Loading...
HomeMy WebLinkAbout20041743 Ver 2_More Info Received_20080520ILY? THE LPA GROUP of North Carolina, p.a. Transportation Consultants 5000 FALLS OF NEUSE ROAD ¦ SUITE 304 ¦ RALEIGH, NORTH CAROLINA 27609 ¦ 919-954-1244 ¦ FAX 919-954-1345 May 19, 2008 Ms. Annette Lucas NCDENR, Division of Water Quality DWQ 401 Permitting Unit 2321 Crabtree Blvd., Suite 250 Raleigh, North Carolina 27604 Re: Martin County Airport Taxilane Development Dear Annette: D?f -I193 ?z Enclosed please find two copies of the plans, calculations, BMP Checklist, and soils report for the above referenced project for your review and approval. Also enclosed is a signed and notarized copy of the of the Operation and Maintenance agreement for the wet detention pond. The enclosed plans correspond to the first phase of development in the taxilane area. The initial project consists of the construction of three taxilanes to be used for access to a t-hangar building as well as future corporate hangars. This initial phase also includes the construction of a wet detention pond that has been designed for the full buildout of this area. The plans for this project have been packaged together with a separate parallel taxiway project that is to be bid at the same time. Due to the amount of excess information, have only enclosed the plan sheets that are relevant to the taxilane development and the pond. If you think you need additional sheets, let me know and I'll get them to you as soon as possible. The required check, in the amount of $570.00, was submitted in December. If you have any questions or need additional information, please do not hesitate to call. Sincerely, THE LPA GROUP of North Carolina, p.a. aso L. Elliott, EI Aviation Design Enclosures Member of THE LPA GROUP INCORPORATED rzn MAY ? 2.008 ATLANTA ¦ BALTIMORE ¦ BATON ROUGE ¦ CHARLOTTE ¦ COLUMBIA ¦ GREENSBORO ¦ IRVINE ¦ JACKSONVILLE ¦ KENNESAW ¦ KNOXVILLE ¦ LITTLE ROCK McLEAN ¦ MOBILE ¦ NASHVILLE ¦ OCEAN SPRINGS ¦ ORLANDO ¦ RALEIGH ¦ SARASOTA ¦ TALLAHASSEE ¦ TAMPA ¦ WEST PALM BEACH Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does ® does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.3 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.3 Page 2 Of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 6.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Sediment Removal Bottom Permanent Pool Elevation 67.2' 63.7 Pe anen? --------------- I—/ Volume 62.7 -ft Min. Sediment Storage FOREBAY Pool -----Sediment Removal Elevation 607 ----------- Volume Bottom Elevation 59.7' I 1-ft 1W MAIN POND Storage Form SW401-Wet Detention Basin O&M-Rev.3 Page 3 of 4 ' Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Martin County Airport - Parallel Taxiway and Taxilane BMP drainage area number: Area 2 - Pond Print name: Russell Overman Title: County Manager Martin County Address: Post Office Box 668, Williamston, North Carolina 27892-0668 Phone: (252) 7 24? -1%cA`(3oO Signature: % `?^ gQ, ? Date: SI iS/o Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, lip , a Notary Public for the State of N` ?, tr ?L[ fp^ l I tit , County of mck r-}1 n , do hereby certify that W , ?Russelk aKman personally appeared before me this day of , goo% , and acknowledge the due execution of the forgoing ym? detention basin maintenance requirements. Witness my hand and official se :f ? ti} ? >?rue!?eet ms, y pj.?. ter' CA SEAL My commission expires Form SW401-Wet Detention Basin O&M-Rev.3 Page 4 of 4 Permit No. (o be provided by DWQ) # Vto v Oa?F W A TF9pG h r NCDENR ° STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. PROJECT INFORMATION Project name Martin County Airport - T-Hangar Taxilane Construction Contact person Jason L. Elliott, El Phone number (919)954-1244 Date 8-May-08 Drainage area number Drainage Areas 14 II. DESIGN INFORMATION Site Characteristics Drainage area 184,529.00 ft2 Impervious area 102,480.00 ftz % impervious 55.54 % Design rainfall depth 1.00 in Storage Volume: Non-SR Waters Minimum volume required 8,388.00 ft3 Volume provided 8,944.00 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre-development 1-yr, 24-hr runoff ff3 Post-development 1-yr, 24-hr runoff _ ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations ? f 1-yr, 24-hr rainfall depth 3.11 in ${ t(?B t ` " ?' Rational C, pre-development 016 (unitless) s Rational C, post-development 0.59 (unitless) MAY 2 0 2008 Rainfall intensity: 1-yr, 24-hr storm 0.13 in/hr Pre-development 1-yr, 24-hr peak flow 0.09 ft3/sec DENR - WATER OUAU i r WETLANDS AND STORMWATER BRANCH Post-development 1-yr, 24-hr peak flow 0.33 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 0.24 ft3/sec Basin Elevations Basin bottom elevation 59.70 ft Sediment cleanout elevation 60.70 ft Bottom of shelf elevation 66.70 ft Permanent pool elevation 67.20 ft SHWT elevation 68.0 (approx.) ft Top of shelf elevation 67.70 It Temporary pool elevation 68.00 It Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) 11. RESIGN INFORMATION Volume and Surface Area Calculations SA/DA ratio 4.60 (unitless) Surface area at the bottom of shelf 7,930.00 ftz Volume