HomeMy WebLinkAbout20080673 Ver 1_Triage Check List_20080416Triage Check List
Date:
Project Name:
9DWQ#: U
County: M' a W
?A6 ??
ILE
To: ARO Kevin Barnett
FRO Ken Averitte
? MRO Alan Johnson
? RRO La en W't erspoon
From:
? WaRO Kyle Barnes
? WiRO Joanne Steenhuis/Chad Coburn
? WSRO Sue Homewood
Telephone . (919
)
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
? Stream length impacted
? Stream determination
? Wetland determination and distance to blue-line surface waters on USFW topo maps
? Minimization/avoidance issues
? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
? Pond fill
? Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
? Is the application consistent with pre-application meetings?
? Cumulative impact concern
Comments: