Loading...
HomeMy WebLinkAbout20061154 Ver 3_Approval Letter_20080523o?o? W A T ?9p? co > i.? C? `iiii? "C Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality May 23, 2008 DWQ Project # 06-1154, Ver. 3 Wake County Mr. Johnny Blankenship ABM Associates, LLC 2204-F Associates Drive Raleigh, NC 27603 Subject Property: Associates Park II Mills Branch [030403, 27-43-15-7, C, NSW] Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions Dear Mr. Blankenship: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 60 linear feet of perennial stream and 4,729 square feet of Zone 1 Neuse River basin protected riparian buffer, and 2,304 square feet of Zone 2 Neuse River basin protected riparian buffer (1,610 square feet permanent impact, and 694 square feet temporary impact), as described in your application dated May 8, 2008, and received by the Division of Water Quality (DWQ) on May 9, 2008, to construct a business park at the site and provide a turn lane to an adjacent business park. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3705 (GC3705). The Certification(s) allows you to use Nationwide Permit(s) NW39 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-,6893 / Internet: http://h2o.enr.state.nc.us/ncwetlands None Carolina AMM11y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper ABM Associates, LLC Page 2 of 5 May 23, 2008 .Type of Impact Amount Approved Units Plan Location or Reference Stream - intermittent 60 linear feet PCN page 4 of 8 Buffers Zone 1 4,729 (square feet PCN page 7 of 8 Buffers Zone 2 2,304 [(square feet) 1,610 square feet permanent impact, and 694 square feet temporary impact] PCN page 7 of 8 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 4. Sediment and Erosion Control Measures Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; 5. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (http://www.ncdot.orgJdoh/operations/BMP manuaUdownload/BMP_Manual pdf) such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting. of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. ABM Associates, LLC Page 3 of 5 May 23, 2008 Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401 /Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please send photographs upstream and downstream of each culvert site to document correct installation along with the Certificate of Completion form. 6. Diffuse Flow (DWQ Reviewed Plans) All stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the stream as identified within 15A NCAC 2B.0233 (5) In an effort to comply with the diffuse flow provision of the Buffer Rule (15A NCAC 02B .0233(5)), you have provided the DWQ with level spreader designs received by the DWQ on January 23, 2008. The DWQ believes that if implemented, as per these plans, diffuse flow will be achieved. However, if diffuse flow as per 15A NCAC 02B .0233(5) is not achieved, then the DWQ shall be notified and corrective actions to restore diffuse flow shall be taken if necessary to impede the formation of erosion gullies. At no time shall stormwater.;from the proposed development be piped directly through the buffer without prior DWQ written authorization. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. Stormwater easements shall be recorded for a distance of at least 10 feet on each side of all stormwater conveyances on all lots containing these structures including future access for maintenance. The stormwater easements shall allow for the ability to maintain the structures, perform corrective actions as described ABM Associates, LLC Page 4 of 5 above and shall provide protection of the structures from May 23, 2008 owners. potential alternations by future property Stormwater Management Plan The Stormwater Management Plan for each lot must be approved Unit prior to any land disturbance associated with developing t subject to another state st disturbance by the th401 e project becomes program government's a co hat lot. If the project becomes approved SMp must be submitted to the 401 Ovesight/Express Unit b approval letter and disturbance associated with developing that lot ma occur. before any land Protective Fencing Y The outside buffer, wetland or water boundary and along the co boundaries approved under this authorization shall be clearl nstruction corridor within these (or similar high visibility material) for the areas that have been a proved with orange warning fencing buffer, wetland or water prior to an g y land disturbing activities; approved to infringe within the 9. Certificate of Completion Upon completion of all work a Buffer Rules, and any all work approved within t the applicant Water certificate of completion to the s401 ubsequent modifications, i bons, res Quality Certification applicable pis required to return the attached Division of Water Quality, 1650 p s Review Permitt in Mai] Service Center, Raleigh, NC, 27699 g Unit 1650Nort h Carolina Violations of any condition herein set forth may result in revoc ' criminal and/or civil penalties. The authorization to proceed with impacts to waters as depicted in your application anon of this Certification an d may result in expiration of the 404 or CAMq permitand as authorized by this Cert ifcations shr to conduct If you do not accept any of the conditions of this Certification you receive this letter. Y ask for an adjudicato (associated with the app at To ask for a hearing judicatory hearing' YOU must act within 60 da s of d the date wetland that send a written petition, which conforms to the North Carolina General Statutes to the Chapter 150B of Office ofAdministra ' y Raleigh, N.C. 27699-6714. This certification and its condition trve Hearings hearing. , 6714 Mail Service Center, s are final and binding unless you ask for a Any disputes over determinations regarding this Authorization Certificate impacts) shall be referred in writing to the Director for (associated with the approved subject to review as provided in Articles 3 and 4 of G.S. 150Ba decision. The Directors decision i This letter completes the review of the Division of Water is Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 5A any questions, please telephone Cyndi Karol y or Ian McMillan at 91917 3N786C 2B •0233. If you have Sullins ABM Associates, LLC Page 5 of 5 May 23, 2008 CHSlijm Enclosures: GC 3705 Certificate of Completion cc: USACE Raleigh Regulatory Field Office Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Central Files Todd Preuninger, Withers & Ravenel, 111 MacKenan Drive, Cary, NC 27511 Filename: 061154Ver3 Associates Park I I(Wake)40 I _NB R