at the bottom of shelf 25,757.00 ft3 Permanent pool, surface area required 8,734.00 ft2 Permanent pool, surface area provided 9,624.00 ft2 OK Permanent pool volume 28,927.00 ft3 Average depth for SA/DA tables 3.01 ft OK Surface area at the top of shelf 11,788.00 ft2 Volume at the top of shelf 35,483.00 ft3 Forebay volume 5,756.00 ft3 Forebay % of permanent pool volume 19.90 % OK Temporary pool, surface area provided 12,212.00 ft2 Drawdown Calculations Treatment volume drawdown time 3.40 days OK Treatment volume discharge rate 003 ft3ls Pre-development 1-yr, 24-hr discharge 0.09 ft3/s OK Post-development 1-yr, 24-hr discharge 0.12 ft3/s Decrease discharge rate Additional Information Diameter of orifice 1.5 in Design TSS removal 85 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 2.50 :1 Too short, increase ratio to at least 3:1 Length to width ratio 1;90 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.50 ft OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? NIA (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies Pump Out Form SW401-Wet Detention Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) III. `REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. - a-.;Z 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, - Pretreatment system, High flow bypass system, - Maintenance access, Proposed drainage easement and public right of way (ROAN), Overflow device, and - Boundaries of drainage easement. v 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 3. Section view of the dry detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. G Q'2 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.4 Part III. Required Items Checklist, Page 1 of 1 JUSTIFICATION FOR NOT USING VEGETATIVE FILTER STRIP Despite being designed for 85% TSS removal, the pond outlet system does not include a Filter Strip. The main reason for this is that the site is just too flat to be able to release the water high enough. The only option was to release the outflow directly into the downstream ditch. The ditch, however, should be an adequate substitution for the extra stormwater treatment required. The outlet pipe is released into a new 650 ft long v-ditch with a 0.15% longitudinal slope and 3:1 side slopes. During the 2-yr storm, the velocity in this ditch is 1.48 fps. The new ditch connects to an existing v-ditch w/ 5:1 side slopes and a similarly flat longitudinal slope. The water will travel 175 ft down this existing ditch to where it will connect to the existing ditch running parallel to the runway. Martin County Airport May 2008 401 WATER QUALITY CERTIFICATION FOR TAXILANE DEVELOPMENT AT MARTIN COUNTY AIRPORT PROJECT DESCRIPTION AND PURPOSE Due to an increasing general aviation and corporate presence at Martin County Airport, additional hangar space is needed to meet the current and future needs of Airport users. The Airport is preparing to begin two projects which will address needs associated with ongoing and future growth. The first project is the addition of Taxiway A, which is a parallel taxiway southwest of the existing terminal and apron. The second project is the initial phase of the proposed Hangar Area Development. The Taxiway A project is considered a Low-Impact Development and should not require the use of a BMP for stormwater treatment purposes. The Hangar Area Development is considered a High-Impact Development that will impact forested wetlands. This project is required to go through the Section 401 / 404 permitting process. EXISTING CONDITIONS This project, located in Williamston, North Carolina, lies within the Tar-Pamlico River Basin. The unnamed tributaries within the project site lead to the Huskanaw Swamp and eventually to the Tar River. The Huskanaw Swamp is considered a class C waterway, with supplemental classifications as NSW (nutrient sensitive waters), and Sw (swamp waters). PROPOSED DEVELOPMENT The proposed Hangar Area Development has been divided into two phases. The initial phase of this project is the addition of three taxilanes to be used for access to the t-hangar building, which is to be constructed on the site. The second phase would consist of the construction of two corporate hangars, a paved apron, parking, and access roads. The current phase of development for the Hangar Area will include 28,650 square feet of new impervious area. An additional 28,016 square feet of impervious area will be added upon the construction of the t-hangar building. Stage 2 of development in this area will add 42,614 square feet of impervious area. Upon completion of both stages of development, 99,280 square feet (2.3 Acres) of impervious area will be added, draining to the proposed wet detention pond. SOILS INFORMATION A subsurface exploration was performed on the project site in November, 2006. The soil on the site consisted of inter-layered coastal plain deposits of sands (SM, SC) and clays (CL). A water table elevation was not established during the exploration. It was, however, noted that groundwater was observed in existing drainage ditches at approximately 1 to 3 feet below the ground