Loading...
HomeMy WebLinkAbout20080229 Ver 2_Mitigation Info_20080325 DE 4 (Version 2.0 March, 2008) Y&TUwDSAN+ AGREEMENT TO ESTABLISH THE FORREST CREEK RIPARIAN BUFFER MITIGATION BANK IN ORANGE COUNTY, NORTH CAROLINA This Riparian Buffer Mitigation Banking Instrument (RBMBI) is made and entered into on the *day ofd, 2008 by Mid-Atlantic Mitigation, LLC, hereinafter Sponsor, and the North Carolina Division of Water Quality (NCDWQ). WHEREAS the purpose of this Agreement is to establish the Forrest Creek Riparian Buffer Mitigation Bank (Bank) providing compensatory mitigation for unavoidable riparian buffer impacts separately authorized by Authorizations or Variances to impact Riparian Buffers in appropriate circumstances (15A NCAC 2B .0200); WHEREAS the Sponsor currently controls through the purchase and recording of a permanent conservation easement of certain parcels of land containing approximately 31.5 acres located in Orange County, North Carolina, described in the Forrest Creek Mitigation Bank Mitigation Plan (Mitigation Plan) and overall Mitigation Banking Instrument (MBI) in Appendix A, and as shown on the attached in Figure 2 of the Mitigation Plan. WHEREAS NCDWQ agrees that the Bank site is a suitable riparian buffer mitigation bank site, and that implementation of the plans as described in the Mitigation Plan is likely to result in restored and protected riparian buffers at the Bank site, and has therefore approved the Mitigation Plan; THEREFORE, it is mutually agreed between the parties to this Agreement that the following provisions are adopted and will be implemented upon signature of this RBMBI. General Provisions 1. The goal of the Bank is to restore, enhance, and preserve stream systems with the adjacent riparian buffers and their functions and values to compensate in appropriate circumstances for unavoidable stream impacts authorized by 15A NCAC 2B 0.200 in circumstances deemed appropriate by NCDWQ. 2. Use of credits from the Bank to offset riparian buffer impacts authorized by 15A NCAC 2B 0.200 Approvals must be in compliance with said Rules. 3. NCDWQ shall make final decisions concerning the amount and type of compensatory mitigation to be required for authorized riparian buffer impacts, and whether or not the use of credits from the Bank is appropriate to offset those impacts. (Version 2.0 March, 2008) 4. The Bank site is currently a part of a dairy operation. A more detailed description of the baseline conditions on the site is contained in the Mitigation Plan (Appendix A). 5. The Sponsor will perform work described in the Mitigation Plan, including the restoration of approximately 658,000 square feet (15.1 acres) of riparian buffer along Forrest Creek and an unnamed tributary. 6. The Bank Sponsor shall monitor the Bank Site as described in the Mitigation Plan, until such time as the NCDWQ determines that the success criteria described in Section 10 of the Mitigation Plan have been met. The monitoring period shall be a minimum of five years. 7. The Sponsor is responsible for assuring the success of the restoration, enhancement and preservation activities at the Bank Site, and for the overall operation and management of the Bank. 8. The Sponsor shall provide to NCDWQ the reports annually as described in Section 11 of the Mitigation Plan. 9. NCDWQ shall review said reports, and may, at any time, after consultation with the Sponsor, direct the Sponsor to take remedial action at the Bank site. Remedial action required by NCDWQ shall be designed to achieve the success criteria specified above. 10. The Sponsor shall implement any remedial measures required pursuant to the above. 11. In the event the Sponsor determines that remedial action may be necessary to achieve the required success criteria, it shall provide notice of such proposed remedial action to NCDWQ. No remedial actions shall be taken without the concurrence of NCDWQ. 12. NCDWQ will be allowed reasonable access to the Property for the purposes of inspection of the Property and compliance monitoring of the Mitigation Plan. The Sponsor shall be notified 48 hours in advance of any NCDWQ accessing the property. Use of Mitigation Credits 13. The Geographical Service Area ( GSA) is the designated area wherein a bank can reasonably be expected to provide appropriate compensation for impacts to wetland or other aquatic resources. The GSA for this Bank shall include the Neuse River Basin Hydrologic Unit 03020201 in North Carolina. Use of credits from the Bank to compensate for impacts beyond the geographic service area may be considered by NCDWQ. -TABLE- Proposed Mitigation Type Square Feet Credits Riparian Buffer Restoration 658,000 658,000 (Version 2.0 March, 2008) 14. It is anticipated by the parties to this Agreement that use of mitigation credits shall be "in-kind;" that is, that riparian buffer credits will be used to offset riparian buffer impacts. 15. Riparian Buffer Mitigation - Riparian buffer mitigation credit will be determined according to the procedures 15A NCAC 2b 0.200. Buffer restoration and buffer enhancement shall be defined per the Memorandum titled "NCDWQ Buffer Interpretation/Clarification #2008- 17, January 25, 2008". 16. Notwithstanding the above, all decisions concerning the appropriateness of using credits from the Bank to offset impacts to riparian buffers shall be made by NCDWQ. Any necessary notice to and consultation with NCDWQ for use of credits shall be through the riparian buffer impact review process. 17. Riparian Buffer Mitigation - Fifteen percent (20%) of the Bank's total restoration credits shall be available for sale immediately upon completion of all of the following: a. Execution of this RBMBI by the Sponsor and NCDWQ; b. Approval of the final mitigation plan (already completed); c. Delivery of the financial assurance described in paragraph 23 of this RBMBI; d. Recordation of the preservation mechanism described in paragraph 22 of this RBMBI; Additionally, the Sponsor must complete the initial physical and biological improvements to the bank site pursuant to the mitigation plan no later than the first full growing season following initial debiting of the Bank. The Sponsor shall provide a record drawing or as-built survey to provide a record of the amount and nature of buffer restoration and enhancement completed. 