Loading...
HomeMy WebLinkAbout20070656 Ver 3_401 Application_20080508Wt*J;t 67-?5LV3 Wetland and Natural Resource Consultants, Inc. May 16, 2008 To: NC Division of Water Quality 401 Wetlands Unit Attn: Mr. Ian McMillan 2321 Crabtree Blvd., Suite 250 Raleigh, North Carolina 27604 o C_?O lJ MAY 19 2008 Re: Road and Dam Upgrade Project DENR -)NArEriQUAUY The Cliffs at High Carolina (+/-2100 acres) WETUwDSANDSTORMWATERBRAN04 Buncombe County, North Carolina Ian: Thank you for discussing this project with me on May 15, 2008 in your office. Based on our discussions enclosed is a re-submittal of the 401 previously requested back in February 2008. During a further phone conversation on May 16, 2008 you agreed with the language we are using on the conceptual master plan for the lots that were previously questioned as being buildable by your office. Please refer to the last three paragraphs of this cover letter for additional information that was not included in the previously submitted certification request that was withdrawn. The attached Pre-Construction Notification (PCN) is being submitted on behalf of Mr. Rob Weber of The Cliffs Communities. The Cliffs are currently upgrading an existing road on approximately 2100 acres near Swannanoa in Buncombe County, North Carolina and are seeking authorization under Nationwide Permit 29 for impacts associated with the construction of two road crossings. These road crossings are a stream at the entrance to the property (already installed) and a linear wetland at the top of one of the drainages on site. There was 30' pipe at the entrance crossing and 120' was installed leaving 90' of new impact. At the wetland there is an existing 20' pipe and the request is to replace, upgrade, and lengthen this existing pipe from 20' to 80'. The addition of 60' is needed because of the steeper topography at this crossing. The upgraded road will require a wider surface area than the current road and will need to be constructed with more gradual side slopes. Canton Office PO Box 882 Canton, NC 28716 828-648-8801 828-648-8802 Fax This request also includes impacts at Tsuga Lake on the property in order to bring the lake up to current NC Dam Safety standards. These impacts include 59' of stream impact and 0.0377 acre of wetland impacts. See the enclosed report and drawing from S&ME regarding the necessity for the dam impacts. There will be a new outlet structure constructed at the lake. A cold water release will be incorporated with this new structure. The pond does not currently have a cold water release structure so this addition will improve downstream water quality. The existing outlet structure is perched above the streambed by approximately 7'. This PCN includes all stream and wetland impacts associated with this road and dam upgrade project. The road upgrades are necessary to gain access across the site. There will be no additional impacts from fill slopes, dissipaters, or bank stabilization associated with the road and dam upgrade project. The road proposed for upgrading is currently graveled and will remain a gravel road through at least early 2010. Eventually this road will be paved. All necessary stormwater permits have been obtained through Buncombe County. A copy of the erosion and sediment control permit is enclosed. The Cliffs have constructed four bridges to avoid additional stream impacts associated with this upgrade and maintenance project. Construction drawings of these bridges are included for review. The construction of these bridges which cost approximately $250,000 each to design and construct have avoided 240 to 320 linear feet of stream impact. Enclosed is a copy of a letter received from the DWQ Swannanoa office indicating that we must include the impacts requested in this application in an Individual Permit application for the project since eventual thresholds will exceed 300 linear feet. The Corps has considered the road and dam upgrade project a single and complete project. The Corps approval is enclosed for review. This project can be completed independently of the eventual further site development and should be considered as such. The Cliffs have agreed to mitigate for the proposed impacts through EEP. The acceptance letters from EEP are enclosed for review. There are four categories of lots included in the enclosed conceptual master plan. Category 1 is lots that are buildable without further description. Category 2 is lots that will require a bridged driveway crossing to access the buildable area within the lot. Category 3 is lots that have a building envelope included to present the buildable area with the lots. These lots that include building envelopes on the attached map have the following buildable areas: lot 1 - .4 acre; lot 2 - .7 acre; lot 3 - 1.7 acres; lot 4 - 1 acre; lot 5 - 1.9 acres; and lot 6 - .6 acre. Category 4 is lots that appear to require impacts. These lots will not be developed unless the lot lines are