surface. Martin County Airport 1 May, 2008 I STORMWATER QUALITY ANALYSIS Much of the existing area is composed of wetlands and flat land. The majority of runoff is either contained in low areas or exits through the existing ditch, which is located on the northwestern side of the site. This ditch connects to the ditches that run parallel along the runway, through which it eventually leaves the Airport property. Due to the large percentage of new impervious area and the impacts to the existing wetlands, a wet detention pond is being added to treat the first 1 inch of rainfall, in accordance with the NCDENR Stormwater BMP Manual. The wet pond is being designed to remove 85% TSS. The runoff which exceeds the 1 inch rainfall will bypass the pond through a new ditch which the pond outlet will connect to. The ditch will then go around the hangar area and will be connected to the existing ditch on the northwest edge of the site. The temporary pool elevation is set at 0.8 feet above the permanent pool elevation. This elevation provides a slightly larger volume than the required treatment volume of 8,388 cubic feet. The actual volume of the temporary pool, at this elevation, will be 8,944 cubic feet. The first 1 inch of rainfall will be detained by a diversion structure located in the new ditch, just beyond the pond's inlet pipe. The diversion structure will consist of an earthen weir with a height of 8 inches. The invert elevation of the ditch at the base of the weir is 67.35 feet. The crest of the weir is designed to match the temporary pool elevation. Runoff will drain into the pond's forebay through the 15 inch inlet pipe until the temporary pool is filled and will then begin to flow over the diversion weir and through the ditch. The stormwater will go from the forebay to the main pond via an earthen berm. The main pond contains a riser structure and an emergency outlet with a concrete apron. The riser structure will have a submerged orifice with a 1.5 inch opening, set to match the permanent pool elevation. Runoff that exceeds this elevation will leave through the orifice. The orifice is designed to release the full volume of the temporary pool over 3.4 days. The riser will have a rectangular weir opening with a crest matching the temporary pool elevation. The weir opening will have a height of 8 inches and a width of 4 feet. Flow from both the orifice and the weir will be discharged from the structure through a 12 inch outlet pipe. The invert of the outlet pipe will be equal to the permanent pool elevation. Despite being designed for 85% TSS removal, the pond outlet system does not include a Filter Strip. The main reason for this is that the site is just too flat to be able to release the water high enough. The only option was to release the outflow directly into the downstream ditch. The ditch, however, should be an adequate substitution for the extra stormwater treatment required. The outlet pipe is released into a new 650 ft long ditch with a 0.15% longitudinal slope and 3:1 side slopes. During the 2-yr storm, the velocity in this ditch is 1.48 fps. The new ditch connects to an existing ditch w/ 5:1 side slopes and a similarly flat longitudinal slope. The water will travel 175 ft through this existing ditch to where it will connect to the existing ditch running parallel to the runway. Martin County Airport 2 May, 2008 DRAINAGE AREAS DRAINAGE AREA PERVIOUS AREA IMPERVIOUS AR EA TOTAL AREA C CN TIME OF IMP % EXISTING PROPOSED FUTURE TOTAL CONCENTRATION SQ. FT ACRES SQ. FT. SQ. FT. SQ.FT. SQ. FT. ACRES SQ. FT ACRES HR MIN. Drainage Area 1 16,438 0.38 3,200 9,654 33,037 45,891 1.05 62,329 1.43 0.74 90 0.1 6 74% Drainage Area 2 16,329 0.37 0 47,012 3,104 50,116 1.15 66,445 1.53 0.75 92 0.1 6 75% Drainage Area 3 5,249 0.12 0 0 677 677 0.02 5,926 0.14 0.24 77 0.083 5 11% Drainage Area 4 42,681 0.98 0 0 7,148 7,148 0.16 49,829 1.14 0.26 77 0.1 6 14% TOTALS = 80,697 1.85 3,200 56,666 43,966 103,832 2.38 184,529 4.24 56% T-Hangar Taxilane Pond Martin County Airport May 2008 PIPE DATA, 2-YEAR STORM Name Shape Diameter/Depth inches Len th feet Conduit Slope % Upstream Invert Elevation feet Downstream Invert Elevation feet Ditch Side Slopes Max Flow cfs Max Velocity ft/s FP-2* Circular Pie 18 40 0.20 67.85 67.77 0 5.76 4.16 Ditch Below Taxilanes Trapezoidal Ditch 5' bottom 24 115 0.20 67.77 67.53 4:1 5.48 0.57 FP-3* Circular Pie 24 40 0.20 67.53 67.45 0 11.59 5.78 Ditch to Diversion Weir Trapezoidal Ditch 5' bottom 24 50 0.20 67.45 67.35 4:1 11.47 1.16 Bypass Ditch V-Ditch 24 135 0.18 68.00 67.10 3:1 5.48 1.48 P-3 Circular Pie 15 35 0.43 67.35 67.20 0 6.07 5.19 P-4 Circular Pie 12 47 0.21 67.20 67.10 0:00 -1.39 -1.72 Outlet Ditch V-Ditch 36 656 0.14 67.10 66.16 3:1 6.98 1.48 Orifice Area Orifice Invert Max Velocity Name s .ft. Orifice Shape Orifice Type Elevation feet Max Flow cfs ft/s Orifice from Wet Detention Pond to Riser Structure 0.012 Circular Side Outlet 67.2 0.08 6.08 Name Weir Type Weir Length feet Weir Crest Elevation feet Weir Crest Top feet Max Flow cfs Max Velocity ftls Diversion Weir Transverse weir 10 68 