Loading...
HomeMy WebLinkAbout20031127 Ver 2_More Info Received_20080519aT F 03 - 112,'1 v 2 DR. J.H. CARTER III & ASSOCIATES, INC. Environmental Consultants P.O. Box 891 . Southern Pines, N.C. 28388 (910) 695-1043 9 Fax (910) 695-3317 16 May 2008 Mr. Ian McMillian AN _ 401 Oversight/Express Review Permitting Unit MAY 1 9 2008 NC Division of Water Quality 2321 Crabtree Blvd Suite 250 `?`'?tr?{u 5 yyF [? aNDS "+?!i1 ?T;?!Rt?4'N{+iCit uki'-.!`di,hG Raleigh, NC 27604 RE: Ninth Street North Phase 2 Redevelopment Project DWQ Project #03-1127, Ver. 2 Durham County Dear Mr. Miller: This letter is in reference to the request for more information in a letter dated 18 April 2008, regarding the proposed Ninth Street North Phase 2 Redevelopment Project permit renewal, Durham County, North Carolina (NC). We offer the following information to address the questions raised in your letter. The segment of stream proposed for culverting measures approximately 40 feet and is extremely degraded; having concrete sides and a broken asphalt and debris lined bottom. It originates at an underground culvert containing the stream and passes off site through an underground culvert. The stream is located in an urban landscape in downtown Durham and lacks a natural buffer. The only vegetation left onsite is a narrow strip of shrubs and trees adjacent to the existing ditched stream. The proposed project will replace the existing ditch with a 40 foot culvert, linking two existing culverts on opposite ends of the ditch. With regard to questions 1, 2 and 5, the proposed culvert will be completely enclosed and there will be no open channels left on site, and the water will continue off site in a closed culvert system. The culvert will match the grade of the culverts it is linking; the top of the culvert will match the surrounding ground elevation and as such be flush with the ground on site. We are working for Haden Stanziale on this project; we had originally been contracted by Coulter Jewell and Thames as they were the lead on the project. Haden Stanziale took over the project as such we are now working with them to maintain their compliance with stream and wetlands regulations. The stormwater management plan for this project has not yet been forwarded to our Endangered Species Surveys 9 Environmental Assessments • Land Management 9 Wetlands Mapping and Permitting office. I have requested that Haden Stanziale forward this information to me as soon as possible. Upon receiving this information I will forward it to you. I hope this letter clarifies your concerns regarding the proposed culvert construction at the 9th Street site. Please contact me if you have additional questions or need more information. Thank you for your time. S' c r , William Mullin Wetland Biologist