reconfigured. The following description should address the cumulative impact analysis that was requested in the previous application. It is not anticipated that this project will result in Canton Office PO Box 882 Canton, NC 28716 828-648-8801 828-648-8802 Fax The following description should address the cumulative impact analysis that was requested in the previous application. It is not anticipated that this project will result in additional impacts on the property surrounding this project. The majority of the adjoining property is existing residential development. On the southern half of the project (the Fairview side), there are two large tracts owned by land companies who have no interest in selling their property. The northern half of the project (the Swannanoa side) borders I-40 and the town of Swannanoa. Swannanoa is a fully self- sustaining town with ample businesses and amenities to support the local population as well as absorb the proposed development. High Carolina will be a primarily second home development. As such the residents will not require the municipal services such as schools necessitated by permanent residents. Nor will it necessitate the amount of adjacent services that a permanent resident population would. Asheville is also within minutes of the property and will serve the project for both shopping and recreation. Thank you for your help with this project. Best regards, Jennifer L. Robertson Enclosures: PCN Agent Authorization Vicinity Map USGS Extent and Zoomed Maps Tax Parcel Map Aerial Photograph Soil Survey Map Aquatic Life Passage Provision Typical Road Impact Maps (9) Dam Safety Report from S&ME Dam Impact Map from S&ME Corps NW 29 Approval Letter EEP Approval Letter DWQ Swannanoa Office Application Letter Construction Details for Bridges (4 sets) Erosion Control Approval Conceptual Impact Table Conceptual Master Plan (Overall Project - 800' Scale) Conceptual Master Plan (Sub-sheets - 100' Scale) Canton Office PO Box 882 Canton, NC 28716 828-648-8801 828-648-8802 Fax Pre-Construction Notification Office Use Only: Form Version March 05 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NW 29 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: N 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details) F?? i II. Applicant Information L=P fi? 9 Do MAY 1 9 2008 1. Owner/Applicant Information DENR - WATER QUAUTY Name: Mr. Rob Weber WETLANDS AND STORMWATER BRANCH Mailing Address: The Cliffs Communities 3598 Highway 11 Travelers Rest SC 29690 Telephone Number: 864-371-1081 Fax Number: E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Jennifer Robertson Company Affiliation: Wetland and Natural Resource Consultants Mailing Address: Post Office Box 882 Canton North Carolina 28716 Telephone Number: 828-712-9205 Fax Number: 828-648-8802 E-mail Address: Jennifer. Robertsonaa,,wetland-consultants.com Updated 11/1/2005 Page 1 of 9 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: High Carolina - Road and Dam Upgrade 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): See Attached Tax Parcel Map 4. Location County: Buncombe Nearest Town: Swannanoa Subdivision name (include phase/lot number): High Carolina Directions to site (include road numbers/names, landmarks, etc.): From Asheville, take I-40 East to Exit 59. Turn right at top of exit ramp, take an immediate left onto New Valle Entrance to High Carolina is immediately on the left. OR from Asheville, take I-240 East to US Highway 74, continue on US Highway 74 and turn left onto Old Fort Road. Turn left onto Spring Mountain Road and continue to the green gate. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35.581506 ON 82.384495 °W 6. Property size (acres): +/- 2100 acres 7. Name of nearest receiving body of water: _ Swannanoa River and Rocky Fork 8. River Basin: French Broad River Basin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at itip://112o.enr.state.tic.us/adniin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The majority of the site is wooded. There is an extensive Updated 11/1/2005 Page 2 of 9 road network that allows for 4WD and ATV access around the site. The general land use in the vicinity of the project is residential, industrial, commercial, and forested. 10. Describe the overall project in detail, including the type of equipment to be used: This project involves the upgrading of an existing road and an existing dam. Typical construction and earth-moving equipment will be utilized on site. 11. Explain the purpose of the proposed work: The purpose of the proposed work is to provide access to the site and to make the existing dam safer. The dam does not currently meet dam safely regulations. The upgrade of the existing wetland crossing will allow travel from one side of the property to the other. The upgrade of the two existing road crossings and the dam can be done independently of future site development. The . Corps has issued approval for this project. A copy of the approval is enclosed. The Corps is considering this project a single and complete project. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. A request for jurisdictional determination was submitted to the Corps on September 13, 2006. On December 14, 2006, a visit was conducted with the Corps to look at the main entrance off New Valley Road. A second site visit, to review the rest of the property which only include the Swannanoa side, was conducted on January 9, 2007. A third site visit was conducted on April 18, 2007 with the Corps, NC DWQ, and NC WRC to both the Swannanoa and Fairview sides of the property. The parcels on the Fairview side had been purchased at a later date. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. Yes, The Cliffs at High Carolina is a 2,100 acre master-planned development. As such an Individual Permit application will be submitted for review at a later date and will include all anticipated impacts outside of the scope of this application. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, Updated 11/1/2005 Page 3 of 9 permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The impacts associated with this project include the upgrade and extension of two culverts. Four bridges have been constructed to date. This project also involves the upgrade and maintenance of an existing pond to meet current dam safety standards. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain ( es/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) 5 Pipe upgrade & extend Linear vegetated No < 50' 0.014 7 Dam upgrade Created on dam slope No < 50' 0.038 Total Wetland Impact (acres) 0.052 3. List the total acreage (estimated) of all existing wetlands on the property: z 1.14 acres 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Perennial or Average Impact Area of Number Stream Name Type of Impact Intermittent? Stream Width Length Impact (indicate on ma) Before Impact (linear feet) (acres) 1 UT to Swannanoa Pipe P 2' 90' 0.004 2 UT to Swannanoa Bridge (no impact) P 0' 0 3 UT to Swaunanoa Bridge (no impact) P 2' 0' 0 4 UT to Swannanoa Bridge ( no impact) P 5' 0' 0 6 UT to Licklog Bridge (no impact) P 6' 0' 0 Updated 11/1/2005 Page 4 of 9 8 Rocky Fork Pipe P 8' 59' 0.011 Total Stream Impact (by length and acreage) 0.015 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Site Number (indicate on ma) Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) n/a Total Open Water Impact (acres) 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0.015 Wetland Impact (acres): 0.052 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0.067 Total Stream Impact (linear feet): 149 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): no pond construction proposed Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): no pond construction proposed Current land use in the vicinity of the pond: no pond construction proposed Size of watershed draining to pond: see above Expected pond surface area: see above VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and Updated 11/1/2005 Page 5 of 9 financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Impacts on site have been minimized to the maximum extent practicable. Four crossinas have utilized bridges and will have no impacts on their respective streams. The old existing road alignment has been used as much as possible to reduce impacts to streams, wetlands, and uplands. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o. enr. state.nc. us/ncwetiands/ strmgide.lltml. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Since it is anticipated that future development will require additional impacts the project proponent has agreed to mitigate for the stream impacts associated with the two road crossings and dam upgrades now. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at Updated 11/1/2005 Page 6 of 9 (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://li2o.eiir.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): 591f cold and 901f cool Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ? No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (square feet) Mitigation 1 3 (2 for Catawba) Updated 11/1/2005 Page 7 of 9 * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The project will not exceed 20% impervious surface. Buncombe County has adopted a Stormwater Ordinance pram. The Cliffs Communities are obtaining stormwater approvals through Buncombe County. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No wastewater treatment is proposed since the project will not generate M. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Z Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No ? If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at httn://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: This project will not result in cumulative impacts which will affect water quality. The addition of a cold water release on the existing pond that currently has a ton water release will have a positive effect on downstream water quality. XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may Updated 11/1/2005 Page 8 of 9 choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). February 27, 2008 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Updated 11/1/2005 Page 9 of 9 Agent Authorization WM;t Wetland and Natural Resource Consultants Inc.