18. Subject to the Sponsor's continued satisfactory completion of all required success criteria and monitoring, additional buffer mitigation credits will be available for sale by the Sponsor on the following schedule: Riparian Buffer Restoration and Enhancement Credit Release: Table 1-Credit Release Schedule Task Project Milestone % Credit Available for Sale (Version 2.0 March, 2008) 1 Bank Parcel Development Package Approved by DWQ, Conservation Easement or Restrictive Covenants Recorded and 20 2 Mitigation Site Earthwork, Planting and Installation of Monitoring Devices Completed 20 3 A r val of As-Built Report and Monit rip Bond Purchased 10 4 Submit Monitoring Report #1 to DWQ (meets success criteria) 10 5 Submit Monitoring Report #2 to DWQ (meets success criteria) 10 6 Submit Monitoring Report #3 to DWQ (meets success criteria) 10 7 Submit Monitoring Report #4 to DWQ (meets success criteria) 10 8 Submit Monitoring Report #5 to DWQ (meets success criteria) 10 Total 100% The above schedule applies only to the extent the Sponsor documents acceptable survival and growth of planted vegetation as described under the success criteria in the monitoring section of the Mitigation Plan. The Mitigation Plan shall be amended to specify a vegetation success rate of 320 trees per acre after five years within the stream buffers for which riparian buffer mitigation credit is specified. Monitoring of the riparian buffer restoration and enhancement shall be based on the CVS-EEP Protocol for Recording Vegetation Level 1-2 Plot Sampling Only Version 4.0., as indicated in the Mitigation Plan. 19. The Sponsor shall submit an annual ledger documenting buffer credit releases and debits to NCDWQ for maintaining accurate records of credit transactions made from the Bank. Accounting procedures shall include the generation of a report by the Sponsor showing credits used each time they are debited from the Bank, which the Sponsor shall provide within 30 days of the debit to NCDWQ. In addition, the Sponsor shall prepare an annual report, by the end of each calendar-year, showing all credits used, and the balance of credits remaining to NCDWQ, until such time as all of the credits have been utilized, or this Agreement is otherwise terminated. All reports shall identify credits debited and remaining by type of credit (e. g., riparian buffer), and shall include for each reported debit the NCDWQ ID number for the Authorization for which the credits were utilized. Property Disposition 20. The Sponsor shall secure a Permanent Conservation Easement as part of the requirements for the overall Bank MBI. Financial Assurances 21. The Sponsor will provide security in the form of acceptable performance bonds or letters of credit as described in and as part of the MBI for the entire Bank. Long-term Management 22. The Sponsor shall implement the long-term management measures described in the Mitigation Plan, section 14. The Mitigation Plan shall be amended to specify a vegetation (Version 2.0 March, 2008) success rate of 320 trees per acre after five years within the stream buffers for which riparian buffer mitigation credit is specified. Miscellaneous 23. Any delay or failure of Bank Sponsor shall not constitute a default hereunder if and to the extent that such delay or failure is primarily caused by any act, event or conditions beyond the Sponsor's reasonable control and significantly adversely affects its ability to perform its obligations hereunder including: (i) acts of God, lightning, earthquake, fire, landslide, drought, hurricane, storm, flood, or interference by third parties; (ii) condemnation or other taking by any governmental body; (iii) change in applicable law, regulation, rule, ordinance or permit condition, or the interpretation or enforcement thereof; (iv) any order, judgment, action or determination of any federal, state or local court, administrative agency or government body; or (v) the suspension or interruption of any permit, license, consent, authorization or approval. If the performance of the Bank Sponsor is affected by any such event, Bank Sponsor shall give written notice thereof to the NCDWQ as soon as is reasonably practicable. If such event occurs before the final availability of all credits for sale, the Sponsor shall take remedial action to restore the property to its condition prior to such event, in a manner sufficient to provide adequate mitigation to cover credits that were sold prior to such delay. Such remedial action shall be taken by the Sponsor only to the extent necessary and appropriate, as determined by NCDWQ. 24. No third party shall be deemed a beneficiary hereof or shall be entitled to seek enforcement hereof. 25. In the event any one or more of the provisions contained in this RBMBI are held to be invalid, illegal or unenforceable in any respect, such invalidity, illegality or unenforceablility will not affect any other provisions hereof, and this RBMBI shall be construed as if such invalid, illegal or unenforceable provision had not been contained herein. 26. This RBMBI shall be governed by and construed in accordance with the laws of North Carolina and the United States as appropriate. 27. The terms and conditions of this RBMBI shall be binding upon, and inure to the benefit of the parties hereto and their respective successors. 28. All notices and required reports shall be sent by regular mail to each of the parties at their respective addresses, provided below: (Version 2.0 March, 2008) Sponsor: Richard K. Mogensen Mid-Atlantic Mitigation, LLC 1960 Derita Road Concord, NC 28027 NCDWQ: Ms. Coleen Sullins, Director Division of Water Quality Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 (Version 2.0 March, 2008) IN WITNESS WHEREOF, the parties hereto have executed this Agreement entitled "Agreement To Establish The Forrest Creek Mitigation Bank In Orange County, North Carolina": Sponsor: Mid-Atlantic Mitigation, LLC By: - Date: 3 - ? o -60 North C4rDkna Division of Water Quality: By: - Date: 2 o6 (Version 2.0 March, 2008) List of Appendices Appendix A: Forrest Creek Mitigation Bank Mitigation Plan and MBI