2 to 8 percent slopes (PnB), Poindexter and Zion sandy loam 8 to 15 percent slopes (PnD), and Poindexter and Zion sandy loam 15 to 25 percent slopes (PnE) (Appendix A - Figure 3). According to the USDA Soil Survey of Guilford County (1977) project corridor soils consist of Chewacla sandy loam (Ch), Wilkes sandy loam 6 to 10 percent slopes (WkC), and Wilkes sandy loam 15 to 45 percent slopes (WkE) (Appendix A - Figure 4). Chewacla sandy loam is listed as a hydric soil on the North Carolina Hydric Soils List. Poindexter and Zion sandy loam 15 to 25 percent slopes (PnE) are mapped within the corridor of Stream 1 and 2 in the proposed mitigation area. 3.0 SITE PREPARATION The preparation of the mitigation area involves several steps that are necessary to change the topography and hydrological regime within the stream relocation and wetland creation area. The initial preparation involves the clearing and grubbing of the existing vegetation. This clearing will be followed by the regrading of the topography to match the design plans. The preparation of the mitigation area will coincide with the relocation of the sanitary sewer that crosses the project corridor in this area, so the clearing and regrading of this area will be necessary regardless of whether or not the stream relocation and wetland creation mitigation is done. The hydrology for the mitigation area will be provided by the rerouting of the project corridor's Stream 2 into Stream 1 slightly upstream of the existing confluence. The existing stream flow will be maintained until after the mitigation area substrate has been prepared and the wetlands plantings have been established. 3.1 Clearing Mechanical clearing of the area vegetation will be the initial step in the preparation of the mitigation area. The clearing of the area vegetation is necessary for the relocation of the sanitary sewer that crosses the project corridor in this portion of the project, as well as the relocation of a portion of Stream 2. Clearing will extend from the area where the sanitary sewer will be relocated through the stream relocation/mitigation area, to the proposed roadway. As mentioned in Section 2.2, the vegetation of the area includes sweetgum, red maple, and American sycamore. Grubbing of the cleared vegetation roots will follow the vegetation clearing to remove the roots of these saplings, only in the area that will require grading. Temporary impact areas will not be grubbed, leaving the stumps and root mat intact. This will help to keep the soils stabilized and assist in the revegetation of the area when the project has been completed. The location of the proposed mitigation area will 'F STV 4 be cleared as necessary, but with an eye toward preserving any trees or shrubs adjacent to the work area. Soil erosion and sediment control fencing will be installed at the outer and down slope limits of the proposed wetland mitigation area, and around the areas of exposed soils. 3.2 Regrade The area topography will be graded after the clearing of the area vegetation. Earthworking equipment such as bulldozers, backhoes, front-end loaders, and track hoes may be used to initially prepare the site, and remove the top soil of the area. All large boulders, rocks and stones will be separated from the soils and stockpiled for later use. No soils, boulders, rocks, stones, or any other materials will be stockpiled within jurisdictional areas. After the boulders, rocks and stones have been screened out of the regraded project area, site soils will be temporarily stockpiled outside of the jurisdictional areas for use within the mitigation area. Temporary soil erosion controls around the stockpiled soils will consist of silt fencing around the base of the stockpile. Other sediment and erosion control measures may possibly involve seeding the stockpiled soils with a temporary cover of ryegrass (Lolium sp.) or similar temporary vegetative cover. The proposed mitigation area will be regraded to achieve a level topography. This level grading for the mitigation area will tie into the proposed regrading of the sanitary sewer relocation area in order to achieve a uniform slope from the sanitary sewer relocation area, to the wetland mitigation area. The proposed grading plan is depicted in Appendix E - Sheet 17. Bankfull elevations and thalweg elevations shall be set by surveyors to establish depths for the relocated stream. The flood prone area surrounding the relocated stream will also be established to handle the largest of the anticipated storms. Flooding of the stream channel during extreme precipitation events will also provide additional hydrological input for the wetland mitigation area. The finished surfaces of the planting area will be smooth within specified tolerances in uniform levels or slopes between points where elevations are indicated or between such points and existing grades. The accepted grading tolerance will be an even surface, free of voids, and within 1 to 0.5 feet of the specified elevation depending on the amount of topsoil that has been stockpiled. Leaving the surface rough, creating mounds and kettles for a variable microtopography can be beneficial, and will be done when the topsoils are spread over the area. The regraded area will be inspected by the mitigation wetland scientist when approximately 90% completed. Some changes to the grades may be appropriate to establish flow paths and preserve the planting areas. These determinations will be made by the wetland specialist supervising the grading. STV 5 3.3 Prepare Hydrology Upon the completion of the site regrading, the new stream channel will be prepared. The existing Stream 1 and the proposed stream will be created with a similar entrenchment ratio, width/depth ratio and sinuosity. The recreated stream meanders will essentially be a reverse of the existing stream sinuosity. Additionally, since the length of the relocated portion of the stream is less than the impacted portion of the stream, the meanders have a shorter run length between them. This is required to direct the stream into the culvert that is proposed underneath the roadway. This reduction in natural stream length prohibits a duplication of the existing stream wavelength. The portion of the stream reach that will be impacted has provided the representative reference stream morphology for the relocated stream. The stream morphology in the non-impacted upstream portion does not provide the entrenchment and sinuosity representation of the portion of the stream reach to be impacted. Representative cross sections for the proposed stream are depicted in Appendix E - Sheet 17. Approximately 140 linear feet of new stream channel will be created. This new stream channel will also convey the necessary hydrology to the proposed wetlands mitigation area which will be located between the relocated stream and the new section of the Hartley Drive roadway. The relocated stream channel will be drained by a proposed culvert under the new section of Hartley Drive, which will be connected to the portion of Stream 1 that is located south of the proposed project corridor. The relocated portion of the stream will consist of a thalweg which will be the deepest portion of the proposed stream channel and will convey the area stormwater runoff in low flow conditions, and a larger bankfull area to handle larger flows of stormwater from the upstream areas. From the bankfull area, the relocated streams associated flood prone width provides additional volume for the design storm and includes the wetland mitigation area on the south side of the stream. Coconut fiber matting (or similar material) will be used to line the stream banks to assist in the stabilization of the soils. The thalweg of the relocated stream channel will be unlined. Boulders and stones will be placed on top of the matting in designated areas to stabilize the stream banks and further limit the erosion and scouring of the stream flow. A rock cross vane will be placed across the stream as shown on the mitigation plan (Appendix E - Sheet 17) to provide grade control, maintain the thalweg in the center of the channel, and to provide a pool which will help to reduce flow velocities, reduce stream bank scour and provide additional aquatic habitat. Over time, sediment transport and deposition by the stream flow will cover the crushed rock with material such as leaf litter and sediments. This should help the relocated stream channel to mimic the conditions of the stream channel to be abandoned, and provide a benthic substrate suitable for macro invertebrates such as Ephemeroptera, Plecoptera and Trichoptera "- STV 6 .. species. It is also anticipated that crayfish and various amphibians will colonize the area of the relocated stream channel. No fish populations exist in this portion of the stream. The culvert that is proposed to be placed under the roadway (Appendix A - Figure 11) will then be put into place. This culvert will take the stream flow and direct it under the proposed roadway to the downstream portion of Stream 1. The invert elevation at the point where the culvert intercepts both Stream 1 and the relocated Stream 2 is at approximately 816.5 feet. 3.4 Prepare Substrate As previously mentioned, earthworking equipment such as bulldozers, backhoes, front- end loaders, and track hoes may be used to initially prepare the site. Similar equipment may be used to transfer the stockpiled soils and boulders from the stockpile areas to the proposed mitigation area. No heavy earthworking equipment will be permitted to enter existing jurisdictional areas, and will be largely limited to the proposed mitigation area. The placement of the stockpiled boulders (or coir logs if no boulders are available) at the designated areas along the stream banks will be done to armor the stream banks against erosion during high flow periods. A coconut fiber mat will be placed over the stream banks at these areas prior to boulder (or coir log) placement. The coconut fiber matting will help to stabilize the stream bank soils, and will be permitted to decompose naturally after the boulders have been placed. The boulder revetment will help to maintain the stream bank and still provide a natural stream bank substrate. The boulder revetments along the stream bank will be constructed by first lining the smaller boulders along the toe of the stream bank, under the proposed water table elevation. Progressive layers of larger boulders will be placed over the smaller boulders, until the top of bank is reached. The substrate soils of the wetland mitigation area will be prepared by first grading the area subsoil (as described in Section 3.2) to elevations approximately one foot below the final proposed grade, and then spreading the stockpiled soils over the prepared subsoil. The stockpiled soils will be spread over the mitigation area by hand to ensure that the compaction of the soils is minimized. The topsoil will be loosely placed over the subsoil, and will be spread in a slightly uneven manner creating mounds and kettles for a variable microtopography in the mitigation area. 4.0 VEGETATION PLANTING PLAN After the soils substrate has been prepared, landscaping contractors shall begin the installation of the vegetative plantings for the area surrounding the relocated stream and for the wetland mitigation area. Tree species to be planted in the wetland mitigation area will match the types of species found naturally within the existing forest of the area. =a STV 7 The nurseries that are found within the vicinity of the project will be used to provide the mitigation area vegetation. Example nurseries that may be used include Fern Valley Farms located in Yadkinville, or Piedmont Carolina Nursery located in Colfax. Pricing and availability of the desired wetland species will be evaluated prior to contracting