70.4 5.59 0.00 Weir from Forebay to Wet Detention Pond Transverse weir 20 66.7 67.2 7.63 0.00 Riser Weir Transverse weir 12 68 68.7 -1.29 0.00 Emergency Overflow Weir Transverse weir 28 70 71 0 0.00 * FP-2 and FP-3 are Future Pipes, to be installed in Phase 2 Martin County Airport T-Hangar Talilane Pond May 2008 PIPE DATA, 10-YEAR STORM Name Shape Diameter/Depth inches Length feet Conduit Slope % Upstream Invert Elevation feet Downstream Invert Elevation feet Ditch Side Slo es Max Flow cfs Max Velocity ft/s FP-2` Circular Pie 18 40 0.20 67.85 67.77 0 9.69 5.30 Ditch Below Taxilanes Trapezoidal Ditch 5' bottom 24 115 0.20 67.77 67.53 4:1 9.19 0.60 FP-3' Circular Pie 24 40 0.20 67.53 67.45 0 19.27 7.07 Ditch to Diversion Weir Trapezoidal Ditch 5' bottom 24 50 0.20 67.45 67.35 4:1 19.13 1.28 Bypass Ditch V-Ditch 24 135 0.18 68.00 67.10 3:1 11.1 1.80 P-3 Circular Pie 15 35 0.43 67.35 67.20 0 8.25 6.54 P-4 Circular Pie 12 47 0.21 67.20 67.10 0:00 -2.86 -3.63 Outlet Ditch V-Ditch 36 656 0.14 67.10 66.16 3:1 14.19 1.83 Orifice Area Orifice Invert Max Velocity Name s .ft. Orifice Shape Orifice Type Elevation feet Max Flow cfs ft/s Orifice from Wet Detention Pond to Riser Structure 0.012 Circular Side Outlet 67.2 0.08 6.07 Name Weir Type Weir Length feet Weir Crest Elevation feet Weir Crest Top feet Max Flow cfs Max Velocity ft/s Diversion Weir Transverse weir 10 68 70.4 11.34 0.00 Weir from Forebay to Wet Detention Pond Transverse weir 20 66.7 67.2 11.63 0.00 Riser Weir Transverse weir 12 68 68.7 _ -2.79 0.00 Emergency Overflow Weir Transverse weir 28 I 70 71 t 0 0.00 " FP-2 and FP-3 are Future Pipes, to be installed during Phase 2 Martin County Airport T-Hangar Talilane Pond May 2008 CONICAL VOLUME METHOD COMBINED (POND & FOREBAY) Elevation (ft) Area (sq. ft.) Area (ac) Al+A2+SQRT(Al*A2) Volume (ac-ft) Sum (ac-ft) Acc. Vol. (cu. ft) 59.7 1,003 0.02 0.02 0.46 60.7 1,433 0.03 0.08 0.03 0.03 1,212 61.7 1,932 0.04 0.12 0.04 0.07 2,888 62.7 2,935 0.07 0.17 0.06 0.12 5,304 63.7 3,873 0.09 0.23 0.08 0.20 8,697 64.7 4,974 0.11 0.30 0.10 0.30 13,109 65.7 6,225 0.14 0.38 0.13 0.43 18,697 66.7 7,930 0.18 0.49 0.16 0.59 25,757 67.2 9,624 0.22 0.60 0.10 0.69 30,139 67.7 11,788 0.27 0.74 0.12 0.81 35,483 67.8 11,928 0.27 0.82 0.03 0.84 36,669 67.9 12,070 0.28 0.83 0.03 0.87 37,869 68.0 12,212 0.28 0.84 0.03 0.90 39,083 68.1 12,355 0.28 0.85 0.03 0.93 40,311 68.2 12498 0.29 0.86 0.03 0.95 41,554 68.7 13221 0.30 0.89 0.15 1.10 47,983 69.7 14730 0.34 0.96 0.32 1.42 61,951 * Volume = (1/3) * (Elev. 2 - Elev. 1) * [Al +A2 + SQRT (A1 * A2) Permanent Pool Volume = 30,139 - 1,212 = 28,927 cf Forbay Volume @ Permanent Pool Elevation = 5,756 cf (20% Permanent Pool Volume) Avg. Depth of Permanent Pool = 28,927 cf / 9,624 sf = 3.0 ft CONICAL VOLUME METHOD FOREBAY Elevation (ft) Area (sq. ft.) Area (ac) Al+A2+SQRT(A1*A2) Volume (ac-ft) Sum (ac-ft) Acc. Vol. (cu. ft) 62.7 435 0.01 0.01 0.21 63.7 738 0.02 0.04 0.01 0.01 580 64.7 1,114 0.03 0.06 0.02 0.03 1,499 65.7 1,561 0.04 0.09 0.03 0.06 2,831 66.7 2,080 0.05 0.12 0.04 0.11 4,645 67.2 2,366 0.05 0.15 0.03 0.13 5,756 CONICAL VOLUME METHOD MAIN POND Elevation (ft) Area (sq. ft.) Area (ac) Al+A2+SQRT(Al*A2) Volume (ac-ft) Sum (ac-ft) Acc. Vol. (cu. ft) 59.7 1,003 0.02 0.02 60.7 1,433 0.03 0.08 0.03 0.03 1,212 61.7 1,932 0.04 0.12 0.04 0.07 2,888 62.7 2,500 0.06 0.15 0.05 0.12 5,098 63.7 3,135 0.07 0.19 0.06 0.18 7,909 64.7 3,860 0.09 0.24 0.08 0.26 11,401 65.7 4,664 0.11 0.29 0.10 0.36 15,656 66.7 7,930 0.18 0.43 0.14 0.50 21,881 67.2 9,624 0.22 0.60 0.10 0.60 26,263 67.7 11,788 0.27 0.74 0.12 0.73 31,607 67.8 11,928 0.27 0.82 0.03 0.75 32,793 67.9 12,070 0.28 0.83 0.03 0.78 33,993 68.0 12,212 0.28 0.84 0.03 0.81 35,207 68.1 12,355 0.28 0.85 0.03 0.84 36,435 68.2 12,498 0.29 0.86 0.03 0.86 37,678 68.7 13,221 0.30 0.89 0.15 1.01 44,107 69.7 14,730 0.34 0.96 0.32 1.33 58,075 * Volume = (1/3) * (Elev. 2 - Elev. 1) * [Al +A2 + SQRT (Al * A2) Permanent Pool Volume = 30,139 - 1,212 = 28,927 cf Forbay Volume @ Permanent Pool Elevation = 5,756 cf (20% Permanent Pool Volume) THE LPA GROUP OF NORTH CAROLINA, P.A. 5000 Falls of Neuse Road, Suite 304 Raleigh, North Carolina 27609 (919) 954-1244 FAX (919) 954-1345 Pfl000CT 2119-1 (Single Sheets) 2051 (Padded) JOB SHEET NO. / OF LL? (?d8 CALCULATED BY DATE J ? V CHECKED BY DATE SCALE THE LPA GROUP OF NORTH CAROLINA, P.A. 5000 Falls of Neuse Road, Suite 304 Raleigh, North Carolina 27609 (919) 954-1244 FAX (919) 954-1345 JOB /gal-"ll 1?0- '?! SHEET OF CALCULATED BY JI y DATE ?yd 0d CHECKED BY DATE PRODUCT 204-1 (Single Sheels) 205-1 (Padded) THE LPA GROUP OF NORTH CAROLINA, P.A. 5000 Falls of Neuse Road, Suite 304 Raleigh, North Carolina 27609 (919) 954-1244 FAX (919) 954-1345 JOB ?jj'ie; e? ?o (?h 6z' - T/L / SHEET NO. 3 OF K CALCULATED BY 41 DATE ?'-- 6Q ^O" CHECKED BY DATE SCALE PRODUCT 204-1 (Single Sheets) 205 4 (Padded 6 *?+( St e- 6 P8 ?7?