Loading...
HomeMy WebLinkAbout20080430 Ver 1_Staff Comments_20080417 (380)08-0430 American Honda Motor Co., Inc. AML comments April 17, 2008 The proposed BMPs must be designed to meet state requirements regardless of whether the stormwater review is being conducted by the City of Burlington or the DWQ. Please insure that the proposed BMP includes provisions for pretreatment, flowpath lengths, 3:1 side slopes and other required design elements listed in the DWQ BMP Manual. 2. Please submit one copy of the approved stormwater management plan approved by the City of Burlington, including plan details, calculations and other supporting information (See our stormwater policy at: http://h2o.enr.state.nc.us/' ncwetlands/documents/SMPRequirementsforApplicantsotherthanNCDOT.doc).