a plant supplier. All planting will proceed by hand. Materials will be brought to the site in good condition (see below) and then placed in central drop locations. The materials will then be hand- carried to their planting locations and in turn, planted by hand. Only rounded, shallow planting shovels will be used in this effort. Criteria for selecting plant material will include (1) the plant's ability to withstand the expected light and saturation conditions; (2) its demonstrated survival on this site and other nearby sites; (3) the plant must be native and non-invasive; and (4) whether the plant material is available at nurseries in the same region as the site. See Table I for complete plant species list. Container-grown plant material delivered to the job site will be inspected to assure moist soil/root masses. Any dry and light weight plants will not be accepted. If not planted immediately, the container will be stored out of the sun and wind and kept moist (i.e., a means of watering will be provided and watering will occur daily). When removed from the containers, the plants will be the size of the specified container. If in leaf, the plants will appear healthy with no spots, leaf damage, discoloration, insects or fungus. If not in leaf, the buds will be firm and free of damage, discoloration, insects or fungus. Containers will be a minimum of quart size for shrubs and gallon size for trees. Trees and shrubs would preferably be planted in early to late spring (between April 1 and June 15), or in the fall (September 15 to October 30). In all cases, a hole will be dug twice as deep as the root ball. The only shovels allowed are rounded, shallow spades. The hole will then be backfilled with a thin layer (two to four inches) of rich, organic topsoil, the plant placed inside, the hole backfilled to the top and then gently tamped down. A wetland seed mix will be chosen based on commercial availability and the seed species' ability to survive in moist areas adjacent to the road with some sun. Seeding within wetland areas should not be completed when there is more than two inches of standing water, or in areas that are likely to be flooded. Seeds should be broadcast by hand or knapsack seeder using the proper seeding rate, and carefully proportioning seed for the entire area. The seed will be covered with a light layer of straw mulch following seeding. The overstory species to be planted are considered to be facultative and facultative wetland species. These include American sycamore (FACW-), red maple (FAC), sweetgum (FAC+), and pussy willow (Salix discolor, FACW). Each of these tree species r- STV 8 will be planted on a raised mound of soil to create a varied microtopography within the wetland area, and to ensure that the tree can receive adequate air during periods of prolonged inundation and flooding within the wetland area. Shrubs planted in this area include highbush blueberry, (Vaccinium corymbosum, FACW), American hornbeam (Carpinus caroliniana, FAQ, and winterberry holly (Ilex verticillata, FACW). Herbaceous wetland species to be planted as plugs will include upright sedge (Carex stricta, OBL), soft rush (Juncus effusus, FACW+), woolgrass (Scirpus cyperinus, OBL), and Virginia blue flag iris (Iris virginica, OBL). A wetland seed mixture will also be sown into the wetland mitigation area. The existing seed bank in the area soils that will be used in the final grading are also anticipated to germinate and colonize the wetland mitigation area. American holly (Ilex opaca, FAC-) will be planted at the toe of the slope of the proposed roadway and a wildflower seed mixture or NCDOT approved slope stabilizing vegetation will be sown into the slope. Black-eyed Susan, purple coneflower, poppy, and coreopsis are some of the wildflowers that are suggested. This vegetation will help to stabilize the slope of the roadway. The wildflower species will also offer scenic views for the travelers on the proposed extension of Hartley Drive. Alternative species may be used within the proposed mitigation area depending on the availability of the listed plant species, or based on the preferences of the USACE or the NCDWQ. This flexibility in planting schemes will help to prevent planting delays if a species is not readily available at a local nursery, and will pen-nit input from the regulatory agencies to choose desired species. Prior to making any substitutions to the planting palette, regulatory agencies will be notified and allowed to comment on, and/or accept proposed substitutions. 5.0 HYDROLOGY ESTABLISHMENT The relocation of the sanitary sewer, installation of the proposed 60" culvert pipe, and the preparation of the relocated stream channel will be completed before establishing the hydrology to the proposed wetland mitigation area. The existing stream flow will continue as the stream relocation and the mitigation area are prepared, and the proposed culvert is put in place. When the procedures outlined in Section 3 (Site Preparation) and Section 4 (Vegetation Planting Plan) are completed, the stream will be directed from the existing location to the prepared, relocated stream channel. A portion of the existing stream channel to be abandoned will become incorporated into the proposed wetland mitigation area. The remaining portion of the stream channel will be blocked off by an embankment protected by a matting of coconut fiber covered by a STV 9 row of boulders. Coir logs will be used if an insufficient amount of boulders are unearthed during site grading. The thalweg will be partially blocked temporarily at the rock vane prior to the stream diversion into the newly created stream channel. The thalweg will be blocked using a board or similar removable weir-like material until a stormwater event has occurred. The temporary blocking of this main drainage way for the stream will back the water up into the wetland mitigation area, creating a pool in this portion of the relocated stream channel. The inundation of the wetland mitigation area by stormwater may reduce the need to water this area as it is being established. It will also pen-nit the fine sediments carried in the water column to fall out into this pool and wetland area. Fine sediments and clay particles on the substrate surface will help to decrease the soil permeability, and increase the surface inundation within the mitigation area. 6.0 MAINTENANCE AND MONITORING At least one pre-construction meeting will occur between the chosen grading and/or planting contractor/subcontractor and the site environmental systems planner prior to beginning construction on site. The construction monitor will have experience in wetland construction and a Bachelor of Science degree in Biology or Environmental Science. Monitoring and maintenance efforts for the mitigation plantings will take place over a five year period following construction. This will include frequent visits for the first growing season, and then twice a year for the next two years, with additional inspections as required depending on the site conditions. The scientist in charge will conduct a survey of the site and site conditions will be noted and adjusted as necessary. An annual report will be provided to the NCDWQ, the City of High Point and the Anny Corps of Engineers every year for each of the five years. These reports will include the following information: 1. All plant species, along with their estimated relative frequency and percent cover, shall be identified. 2. Photographs showing all areas of the mitigation site shall be taken at least once each year during the growing season. Plantings will meet or exceed an 85 percent survival rate by the end of the second growing season. If this goal is not met, the site will be re-evaluated, and re-grading and/or replanting will be completed as necessary. Invasive species will not constitute more than 10 percent of the vegetative community. If this goal is exceeded, measures will be taken to eradicate the invasive species. 6.1 Project Goals Project Goal 1: The created wetland community should be a jurisdictional wetland as defined by current federal standards. STV 10 Objective: The created wetland should develop the three characteristics (hydrophytic vegetation, hydric soils, and hydrology) that define a wetland to compensate for a portion of the wetlands that will be impacted by the extension of Hartley Drive. The remaining compensation at a 2:1 ratio will be fulfilled using the North Carolina Ecosystem Enhancement Program in-lieu fee mitigation program. Performance criteria: a. Predominance of hydrophytic vegetation: More than 50% of the dominant plant species must be hydrophytic. b. Occurrence of hydric soils: Hydric soil characteristics should be present, or conditions favorable for hydric soil formation should persist at the site. c. Presence of wetland hydrology: The area must be either permanently or periodically inundated or have soils that are saturated to the surface for at least two weeks during the growing season. Project Goal 2: The created wetland plant community should meet standards for planted species survival and floristic composition. Objectives: The planting of trees will create a forested wetland. Other woody and herbaceous vegetation that is planted as plugs, seeded, or develops from the natural seed bank will be allowed to colonize the site naturally, which the exception of noxious invasive weed species that will be removed. Performance criteria: a. Planted species survivorship: At least 85% of the planted trees ad shrubs should be established and living by the end of the five year monitoring period. b. Native species composition: At least 50% of the plants present should be non-weedy, native, perennial species. c. Dominance of ve etg ation: None of the three most dominant plant species may be non- native or weedy species, such as cattail, or reed canary grass. 6.2 Methods a. Predominance of hydroph3iic vegetation The method for determining dominant vegetation at a wetland site is described in the Corps of Engineers Wetlands Delineation Manual (Environmental Laboratory 1987) and further explained in the Federal Manual for Identifying and Delineating Jurisdictional Wetlands (Federal Interagency Committee for Wetland Delineation 1989). It is based on aerial coverage estimates for individual plant species. Each of the dominant plant species is then assigned its wetland indicator status rating. Any plant rated facultative or wetter, i.e., FAC, FAC+, FACW, and OBL, is considered a hydrophyte. A predominance of wetland vegetation in the plant community exists if more than 50% of the dominant species present are hydrophytic. b. Occurrence of hydric soils The soil will be sampled in order to monitor hydric soil development. Soil profile morphology including horizon color, texture, and structure will be described at various F STV 11 points throughout the mitigation site. Additionally, the presence, type, size, and abundance of redoximorphic features will be noted. Hydric soils may develop slowly, and characteristics may not be apparent during the first several years after project construction. c. Presence of wetland hydrology Wetland hydrology will be assumed if the dominance of hydrophytic vegetation is established and hydric soils develop within the mitigation area. 6.3 Contingency In the event that the area has not developed wetland characteristics as determined by the project goal methodology, an evaluation of the potential causes for this failure will be performed and corrective action will be taken. The absence of wetland soils, hydrology and/or the absence of the prevalence of hydrophytic vegetation over some or all of the desired mitigation area will be the trigger to perform this corrective action. Corrective actions may include minor grading, soils reworking/amending and replanting as