- C -ks ) THE LPA GROUP OF NORTH CAROLINA, P.A. 5000 Falls of Neuse Road, Suite 304 Raleigh, North Carolina 27609 (919) 954-1244 FAX (919) 954-1345 JOB 6/? "4 C'ol SHEET NO. r? OF 6 CALCULATED BY DATE CHECKED BY DATE SCALE &11? PRODUCT 204-1 (Single Sheets) 205-1 (Padded) THE LPA GROUP OF NORTH CAROLINA, P.A. 5000 Falls of Neuse Road, Suite 304 Raleigh, North Carolina 27609 (919) 954-1244 FAX (919) 954-1345 JOB i ' Q/ `A :0. SHEET NO. OF CALCULATED BY V DATE ?- OJ, CHECKED BY SCALE /V ZI DATE PROM MM 1 Minale Sheelsl 205-1 Waddedl THE LPA GROUP OF NORTH CAROLINA, P.A. 5000 Falls of Neuse Road, Suite 304 Raleigh, North Carolina 27609 (919) 954-1244 FAX (919) 954-1345 PRODUCT 2G41 (Single Sheets) 205-1(Padded) JOB SHEET NO. OF CALCULATED BY V DATE CHECKED BY DATE SCALE FP-2 - 10 yr [Max Flow = 9.6862][Max Velocity = 5.30] Upstream Elevation Downstream Elevation Flow 69.5 69.0 C- 0 m 68.5 w 68.0 cn U 0 U- 10 9 8 7 6 5 4 3 2 1 0 24 Thu 3AM Apr 2008 6AM 9AM 12PM 3PM 6PM Time J J J J Velocity 9PM 25 Fri 3AM 6AM 9AM 12PM 5.5 5.0 4.5 4.0 3.5 3.00 0 2.5 2.0 1.5 1.0 0.5 0.0 69.0 0 68.5 c? Q) W 6 Cn U 3 0 67.5 9 8 7 6 5 4 3 2 1 0 24 Thu 3AM Apr 2008 6AM 9AM 12PM 3PM 6PM Time 9PM 25 Fri 3AM 6AM 9AM 12PM 0.6 0.5 0.4 (D 0 0.3,E Cn 0.2.-" 0.1 0.0 Ditch Below Taxilanes [Max Flow = 9.1944] [Max Velocity = 0.60] Upstream Elevation Downstream Elevation Flow Velocity FP-3 - 10 yr [Max Flow= 19.2715] [Max Velocity = 7.07] Upstream Elevation Downstream Elevation Flow J J J J Velocity CD 0 n 1< c? 24 Thu 3AM 6AM 9AM 12PM 3PM 6PM 9PM 25 Fri 3AM 6AM 9AM 12PM Apr 2008 Time Ditch to Weir - 10 yr [Max Flow = 19.1337][Max Velocity = 1.28] Upstream Elevation Downstream Elevation Flow J J J J Velocity 2 0 .8< 0 0 .6 Cn .4 .2 .0 24 Thu 3AM 6AM 9AM 12PM 3PM 6PM 9PM 25 Fri 3AM 6AM 9AM 12PM Apr 2008 Time 76 Upstream Elevation 74 0 72 4-1 CO w 70 10 9 8 7 U 3 6 _ 0 U- 5 4 3 2 0 ...®.?- 24 Thu 3AM Apr 2008 Diversion Weir - 10 yr [Max Flow = 11.3414] [Max Velocity = 0.00] Downstream Elevation 6AM 9AM 12PM 3PM 6PM Time awftu? Flow 9PM 25 Fri 3AM 6AM 9AM 12PM 68. C 68. a? U' 67. 1 1 U O LL Bypass Ditch - 10 yr [Max Flow = 11.0954] [Max Velocity = 1.80] Upstream Elevation Downstream Elevation Flow J J J J Velocity 1.8 1.6 1.4 1.2 < CD 1.0 `G 0.8 Zc 0.6 0.4 0.2 0.0 24 Thu 3AM 6AM 9AM 12PM 3PM 6PM 9PM 25 Fri 3AM 6AM 9AM 12PM Apr 2008 Time P-3 - 10 yr [Max Flow = 8.2494] [Max Velocity = 6.54] ,.., 68. C O 68. m w 67. Cn U O U- Upstream Elevation wrrrros? WWAOWW?j Downstream Elevation Flow J J J J Velocity (D 0 n `G N 24 Thu 3AM 6AM 9AM 12PM 3PM 6PM 9PM 25 Fri 3AM 6AM 9AM 12PM Apr 2008 Time 68.2 68. 68. 67. 67. 0) co U) 67.1 67. 67.E 67.; 67.; Forebay - 10 yr [Max Stage = 68.155] L4 i nu JAM bAM 9AM 12PM 3PM 6PM 9PM 25 Fri 3AM 6AM 9AM 12PM Apr 2008 Time 68.2 68.0 67.8 0 > 67.6 a? W 67.4 67.2 12 10 8 U 6 0 U- 4 2 0 Forebay Berm - 10 yr [Max Flow = 11.6341 ] [Max Velocity = 0.001 Upstream Elevation Downstream Elevation i Flow 24 Thu 3AM 6AM 9AM 12PM 3PM 6PM 9PM 25 Fri 3AM 6AM 9AM 12PM Apr 2008 Time Pond - 10 yr [Max Stage = 68.161 ] 68.2 68.1 68.0 67.9 67.8 ? 67.7 rn c6 vJ 67.6 67.5 67.4 67.3 67.2 24 Thu 3AM 6AM 9AM 12PM 3PM 6PM 9PM 25 Fri 3AM 6AM 9AM 12PM Apr 2008 Time Flow (cfs) W N N ? ? O O O ? ? D O CJ1 O U1 O ()1 O U'I O CI1 N N O ? O ? O S C w D 0) D D N W CD O N CJ1 W D O D CC' D N Elevation (ft) O rn OD C0 v O C CD 3 I 3 m CD n<i 0 7 D N O O co X "+7 it O N CD 7 00 00 (D 3 k 3 m ?ll<o a o 0 II 0 O O T O C CD O I m m 0 7 X 'T7 p II 0 7 O 0) 3 I X ml <p CD CD W L o 7 I I Q` N -i3l Flow (cfs) Elevation (ft) P-4 - 10 yr [Max Flow = -2.8584][Max Velocity = -3.63] Upstream Elevation Downstream Elevation Flow J J J J Velocity 2 1 0 cu 0 0 -1 ? -2 -3 24 Thu 3AM 6AM 9AM 12PM 3PM 6PM 9PM 25 Fri 3AM 6AM 9AM 12PM Apr 2008 Time 68. C: 67. 0 67. W 66. 1 1 1 Cn U 3 0 U- Outlet Ditch - 10 yr [Max Flow = 14.1895][Max Velocity = 1.83] Upstream Elevation Downstream Elevation Flow J =:W J Velocity 1.8 1.6 1.4 1.2 < (D 0 1.00. 0.8 0.6 0.4 0.2 0.0 24 Thu 3AM 6AM 9AM 12PM 3PM 6PM 9PM 25 Fri 3AM 6AM 9AM 12PM Apr 2008 Time Pond - 50 yr [Max Stage = 68.507] 68.4 68.2 68.0 a? 67.8 67.6 67.4 67.2 24 Thu 3AM 6AM 9AM 12PM 3PM 6PM 9PM 25 Fri 3AM 6AM 9AM 12PM Apr 2008 Time November 17, 2006 S&ME The LPA Group of North Carolina, P.A. 4904 Professional Court, Suite 201 Raleigh, North Carolina 27609 Attention: Mr. Terry Bumpus J Reference: Subsurface Exploration Report Proposed Corporate Apron and Taxiway Martin County Airport Williamston, North Carolina S&ME Project No. 1051-06-365 Dear Mr. Bumpus: S&ME, Inc. is pleased to submit this report of the subsurface exploration conducted for the referenced project. Work was conducted in accordance with S&ME's Revised Proposal P059-06E 3rd Revision dated June 21, 2006. The purpose of the exploration was to evaluate subsurface conditions as they relate to site grading and pavement subgrade support for the proposed corporate apron and taxiway. This report presents a summary of pertinent project information, a description of our exploration program, and results of field testing. A Boring Location Plan, Generalized Subsurface Profile, and Test Boring Records are included in the Appendix. PROJECT AND SITE DESCRIPTION A Corporate Apron and Taxiway are planned for the Martin County Airport located in Williamston, North Carolina. The proposed taxiway will be