Loading...
HomeMy WebLinkAbout20080697 Ver 1_Triage Comments_20080523Ll ??J Use this form instead of writing inside the folder J? l Triage Comment Sheet DWQ# 2?a `3 -- 86 `?l Triaged By: Reviewer 1 IDA V,?J Date: A fV -.PD Reviewer 2 Date: A /016 U Reviewer 3 Date: 1-J ? Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) Issue with conditions (Reviewer 1) 44 ? Issue with conditions (Reviewer 2) ? More Information (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 1) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 1) ? Send to Regions (Reviewer 2) SATriage Forms\Tnage Issue Sheet.doc PLEASE PRINT CLEARLY 08-0697 Smith Elementary School Renovation AML comments May 23, 2008 Per the requirements of the Neuse Riparian Buffer Rule, you must show that this site meets diffuse flow requirements with properly designed level spreaders at every stormwater outfall (or other appropriate BMP) as explained in Chapter 8 of the BMP Manual (see http:Hh2o.enr.state.nc.us/su,/bmp forms.htm). If you plan to use level spreaders to achieve diffuse flow, then please submit a Level Spreader Supplement Form with all required items for each proposed level spreader (see above web site). 2. Please provide documentation of the Town of Garner's approval of the stormwater management plan for this project by providing EITHER: • A valid approval letter and one copy of the approved SMP, including plans and calculations, OR • A set of stormwater plan details and calculations stamped as "Approved" by the Town of Garner. 3. Please be advised that the BMPs on this site must be designed such that the meet the minimum requirements listed in the North Carolina BMP Manual.