described below. Additional vegetation plantings This is the most common contingency plan utilized for wetland mitigation projects. Replanting is most often used to remedy failures to meet cover or plant survival standards. If plantings have failed, it is likely that some underlying problem (e.g., too much or too little water) is at fault. Replanting without addressing the root cause is likely to result in another failure. Invasive species control This is a necessary contingency when the standard of success limits the cover of invasive species on the site. Also, when plant survival or diversity standards are not being met, weed control may be needed. The control method(s) which may be used will include clearing undesirable species by hand, and spot pesticide/herbicide application. Soil amendment If vegetation populations are not responding as expected, it may be necessary to add organic matter, structural components, or specific nutrients to the soil. Supplement hydrology If the site does not have sufficient water supply, surface water may need to be diverted from a nearby stream or stonnwater system. If such supplemental sources are not available, then additional remedial measures such as those listed below may be required. Decrease soil permeability F STV 12 II;, d [ Fine sediments may be added or subsoil could be compacted to decrease soil permeability and increase water retention time. This is best used very early after site construction in order to avoid the need to replant. Grading revisions Grading may be required to slow surface water sheet flow across the site or adjust stream dynamics of channelized systems. Erosion control If surface water drainage channels develop, additional planting might be adequate to control this. Or, erosion-control matting (e.g., biodegradable fiber mats) or physical controls (rock, hay bales) may be installed as an interim measure. The ultimate goal should be to have erosion controlled by an appropriate combination of reduced slope and increased vegetation density. Access control Fencing, blocking vehicle access points, and other measures can be employed to prevent vandalism, dumping of trash, and other impacts caused by humans or domestic animals. The planting of a boundary of dense thorny holly shrubs may help to provide both access control as well as providing wildlife habitat. Pest control If revegetation is failing due to herbivory, the wildlife responsible need to be identified and appropriate damage control methods employed. Possible methods include deer fencing, rabbit fencing, goose fencing, use of repellents, and temporary barriers. This pest control will be the responsibility of the responsible party to erect and maintain throughout the five year monitoring period. 7.0 PRESERVATION The City of High Point will purchase the proposed mitigation area property during the R/W acquisition. A 50 foot buffer will be been placed around the relocated stream and mitigation area, except where it is directly adjacent to the roadway. This additional protected area will be purchased by the City of High Point and the deed placed in a conservation restriction to protect the area as a stream and wetland in perpetuity. I- STV 13 APPENDIX A FIGURES old Plank Rd G'H"4?1 __n. _?sto ??r Or ,_ 300m N a` Q o?saott m '3 try ?a ?iS' Ladfurd !.n l6Q6stil V4 -61 Rankin ,P( 1 C ? r St Arai r tp. v 6?m % a Cf z 0. ;n L')aAdson Ct C., 20.06 MapQuest, Inc .? ?? ?Q E Gf ?G" Or 00Lu Project Vicinity .a >I ; CarolS71d,p C7r at1eV OF VIe. er ?R -Stlidge dt ? i dine R,?ige pi c. Fredgecack d aq\ VIV t'airis Ay P ark C/! Hames:??ad'q 02446 NAVTEQ North Carolina Vicinity Map STV/Ralph Whitehead N Associates, Inc. Scale as shown Hartley Drive Widening and Extension Site Location Map Davidson and Guilford Counties, NC FIGURE 1 N Not to Scale ®? Pr? 4 Hi 1w Las mcw, i &?? 4 CBCO® I Ak STV/Ralph Whitehead ( N, Associates, Inc. Hartley Drive Widening and Extension U.S.G.S. Location Map Davidson and Guilford Counties, NC FIGURE 2 North Carolina Vicinity Map a, a Q U M U z w 0 U c cv O 4.. 0 L O Mapped Soil Units in Project Area N Poindexter and Zion sandy loams, 2 to 8 percent slopes (PnB) Poindexter and Zion sandy loams, 8 to 15 percent slopes (PnD) Poindexter and Zion sandy loams, 15 to 25 percent slopes (PnE) STV/Ralph Whitehead N Associates, Inc. Hartley Drive Widening and Extension Soil Survey Davidson County, NC Davidson and Guilford Counties, NC FIGURE 3 Not to Scale r` o, Q O M L VJ U z O U L F U w 0 v L C? .O 4. Mapped Soil Units in Project Area Wilkes sandy loam, 6 to 10 percent slopes (WkQ Wilkes sandy loam, 15 to 45 percent slopes (WkE) Chewacla sandy loam (Ch) Enon-Urban Land complex, 2 to 10 percent slopes (EuB) STV/Ralph Whitehead { Associates, Inc. Hartley Drive Widening and Extension Soil Survey Guilford County, NC Davidson and Guilford Counties, NC FIGURE 4 N Not to Scale F - -- -- - - --- --- --- - - - - - - - - - - --- - -- -- -1 APPLICANT:CITY OF HIGH POINT LOCATION:HARTLEY DRIVE ACTIVITY: ROADWAY EXTENSION COUNTY: GUILFORD/DAVIDSON ROUTE: HARTLEY DRIVE STATE: NORTH CAROLINA PROJECT": 3202000, TASK 400 DATE: 03/20/08 SCALE: I" = 600' 0 o r? v SEE F I GUR o? - s, - - e O ?p SEE FIGURE 7 0 h GU ,O P S? 1?1 STV/RALPH WHITEHEAD ASSOCIATES 1000 W.MOREHEAD ST. SUITE 200 CHARLOTTE, NORTH CAROLINA 28208 HARTLEY DRIVE EXTENSION 0 ft 600 ft CITY OF HIGH POINT, NC PROJECT OVERVIEW SCALE FIGURE 5 PHONE 8:(704)372-1885 FAX •:(704)372-3393 l/1 - - - - - - - - - - - - - - - - - - - - - - --- - - - - -- I LEGEND PERMANENT PALUSTRINE FORESTED WETLAND FILL IMPACT (0°301 AC) PERMANENT PALUSTRINE FORESTED WETLAND CLEARING IMPACT (0.010 AC) PERMANENT PALUSTRINE FORESTED WETLAND EXCAVATION (0.006 AC) STREAM FILL IMPACT (0 AC; 0 LF) WETLAND BOUNDARY: STREAM BOUNDARY: EROSION CONTROL FENCING LINE: CONSTRUCTION LIMITS: LP © 1'l\ LP D OE OF, S. Sd S r Q p '4 P'c V PG O I II t"'001 NV AG NV A II 8v I E3ST I EROSION CONTROL L0 II II FENCING LINVPL III III _>" APPLICANT:CITY OF HIGH POINT ACTIVITY: ROADWAY EXTENSION ROUTE: HARTLEY DRIVE PROJECT": 3202000, TASK 400 ----no---- c AND GG 30 S 1 S PSTQ I NETT F PER _PANENT I PST I I J CONTROL J LINE TRINE FORESTED lND FILL IMPACT 15 SF = 0.301 AC PERMANENT PALUSTRINE FtRESTED WETLAND CLEARIN IMPACT +/- q4q SF = .010 AC LOCATION: HARTLEY DR I VE COUNTY: GUILFORD/DAVIDSON STATE: NORTH CAROLINA DATE: 06/14/07 SCALE: ill = 80' PERMANENT PALUSTRINE FORESTED WETLAND EXCAVATION IMPACT +/- 264 SF = 0.006 AC c , A c / ppS/ F RACK / ?? .._rtr. Wpb` .. ? .• / / FO Z i / ? xistin9 RN's i" / a / y I / I / 1 Z / ? 1./ ? I I I DDT 1 I RIDG I I 35 C xf st ,( pR1VE PROPOSED BRIDGE ABUTMENT i STREAM 4 STV/RALPH WHITEHEAD ASSOCIATES 1000 W.MOREHEAD ST. SUITE 200 CHARLOTTE, NORTH CAROLINA 28208 71M HARTLEY DRIVE EXTENSION S CITY OF HIGH POINT, NC 0 ft 80 ft SITE PLAN (FIGURE G) SCALE PHONE ": (704) 372-1885 FAX •:1704) 372-3393 LEGEND APPLICANT:CITY OF HIGH POINT LOCATION: HARTLEY DRIVE PERMANENT PALUSTRINE FORESTED ACTIVITY: ROADWAY EXTENSION COUNTY: GUILFORD/DAVIDSON WETLAND FILL IMPACT (0.055 AC) STATE: NORTH CAROLINA PERMANENT PALUSTRINE FORESTED ROUTE: HARTLEY DRIVE DATE: 06/14/07 WETLAND CLEARING IMPACT ( 0 AC) PROJECT": 3202000, TASK 400 SCALE: ill = 80' PERMANENT PALUSTRINE FORESTED WETLAND EXCAVATION ( 0.004 AC) STREAM FILL IMPACT RIPRAP APRON EROSION CONTROL ( O AC; O LI-) 23 FENCING LINE WETLAND BOUNDARY: ----.?---- 8.56 CY INSET A STREAM BOUNDARY: PERMANENT PALUSTRINE FORESTED 0 ' EROSION CONTROL FENCING LINE: WETLAND EXCAVATION IMPACT 171 SF = 0,004 AC CONSTRUCTION LIMITS: - - - - - - - - - - - - - - - - - - - - - - - - _ _ _ _ _ --------- - PROP. END WALE - STREAM 3 BEGINS F , 40 Y+ _ Ic < STRUCT SEEIIN?ET A N FOR bE AILS POr W. HARTLEY Da f r 120 LF 212'RCP A451O I ' I 'l !?? STA /2ra01G?3 ~? F !-'?- nE LHNU L.xIstl HARTLEY DRIVE 1 RI-LE R7A?" r x 41 Y DRIVE N _ N ?C_p 4 VANENT k E LIB TRINE FILL FORESTED IMPACT -? "`IHTLAND STU/RALPH WHITEHEAD ASSOCIATES MOREHEAD ST 0 W '*/- 2,394 SF = 0.055 AC EROSION. CONTROL ?c .:_r *` - + . 100 . SUITE 200 FENCING- . LINE ? __,..?^..• ......... ? c c CHARLOTTE. NORTH CAROLINA 28208 PRA END WALL ?..,. HARTLEY DRIVE EXTENSION w ` x= CITY OF HIGH POINT, NC y, ,•: r' / Q fit 80 t SITE PLAN (FIGURE 7) f .. SCALD PHONE a (704) 372-1965 FAX ,(704) 372-7393 ,I LEGEND APPLICANT:CITY OF HIGH POINT LOCATION: HARTLEY DRIVE PERMANENT PALUSTRINE FORESTED VIIIIZZZZZZA ACTIVITY: ROADWAY EXTENSION. COUNTY: GUILFORD/DAVIDSON WETLAND FILL IMPACT (0 AC) STATE: NORTH CAROLINA PERMANENT STREAM ROUTE: HARTLEY DRIVE DATE: 03/20/08 EXCAVATION IMPACT (0.005 AC; 24 LF) PROJECT": 3202000, TASK 400 SCALE: 1 80' PERMANENT STREAM FILL IMPACT (0.087 AC; 514 LF) ?N HVAC TEMPORARY STREAM c DK/, DE 2SFD ` EXCAVATION IMPACT (0.008 AC; 23 LF) MB / --- WETLAND BOUNDARY: -MLB---- C H ^ ^-61 WALL STSE?D ?/ ro STREAM BOUNDARY: SEE INSET A FOR DETAILS Wc - EROSION CONTROL FENCING LINE: ` ss HVAD 25FD ?i MO F I CONSTRUCTION LIMITS: ' - - M1?'iDECK WAL ' LP\ ` c Nq R T SO `x? ?M C v N W P?` ?CONC Q - ?Y / \ h 2SFo Co-, \ L! PATIO ???`s7y FILL I ACT O sE PEAANENT STREAM \ R\ F g +/M- 3060 SF = ?7 1 AC ?1k:?1 Hvnc ?ILE + LUORAGE GRAD ? SHED W / Llo-,,-Al 35 C F L/0 0 INSET A N "'LEY DRIVE } PERMANENT STREAM 200 LF 60'RCP EXCAVATION IMPACT +/- 204 SF = I 0.005 AC I / FGi_ RIPRAP APRON EROSION CONTROL I i 433 SF FENCING LINE 16.04 CY - ? '*\-EROSION CONTROL - FENCING LINE I \? \ TEMPORARY 359 SF STO EAM08 ACCAVATION IMPACT F\ STREA RELOCATION I, D STV/RALPH WHITEHEAD ASSOCIATES ? ?? \ \ D 7 1000 W.MOREHEAD ST. SUITE 200 - - PERMANENT STREAM 2 FILL IMPACT 017 AC \ +/- 737 SF = 0 CHARLOTTE, NORTH CAROLINA 28208 . PROP. SEWER LINE ` HARTLEY DRIVE EXTENSION CITY OF HIGH POINT, NC 0 ft 80 fit SITE PLAN (FIGURE 8) --- SCALE PHONE «: (704) 372-1885 FAX =: (704) 372-3393 L - -------------------------- I r VOLUME OF FILL IN WETLAND CALCULATION AREA OF WETLAND FILL IMPACT = 13,095 SF AVERAGE FILL HEIGHT = 20 FT VOLUME OF FILL = 13,095 SF X 20 FT = 261,900 CF = 9,700 CY CROSS SECTION A-A -HARTLEY- STA. 31+50 PROPOSED CENTERLINE 26.75' 26.75' PROPOSED GRADE 19.25' 86.68' 3' PROPOSED - GROUND 830 ft 825 ft 820 ft 3`\ 815 fit 810 ft 805 fit 800 ft WETLAND EXCAVATION IMPACT PROPOSED TOE OF FILL DITCH EXISTING GROUND VOLUME OF EXCAVATION IN WETLAND CALCULATION AREA OF WETLAND EXCAVATION IMPACT = 264 SF AVERAGE EXCAVATION DEPTH = 3 FT VOLUME OF EXCAVATION = 264 SF X 3 FT = 792 CF = 29.33 CY iii WETLAND FILL IMPACT WETLAND CLEARING IMPACT 0 ft 20 ft SCALE 18.63' 1 J VOLUME OF FILL IN WETLAND CALCULATION AREA OF WETLAND FILL IMPACT = 2,394 SF AVERAGE FILL HEIGHT = 8 FT VOLUME OF FILL = 2,394 SF X 8 FT = 19,152 CF = 709.33 CY CROSS SECTION B-B -HARTLEY- PROPOSED PROPOSED CENTERLINE GROUND 16.91 32.48' 35.14' 35.08' 840 fit 835 ft 830 ft 825 fit 820 fit = 829.10 EXISTING GROUND WETLAND EXCAVATION IMPACT WETLAND FILL IMPACT VOLUME OF EXCAVATION IN WETLAND CALCULATION AREA OF WETLAND EXCAVATION IMPACT = 171 SF AVERAGE EXCAVATION DEPTH = 2 FT VOLUME OF EXCAVATION = 171 SF X 2 FT = 342 CF = 12.67 CY -PROPOSED GRADE PROPOSED 42"RCP W/NCDOT STD. 838.80 ENDWALLS 0 ft 20 ft SCALE INVERT = 833.60 7.62' I ------ -- ----- ---------- ------ I VOLUME OF FILL IN STREAM CALCULATION AREA OF STREAM FILL IMPACT = 0.087 AC = 3,797 SF AVERAGE FILL HEIGHT = 18 FT VOLUME OF FILL = 3,797 SF X 18 FT = 68,346 CF = 2,531.33 CY CROSS SECTION C-C -HARTLEY- 820 ft 815 ft w ft 805 ft 800 ft EXCAVATION IMPACT VOLUME OF EXCAVATION IN STREAM CALCULATION AREA OF STREAM EXCAVATION IMPACT = 150 SF AVERAGE EXCAVATION DEPTH = 5 FT VOLUME OF EXCAVATION =150 SF X 5 FT = 750 CF = 27.78 CY 0 ft 25 ft SCALE 16=0 I i i --- ----- - ---- = - -- - --- --- - - --- - - ----- --- CROSS SECTION CROSS SECTION D-D -SANITARY SEWER- 828 EXISTING GROUND 824 820 816 812 EX. 12' SANITARY SEWER VOLUME OF TEMPORARY STREAM EXCAVATION CALCULATION AREA OF STREAM EXCAVATION IMPACT = 100 SF AVERAGE DEPTH OF SANITARY