approximately 1,200 feet long and constructed south of the existing apron and taxiway. The proposed Corporate Apron portion of the project will consist of two taxiways constructed to the east of the existing apron. l S&ME, INC. / 3201 Spring Forest Road / Raleigh, NC 27616 / p 919.872.2660 f 919.876.3958 / www.smeinc.com Subsurface. Exploration Report S&ME Project No. 1051-06-365 Proposed Corporate Apron and Taxiway November 17, 2006 ' Martin County Airport Williamston, North Carolina • Based on our site reconnaissance, the site is relatively flat with drainage ditches along the runway and tree line on the northeastern portion of the site. The site is mostly open with pine trees in the vicinity of the proposed Corporate Apron. An access road runs along the proposed taxiway. The existing apron and access road are paved with asphalt. J EXPLORATION PROGRAM The exploration program for this project included the performance of 9 soil test borings. Soil test J borings were advanced to an approximate depth of 10 feet beneath existing ground surface. The J boring locations were selected by The LPA Group of North Carolina and were located in the field J by a representative of S&ME by estimating distances from existing site features. Two of the J provided boring locations (B-8 and B-9) were moved out of the woods since clearing was not allowed. The approximate boring locations are shown on Figure 1 in the Appendix. The soil borings were advanced using hollow stem auger drilling procedures with a CME-45-06 drill rig. Within each of the soil test borings, samples of subsurface soils were obtained at approximately 2-1/2 foot intervals to a depth of 10 feet using a split-spoon sampler. Standard penetration tests were conducted in conjunction with split-spoon sampling in general accordance 7 with ASTM D 1586. The boreholes were observed for groundwater at completion of drilling. Boreholes were then backfilled up to the original ground surface with auger cuttings. Boreholes performed in pavement areas were patched with cold patch asphalt. A Generalized Subsurface Profile drawing (Figure 2) and Test Boring Records presenting subsurface information from the borings are included in the Appendix. Stratification lines shown on the Test Boring Records are intended to represent approximate depths of changes in soil types. Naturally, transitional changes in soil types are often gradual and cannot be defined at a particular depth. t J 1 l 1 a a Subsurface Exploration Report Proposed Corporate Apron and Taxiway Martin County Airport Williamston, North Carolina SUBSURFACE CONDITIONS S&ME Project No. 1051-06-365 November 17, 2006 Borings B-2, B-4, and B-6 were performed in asphalt paved areas. Approximately 3 to 5 inches of asphalt and 5 inches of aggregate base course (ABC) stone were encountered at the ground surface. Topsoil was encountered at the ground surface in the remaining borings. Topsoil thickness ranged from approximately 6 to 12 inches. The typical subsurface profile below the pavement sections and topsoil consists of interlayered coastal plain deposits of sands (SM, SC) and clays (CL, CH). SPT N-values within natural soils ranged from 4 to 23 blows per foot. N-values indicate soft to stiff consistencies for clays and loose to medium dense relative densities for sands. Natural soils appeared moist to wet. Groundwater was not observed in any of the boreholes at the termination of drilling operations. However, groundwater was observed in the drainage ditches approximately 1 to 3 feet below the existing ground surface. Groundwater elevations can be expected to fluctuate due to seasonal variations in rainfall, evaporation, and other factors. LABORATORY TESTING Laboratory testing consisted of natural moisture content, grain size analysis, Atterberg limits, standard Proctor, and California bearing ratio (CBR) testing. Grain size analysis testing was performed on a split-spoon sample obtained from boring B-3 at an approximate depth of 1 foot. Testing indicates the sample contained mostly fine sand (73 percent) with 24 percent fines (silt and clay). Atterberg limits testing were performed on a split-spoon sample obtained from boring B-7 at an approximate depth of 1 foot. Atterberg limits testing indicated a liquid limit of 28 percent and plasticity index of 9 percent. These values indicate the sample was a low plasticity clay with USCS classification of CL. 3 Subsurface Exploration Report S&ME Project No. 1051-06-365 Proposed Corporate Apron and Taxiway November 17, 2006 Martin County Airport Williamston, North Carolina A standard Proctor test was performed on the bulk sample of near surface soils obtained from boring B-3. Testing indicates a maximum dry density of about 120 pounds per cubic foot with an optimum moisture content of about 13.1 percent. Natural moisture content tests performed on near surface soils-indicated moisture contents ranging from 8.7 to 21.3 percent. A California bearing ratio (CBR) test was also performed on the recompacted bulk sample of the soils obtained from boring B-3 from an approximate depth of 1 to 5 feet. The