Loading...
HomeMy WebLinkAbout20061059 Ver 4_Application_20071120[Fwd: [Fwd: 37740 pemnit mod] NC 97 Edgecombe Cty.] a Subject: [Fwd: [Fwd: 37740 permit mod] NC 97 Edgecombe Cty.] From: Chad Coggins <ccoggins@dot.state.nc.us> Date: Thu, 15 May. 2008 15:53:44 -0400 To: Rob Ridings <rob.ridings@ncmail.net> Rob, We need 403 sq ft of additional buffer zone mpact for NC 97 project in-'dgecombe Co. See attached drawing and explanation below. DWQ project # 20061059. Thanks.. Chad Coggins NCDOT Div. 4 Environmental officer 252-296-3532 office 252-717-8699 cell My email address will ccoggins@ncdot.gov as records. change from ccoggins'@dot.state.nc.us to of May 27, 2008. Please update your Subject: [Fwd: 37740 permit mod] NC 97 Edgecombe Cty. From: "Eddie J. Bunn, PE" <ebunn@dot.state.nc.us> Date: Thu, 15 May 2008 14:52:53 -0400 To: Chad Coggins <ccoggins@dot.state.nc.us> CC: "John K. Arms" <jkarms@dot.state.nc.us> Chad, There is a need for rip-rap in order to provide slope protection at the inlet end of a new retaining wall that was just installed. Our concern is to provide protection from potential high veloctiy storm waters that may undermine the toe and create instability of the retaining wall. Attached is a drawing that depicts the preferred placement of the rip-rap at this wall. Can we arrange this change with DWQ? No rip rap will be placed in the -stream itself, only in the RBZ. Thank you, Eddie "My email address will change on May 27, 2008 from ebunn@dot.state.nc.us to ebunn@ncdot.gov" Please update your records. Subject: 37740 permit mod From: Jimmy Long <jmlong@dot.state.nc.us> Date: Wed, 14 May 2008 15:12:14 -0400 To: "Eddie J. Bunn, PE" <ebunn@dot.state.nc.us> 1 of 2 5/16/2008 11:50 AM 0 t i' f ?z Lu e }}>> , z N t Y " m Q J S3?^ ? y LIJ w? k 1 it, f zap--?-- ? __ } } 1 9? z za i. k } t i E 1 { { ?i { i} } } } ell O L Z i w { { { II ? LS.C 1 I I { { { LLJ 1 i II LLJ u z LLJ LL Cn to }}} }}} M