SEWER = 5.7 FT VOLUME OF TEMPORARY EXCAVATION = 100 SF x 5.7 FT = 570 CF = 21.11 C Y m m J J 3 3 i V PROP. 132 LF OF 12' DIP 0 2.42% TEMPORARY STREAM EXCAVAION IMPACT AREA =100 SF AVERAGE DEPTH = 5.7 FT STV/RALPH WHITEHEAD ASSOCIATES 1000 W. MOREHEAD ST. SUITE 200 CHARLOTTE, NORTH CAROLINA 28208 HARTLEY DRIVE EXTENSION CITY OF HIGH POINT, NC 0 ft 80 ft SITE PLAN (FIGURE 12) SCALE PHONE ":(704)372-1885 FAX •:(704)372-3393 APPENDIX B PHOTOGRAPHS Hartley Drive Widening and Extension, High Point, NC Mitigation Plan Photo 1 - A view of Stream 1 above the confluence with the intermittent Stream 2 with the proposed mitigation area on the left. Photo 2 - A view of the reference reach portion of Stream 2 which will be bypassed by the proposed culvert and crossed by the extended portion of the proposed Hartley Drive. Hartley Drive Widening and Extension, High Point, NC Mitigation Plan Photo 3 - The existing sanitary sewer easement located in the proposed mitigation area. Photo 4 - Another view of the existing sanitary sewer easement located north of the proposed mitigation area. Hartley Drive Widening and Extension, High Point, NC Mitigation Plan Photo 6 - A view of the upland forest, Stream 1, and the proposed mitigation area. Photo 5 - A view of the successional upland forest located east of the proposed mitigation area. APPENDIX C PERSONNEL QUALIFICATIONS The following STV/RWA employees were responsible for the preparation of this document: STV/ Ralph Whitehead Associates Michael A. Iagnocco, P.W.S., Senior Environmental Scientist B.S. Biological Sciences Mr. Iagnocco has over 25 years of experience in performing environmental studies and managing the preparation of environmental documents, including assessments and impact statements, at federal and state levels. Mr. Iagnocco also has extensive experience in wetland assessment, delineation, and permitting; the development of comprehensive mitigation plans involving restoration, creation, and enhancement; and natural resource inventories. Brandon J. Phillips, C.H.M.M., Senior Environmental Specialist B.S. Biology Mr. Phillips has over 20 years of professional experience in environmental science and wetlands/natural resources management throughout the eastern United States. Mr. Phillips performs environmental studies, wetland mitigation design and participates in the preparation of environmental assessments, Clean Water Act Section 404 permit documents and National Environmental Policy Act (NEPA) documents. Mr. Phillips has conducted wetlands studies for properties in the eastern US from Massachusetts to Florida, and has appeared as an expert witness to provide testimony to support clients in the New York State Wetlands Appeals Court and multiple municipal hearings. W. Steven Busbee, P.W.S., Project Environmental Scientist M.S. Forest Resources B.S. Aquaculture, Fisheries, and Wildlife Biology Mr. Busbee has over seven years of professional experience in environmental science and wetlands/natural resources reporting throughout the southeastern United States, including North and South Carolina, Georgia, and Florida. He has extensive regulatory wetlands permitting experience at both the federal and state levels. His experience includes jurisdictional stream and wetland determinations, delineations, and functional assessments, Section 404 pennitting, compensatory wetland mitigation design, planning and monitoring, protected plant and animal species surveys, invasive plant species management, water quality monitoring, and regulatory agency reporting and coordination. Jennifer L. Schwaller, NEPA Project Planner B.S. Organismal Biology Ms. Schwaller has over nine years of experience in ecological studies and environmental assessment. She is well versed in National Environmental Policy Act (NEPA) and State (North Carolina) Environmental Policy Act (SEPA) compliance, and has served as the primary author on numerous environmental documents, including environmental assessments. She has completed coursework towards earning a NEPA Certificate from Duke University's Environmental Leadership Program. In addition, Ms. Schwaller has attended several workshops sponsored by the USFWS, which focused on rare plant identification within the Carolinas. These workshops have included instruction on Schwenitz's sunflower (Helianthus schweinitzii), dwarf-flowered heartleaf (Hexastylis naniflora), bunched arrowhead (Sagittaria fasciculata), mountain sweet pitcher plant (Sarracenia jonesii), and swamp pink (Helonias bullata). APPENDIX D CORRESPONDENCE r '11V- -d;J; osstem ' J11a1 %eMenI PROGRAM July 18, 2007 Keith Pugh, P.E. City of High Point 3301 Stafford Drive High Point, NC 28208 Project: Hartley Drive Extension and Widening County: Guilford The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification/CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.neeep.net. Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the following table. Yadkin 03040101 Stream (feet) Wetlands (acres) Buffer I (Sq. Ft.) Buffer II (Sq. Ft.) Cold Cool Warm Riparian Non-Riparian Coastal Marsh Impacts 0 0 506 0 0.352 0 0 0 Credits 0 0 1,012 0 0.75 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998. If you have any questions or need additional information, please contact Kelly Williams at (919) 716-1921. Sincerely, Jam. Wit ' D. Gilmore, PE Director cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit Andy Williams, USACE-Raleigh Daryl Lamb, NCDWQ-Winston-Salem Brandon Phillips, agent File Restorutg... E ... Pro Oar Sta. S?V--o +- FWWOWRA North Carolina Ecosystem Enhancement Program, 165,2 Mail Service Center, Raleigh, NC 27699-1652 / 91 9-71 5-0476 / www.nceep.net APPENDIX E MITIGATION AND ENGINEERINGS PLANS E F CITY OF HIGH POINT DAVIDSON AND GUILFORM COUNTIES .?> -- LLV! --- Jl LOCATION: HARTLEY DRIVE FROM US 311(N. MAIN STREET) TO WESTOVER DRIVE TYPE OF WORK: GRADING, DRAINAGE, PAVING, WIDENING, SIGNING, PAVEMENT MARKING, GUARDRAIL, CULVERTS, SIGNALS, UTILITIES, AND STRUCTURE I tiles BEGIN CONSTRUCTION INGLESIDE DRIVE ,Or ojo STA. 10+48.00 o, 0 END CONSTRUCTION WESTOVER DRIVE =1° STA.I6+08.81 ul a BEGIN 9RIDGEG j? BEGIN CONSI SHADOW VAL Z D O umi n z p 0 o' a 0 v r i 0 N 0 N M 0 CL i T 3 0 0 c 0 a P z 0 Q]N L ? Q4- N/O rn C•, ST A.15+09.23 N. MAIN bIKLLI STA. 31+43.17 _L,_ STA. 12+52.11 STA. 6+05.00 W. HARTUY DR. i I Y BEGIN CONSTRUCT STA. 10+00.00 p a 5 All END CONSTRUCT CALLOWAY FAR STA. 11+70.25 END BRIDGE 6 STA.33+96.83 j ? ? END CONSTRUCTION INGLESIDE DRIVE Tp STA. 13+07.74 RL_ 9 D ? oho S1 END CONSTRUCTION N. MAIN STREET BEGIN CONSTRUCTION 8 STA. 17+44.33 Jio WESTOVER DRIVE RUCTION MAY "`11777 D _ STA. 12*54.68 3EGIN CONST o END CONSTRUCTION W. HARTLEY DRIVE STA. 10+45.16 qrTtM?' ?Sftslaq kjrr AILlRe,?,WCH STV! Ralph Nhitehead Associates CHARLOTTE, NC 28235-5624 RIGHT OF WAY PLANS FOR REVIEW 3/2"8 35624 ILA:ems VICINITY MAP W. HARTLEY DRIVE -L- STA. 70+51.79 CLEARING ON THIS PROJECT SHALL BE PREFORMED INCON4PLETE PLANS TO THE LIMITS ESTABLISHED BY METHOD H oo Nv uss roa a/w Aw-I N GRAPHIC SCALES DESIGN DATA PROJECT LENGTH 50 0 50 100 ADT 2006 = 5,400 ADT 2030 =17,500 LENGTH OF ROADWAY PROJECT = 1.465 MI PLANS DHV = 13 % 50 0 50 100 D = 55 % LENGTH OF STRUCTURES, PROJECT = 0.048 MI PROFILE (HORIZONTAL) V = 50 MPH TOTAL LENGTH OF PROJECT = 1513 Ml o 10 0 10 20 PROFILE (VERTICAL) ' TTST DUAL Prepared in the Office of: HYDRAULICS ENGINEER STV I RALPH WHITEIIEAD ASSOCIATES for 11e C11y of High Point 2046 STAMDARD SPECD7CATTONS _ P8 RIGHT OF WAY DATE., KEN HERRING, P.E. SIGALAlf! PROJELT' n+r>nrsee ROADWAY DESIGN ENGINEER LETTING DATE: _ KIT PERSIANI, P.E. PROJECT DESIGN ERGPTFR PR SIDNATUREe NOTe C m AMLlk KSIN18R7AnOl-W QIY? P P PROJECT REFERENCE NO, SHEET ND. STV/MAphWhitehead Associates 2287 2 P.O. BOX 35624 C HARLO-TE, NC 28235-56[4 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLi E PLANS DO NM USE FOR !W AWUIFITION VARIES 26.75'- 44.75' VARIES 26.75'- 44.75' ,R2 RAISED MEDIAN VARIES 4' TO 28' R2 VARIES 7.5' -10' VARIES 11.5'- 12' VARIES 11.5'- 12' VARIES VARIES VARIES 11.5'- 12' VARIES 11.5'- 12' VARIES 7.5'- 10' VARIES 0.5'- 3' 2'- 8' 2'- 20' VARIES 0.5'- 3' EXISTING r5' 1-2 -6 2' 0.75' 2' 5'-6' V-2' GROUND DEALK 0.75 SIDEWALK 1 .02 FGFr 0 02 Fr+T 0.02 FT/Fr 0.02 FTFT JpP•A . 0.02 FLFF, 0.02 Fr/FT 1Y O , S GRADE 1 EXISTING GROUND JP? S - Cl POINT \Rl 1' 1 C2 TRAFFIC T E1 01 ? Dl S ? 777 (El T TYPICAL SECTION NO. 1 -L- STA. 10+45.16 TO STA. -L- 16+10.20 -VARIABLE - -L- STA. 19+14.56 TO STA.-L- 22+00.00 W MILLING- -L- STA. 28+78.93 TO STA.-L- 31+43.17 (BEGIN BRIDGE) TRAFFIC _.._ -L- STA. 33+96.83 (END BRIDGE) TO STA. -L- 65+02.00 . ---------------------- --===?zr--- +------------------ -------- JDETAIL 'A' VARIAB 1 MILLING J (N,T.S.) VAR. MILLING USE S DAT TIE-IN IRECTED LOCATIONS AND BY ENGINEER VARIES 31'- 32.75' VARIES 31'- 39' 10, (TYPICAL DETAIL FOR ALL TYPICAL SECTIONS) 1?_ VARIES 14' TO 23.75' PAINTED MEDIAN 12' 12' _ VARIES VARIES 12' N 12' 5' h2 SIDEWALK 2' T T-8.75' T-15' -- SIDEWALK EXISTING GROUND 1? 2 i1 ,A O GRADF W i A` POINT J Pg. ' 0.02 FDFI 0.02 FT/FT 0.02 FWr FLFI 1Y .. ..., 0.02 ,SO EXISTING GROUND $ ?--- D1 C1 IC1 S T E1 DI ?E1 T EXISTING PAVEMENT VARIES 24' TO 30' TYPICAL SECTION NO. 2 -L- STA. 16+10.20 TO STA. -L- 19+14.56 -L- STA. 22+00.00 TO STA.-L- 28+78.93 SURVEY c a a iC1 3 - O 2 D1 o PAVEMENT SCHEDULE ni m PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE 2 n" U 2 l2" C1 S9.58, AT AN AVERAGE RATE OF 168 LBS. PER SD. YD. IN EACH F1 PROP APPROX 6" GOADED AGGREGATE BA G . . SE 4 SURVEY 4 EXISTIN MIN. MIN. OF TWO LAYERS. " o' a i ?ARIARIE__ MIN 3 MIN PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE C2 S9.5B, AT AN AVERAGE RATE OF 168 LBS. PER S0. YD. R1 V-6" CONCRETE CURB AND GUTTER GRADE 3 Detail Showing Method of Wedging VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.58 /E2 POINT 2 E2 o C3 AT AN AVERAGE RATE OF 112 LBS. PER SO. YD. PER 1" DEPTH, R2 2'-6" CONCRETE CURB AND GUTTER I D2 D1 CI 2 TO BE PLACED IN LAYERS NOT TO EXCEED 2.0" IN DEPTH. C3 PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE c , U1 TYPE 119.08, AT AN AVERAGE RATE OF 456 LBS. PER $Q. YD. S 4" CONCRETE SIDEWALK i a :E VAR. DEPTH INTERMEDIATE COURSE, TYPE I19.0151, AT AN AVERAGE , U 212" 3" D2 RATE OF 114 LBS. PER SQ. YD, PEA 1" DEPTH, TO BE PLACED T EARTH MATERIAL `J IN LAYERS NOT TO EXCEED 4.0 IN DEPTH. 3' 4 2 1Q" MIN. MIN. a PROP. APPROX. 6" ASPHALT CONCRETE BASE COURSE, TYPE MIN. MIN. 2 1,2" 3° bN E1 825.08, AT AN AVERAGE RATE OF 342 LBS. PER 90. YD. IN U EXISTING PAVEMENT Detail Showing Method Of Wedging MM MIN Wedging Detail For Resurfacing EACH OF TWO LAYERS. ° VA q. UEPTH ASPHALT CONCRETE BASE COURSE, TYPE S25.OB, AT Nay 'E E2 AN AVERAGE RATE OF 114 LBS. PER 80. YD. PER 1" DEPTH, TO BE PLACED IN LAYERS NOT TO EXCEED 5.5" IN DEPTH. W SEE WEDGING DETAIL (TYPICAL DETAILS FOR ALL TYPICAL SECTIONS) c N PROJECT REFERENCE N0, SHEET N0. ®S 0 BOX 3Nh 35624 iteheadAssociazes PA 2287 2-A . C.HARLLD?TE. NC 28275-5E24 ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER INCOMPLE DD Nor uSE vox E PLANS ix ACQ-MON 10, VARIES 12'- 20.75, VARIES 12' - 20.75' 10, 8' 2' 12' VARIES 0' TO 17.5' _ 12'_ 2' 8' 8' 6' ?PS PAINTED MEDIAN PS EXISTING GRADE j W GROUND iii POINT ? 1? 0.02 Fr/Fr 110 0.0-_ FT/FT _ 0.02 FDFT b.` OAB FPFT APg SD 4? A-A GROUND 6T El 01 Cl U C1 D1 El T EXISTING PAVEMENT / VARIES 0' TO 24.5' TYPICAL SECTION NO. 3 -L- STA. 65+02.00 TO STA. -L- 70+51.79 EXISTING GROUND C rn v N a 3 0 a N N a N \oa ? au nC PAVEMENT SCHEDULE PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE C1 I S8.513 , AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. IN EACH F1 PROP. APPROX. 6" GRADED AGGREGATE BASE OF TWO LAYERS. C2 PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE " S9.5B, AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. R1 V-6 CONCRETE CURB AND GUTTER VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9-.5B C3 AT AN AVERAGE RATE OF 112 LBS. PER SO. YD. PEA i" DEPTH, ' " TO BE PLACED IN LAYERS NOT TO EXCEED 2.0" IN DEPTH. H2 2 -6 CONCRETE CURB AND GUTTER Di PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 219.013, AT AN AVERAGE RATE OF 456 LBS. PER SO. YD. S CONCRETE SIDEWALK VAR. DEPTH INTERMEDIATE COURSE, TYPE I19.OB, AT AN AVERAGE D2 RATE OF 114L11 . PER N. YD. PEA 1" DEPTH, TO BE PLACED T EARTH MATERIAL IN LAYERS NOT TO EXCEED 4.0 IN DEPTH. PROP. APPROX. 6" ASPHALT CONCRETE BASE COURSE, TYPE E1 825.06, AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD. IN U EXISTING PA EACH OF TWO LAYERS. VEMENT VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE 825.08, AT E2 AN AVERAGE RATE OF 114 LBS. PER SO. YD. PER i" DEPTH, W SEE WEDGING DETAIL TO BE PLACED IN LAYERS NOT TO EXCEED 5.5" IN DEPTH. R I VARIES 26' TO 32' i VARIES 13' TO 16' VARIES 13' TO 16' 2' y GR ADE C1 ii POINT C1 1 T 0.02 FWT Al 0.02 FLFf ?c ? _ Et 01 L El EXISTING PAVEMENT L VARIES 0' TO 32' TYPICAL SECTION NO. 4 -Y1- (INGLESIDE DRIVE) STA. 10+48.00 TO STA. 13+07.74 N EXISTING GROUND fJ L 6' 24' 66' I I 4' 2' 12' 12' 2' 4'1 PS PS - --- ! GRADE i EXISTING ?Cl POINT `Cl GROUND ,0.08 FT 0.02 Fr/Fr 0.02 FTiFtDlEl 0.08 FTIFT Z•? 1 EXISTING A:1 4:1 GROUND y T El Dl T TY PICAL SECTION NO. 5 -Y2- (WESTOVER DRIVE) STA. 12+54.68 TO STA. 16+08.81 I 1 Ii 6' 10' 10' GRADE POINT 0.0,_ 8 0.02 FCfr 0.02 FW, EXISTING GROUND 4,1 1 T Fl C2 C2 ?fl TYPICAL SECTION NO. 7 N a i 0 -Y4- (CALLOWAY FARM ROAD) STA. 10+00.00 TO STA. 11+70.25 0 PAVEMENT SCHEDULE PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE Cl S9.58 , AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. IN EACH F1 PROP. APPROX. 6" GRADED AGGREGATE BASE OF TWO LAYERS. C2 PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE 1 6" CONCRETE CURB AND GUTTE ' 89.5B, AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. R 1 - R VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.58 C3 AT AN AVERAGE RATE OF 112 LBS. PER 50. YD. PER 1" DEPTH, R2 2'-6" CONCRETE CURB AND GUTTER TO BE PLACED IN LAYERS NOT TO EXCEED 2.0" IN DEPTH, PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, D1 TYPE 119.08, AT AN AVERAGE RATE OF 456 LBS. PER SO. YD. S 4" CONCRETE SIDEWALK VAR. DEPTH INTERMEDIATE COURSE, TYPE I19.OB, AT AN AVERAGE D2 RATE OF 114 LBS. PER SO. YD. PER 1" DEPTH, TO BE PLACED T EARTH MATERIAL IN LAYERS NOT TO EXCEED 4.0" IN DEPTH. PROP. APPROX. 6" ASPHALT CONCRETE BASE COURSE, TYPE E1 B25.OB, AT AN AVERAGE RATE OF 342 LBS. PER SO. YD. IN U EXISTING PAVEMENT EACH OF TWO LAYERS. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.OB, AT E2 AN AVERAGE RATE OF 114 LBS. PER SO. YD. PER 1" DEPTH, W SEE WEDGING DETAIL TO BE PLACED IN LAYERS NOT TO EXCEED 5.5" IN DEPTH. U I? EXISTING PAVEMENT 32' TYPICAL SECTION NO. 6 -Y3- (SHADOW VALLEY ROAD) STA. 12+52.17 TO STA. 15+09.23 EXISTING GROUND EXISTING GROUND PROJECT REFERENCE NO. - SHEET NO. sTV?RaIphWhihhearlAssociates 1 2287 2-B P.O. BO% 35624 CHARLOTTE, t\C 28235-5624 ROADWAY DESIGN ENGINEER PAYENE DESIGN I NEER ENGINEER INC®In E L ?I5 , 0o Nor os van e ?w nca o m EXISTING GROUND ///7 EXISTING GROUND ___ VARIES 34' TO 39 12' - 12' 6' SIDEWALK 2' VARIES 0.02 Fr/FT 0' TO 6.12' 1RIES 7.5'- 9.5' 0' TO 12' UiIES 0.5'- 3.5' 5'- 6' SIDEWALK 2' VARIES 0.02 FGfl 0' TO 11.08' 6.5' VARIES 0' TO 12' 12' VARIE? 1 0' TO 11.5' 0.02 Fr/Fr \t0 -- DUSTING 14 - GROUND •r m CL N a 0 m n 0 a ; 0 c -Y- IN. MAIN ST.) STA. 8+05.00 TO STA. 10+65.26 39.78' TO 54.32' 12' VARIES 0' TO 12' 12' 12 VARIES 2.5' TO 10.09' 57' 12' 1 I TYPICAL SECTION NO. 8 C2 E1 D1 C1 TYPICAL SECTION NO. 9 I TYPICAL SECTION NO. 10 ST'V/ R l h Whi h d PROJECT REFERENCE NO. SHEET NO. a p te ea Associates P.O. BOX 35624 2287 Z-C CHARLOTTE, NC 28235-5624 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLE n NOT USE SOR E PLANS h/W ACQUISITION i i I PAVEMENT SCHEDULE PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE C1 S9.5B, AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. IN EACH F1 PROP. APPROX. 6" GRADED AGGREGATE BASE OF TWO LAYERS. C2 PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE ' " S9.5B, AT AN AVERAGE RATE OF 168 LBS. PER S0. YD. R1 1 -6 CONCRETE CURB AND GUTTER VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9,5B C3 AT AN AVERAGE RATE OF 112 LBS. PER SO. YD. PER 1" DEPTH, ' " TO BE PLACED IN LAYERS NOT TO EXCEED 2.0" IN DEPTH. R2 -6 2 CONCRETE CURB AND GUTTER D1 PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.08, AT AN AVERAGE RATE OF 456 LBS. PER SO. YD, S 4" CONCRETE SIDEWALK VAR. DEPTH INTERMEDIATE COURSE, TYPE 119.08, AT AN AVERAGE D2 RATE OF 114 LBS. PER SO. YD. PER 1" DEPTH, TO BE PLACED " T EARTH MATERIAL IN LAYERS NOT TO EXCEED 4.0 IN DEPTH. PROPAPPROX. 6" ASPHALT CONCRETE BASE COURSE, TYPE E1 11%6B , AT AN AVERAGE HATE OF 342 LBS, PER S0. YD. IN EAOF TWO LAYERS. U EXISTING PAVEMENT VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE 826.OB, AT E2 AN AVERAGE RATE OF 114 LBS. PER S0. YD, PER 1" DEPTH, W S TO BE PLACED IN LAYERS NOT TO EXCEED 5.5" IN DEPTH. EE WEDGING DETAIL CL MILL TO 1.5" BELOW EXISTING PAVEMENT RESURFACE WITH SURFACE C APPROX. 1.5" S9.5C - 2 U STEP 1 STEP 2 DETAIL 'B' (N.T.S.) USE MILLING DETAIL ALONG N. MAIN STREET LEFT SIDE : FROM -Y- STA. 8+05.00 TO STA. 17+44.33 RIGHT SIDE: FROM -Y- STA. 9+85.00 TO STA. 15+95.00 L -Y- (N. MAIN ST.) STA. 10+65.26 TO STA. 15+00.00 VARIES 12' 12' 5.3' TO 5.7' L L 3 1 -Y- IN. MAIN ST.) STA. 15+00.00 TO STA. 17+44.33 c PROJECT REFERENCE NO. SHUT NO. LENGTH=59.,V, INV. OUf=835.0' INV. 0 0 20 40 . BOX 35624 GRAPHIC SCALE BOTTOM Of POND = 839.0 POND NO. 3: OT ' POND 84.0 F POND = 843.0 BREED BOARD FROM 1005 TOP W. 60 1?? 843 ?'' >?I 1 ? I ll 11 1 l/ H/ST ? ?f(I 111?? ? /B55 00 840.0 '?? ? I `v,h I I j j I I m v N 845.0 ? i ?? I ? ? ? ? ` ` y?•, % / I L;: . ?:? I I I 1 1 ? / ?? l 845.68' 3 0 N m N 0 a 0 0 0 0 a t rn N m ?N M o, a 0 20 40 a m POND NO m . BOTTOM OF POND = 835.0 2287 2-D I l ? ` ? I TOP OF POND = 842.0 OR ? RM' sNEE7 No. 843.0 FREE BOARD FROM 100 YR ROADWAY DESIGN HYDRAULICS STORM = 1.31 FT ? r ENGINEER ENGINEER l 1. I I I , .? fI y S7?. 840.76 FRAME 8 GRADE _ COMPLETE E P ANS 11 j i IN HP STD. W. t?ARTLEY RIVE BRICK COPING (INCIDENTAL NOT ACQUISITION 40 •00 THROAT ELEVATION =640.6' u c ? 6'CONCRETE BLOCI( ' 38 R.C. DISCHARGE PIPE ? ? ? IN=832.U ? ' • ' V ?1 ' // ?! S i.? ?/// l/? ll /' '-del 1 7 7f1,?' p N A DOWEL (L=12'8W=6'-X4 BRR) / j / / r 1 sralL , •D F ? °?- w? T0IHE BA6E ? / \ W? / //? I NVERT EIIV. =83620' CI. ELEV._835.45 / INSTALL ON FACE OF BOX THAT 9 ??' ? FACE9 CENTER OF POND. 7?SY ! 1 .ND.0 - P OM ELEVATION=835.0' d21 E?.BOIW / 4 , ICI e'CONC.9EAE WITH R4'6 12'E W ® . . PERMANENT OUTLET STRUCTURE DETAIL N0.1 OUTLZ fSEE 'D AIL IT1?'1 DETENTION BASIN 1 GRADING DETAIL 51'V/Ralph MuteheadAssociates (SEE CROSS SECTION STA. 29+00.00) ®P??OTTE,NC2823S5624 POND NO. 2 --- l??d? LEY f?IV r FREE a ?' ? BOARD FROM !00 YR ? TOP OF POND - 852 0 -------------- , STORM = 126 FT OT NQb . YR ------- _ -- STORM - 5 51 FT ,? f D I I I , ? ?' `„l 1 1 852.061 1 / _ . . I HP0ST6. I I I '11 1 3 ? I Hal ` 1 ? I II I ? 11 I ? I ? ? HARIT?cY DRIy-& 1 ? ?' I HP ST ? I 11 ? I / $4 _ 4, 3 l ?II I 840 f. 0 ? / 8 50 ? ? ? I"11 I III I ?.. I t 1 1 I // % 111 ? !,l I 1 I I l I I ? =1,85000 84 5? / 1 I / .; I ; ^ ? I / ? i 1 I / I I I I I ? -__- ? ? I / ? ? I \ 1 I I,J1 1 / ? -_- I ? / '?7 v v v I 11 ?. ?1I J I i I I f r I v / // / ?''? I III,. I 1111 1 r / v I / / INV -?839 0 / . . 6? DETENTION BASIN 2 GRADING DETAIL ? DETENTION BASIN 3 GRADING DETAIL 6xMxrc SCALE (SEE CROSS SECTION STA. 46+00.00) ? (SEE CROSS SECTION STA. 63+00.00 - 64+00.00) cawmc sc ut e _ N - -- _--_--_-- - STV I M h VA t h d A i PROJECT REFERENCE NO. SHEET NO. ? i p n e ea ssoc ates ® P.O.BOX3562} 2287 2-E i CHARLOTTE, NC 28235-5624 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER 98' 12' I compLE E PLANS J DO NOT USE FDR /R ACUUwT10N W + APPROX. TOP OF CURB Z o Oo (BACK SIDE WALL) w m ? eQ TOP OF WALL w. ? TOP OF SIDEWALK STREET SIDE c t7 ii W m wv i ( WALL) + 5-6+ 3 - r Un -"---------------- ' ---- ----------- ------ w i5 Z.q? -- ___ __--- m w wnW Z - - ---- ------------------ - _--_-_-_-.----_-_-_-_-_------_-_-_-_- _ _ _ ___ _ __ _-- _-------- -- __ __ -- -_---.----_------- .- .----- _ _ -?------- --- ELEVATION SEGMENTAL BLOCK RETAINING WALL NO.1 SEE SHEET 4 FOR LOCATION SEE WALL DETAIL 'A', THIS SHEET SIDEWALK MAINTAIN EXISTING SIDEWALK GRADE rc 6' 16.7' 6' SEGMENTAL ----- ---- j- wnu uNlrs T :. J SEGMENTAL APPROX. FINISH GRADE °e a MAINTAIN EXISTING GRADE WALL UNITS Z v (BACK SIDE WALL( v e __ _ - ?? O Q F TOP OF WALL a 6 ? 6` CRUSHED STONE m " v~i v~i LEVELING PAD DETAIL 'A' 6" CRUSHED STONE LEVELING PAD DETAIL 'B' ? TOP OF SIDEWALK n (STREET SIDE WALL( M USE DETAIL FOR RETAINING WADS N0.2 & 4 USE DETAIL FOR RETAINING WALLS N0.1 6 3 ----- ------------- -------------------- NOTES: 1. MINIMUM WALL EMBEDMENT IS 6". 2. SEE SPECIAL PROVISIONS FOR MATERIAL SPECIFICATIONS. ELEVATION 3. CONTRACTOR SHALL PROVIDE CUT SHEETS AS DIRECTED IN THE SPECIAL PROVISIONS FOR APPROVAL BY ENGINEER PRIOR TO ORDERING MATERIALS. SEGMENTAL BLOCK RETAINING WALL NO 2 4. HANDRAILS SHALL BE PROVIDED WHEN SIDEWALK IS ABOVE . WALL AND HEIGHT OF WALL EXCEEDS 30 INCHES. SEE SHEET 4 FOR LOCATION SEGMENTAL BLOCK RETAINING WALL DETAILS SEE WALL DETAIL 7, THIS SHEET (N.T.S.) 98' 21' S' ;+ Z r m h TOP OF WALL + a ?n TOP OF SIDEWALK Z d c -- - - ----------------------------- ------------------------ --- ------- --- (STREET SIDE WALL) m u~i z -- --------------- ----------- ---- ----------------- - - - - ----------------------- Z - - - - - - - - - - - - -- ---------- N b PPROX. FINISH GRADE 'D. - - - - - - - - - Z a (BACK SIDE WALL) '? w ru D ' a a SEGMENTAL BLOCK RETAINING WALL NO.3 o SEE SHEET 5 FOR LOCATION 0 c a SEE WALL DETAIL 'A', THIS SHEET a i N D ?Nt Cl O'?0 Ndy M [' o COMPUTED BY : DATE: CHECKED BY: DATE: PROJECT REFERENCE N0. SNO. NORTH q 7? gay p ®p STATE OF CA ENTA R1 1l DIVISION OF 1111 GHWA YS LIST OF PIPES, ENIDWALLS, ETC. IND WALLS i Ou m Q O ' 0 0 0 O C LASS BI R.C . PIP E 0 m _ C u u ABBREVIATIONS STATION 2 CU SS III RC . PIP E C.S . PIPE TYP E B CS . PIPE , TYPE OR IR A LUMI NIZED 57D 839 O7 x 7 = = 0 U Z Z u (UN IF55 NOT ED OTHE RWIS E) RINL ES$ N07F D O THR WISE7 OR SID. 838.11 0 ? _ 0 0 F 0 ^. Z o 0 B. CATCH BASIN 0 t7 NDPE PIPE, TYPE 5 OR D STD OR 838 80 0 FRAME AND 0 $ N.D.I. NARIOW D DR ROP INLET 0 0 . (UN . LESS STANDA 03 o Z s 0 °- Z o D.I. DROP INLET Q < < TED ° G G D I GRATED DROP INLET 0 OTHE RWISE) < 0 = a° 0 i 0 a ? u Z m , a . . . ° U N 4 0 = e m z _ C Z 0P INLET G.D.I. (N,S.I GRATED D0. SIZE g ~ ~ ' ' ' . ' ° FT. G 6 = U . N u (NAROW SLOT) 0 0 72 15 18 24 30 36 " 42 ' 60' 12' 15' IB' 24" 30' 36' 42' 48' 12' 15' IB' 21' JO' 36' 42" 68" w CU . YDS. °j A B 0 Q r C 9 t r 7 O ? J9. JUNCTION Box s p 0 u i 0 u u > S 0 z 3 M.H. MANHOLE ' u u A` p u a p = CKNE55 TORW GAUGE 2: 2: Z e e m 0 9 O 6 - y u d W 3 S j j T.B.D.I. TRAFFIC BEARING DROP INLET o 0 T n o ? TYPE OF GRAT 5 ' W T.BJ.B. TRAFFIC BEARING JUNCTION BOX Fv O E P { o N a ? Z W 6 Zi r N - U < w GGG si p e u td I . G z z z Z 0? b ?