test specimen was recompacted to approximately 98 percent of the standard Proctor maximum dry density neat the optimum moisture content. The test specimen was then soaked. A California bearing ratio of 6.4 percent was measured. Based on the laboratory testing it is our recommendation that a CBR value of 6 percent be used for the design of the corporate apron and taxiway. Subgrade soils should be reworked and compacted to at least 98 percent of the standard Proctor maximum dry density within plus or minus 3 percent of the optimum moisture content. CONCLUSIONS AND RECOMMENDATIONS If The subsurface exploration indicates that the site is adaptable for the proposed construction site grading does not occur during hot and dry conditions, some repair of moisture sensitive near surface soils should be expected. The following paragraphs present more detailed conclusions and recommendations regarding site development. Site Preparation Site grading will be difficult during wet periods of the year. Most near surface soils are moisture sensitive, and when wet, will tend to rut and pump under rubber-tired traffic and provide poor subgrade support for structures and pavements. To reduce potential earthwork problems, we recommend that site preparation and grading be conducted during the typically drier summer months, if possible. If grading is attempted during wet conditions, more extensive repair of near surface soils and possible use of select off-site borrow will be necessary to adequately prepare subgrades for new construction. Heavy rubber-tired construction equipment should not be allowed 4 Subsurface Exploration Report S&ME Project No. 1051-06-365 Proposed Corporate Apron and Taxiway November 17, 2006 Martin County Airport Williamston, North Carolina to operate on exposed subgrades during wet conditions. Even during drier periods of the year, we recommend that exposed subgrades be sloped and sealed at the end of each day to promote runoff and reduce infiltration from rainfall. Site preparation should begin with clearing of all trees, vegetation, topsoil, existing asphalt, and other unsuitable surface materials. The existing ABC stone may remain in place provided it is stable during proofroll. However, the existing ABC stone should not be included as part of the new pavement section. Approximately 6 to 12 inches of topsoil/rootmat was encountered in borings. Deeper stripping depths are usually required to remove rootmat from areas with trees. The depth of topsoil stripping will also depend on prevailing weather conditions at time of construction. During wet conditions, rubber-tired equipment will mix topsoil with underlying "clean" soils, causing stripping depths to be greater than topsoil depths indicated on borings. As such, actual stripping depths could be greater than topsoil/rootmat thicknesses encountered. Topsoil may be stockpiled on site and reused in landscaped areas. Topsoil should not be used for construction of permanent slopes. Following stripping, areas at planned grades and areas that will receive fill should be proofrolied with a loaded tandem axle dump truck or equivalent. Any areas that are observed to rut, pump, or deflect excessively during the proofrolling process should be repaired as recommended by the geotechnical engineer. It is anticipated that some repairs will be required in the area of borings B-1, B-7, B-8 and B-9. Possible repair measures may include undercutting to stable soils and backfilling with well compacted, low-plasticity materials, discing/drying/compacting existing soils, placement of a geotextile stabilization fabric and crushed stone, or some combination of these. The most practical repair measure will be influenced by the degree of instability which exists and weather conditions. As such, actual repair measures must be determined in the field at time of construction. I Excavations Based on results of borings, low to moderate consistency soils are present at the site. Past experience indicates that these materials can be excavated by routine earth-moving equipment. That *11 Subsurface Exploration Report S&ME Project No. 1051-06-365 Proposed Corporate Apron and Taxiway November 17, 2006 Martin County Airport . Williamston, North Carolina is, mass excavation can be accomplished by bulldozer-pushed scrapers with light to moderate preloosening of higher consistency soils by tractor-drawn rippers. A moderately heavy front-end loader should be able to excavate these materials operating basically unassisted. Local excavations for shallow utility trenches and foundations within soils and fill can likely be accomplished by a conventional backhoe. For confined excavations, trench safety must be evaluated on a case-by-case basis. The contractor will be responsible for all site safety, including the determination of appropriate trench safety measures according to OSHA guidelines. Structural Fill The soils at this site having a Unified Soil Classification designation of CL, ML, SC, and SM are suitable for reuse as structural fill provided that the moisture content is properly controlled