+ fu 2 Z u U E F G U U ) G 0 f f U p 0 0 V REMARKS -Y- 10+80 LT 100 101 87442 870.96 870.84 0.86 14 -T-10+R0 IT 101 703 R7d.00 870.86 869.60 0.80 155 -Y-12+35 IT 102 103 874.43 869.60 868.60 0.81 123 - - - - - - - - - - - - - - - - - -Y-13+58.20 IT 103 1 872.96 868.60 867.90 0.80 - 87 - - - - - - - - - - - - - - - - - - - - - - - - 4-11+98.64 RT 3 6 870.10 861.02 861.52 3.04 181 - - - - - - - - - - - - - - - - - - - - 1 4-13+79.98 Q 5 6 866.97 861.89 861.52 1.00 37 - - - - - - - 7 1- 13+80 RS 6 9 864.97 861.32 856.86 1.96 231 1-10+69.14 IT 1 2 873.00 869.92 866.86 2,35 130 1 1 1 -L-11+96.79 IT 2 d 869.94 866.61 860.22 3.73 192 4-13+88.87 IT d 7 86355 860.12 856.97 1.41 223 -- - - - - - - - - - - - - - - 4-16+2726 IT B 7 865.56 857.86 855.97 7.87 24 2.711 4- 16+11.6 IT 7 9 860.30 855.47 855.09 0.50 76 1-16+10.82 Ri 9 10 860.06 655.09 853.09 0.92 218 - - - - - - - - - - - - - - - - - I i 1 1 -YI-11+18.32 RT 37 835.00 831.99 629.38 2.07 126 - - - - - -YI-10+71.69 Rf 33 75 813.01 836.89 835.09 2.78 36 I 7.15 1 1 YI-10+37.11 ITT 75 843.48 B35.89 830.55 15.26 35 - - - - - - - - - - - - 7.18+30 RT 10 12 858.42 853.09 852.33 0.57 133 1 0.33 I 1 4-18+30.80 IT 11 10 858.42 854.59 854,09 0.54 92 - - - - - - - - - - - - - - - - - - 4-19+65.88 RT 12 14 858.34 862.33 9.5128 0.50 210 - 01 4-21+79.86 CL 13 14 856.78 853.70 853.03 1.56 43 1 4- 21+79.74 RT id 15 857.33 85128 85050 0.50 156 05 1 T 4.23+38,78 Ri 15 16 85563 850.60 84958 0.52 158 0.22 4- 24+99,71 Ri 16 17 856.61 819.48 847,00 1b6 149 44 26+50 RT 17 78 853 51 617 00 840 36 3 . . . .02 220 1 1.57 1 1 4- 28+70 RT 18 045.19 84036 835.00 11.3 66 - - - - - - - - - - - - - - - 4- 29+98.40 IT 19 21 839.43 836.35 827.52 5.70 755 t 1 7 -4 34+97.86 6T 25 24 826.11 819.06 818.44 1.50 10 1 2.07 1 -436+04.2.4 Ri 27 24 926.97 820.60 81954 1,00 106 I 1.33 1- 36+04.60 CL 26 27 826.90 823.62 820.85 8.71 34 1-79+0035 CL 27 29 834.21 831.13 830.70 1.W 43 4- 39+00,13 FIT 29 27 876.21 BJ0.50 820.85 3.34 189 4- 44+30.78 CL 31 33 845.93 86233 &7.70 1.54 h - - - - - - - - - - - - - -L-"+26.56 RT 32 34 864.70 841.60 840.78 1,44 57 46 4 - - - - - - - - - - - - - 1 +74.82 - RT 34 36 844.17 840.68 840.49 0.39 /9 --45+2326 Ri 36 843.06 840.39 840.00 11 1,30 30 1 1 1 4- 34+98.66 RT 24 23 826.11 819,04 818.16 1.02 59 2.07 1 1 -YI-10+71.55 IT 35 33 843.04 838.96 837.64 0,13 72 4-15+99.95 tt 14 37 841.00 839.00 837 99 1 49 156 . . 1-Q+00.35 tt 78 79 812.80 839.72 838.68 3,00 28 4-47+00.61 RT 39 41 .1.16 838.19 837.60 0.60 198 1 1 1 4- 48+98N CL 40 41 841.00 837.92 937.60 1.00 321 1 4-49+01 Rf dl 42 810.71 817.40 835.89 LOl 150 t 1 7 1 1- 50+51.30 RT 42 840.02 835.79 834.00 111 148 1 7 t 4-51+88 CL 44 46 838.94 835.86 834,86 0.99 101 4453+88.70 0. 49 46 B39.30 836.22 836.86 1.36 1 1001 1 1 1- 52+88.70 tt 46 45 838.79 BJl.66 832.18 837 30 1 -451+88 IT 43 45 838.09 835.01 87238 2.86 99 1 1 1 1 1 - T 0 261152111117124116831 0 0 0 40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4s 1361 31 91 3 1 0 1 1 Z 0 D 0 0 0 7 0 0 C a a m a m x rn 12 B N r7 0 a s a 0 D a? d N? ?o m 0 COMPUTED BY PATE; PROJECT REFERENCE NO, SHEEP NO. CHECKED BY: DA1E: STATE OF NORTH CAROLINA 2z s-e DIVIKON OF HIGHWAYS LIST OF PIPES, ENDWAIJ S, ETC. ENDWALIS 0 _ °wm n F Z F 0 0 STATION Z 21 OTi N Z 0 F Z 0 CUSS III RC. PIPE )UNLESS NDTED OTHERWISE) CS. PIPE ttPEB (UNLESS NOTED OTHRWISEI CUSS IIIR.C. PIPE C.S. PIPE, 7Y/?M ALUMINIZED ORttR S OR D HDPE PIPE, 510.883811 OR STD. 838.80 (UNLESS NOTED D u 0 Jt 00'x^ O E + ZY + O¢ 0 H °. ° RAME, GRATES AND HOOD STANDARD 840.03 € Q 9 u 0 u °o F Z 2 0 0 u o ? F O 0 = p Z p F Z ? x = 0 U °o Z n m d t; a e Z_ o d i ' Li F i 0 0 u p u 2 a ?' z ? 5 ABBREVIATIONS C.B. CATCH BASIN N.D.I. NARROW DROP INLET D.I. DROP INLET G.D.I. GRATED DROP INLET Z 0 OTHERWISE) UN, a l x o x 4? I a pp m x x n u Z 0 'd n Z ) G.D.I. M.S.) SOW SLOT SIZE Fa U 0 0 w w w 12" 15' 18" 21' " 6' 2" 0° " 5' 18' 4° 0" 6" 2° 8° 2' S' B" 1" 0.' 6' 2" 8' s s x U. YDS. n 0 F A T B 0 0 u p G Q 0 E F 0 0 _ 0 u pp F > a y S 00c W Z ? O`, O p Z I.B. JUNCTION BOX M.H. MANHOLE THICKNESS OR GAUGE c 0 $ > < G Z 0 Z Z 0 ° u 6I c x o < 0 - o w YPE OF GRATE $ a 16 c o e ? a C O 0 t c a W ° U a Q 6 Z p 6 Z y 0 0 T.B.DA. TRAFFIC BEARING DROP INLET T. JA. TRAFFIC BEARING JUNCTION BOX r - - A u € < p F x x x 0 > u 0 'a u u E F G u u S o 8 F F u u p o u REMARKS -L- 53+88.70 LT 48 45 838.90 835.82 832.18 3.68 99 1 1 1 4-52+88.60 LT 45 837.91 831.98 BW-00 1.92 72 I 0.96 1 i -L- 58+49 IT 52 53 852.60 849.52 846.82 1.00 70 1 1 1 4-58.50 RT 53 51 852.37 848.72 839.96 3.61 242 1 I i 4- 56+07.85 IT 50 51 843.68 840.60 839.98 1.00 62 I I I -L- 56+08.11 0.T 51 844,17 839.78 83815 2.32 66 I 1 I 4.62+24.33 W 55 859.95 816.43 845.68 0.69 109 1 5.00 352 1 1 4.31+5359 LT 21 83050 827.42 812.00 9.27 80 I 7 1 4.30+64.34 RT 20 833.47 830.39 809.50 698 123 1 1 1 -1-33+92.78 RT 22 24 828.16 823.91 619.79 3.89 106 1 I 1 4.34+90.66 LT 23 826.74 818.44 803.00 1.15 38 73 1 4.30 1 1 -E-16+26-05 IT Ex-0 8 867A5 861.96 858.36 7.06 51 k 61+86.18 RT 54 55 850.00 846.92 846.53 1.03 38 1 1 -L- 64+93.90 ITT 56 855.24 852.15 850.00 2.79 77 1 I -I- 26+49.91 RT 17A 17 852.00 840.92 848.75 1.00 17 1 1 -1- 34+97.86 RT 25 24 839.00 835.92 819.92 40.00 40 1 1 -L- 25+00.43 ITT 16A 16 852.93 850.63 850.54 0.50 18 i 1 4.16+49.15 IT 81 8 865.56 860.94 859.11 7.21 24 1 I 4-40+54.72 CL 3D 833.60 829.10 33.6 130 1 1 4.53+24.20 CL 47 816.50 811.30 2.60 200 1 7 -t- 66+77.66 IT 57 48 1 -L- 67+97.57 IT 58 30 1 4. 68+41.60 IT 59 30 1 -1- 69+55.62 IT 60 26 1 -1- 70+07.02 IT 61 32 1 Y4-10+75.70 IT 63 24 1 SHIT. TOTAL a 26. 0 51 0 130 200 0 : D t 0 0 0 D 0 0 D 0 0 0 D 0 0 0 0 0 0 0 1 - D 0 0 D D 11 11 / 0 0 T 0 2 6 T 1 1 TOTAL 527 298 24 1683 130 200 0 243 0 73 0 0 0 0 0 D 0 0 0 0 - o 0 0 0 0 0 D 0 6T 28.28 0 D 0 0 0 42 42 7 1 0 I 1 2 0 2 6 2 1 8 m v m a m x N O N B N 0 a 0 s v 0 0 uix e d' ?i ? mS 25 N m N M 9 a COMMUTED BY: DATE: CHECKED BY. DATE: UMMA Y O IN C EA UBIC YARDS THW RK PROJECT REFERENCE NO. SHEET NO. 2287 3-C LOCATION UNCLASSIFIED EXCAVATION UNDERCUT EMBT+20% BORROW WASTE HARTLEY DRIVE 148,241 97,041 51,200 INGLESIDE DRIVE 294 637 343 WESTOVER DRIVE 41 547 506 SHADOW VALLEY ROAD 624 624 CALLOWAY FARMS ROAD 534 20 514 C m m x N O R N B N M 0 a 0 0 0 0 0 m t N 0 N O? ? 0 nq n C L CHECKED B'!: DATE: STATE ®11' 2za? 3-0 LINE BEG. STA. EIS STA. LOCATION STRAIGHT SHOP DOUBLE X7_1 GRAD lypE 111 AT-1 TYPE 350 REMARKS C N O M I _ N 3 O N 8 N o' n m 0 a a 'o t rn 2 N B ?N Om O -, N° nC COMPUTED BY: DATE: OF NORTH CAROLINA ROIECi REFERENCE N0. SHEET NO. 'N° = DISTANCE FROM EDGE OF LANE TO FACE OF GUARDRAIL, DIVISION ?y+?1?p' . HIGHWAYS TOTAL SHOULDER WIDTH DISTANCE FROM EDGE OF TRAVEL LANE 70 SHOULDER BREAK POINT. Ap FLARE LENGTH DISTANCE FROM LAST SECTION OF PARALLEL GUARDRAIL TO ENO OF GUARDRAIL. W TOTAL WIDTH OF FLARE FROM BEGINNING OF TAPER TD END Of GUARDRAIL. G = GATING IMPACT ATiENUATOA TYPE 350 NG NON-GATING IMPACT A7TENUA700. NPE 350 GUARDRAIL SUMMARY SURVEY LENGTH ANCHORS IMPACT 0.TTENUATOR CURVED FACED 350 ND. G NG HaHley 29+51.59 31+76.95 LT 225.36 1 7 HoHlay 29+41.89 29+56.59 RT 14,70 7 Holly 29+5659 30+71.89 RT 115.30 7 Holly 33+63.05 35+00.34 RT 13789 1 1 HeMry 34+68.11 36+54.54 li 186.43 1 1 FImBy 52+00.00 55+50.00 RT 350,00 1 1 Hmlly 52+25.00 55+50.00 IT 325.00 1 1 - - -- - - - ? - _--- - HnMy 59+00,00 63+25.00 IT 425.00 i 1 Holly 65+75.00 69+25.00 RT 350.00 2 SHi. TOTAL 2114.38 .70 14 5 6 q 1 P m m COMPUTED BY: PATE: PROJECT REFERENCE NO. SHEET N0. N CHECKED ar: Dale: CITY OF 1[-??GH POINT tD ENGINEERING SERVICES NO. AMES ACREAGE TAKEN R{, IT, EASEMENT EASEMENT EASEMENT m M i w 3 N m M 0 d 0 1) a 0 a s m i N B N O?? O ? O Mho 2287 3-E RIGHT OF WAY AREA DATA PARCEL PROPERTY OWNERS N TOTAL LAC OR SF) AREA ISi.I AREA REMAINING (AC OR SFI AREA REMAINING LAC OR SF) TEMPORARY CONSTRUCTION IS.FI PERMANENT DRAINAGE (S.F.) PERIMNEM UTILITY IS F.) I NOTES 1 HOLIDAY LANES INC. 3.12 AC -- 3.12 AC -- 121 -_- 2 DBD INVESTMENT CORP 2.37 AC _ 2.37 AC 721 3 NORM MAIN PROPERTIES LLC 5.53 AC 7,490 5.36 AC 9,344 3,022 d NBT PARTNERS - HIGH POINT LLC 20A47 SF 2,311 18,136 SF _ 2,045 5 OCL REAL ESih1F LLC 19,841 SF 79,841 SF 469 b NORM PDINIE MARKEFPUCE 9.34 AC 2,745 938 AC _ 4,844 7 FOX HOLLOW LTD. 14.89 AC 3,581 14.81 AC 6,229 1,602 8 YOUNG HENS CHRISTIAN ASSN. 35.28 AC 5,213 26.60 AC _ 10.56 AC ? 19,279 77,333 _ _-- 9 HLRI SKEET CLUB MANOR 2.4 AC 790 2.38 AC - 4,990 10 11 FRANKLIN pDGE LLC R. DALE BRGT 8 JEFFERSON X. RR'g 2.94 AC 10,24 AC 303 808 2.98 AC _ 1032 AC 2,771 28,956 966 - 3,681 --- 12 BETTY L USTON 7.40 AC 7,677 7.22 15,939 668 1,448 19 AYALON SUBDMSbN OWNERS ASSOC.INC. 46.I6 AC 1,574 46.42 AC 23,883 9,789 3,962 K BILLY Y. HOOVER 7.86 AC 82,310 5.97 AC 14,821 16A52 - -_- 15 CHERYL CH4PMAN 2.69 AC 1,248 _ 2.66 AC 8,061 1,190 16 FIA0.0LD E.8 CLAUDIA WANOA McUNDLESS 30A56 SF 10,965 SF II,MS 17 RANOALL B. MOMPSON 21,7$1 SF 336 21,395 BF 1,910 18 RICK L.8 JULIE B. GRADY 1.33 AC 1.33 AC 2,816 ' 19 20 PANOALL B. iHOMP5ON GRACE Y. CECIL 9.87 AC 36,810 SF 326 3,86 AC ? ? _ 36,810 SF _ 6,515 337 TOTAL AREAS DIGITIZED FROM DRAWINGS N Ns, .o W W N $ 0 BUJ - Z 8F � NOUS .$ I Wo Op8W + ydU ® N ^Od. N(oN +Mv'^jb'bN N�.SVI(DPOOr� dNNN�7NOp � II II II II II 11 II C QO�II��lna id I i, Ns, XddVl _LJOS 7V1NOZOOH.OS6 ` m Y I BUJ - Z 8F � NOUS .$ I Op8W + + _z N� I- i = a0 N \ I N + \V ¢ :in W i, bb/LI/6 y 3S 00+d t No I . 3 r Ai wI ' 'z• s :; ud1S `1- 3 r. NnN�l�W 7 U l �•'' ! O Ir»R +ami ' r ZQ' .1 ^ __Jy r oa 01? Ob w. 1 ® ' w (av •; j yt', � i I 10 ��•0+ OYry. WF N I I /� J• $ - � _. - ... - �--. 1' m £ £Z+ w M W W I +m =p, iDO W io U Z �? UW I U O OI {O ¢ + o10 IT 30 X3,0;1 I_ r, - 0 f} --=__ - 2br+ x fI / w W o Osw Uld CSI JN I jYlOF ,bZ O p O $ F—Cc 6 a:. ;e Tb ! •'86+ 000Ncoim l: WZWW .0 N I �3Z N $bow iY N_In ¢r Imo m ItO j Ir a o or¢ -1= tea- �.oi � j<":•, I �v8� $zall- � rip Kw w =Q S;Q �G+ 03111 a - a¢o - - SIOz a 00 b8+z - o I e za �a II£t£ I IW} + Q / 4( i uo �o$wl Fo 3 po O pal;Za - a Nip R1 F II Vl�lpp0 _ Ii OUW M1 h NUa YI UN 00L b£+ w - � : N Z I'I sQ ILr _- v I II�2 to N ! wN +„ �tiZ ' w• 06 3 , M +In I� <_.. �� w £S b0'k' oW ,ZLOF 9� .'W a Y a oo 3 2g1c7 to NO t =Z 1 %� ?' \ \f J .J. �t QJ U Z 'ltta llj xj Wd ~ } i MO N, Z, Ig�,o 32,IJ! Q13cn etl jl 1 Ij (> o A$$i I°yoz I ooaczi �I O1 �ZmJ OU B. 1 S/5/ cN NUN 1H91F1,OSI � \ a o � r;`'i,. 273dV1 F nm$o �o cfa8o c$ oiq/ i f £9'90 39VoD15 NXr} 11X__ X1)11X 5, Tr NNNH 0 'GZ^I a m ,sof O (til O .y lel n J VT f4- ' -= w --S\ xn >zUz4 (z'? ;� 5 4 cEo !I 1� I��� � �1�� �/ •/, -� � � � O ��' �� XO1S Nul? 31.09/ t ooil I'-ZO lid'li / wvJi U L J: W OU ,f Ir I'�(JW I �I I \•�, u6P'bHSd-AM021-ZOZE\fo�d�fie�peoa����od46iH\Z0Z£\��''d\�N A007/RZ/t Ns, oleo -- - _z N� I- 2 nOU L ¢ :in W a 3 � X3dv1 t��u Wed mzl`n bb/LI/6 y 3S 00+d t No I . 3 r Ai wI ' 'z• s :; ud1S `1- 3 r. NnN�l�W 7 U l �•'' ! O Ir»R +ami ' r ZQ' .1 ^ __Jy r oa 01? Ob w. 1 ® ' w (av •; j yt', � i I 10 ��•0+ OYry. WF N I I /� J• $ - � _. - ... - �--. 1' m £ £Z+ w M W W I +m =p, iDO W io U Z �? UW I U O OI {O ¢ + o10 IT 30 X3,0;1 I_ r, - 0 f} --=__ - 2br+ x fI / w W o Osw Uld CSI JN I jYlOF ,bZ O p O $ F—Cc 6 a:. ;e Tb ! •'86+ 000Ncoim l: WZWW .0 N I �3Z N $bow iY N_In ¢r Imo m ItO j Ir a o or¢ -1= tea- �.oi � j<":•, I �v8� $zall- � rip Kw w =Q S;Q �G+ 03111 a - a¢o - - SIOz a 00 b8+z - o I e za �a II£t£ I IW} + Q / 4( i uo �o$wl Fo 3 po O pal;Za - a Nip R1 F II Vl�lpp0 _ Ii OUW M1 h NUa YI UN 00L b£+ w - � : N Z I'I sQ ILr _- v I II�2 to N ! wN +„ �tiZ ' w• 06 3 , M +In I� <_.. �� w £S b0'k' oW ,ZLOF 9� .'W a Y a oo 3 2g1c7 to NO t =Z 1 %� ?' \ \f J .J. �t QJ U Z 'ltta llj xj Wd ~ } i MO N, Z, Ig�,o 32,IJ! Q13cn etl jl 1 Ij (> o A$$i I°yoz I ooaczi �I O1 �ZmJ OU B. 1 S/5/ cN NUN 1H91F1,OSI � \ a o � r;`'i,. 273dV1 F nm$o �o cfa8o c$ oiq/ i f £9'90 39VoD15 NXr} 11X__ X1)11X 5, Tr NNNH 0 'GZ^I a m ,sof O (til O .y lel n J VT f4- ' -= w --S\ xn >zUz4 (z'? ;� 5 4 cEo !I 1� I��� � �1�� �/ •/, -� � � � O ��' �� XO1S Nul? 31.09/ t ooil I'-ZO lid'li / wvJi U L J: W OU ,f Ir I'�(JW I �I I \•�, u6P'bHSd-AM021-ZOZE\fo�d�fie�peoa����od46iH\Z0Z£\��''d\�N A007/RZ/t e ° PROJECT REFERENCE NO. SHEET NO. STV(Ralph VAnteheadAssociates 228 3 P.O. BOX 35624 G S.S,E. EzisTNC 5'ss.E CHARLOTTE, NC 282356624 RAY SHEET No. DRAWN fflOM ROADWAY DESIGN HYDRAIRICS PB = Ii6 SEE SHEET 10 FOR PROFILE ENGINEER ENGINEER URVE ! P1 STA 21+59 27 O DRAWN FROM DRAW Pa : u6 P== 96E --` PG = 96 o u w rro E_---` INC®M?LE E PLANS ATIgJ UO NQT IIBE PQit /W ACQNBRIDN X . . = 23'23'46 03' ] . LOC AppgO GRAPHIC SCALE rwi suRVEYED D . D =2'51'53.24' L = 816 68' FoX Na.LOw LTD -?-`'--- -- -` _ - E ~\ ` - ,'r ` . T =4 R = 2 000 NO • I80002990000100012 08 - 3383 -?_ - p\ E EX N - ' SE 0.0320 P6 : 0986 BASE IST 4- •..,,•... - . kE XISTING LS'S.