during placement and compaction. The moisture condition of near surface soils will be influenced by prevailing weather conditions. At the time our borings were performed, some of the near surface soils were wet and would require some drying prior to use as fill. All structural soil fill should consist of low plasticity soil (PI<30), be free of debris and have less than 5 percent organics. Fill should be placed in 8 to 10 inch loose lifts and compacted to at least 95 percent of the standard Proctor maximum dry density (ASTM D 698) and within three percent of the optimum moisture content. Fill within 18 inches of finished subgrade should be compacted to at least 98 percent of the standard Proctor maximum dry density. In-place testing should be performed during fill placement to confirm that the recommended degree of compaction is achieved. QUALIFICATIONS OF REPORT This report has been prepared in accordance with generally accepted engineering practice for specific application to this project. Any wetland, environmental, or contaminant assessment efforts are beyond the scope of this geotechnical exploration; and therefore, those issues are not addressed 1 ? ? 6 Subsurface Exploration Report S&ME Project No. 1051-06-365 Proposed Corporate Apron and Taxiway November 17, 2006 Martin County Airport Williamston, North Carolina in this geotechnical exploration report. The recommendations contained in this report are based on the applicable standards of our profession at the time this report was prepared. No other warranty, express or implied, is made. Conclusions and recommendations submitted in this report are based, in part, upon the data obtained from the geotechnical exploration. The nature and extent of variations between and outside of the borings may not become evident until construction. If variations appear evident, then it will be necessary to re-evaluate the recommendations of this report. In the event that any changes in the grades, nature, design, or location of the proposed building or pavements are planned, the recommendations contained in this report should be reviewed and modified or verified in writing. We recommend that our firm be provided the opportunity for general review of final design specifications to confirm that our recommendations are properly interpreted and implemented. CLOSURE S&ME, Inc. appreciates the opportunity to provide our professional engineering services on this project. Should you have any questions concerning this report or if we may be of further assistance, please contact us at your convenience. Sincerely, S&ME, Inc. /? efF,r 3 ?8gy ,{?D I?JJ A ?wtaa??'ab y ( ? w+,??iy O'V'A ?? ??44J?C3 l?Ij J. Adam Browning, E.I. Abner F. 4Riggsif".' P Staff Professional Senior Geotechnial guiX 15, 5 h l7 N.C. Registration No.1,415 o e Attachments 4;( F RIG S:\PROJECTS\2006\06-365 Martin Co Airport Apron Taxiway Wmston\Geotech\Report\06-365-rpt Martin County Airport.doc 7 7' ! I I I Jr, I N , Q I W } W ry I ? D ,I I i f f I W V J I I' Z W 2 n V Z l-- r ? ) . ` W Z 0 Z 0 co Y x ? Aa s _ I I }_ j I , I CD, ?\ I I 1 v I I I ?I ?- 1 IT I C? Q\ I O? CO* w [if D Ir- r? 2Q J X Q Z z Z 0 o C v Q o >- o 0 Z u~i Z Q O J m U CY- Q Z W Z tn cr LJ W HN J ? F ZZ F, W I'm WZ Z? 0 W jW ' L. CL D O C.? Q Cl- J W 2 H m 0 w cD _ (D p 0 M 00 N cD ? N m m H W j II M d O w 8 Z z a Lij f- m U) ° m w p z° J cc z 3 w Z m a v CL a a o I- O v i O 0 Q m 4J CD U O co N U_ 2 Q O c O (.J O I l 1 1 t l l w ? A !. -.i t rl ? ? t +?f ? ]? :1? ' ! ' i ? 1• ? ? > > > > ? >• tad Irrr?? GENERALIZED SUBSURFACE CONDITIONS 0 1 2 3 4 d w x CL w 010- 7 8 9 10 11 B- 1 ............................... .......... B- 2 ..... .......... B- 3 ..... ........... B- 4 ..... . .......... B- 5 ..... ........... B- 6 ..... .......... B- 7 ..... ........... B- 8 .... .......... B- 9 ^ ..... ............................ O ................... . 6....... .. .. 1.2..... ..... 1.8 ...... ..... .: . 15...... ..... : . 12 .. .... .9.... 4... :.... 4 • .? . 6.... 5 17 23 16 11 13 6 5 5 00, 7 8 00 0 ?o ' 000 01 000 f1 ...... ...... .. .1?...... ..... .:.. .1.2..... ...... :..: . .8........ . ...... ..... ..... ...:: .8........ .......... ..... ..... 7...... ......... ...... ...... 7.......................... ............................... ..... ...... . ... .......... ...... .. .. ...................... ......... 7 ........ .......... 7 ....... ........... 7 ....... .. ........... 9 ....... .. ...... 14 ......... 9 ...... ... .......... 13 ..... .. ......... . 6 ....... ............................... 8 Topsoil 0 Gravel Silty Sand Clayey Sand Silty Clay Sandy Clay Asphalt N = Standard Penetration Test resistance value (blows per foot). The depicted stratigraphy is shown for illustrative purposes only. The actual subsurface conditions will vary between boring locations. SCALE: N.T.S. GENERALIZED SUBSURFACE CONDITIONS FIGUF Forest Road 3201 S rin p g NO. CHECKED BY: JAB Raleigh, INC 27616 S&ME Martin Co.Airport Taxiway DATE: 11116/2006 - (919) 872-2660 2 (919) 876-3958 fax North Carolina Williamston JOB NO: 1051-06-365 ENV RNONMENTTALSERVICES www•smeinc.com ,