$.E. N 1 O - rOG DENS CHRISTIAN ASSN. / PIDID = 18000291IIO 0000100021 PB = D lir PO _ 110 DRAWN FROM PB = 16 PC = 96 - ?? I `-1 I?CRI SKEET CLUB 010002 Pib 180002940000100020 = PB 116 LIN RIDGE j LOT B LLC FRAM( PID - 180002 40000100002 PB : a6 j ? 1 I f I 1 P = 96 L ? LOT B ? _Ir li I- PC 46 L01 A / J t ? I I 1 p )' r L r '0I i; vA?W ?W/ PROPOSED SECME TN BLOCK D r ROCK WALL TO BE RELOCATED BY OTHERS ' ? RETAINING WALL N S1 y.? z DETAILS ON SNEE 2fE - P , ` jl? •T r CONSTRUCT 2'BASE DITCH .. ;® X 1 T FROM STA,31+00 -.- DTn \ TO STA.32+50 (SE CROSS SECTIONS) r! E 4 a, 5 ?\ 6 EXISTING B UTILITY EASEIdENi W } / " L EXISTING I S.E BEGIN BRIDGE DRAWN Fa0M5. 4 ''c 45 R/W NEw . FROM DRA ! Pa : "IS - ,•, '? MEW 45'R/W I ' ; f it11 Y DR. STA 31+4311 Pe =116 2' 'h ` {.. , ?) r ',I + 7! I 5 CONC SIDEWAL( + oao r I!Lf' 7200?"? S 2 6 C&G L< „ n ti I 5 CONC. SID ALW I -6 C&G a r Pc 96 = 3 (+?.ao- EXISTING 15' ~G )1. & 11000',' )f 5' CONC 51DE49ALK " unulr EASEMENT +75.00 r 'PAWN FROM S I ! Iz,,1 ' i 2 6C&G 650 ^..s ?. c.:+I 30; DS 47b N,"3$w6. _ 62,°' 6200 '- + p '';? +900 '? 4500' {c,; 72 D° 1 °+3000 ° 7 74 oD - 7000 =? 139.W 00' 1 L`? 120 16 PDE P c ,I N 7D 00' 1 PB(.:196 E T? ,,. +''J9P5 EXIIS t 24' CSP y ?STI-C . SB. W 62°0 I".e _ -,520Q': "1 REMOVE 50.00' ) 6 5000`+ .°° g'Ay r 8300 ` UTILITY EASEMEN DRAWN FROM = to 70 +29.43 52 °67.00 PG I°5 E?: A T01 ? -1.00 y 00 /'F I F IS CSP +75 o . 4 /2 ELBOWS 4.099 + E REMOVE v? I + :: ? CURUE 6.6 0 -- p ?- 8 R= S?AN CONC O 1 + O AR D T --HP STD.... : I D 1 7849'24TW HP BTO , AEMO- F , N r/ ?' S ._. 401.00 IT ..__ . 401.00 r `'{ REMOVE -. - 4 5, , / i n 23 Z '' STD 0 ' • / ' . ass; -'x x _.- ?' ? .•., .; 1215 I / ., _ N M '?., 18 ; PIPE ? / y I E ? E r F / / W 24 Z +.0o _ 5 ; d64T _ .. -__ -160- -- O +6000 E ? N 24 N ? ° E +70.00 + 00 HP STD . L V 50.00 54 W' 40 1.00 +t. +55-00 H40 P DO STD. 2-6 'C&C F5 50.00' .1 9 63 Da 1 , +4s.ao S CONC. SIDEWALK HP STD 4 ? ? D? ITA qqq,?pp O +00.00 52..00 56.00' .40.00 +60.00 58.°0 56 38' 4 ? +52.00' . . r.. - ° ^.,• , -'{-? W 55.00' / 4 S, y +650° I "I'• F?? \? Z +4'00 r /? / 15, CSP .05.0.0' \ P D. 44 94 I \ J I = 2 SdDD 08.00 63.00' I r j a6i ? ? , HP STD 5'CONC, 40800 SIDEWALK ?• Irv:: ? ; E l . / / w / W 2 ELBOWS +70.4.0 v \ __F 40.00 +1ono 'r \ Y/ // rT ?/ P 45.00• m g u0.0.0' ? \ ? /LEVEL ? / ? ?? - PDE ° ? 76 ?i`??1 / . - ; . ? _ y o PDE 15, CSP r F 1 f? sd SPREADER \ - TO BE RELOCATED BY OTHERS CONTRACTOR SHALL ADJUST ' o / / Q _ +65.00 W/2 ELBOWS m HP STD. D Two PDE- E I I ?I l: 109.'0 40100 HP STD. °3.00 J 408 00 W -: '? r ALIGNMENT OF 5 SIDEWALK o AS NEEDED TO AVOID CONFLICTS . fe o I 113 DD' + 5 0 O J / 270 P ' s ro WITH EXISTING POLES o / y . TA 270 TAPER ER LEFT AN RIGHT 15°.°4; I vi l f' LEFT AND RIG 00.00 ° r 1 5 + J t +d0 ? !, EXlsilNG ' PROPOSED / S.E. END BRIDGE Bt.ao' 15000 6 ? DETENTION aswfiR ^"q?yy ?g HARTLEY DR. STA W BASIN NO. ?/e ;. T //b // 9+96 'R s DITCH / ' CONS RUCT 2 BA T SE ` 1r :, ,S; 4_. .............. - , F. Y / . (SEE SHEET 2D) ro'NC MEWS cNwsnax ASSN. \ /L . F 1, P6 = 180002940000100020 M A. + .? „? ,' W I -/ /• Pa = oo TO STA. 34+50 PLOT 105 (SEE CROSS SECTIONS) ' A I ?! r BRIDGE SKETCH SHOWING THE RELATIONSHIP BETWEEN n - YOUNG HENS CHg1$i1010 ASSN. PID = leoooz9looooaooo3 DB = 2335 P ( m - THE BRIDGE AND THE PAVEMENT BEGIN APPROACH SLAB c = 532 BEGIN BRIDGE W. HARTLEY DR. STA 31+I8A W. HARTLEY DR. c'• r SIDEWALK 50' STA 31+4317 50, SIDEWALK APPROACH S A o L a END B SIDE WALK -- -"- TAPER - . R W. HARTLEY DR. TAPER 3- Q pp + r + nPEaR 5.5' STA 34+21,83 N N p T E-411 Q a 4- 4? C 6 ~ 21$' N It' =F* 76492416'W in f N ?? N b . r - 50' n 5.5' TYPE -IU m a, `° SIDEWALK END BRIDGE ur_t TAPER W. HARTLEY DR. O 50' N a STA 33+9683 o SIDEWALK N m ME + TAPER + + rr PROJECT REFERENCE NO. SHEET NO. P STY/ Ralph Whitehead Associates 2287 6 m ® P.O. BOX 35624 CHARLOTTE, NC 282355624 RW SHEET NO. SEE SHEET 11 FOR W. HARTLEY DR. PROFILE R?ENCR4E GN ENGINEER SEE SHEET 14 FOR INGLESIDE DR. PROFILE CURE 2 CURVE 3 D u s0 m0 PI 57239+26.21 +1 STA. 47 P! .4 .27 !4 F INC®MPLE E PLANS D = 3'41'4 ).41' D = 3'41'47.41' =7*10' 52 .16' d = 7'!0' D =2'51'53 29' cBAPwe scae II w Nox use FOR /e ACQ--c44 L = 651.60, T = /. 330. 550'550' R = 0 SE = 0.0355 . L = 250.67' T R = .50'' = 25 2.000.000'' SE = 0 0320 >\ R DALE BRITT 6 JEFFERSON H RIVES PID = ISDO02940000100022 / = o PB If RO 162' . RO = 197' / Pc = ws LOT c +54.63 CURVE Y(-( CURVE YI-2 E 22719' o'R 47NON-EXCLUSIVE r-.-._ P( STA.ll+19.27 ' ' ' -1+89.49 PI k I ' • +57.25 +3 '? 241.p1' 216 48' '' S' ELLE iYP /EASEMENT NORTH STATE COMMUNICATIONS DRAWN FROM d = 26 05 0$.23 d = 1457 11.07 ' ' . D - 183T02.OP ' D = 12 27 55.83' ' +2778 J ' y L - 76.97 T =150.65' L = 11996 T = 60.32' 219 69 PROP. SANITARY SEWER RELOCATION a 30' z 30' EncwsvE EASEMENT R - 301.76' R = 459.63 SEE SHEET UC- I FOR DETAILS STRUCT 2' E D}'fC NORTH STATE COMMUNICATIONS WNPROM SE= MATCH EXISTING SE MATCH EXISTING R0 - N/A R6 = N/A 13 FROM TA.r+50 DRA PB:I55 AVALON SUBDIVISION T STA,/ 7+OD PC:26 - zw ( OWNERS ASSOCIATION IN (SEE CR BEGIN CONSTRUCTION PB = 151 S $ TDNS) ("• 450 = e` a6 INGLESIDE DRIVE r5 / ' 189 STA 10+46.00 +4 Op 23.47' / +et / CONSTRUCT 2'BASE DITCH O OUNG MENS CHRISTIAN ASSN 17841n .52. 7 m 181'17 1e6e6' UTILITY 5' FROM STA. 46+00 DRAWN EASEMENT \ gp 7p OA0.WN FROM TO STA. QT+DD pg \ '\ 16.69 = RELAY 24' C tl' I (SEE CROSS SECTIONS) 155 P5 = . 18000294000010008 W Pc = z 6 HP STD. O \ n.p p' PB > 10 PC =IDs 0000 716,00 A 4 73 +74.5 \ 11 87.60' 5' CONC SIDF,WALK POT W. HARTLEY DR. 40 1.00 T9 %J&p r 67 +88' STA 45+02 74= +84 / IT e % +5516 +00.00 4499 88.0°' +4626 ! . . 65AO' ?5D° s 5' MDNOLt HIC INGLESIDE DR. ' / 32 . CONC ISLND REMOVE CB " i :X// ` P'T?SY S7A 12'10683 1 83 00' l +00. 4 , . G 6500 '.I ? . +00.00 +00.00 +0.10 50,00 26. 800° ' o oo 10 00 ? l C 5'CONC SIDEWALK NCDOT . ~ m , +25.0° r 95.66 4499' +00.00 +0000 +4u7 u.9o' , ? 360a \ F 6o.aa TIRO ' \ f!i . 120.00' +pp 401.00 2'-6'C&G 4s.6o E A7 +63 00 ? +n 5 0°' 73 f 07,27 80. 705.00' E 00 iL +50 ExISTINC 15 UT?SEMEN pS B : l0 Pc = O : . , - --?? 1 +OOAO n PD +420 AV ION Lrv P I DO ? - .'.. ?? 6500' - - 1 . 6p.DD' i T HP O. i? DAAYIN fR 1 C&G' _ K. ?z° F I- ?j 9 a-5 02 PO BI ?JN IZ 401.0? 350 0 OgOA 28 N L- it N +E 41.99' I - N W HART LEY DR \ \ vt . . 0 6T W GE \ a / _, ` u 7 + .?' :: :,. _....,. i - ^ } '\pDF H '? C ad N+ 75 ?' -852 / 4a1PE MEr i 55.15' \ uWr 6 62 c I 559 e5 A 66m H ' a I F 29 . . ? L m + I + 45.01' ^O c :., 31 ; P STD 45.01 N N ' a N Ml d + N m 1?-a 26 N - O - .. Ir05' _.... / 2 24.4 . Ib• •.. O - ? r } Y W N ?m + - ? , 4b !2. la. !l+9 5 w F 0 ? om + + N „. {' HP TD ? I )+ F Hk :.. ? s C + 27 ?+ ?" 401 00 R? - 2 00.00 ... ' 6 w' , v SIOEWA R M C?. 00NC.5)D WALK .. 5 J 2 E: 6 .4 z. 7 + 82 00 .• o + o' F `E eoo ' ' AL K E O ? :T5 2'-6'C&G Z 5° TD - HP S 1 C ?. C&G -6 -:,2 K ID N °o 0 0. b ' ® • 5 r a HP ? 6 o - . o 401.00 + y +65.00 r:, I 51 06 ' Y , HP D. a 32 N +00 ti tnl Il?o '? 401 00 ' t + . p 0 5 O+ L ? N 4 N / ? . C, 00 1EFT 7 N-Y;AP 8500 ___ C /.eti '- J 1 Y JI 500' + J ?/'N +5 00 0 ' 61 \ / 1' 800° 6501' ., ,: `C V' , +64.00 +17 1 - n 22- AY ;. 1 L ??? C NE J N, +0656: n/ +14.76 7678 ' - ' . + 91.00' i 70° 4501 6 fT 1 e t - N RN TU HP STD I ' f .' z } y +97.52 D FIGFR- i , 90 00' A ; y 1 .r/ 't0 9522 05 , rv;,:/ i loe.32 M . +81 89 • ANE / + h .74 401.00 ; +7 b L/ 5 ? -.? A ? \ . .Ia.OO R LE . BC&? :.71.35' J \ s ?\\ NZ. \ 4 PT STa.1 +4912 /5a.9r F / ' / U r `?> r r? f6 PALE PANSp'RETAINING WALL S74EETS SI Sz PROP. 48' CHAIN LINK FENCE 4V? ' Z C 5 CON \ V A . +00.00 SIOEWA NCDOT:STD. 866,01 (; -? v ?_ ' ? C LN ' ,77 P 48CHAIN Lh FENCE T , ? t 23.61' -1 Z 1? /,NCDO,T STD. 866.0?y REMDVECB ' u PROP ./ ANITARY SEWER REL in SEE- EET UC-I FOR DETAI +_16Z OCATION N 1 h65?pa 400 d,/ ry' •r/ -L + LS a ' P 7.60 mo F / pO o Q { ®AGi a END CONSTRUCTION /. / CONSTRUCT CONC. V-DITCH FROM STA 35+00 INGLESIDE DRN 'o STA !3+07.74 ,-wr` 12 1 7 A ? 1 + ?1 . 37+ T ST 0 , r / ,?' N + 4=; ?¢ I A. O 0 (SEE CROSS SECTIONS AND ? ? ! . usroN Berry L ?S,,,,PROPOSED PID = 180004950000 ' STANDARD DWG NO. 850.01) 100081 DETENTION PB = IA /C NO.2 pG = Ios i I p -f l " ` j T l h= BASIN , _ LOT D (SEE 02 r SHEET 2D) C YOUNG MENS CHRISTIAN ASSN. PID = 18000294o00O1DOO24 BRLY V HOOVER " = - a PC = 105 LOTH . / ,y' rL i PEI = 151 ? f . PG = 91 a i a I o c ' A l° l to r d c r` W. HARTLEY DR,/ INGLESIDE DR. HARTLEY 2O 1 J. HUT a030 C r .3 PROIECf REFERENCE NO. SHEET N0. ?STVIBe3 Whitehead Associates 228 7 r CHARLOTTE, / %35624 5624 l CH4RLOTTE, NC 282355624 tW SHEET No. ROADWAY DESIGN HYDRAULICS / \ \ SEE SHEET 12 FOR PROFILE ENGINEER ENGINEER \ ORaM7gRY f ?,.. 0 25 50 !m 3 Fgaa lie SFWR °\? \ w o / cRAmHx SCALE INC®MPLE B PQ ANS Ni - ( 00 NOT tISE POR /W ACQVIEtTION GflA°H2 SC Plf E'E.ILE. TYP':' J J) ) y Ci I , AVALON SUBOIVISICN ONNERS ASSOLNIION INC ( ?. •,` P6:5 1 { . W Vl W W H O O O Z 0 F h J z x u ?a TO W N W W N z 0 h N I W Z x H L C V I a 3 O 0 fµ ry- _ t '. W. HART??LppEY DR. / WESTOVER DR, 7R0 OHM' N/A a 3 3!!::°o? 00 2006 2030 ADr 2 46b6- WE570?ER CONSTRUCT V-DITCH STA 16+2956 FROM STA. 61+00 TO STA.62+50 0 5, BEGIN CONSTRUCTION fSEE CROSS SECTIONS) SHADOW VALLEY ROAD ' r STA 12+52'!7 X10„ ,7,,? _ ra 3 .4 E D l;A W. HARTLEY DR. 1 SHADOW VALLEY RD. N/A K u/_ q ? pie t lw 3 ' 39?yi ?/?/TJ1p' T f 1 Nq1?p LO N/q 2006 2030 ALIT PDT W. HARTLEY DR. y sra s + - ~"' PROJECT REFERENCE N0. SHEET N0. 2287 8 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE E PLANS DO NOY UBE FOR /W ACQUIS _ ® STV! Ralph Whitehead Associates P.0.60%35624 CHARLOTTE, NC 28235-5624 SEE SHEET 13 FOR HARTLEY DR. PROFILE SEE SHEET 14 FOR WESTOVER DR. PROFILE SEE SHEET 14 FOR SHADOW VALLEY RD. PROFILE SEE SHEET 14 FOR CALLOWAY FARMS RD. PROFILE 0 PS 50 OJ GRAPH? IC SCALE ) a - 2ea.m NS7RUCTlON _ SHADOW VALLEY ROAD +54 R n ! STA 115+0923 CONSTRUCT DITCHr I T ` l 11 ,e!t m I? ROM STA.66+00 TO STA.70+50 ,'ISEE CROSS SECTIONS) I c , I ,L I l 940+ I ?? / iQ l?? ? -, 17908 BEGIN :RUCTION T ' I x :'" P7 ; ti' CNl AY FARM ROAD J o dH ,? s7o. Ia+2 srA 0+00,00 I L 4 e.? e ? I6 9A f e'1 •?.??` 'l ry IA???OS AROLD 6 C411101A NAND 1 1 g„° 6A +vlo I AO?ooa4 CURVE 5 14 I G S L7 A r L _ b 0 ?' , A ' Pe Pl ST A. 65+88.488.97 - ,,., // ( 1 b / S !• i9: Pc IDO i P =20'549' D -3'34'51.55' ., ( +00 0 / 7 tY\ LOT 4 ??--- r - a Z` o ! 1, 4 4+ ! 1 67.00 ' T 2583.12' ' E\ o. / I I S y? O1Z I I l+ooo , R=1.600' 5' CONC. SIDEWALK 150' LEFT TURN TAP R +' 206' T - R. r 1 t 57 3629 I: ?' ,? -+'bs D? lr? TORAL 5 l uv /. pp 55-0 1599.0] ' ti r u R w ,? B ' oD +40 DD ?? _ 0 ?•. =25 aor O = & 64' 2'-6'C&G T- AT 7UR S --------- ------ _ ?F GRyll-350; o. P.kO'?M.yL m / 4 p_6 l 63 'o, s I g Pio =Eaooeaoooao7 CURVE Y2-1 1T 7/? ,. 1 +00.00 Pe =6 P1STA. 14+69,31 , CRAbY AICR L & JULIE B?; PIDi lO i fl - 9'D5'54,94'? N h h ACdOT N ?- m m ^t ° r PID - IPBAOfi 00005 O w n o r,•, I .+7 . p ' PG 100 T - 256. 4, !m? s C N 7? SY 313'W B. 5' I I I y r. b D i- + - t. H 8. _ o e I 3 "4? ss.w sa ao ! ! LOT 666 = ,600' m f In Tn + ti / / SE MATCH EXISTING O .' Ay 896 0 UR?£ 5 8T15'2a R r +7s oD ? HP STD. ? r /w. ,. de 7a ? ? ,G RO=N/A N 401.00 ?' [f '`, b l Z o;,,.r~ of 5 O? :.^,58 ,!- 1 ?.` y,6 71 ,a 90'00' CURVE Y3-1 O - _ r' ru rp .. +7 0 N 5656'38.4W PI 3rro y p'.. $TA1168.50 NOLITHIC E C NC IS I,Atvfl y" xP$ - a . ? ?.; ? 2 6 G&G \ Pm tO ?I ?l v yew:, ? /TU??Sg ? y . y 9- , - C ? D 2245662 + 00 C?? HIV 54 F 55 l ?? r .,Y?? D" F ?? 1 54DP, '?' T =16930 5 C ®C SIpEWAtK _ 15 IS 1 , ¢ r + ?bV 4 0 1 v2}5g0,?0o7 t ?.., _ MAT SE H EXISTING CONSTRUCT V DITCH R- 0 ', c -' •' - 'i d c B RO=N/A ? Fgg60MM,?ST4?6Tf+50 T HP STD.' 2' 16 s '( m }' +asssar?; +3s.aD Jq,R? s 1-..N +ano J i CURVE Y4-1 = STgfp.l+50 SEE 63.@ 3soo r BaoD o 61' q,7s U .408.00 0 w ?J' G3 1 r 109.60' A r Pl ST33 9.61 R S?SECTONS1 z.. m L. `Y16.56 8 ?` ? ,I ENITCDNSTR a 3 UCTION ° ,?..; / ` ?t36.z' ,+ fI +do.o0 F- I IN I j D _38'11'49.87' 4N - 35 00' + 0 00 o b L = 99.65' WES7OVEF DRNE ppS sooo 3oos'fp' T _ 5(74' 5 ;16+08.8! a r POC W. HARTLEY DR E SE _ M "'; 0? / +43z4 pOF S.TA 66+7731= _?7d.00' ? ATCH EXISTING ;,. 22 w' CA LOWAY FARM gyp. +DO.ao E E? 3 o ( RO = N/A +91.70 92.00' vydT F ?, P ?A A / / ti , R +DSZd STA. !1 o 1. 1? 3' ," O 153.83 4.°ACR' S P$ 0 '-? C END CONSTRUCTION ?? V ao.DD F C, N I f , I ? ? n . Q wT GALLOWAY fARMAD 46.00' POSED " STA 11+7025 PRO DETENTION ti POC W. HARTLEY DR. x r + d.oo BASIN N0.3 a A 65 F45_31_ .._- ? soo 30-22 (SEE SHEET 20) SHADOW VALLEY RD. + °' d4.00 STA 15+30.06^- m ENO CONSTRUCT ON W. HARTLEY DRIVE STA70+5179 CHAPMAN CHERYL PID : IDOBA00000320 e = 1181 PC •.1207 - 9 N &U IHOAPSON RANDALL B PID - IOOBAD000032C iA d R A TT /'% ` ,? - OB = 595 ?, l• '? W / i// ' . n PO =360 v <) 2 41 BEGIN CONSTRUCTION WL51UVER DRIVE STA12+54b8 5v Ii L !`lti a i f o ter;' 60 THOLIPSON RANDALL a y "? n 1 P 111) =111BA000OO3x 00 0? OB I086 2 PC = 1207 I 2 / N PROPOSED PAVEMENT REMOVAL nz ?- INCOPIPLE E PLANS DO NOT USE FOR /M ACQUISITION' PRELIMINA RY PLANS DO NOT USE FOR CONS[RUCnON PROJECT REFERENCE NO. SHEET NO. 2287 1 DADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INC®MPLE E PLANS W Noi - - /W AC =TlON PRELIMINA RY PLANS DO NOi USE FO CONMUC- 910: _ '. 910 900 ,. 900 890 890 aao 880 ILI 870 y W . -. : a7o °o PROPOSED' PI = 27+23.00 860 _ N GRADE EL - 85325, VC = J6 0, n , = e5 K 860 - - - 850 0 - -- ---- ----- ------- ------ -- - - -.0.7498% ---- r9e - osz - GS ? 850 ? Z EXISTING GRADE 2 - CONSTRUCT SPECIAL °o V-DITCH '(SEE CROSS o c\j ??? \\ I W - 840 SECTIONS) ? ? BEGIN BRIDGE y u z N _ o ? N STA. 3I+43.17 ' PI 34+30.00 = , : ur 840 m W W h EL= 818.04' VC = 820 y W \ E ND BRIDGE K = % 0 830 STA 33 +96.83 ° - 830 820 \\ 0 F Q J49 ego y END DITCH STA33+00 RT. 31 3/ i +)3552j S 810 o \ 9 E E s o 7 \\ IZ L v ll. o op x 810 800 x o f 800 o g o ' ' STA.33+40.72 _. a ro z oo° BEGIN DITCH RT 790 w d ?u ti , + o . STA 34+50 co W o oQ °j ELEV. 822.00. 790 a CONSTRUCT SPECIAL zt J CONSTRUCT SPECIAL m 2'BASE DITCH (SEE . w (4 w 2'8ASE DITCH !SEE 780 CROSS SECTIONS) CROSS SECTIONS) a _ .. - - - - - - - STA 32+19.55 780 m 770 a _ ... -: 770 4 760 ' - . ,... 760 750 0 .. . ,,. , 750 . . N_ N ? . .... . 740 US to Ul In N co 7 ? O V Q Q ? ? co, - ?- TO c0 c0 CO. Q0 ?Q co co P Q3 co C CO CO co n M CO co CQ co CO N N N N DO ro 40 22 23 24 25 26 27 28 29 30 31 32 33 34 35 , 7 940_ 930 -L- W. HARTLEY DRIVE ® STV/ Ralph Whitehead Associates P.O.80%35624 CHARLOTTE, NC 28235-5624 PROJECT REFERENCE NO. SHEET NO. --830- --820- -- 810---- -.80G ._. _..790._... _. m a o --76.0.-- _ 0 I ..... -7.50..: pN N h 1? N N V IO 0 c\j Co CU n CID 'ID CD ;Z 35 36 37 38 39 INCOMPLE E PLANS OO NOT USE FOR /W ACOUISITION PRELIMIN RY PLANS DO NOT USE PO CONSTRUCTION _ .!.. 410.._... 400..- 880._.. P1= 42+30.00 W EL = 846.46' VC = 400 M 870... EXISTING K = 93 w O o GRADE W N a -__850 5520 +)3 -107500% . Z 0 840.. 650(, \ w (STING 8° ROPOSED PROPOSED GRADE 1 y J' NlTARY SEWER 42°RCP END DITCH LT. - Z STA 46+00 ELEV.834.00 _ CONSTRUCT SPECIAL 2' BASE. DITCH FS EE CROSS: SECTIONS( 820.._ BEGIN DITCH. LT. STA. 4T+00 ELEV.840.50 _810 80.0 790 770.._ - _75Q. _. N C) R P ni 63 . w 7 P CO CD uj L6 P @ v v W Co v M ?i N P Cc Cc 10 CO CO ?. Co OQ oo Cc Cc 740 40 41 42 43 44 45 46 47 P P 740 TV/ Ralph itehead suciates PROJECT REFERENCE N0. SHEET NO. 228 12 --- -- : L? ,I1I HART [? G 1/ DR IVE ARLOTTE , C282355 ROADWAY DESIGN HYDRAULICS . @1GINEER ENGINEER 930 -> IN C®MPLR DO NOT USE FOR $ PLANS /m -0-ITION PRELIMIN RY PLANS 920 , DO NOT use CONMUCTION 910 I - 910 00 900 890 890 880 _ 880 - y 870 P = 60+59 o N ., 660.2 W 870 EXl 71NG = 88 0 860 GRI DE z 860 s .' +)3b25T 850 54+33 00 o L = 837.4 ' - i C = 98a 850 o 840 ° ? W \ z v 840 257% 6 3 ? Z l-10.75 % , 1 / P POSED F 830 ° GRA DE. . ? H ---- 830 820 820 8 O .. PROP " SED 60 R 810 (STING 1 8 S ITARY S ER 800 0 70 780 . . 3 80 N 70 0 - 0 a o 60 - _ 60 0 m 750 N 50 0., N 4 , q v v -? v M P P M? 47 48 49 50 51 p 52 53 54 V 0 55 56 57 58 59 60 P P :. . _ - 940 PROJECT REFERENCE NO. SHEET NO. N .. . .. STV/Mph Whitehead Associates 2287 13 P.O. p D C BOX 35624 _L_ {?,' HARTLEY D IVE ® ROADWAY DE IGN HYDRAULICS R . 1,. CHARLOTTE, NC 28235-5624 ENGINEER ENGINEER 930 .. INCOMPLE E PLANS ?.. .:. .. .._.. - DO NOE UbE FOR /W ACPNbiT1UN . PRELIMINA 00 NVE USE PU RY PLANS CONSTRUCTIUN i 0 0 0 0 0 o O o o 10, o 0 0 0 0 0 p o c Z O. c» OD do OO N 1O O 00 to OD Cl) O 00 O 00 N 10 00 In 00 `Q 00 00 M 00 N �- 00 O P P �Z zF 77 r o0 II ILII 20 JU. U' ¢ted ' I 2Q �Y WUI� f 6'L68 aG �u 4510 o a U Oc w CO Oot. iu ®� if J 25668 w ��d o ;Y Cl) Z o �W `"go aCN W J . C.3bN o / J ' Cl) � w3 0 �W o - W N Nz W U� Q.Swm - m� J ❑ LLJ � O i Wc� : - .... M W p,. 9L'B98 Q. oD, W 3 J N s oss i I i O r 10, r o0 II ILII 20 JU. U' ¢ted ' I 2Q �Y WUI� f 6'L68 o a O r 10, r ' I f 6'L68 o a U w CO J 25668 ��d o ;Y Cl) Z C.3bN Cl) o - W N �b LLJ i oD, N i I I O O O O O O O p 00 OD 00 00 00Go co ONO 00 000 66/9Z/5 u6p•bl lid -AMou-,'OZ£\fo.ad\fionpoo.a\pu:ody6:y\Z0Z£\fo..d\:u 0- 1 1 STV/Ralph Whitehead Associates PROJECT REfFRENCE N0. SHEET NO. 228 15 _1 ! 1 P.O. BOX 35624 CHARLOTTE, NC 282355624 RAY SHEET NO. ROADWAY DESIGN HYDRAULICS ° ENGINEER ENGINEER INC®MPLE E PLANS DO NOT USE Fro CaNSTRUCTION l BEGIN CR4- i. JZ / \ 1 ' ^ ( STAID+1694; A12 5231 \ ! / , J' I I i ,f ?C PT Sta. 11+67.76 TO BE87A CR3' o END -CR4- LSTAII+00.00 o ; t STA12+66.46 m PT Sta.10+96.44 S .... - ,, PC Stallwo.`b,. . W. HARTLEY DR. PC Sta.11+00,00 L y POT,Sia./0+pp? BEGIN -CPI- ' STAR+00,00 d/ - - END?CR2- C Sta. ItLlDUS, E STA12 +70.57 L CV SYa END -CRl_ /1+9684 g ?qC Sta. 1lvoo00 ' STA11+9684: it p 8591N'-?R2 a J W 1 , ,? ?; STAJOt&20 a ;? . 1 / C. X13, 4, 61 : ;. ?n? ?? !0X, Sy° /?xgb.$ 2 0 107- / Q 1 C o W. RTLE DRIV NGL SIDE RIVE W. HART L Y DRI EIN LESIDE DRIVE W. HAR LEY D 1 IVEIN 17 LESI E DRIVE W HAR LEY D IVEIN LESI E DRIVE J ORTH T C ? RNE (-CR1) ORT WEST CORN R (-C -) SOU HWES COR ER (- R3-) . SOUTHEAST CORI ER (-I--R4-) C? A 70 N @ N 8 c N ° PI - 11+67.41 T g ° ! P EL = 84355 ' a o pl = 11 17 52 n SAO VC 26' 4- : ^ L v d ro ud 1 pEL= VC = 3.3b 66' NN ? U ? df \? v ow. EL= 6 4383'. E =845 -99 ? ? Nrn dv 8 50 ? 4 ? ? N VC - 20'P1= +57 28 C - 20. m_ . .......... D1 - 1.1 850 ? w 850 ROPOSE EDGE z P = 10+42. _ EL , 845.37 a 2200' m - w 1 40 +)30799/. ,-?' ?„(-J e m ?582 w o ?w F PAVE ENT ?? W W o W ¢ ° _ C- 44' w 7z! w 0 . 2 % . Z W S W +1OD200' 3% 4w 3 4 +1093 ' 9% ? 8 40 P!- O 500 f-)0. 500;.1 -J1,6l81% 2.755 =12.71 g% ( )23672% t1 ( (-; 20 00% , - 0 840 840 _ 840 1 ?j C p OF PA EMENT PR POSED DGE EL = 844.42 = 12+31 21 ROPOSED EDGE + OF PAVEME T VC - !0' L = 842. I' F PAVEM NT C VC 27' 0 830 830 R30 --- R?Q N R IO Rln 810 't CC N C1 R (V- .' _ oo 03 DO ROO v v 1'i ? N Cr 1 0 11 12 10 11 12 Ann 00 N 10 11 tmo 12 10 11 12 W NOT USE FOR /A ?MNSITTON PRELIMIN RY PLANS P PRO= REFERENCE NO. SHEET NO. STREAM RELOCATION PLAN ®STV/Ralph Nh eheadAssocates 4287 17 SECTION A P.O.BOX35624 WW SHEk7N0. STREAM STATION 10+00 CHARLOTTE, NC 282385624 840 - ROADWAY DESIGN HYDRAULICS ENG VEER ENGINEER 835 - 830 _- POPose° "a m 828 - ---? ?EU°a'Ik1E"l -- - 01;T NN mn m° 0001 WM P h PN Pc P. P` "'` Z o zo D -0 OR C4 in F, o N N INCOMPLE E PLANS -------' N? NN N^ NO NM C-4,4 N6 0,M RVod ^ N? tV^ NQ; O DO NOT USE MR /W n.000I5IT10N B2O - "STING - + NO + MN + YN + NM + `OM + ^ nM + m +r O + r? + C4 815 M+ N C+ ^ N GFA mES Af - p ^ ^ ^ ^ ^ + ^ ^ CO 817.43 ME. MII co II c') 11 M11 In 11 EMI MII all alp -v 11 NII v11 W MW N? NF IOF NF InF IOF MF- to ?1- Ln1 - IOF NF Lu .14 FLLL FyD FLL In c,' FLL FW FLL FLL arm FLL ,pw FILL -U. FML JO a0 SD JO J JO ?0 wO J NpOL ?1O y0 ?0 i\ I S I I I 1 I J I ? S ? .S IT_ SECTION B STREAM STATION 10+20 )v v - 7- v ?oN? s €wau _ 840 - 625 CONC. EXITING RB AND LITTER - 1 ? 825 - ---sue, _ ?? L HA L Y p ? ?DP 620 - -- ---_-_- \ 815 - 817.68 ISLAI6? I? -6- CONC { CURB `AND GUTTtR SECTION C 840 ANC; ??va?ti ?- - STREAM STATION 10+80 840 - PxarosED ro a e i 5 - Eu&v"uEM ------------- x-'1535 EXISTING 830 _-- 825 - - wf u"nxDrae wIUAnoox . - i ---„' l - / 824,--?'?? DrwwsEDm"owa ?6i s ? I ?, \ 30 815 - nI I v 818.44 i 77 - - FA SECTION D STREAM STATION 11+00 840 i 835 - PRJP°SED xorolra E E, G - EUBM'RNEA'I ?--?G9GUN° 625 62 Of POwRa G0.NIN / l I•,. ` \ \ \ '$15 - i + 1 818.70 SECTION E i It 8\ STREAM STATION 11+10 P"OPOSEO SAWN D,R i ?l I 1 1 ?\ 835 - EuBweuEU [ \ 830 - EXITING -------------- \ 'ro WtiWID m-0. APB1 / 1 \ n 625 - --- sle nwl wI mxnwl rax anm-Wunao PROP6 ED'SAN. SEWER/ &2e Im ,a I/ REL'ODA/riON ?J 815 - SEE.SNVT UCG2 LEGEND 818.82 i AM HOLLY 10 SYCAMORE e PO N , / ? WINTERBERRY HOLLY IV 0 o / / \ \ 0 HB BLUEBERRY VC LS f SWEETGUM SECTION F STREAM STATION 11+50 SD) PUSSY WILLOW 840 - ' % 8 -, Paoroseo xowXrm / '/, fl \? • I;- WETLAND PLUGS AND SEEDS r 830 - EXITING ---- - / - i __--- I 825 - RED MAPLE ? NCDOT BANK STABILIZATION N - - znzl a o? j % VEGETATION 815 - / o> 819.33 / ROCKSBOULDERS OVER ma j j ctc-cboco COCONUT MATTING ROCK VANE ?s PROP. an Ana= utl-D w In. was _3 33'0 \ \ I ? I \ FUTURE CREEK IN ! I ! I I t V. = 817.8 !I I 1 ! I I 1 v x zo r I I I ? ogW ? I I I / o , m Sa o=3 n? _ yry,' Z - ?S = I ? / I / I t ! -- f ma Sii ?3 mtl«. II / \ \ e Az I / \ / pz / _?- / , IJ! ?' % y42? I , / I - ? T2' dP A I / I 2 SS PROP. / I [x- 1J _.. -TAY ' $MM. PROP. 201F OF 4 ij tY DIP AT 18 .0 PROP. 2 2 Lf OF tY DIP 5? PROp IY STV/Ralph Whitehead Associates N :;. 0% ;o:A74 '-ANICI }. VC it 0USINFRASTRUCTIM ?I OF CAROLINA, INC. ID433 E. MOREHEAD STREET, SU17E 203 _ a CHARLOTTE, NORTH CAROUNA 28204 + 20 a, 2D 40 80 n? mp tl ?ioN 1~ - mmcm, ?tl mzzz? Mm n m°F 832 \ + z 1 _'0 ? fQ F_ii \ 828 Ey`ti 55 64?01pe PROJECT REFERENCE NO. SHEET N0. 2287 UC-1 R/W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPL ETE PLANS DO NOT USE FOR ACQUISMON PREL 1 Y PLANS FOR REVI EW ONLY ll0 NOT USE FO CONSIl ucnoN Glb CLASS '0' SEDDIN CLASS '8' BIDDING CLAS 'B' BEDDING D ]iD! E2SP PROP C0NS1RUC00N B00.g7 DATUk S2by ? E_ASEMENT SSMH1 81000 ^E E STA.. SSMH PROP. m m _ UA NC s5' ssxwJym .noes' EA M m n m m m I E ENENT m PB 151 PG B1 I f 5 01'00 I+OD 2+00 3+00 4, DO 0+00 o 5 SSE \ LINE A PROFILE OAA r-IP O' S, E. LINE B PROFILE - SIB v% s? I I / 1 \1 PROP . 30' i 5 ?ss 556 I \? / EX STREW PERMANENT URUn EABEMENT 55E _ o C 1 STA. 0+00 11 PROP. SSMH s uiv eo°s:ssb y I Sf 4 /. 0 SSE ?/sy? I e ? I I a l l I =ASS E ^ ( eke ? ss? \?I ? I ` ? 1 SSE E PROP. TEMPORARY SE ?cSE / \\ Ssf e1---? °c CONSTRUCTION EASEMENT I I FUTURE STREAM o\ / r w o s' \ _, S32' ?' MICNMENT PUE \ \ PU P STA. 3+27.66 TINE A = STA. 0+55.44 '+ Ns wv. s. io, i« \ Sf s STA. 0+00 LINE 8 PROP. SSIAM I PROP. S -O-P-i I 4LINEA r p S I _ PuP - I PUE S G 9 -" \ \ TSf ?^ 01' o PROP. 30' PERMANENT If 1( b ? URUtt EASEMENT \ \ / I \ \ ?SSf I 0 \ x \ ` ' \\OGm o STA. 0+63.38 W PROP. 5518f1 ka } I A Sff \?\ w / J \S,r(\ \S EXISTING 15' ( I EX STREAM EASEMENT m Q ?I PB 151 PC 81 = I I Sgf xm= AI«ppy 1 ? our v xmsca ? I I LINE A AND LINE B PLAN 84'. 84, 83' 82, 0A7W 2LeY 820.00 rRn m o <m e w V?? a iI IIH .:z . + nr II a =ZO -/ // EX. ;ROUND PROP. GROUND H rc izi ; 1 / P / B / o? mH / - oz / a r PROP. 2AT 163% . 1 g• DIP I 1 75 ox? 14 1+uu 2+00 3+OD LINE C PROFILE D7 ' O STA. O+OD.DD STA. O+J5.00 - - I I m STA. 2+03.98 E%. SSMH PROP. SSMH PROP. SSMH e e e s:y? uo a e7apz PUE-_ P U" I I Ixv ??yT =?B<0.10' vw emo Aso 09 PUE- P I ? ` o o 0 tt. 0,,05 410 2- PROP. 20.0' PERMANENT i r U PUE- pUE_ URUTY EASEMENT Ixv ixuD - L.>s Us 'ss_ PUD?'-RlE LINE C P PROP. 10' 1FAIPORARY ° ss _---CONSTRUCTION EASEMENT a. e\ O e' Rte`' ss -- S . 3426. .54 v I 'ss gp PROP. SSW -TT STA o 4 w ,EA,? w,? w P I 60 Ho, ?m,POO, a<<4 16 w I I \ PROP. R/M' 2I.I J' 7 LP, \ ss 1 W ° I J I r I a I I II I I I I ? ? I I I ° N 1 ? 1 &I I II II, ® .c? / LINE C PLAN STV/ Ralph Whitehead Associates P.O. Fii:: ;1514 ;-AFT CI r>SI USINFRASTRQCTURE OF CAROLINA, INC. 1043 E. MOREHEAD STREET, SUITE 203 CHARLOTTE, NORTH CAROLINA 20204 20 0' 20 40 00 SHEET N0.