` Department of the Army Wilmington District, Corps of Engineers Attn: Ken Jolley, Chief Regulatory Division PO Box 1890 Wilmington, North Carolina 28402-1890 -and- NC Division of Wafter Quality Attn: Cyndi Karoiy 2321 Crabtree Blvd. Raleigh, North Carolina 27604-2260 I, the current landowner of the property identified below, hereby authorize Wetland and Natural Resource Consultants, Inc. to act on my behalf as my agent during the processing of permits to impact Wetlands and Waters of the US that are regulated by the clean Water Act and the Rivers and Harbors Act Federal and State agents are authwIzed to be on said property when accompanied by Wedand and Natural Resource Consultants, Inc. staff. Weiland and Natural Resource Consultants, Inc. is authorized to provide supplemental information needed far permit processing at the request of the Corps or DWQ. Property Owner of Record: + Address: 3 5'9 k !-ors k ?L, 4 Y d ^ Address- l fGter ?L'r?' !t L CS C [1cle 0 Address: Phone Number: l t ,0is i Property i.ocation: Owners Signature: Date: \../ fTHlq('0 Conton Off a NrwM office PO 8cx 882 wnrinceom PO Box 234 Canton, NC 28716 Newton, NC 28658 828.648-8801 828465-3035 8284AS4 802 fax I 828-465-3050 Fax Vicinity Map Map of [302-317] Patton Cove Rd Swannanoa, NC by MapQuest ?v ?IZZ O PPaf Ln A ?y r ?f Edwards Ave Ulu U5 70 n 4 c r^$p? Short St g we 94 Richmond Ave ?s 70; >s°f Pie n Bea ?Uth Av we a ° park Rd p ° va1teYij1e` Swannanoa ro p o 0 a ?r NorfolK gauth®?? N 'err Brittmore PI a - o V c s GQ MAPauEST. ,? Ra t_- L s, ?m r Page 2 of 2 9-1 70 Old LYtte Cove Rd 1 M O a All rights reserved. Use Subject to License/Copyright This map is informational only. No representation is made or warranty given as to its content. User assumes all risk of use. MapQuest and its suppliers assume no responsibility for any loss or delay resulting from such use. http://www.mapquest.conVmaps/map.adp?mapdata=bLaOkxtG3xuf3aczCAF4ejJ5uj91 Qp... 11/27/2007 USGS Maps 'v o ° r c ri a u . « y x F 'A < e" k e I r _..,,... " o M o _ \\\,,`t1"r> rD ,"r ?t l (lye .N"1,?"/ tx 4 < ?w Z 1 r? r , t _ -41 , `t t haw .. i ,Y n YY a •• 61 47 60`^/ 1A Name: BLACK MT Location: 035.5690401 ° N 082.3616545'W Date: 1/14/2008 Caption: The Cliffs at High Carolina Scale: 1 inch equals 1.515 miles P t t - '•? '? i' s o i Z J y F i z? _ Cd?J? 11 V' C'1 y o( r??1. 6'W 0 Name: BLACK MT Location: 035.5692532° N 082.3689304°W Date: 1/14/2008 Caption: The Cliffs at High Carolina Scale: 1 inch equals 2667 feet Copyriqht (C) 1997, Maptech, Inc Tax Parcel Map High Carolina Tax Parcel Map 0 1,400 2,800 5,600 Feet Legend High Carolina 0 Adjacent Property Owners Map Created by WNR using Buncombe County data Aerial Map 14 ?M 40. z 'U, -jot 4 .,. .• r ?.. ,. ., 6 +. ?\.'- ?.?'?,•" ?'3Y Si?..u?? .??Y' Y ?.'2n' ? wB.. "1??:.• ":4? i ?'. '`?, . ' Soil Survey Map •,, to•., `� � ** �' �-��•�`+���1� tea, l !. f K3. p s� r " s ♦yr y of ,'�. (i f `�y�y � R �•} yam,, g "f' p��t! 1. �/'� j � 3j �� '_.,.� •� .1��77��.- '���11�'� ,�'a�' �+�j,l� . �ei •� � � � r• ,. £ w 'WL migh Carolina Snik; Man oil Q, OWN 1-10-511� q > CAN i�Legend � � � � !''itr { ., �'� � ��'y�'S�'r' - ,.r'` •*�•ic (vf•: --. •y',j^7�i tvj� �i SCJ i -J r. IN, �,•,� ,SCG - I" C���� � ^;R �r'�`„w•„��.►�11. r, '�'''-r" �,#4�,/ ,p`sI''�..,v `,{���1 � ��. � d r�., �� 4t^.�, �� 4 r High Carolina Property Line Vd'. .�i►"rr������,����` �id�YS�SiRt��`«�a ,r 9s•'; , 3�� ..t��` �e�/I.�" ��. � � .vr� � .` . ;.r, Aquatic Life Passage Typical Specifications: Placement of culverts and other structures in waters and streams must be placed below the elevation of the streambed by one foot for culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts less than or equal to 48 inches, to allow low flow passage of water and aquatic life. Any rip rap required for normal pipe burial shall be buried such that the original stream elevation is restored and maintained. WATER SURFACE Longitudinal Profile CULVERT SHOWING PARTIAL BURIAL AT INLET AND OUTLET Not to Scale Cross Section 112 DIAMETER OF PIPE OR 12" WHICHEVER IS GREATER su?FILTER FABRIC DESIGNED TO HANDLE HIGH WATER' OR FLOOD CONDITIONS. COARSE AGGREGATE EARTH FILL COVERED BY T 6 DEEP LARGE ANGULAR ROCK Not to Scale J DATE: REVISION: Culvert Showing Aquatic Life Passage 1, WN? I j N eland anJ Nalr rail Rexnwce C'un?ulLlnl? N O. B- 8x2 Cmlwn. N.C. 287In Typical x]x-r,ax-xsol PRELIMINARY PLANS -------- -- ----------------- Site and Impact Maps I! ? NORTH O I 4 /O 11111\\q LEGEND: Proposed Road ?..? : Culvert / Road Crossing Piped Crossing Bridged Crossing Jurisdictional Stream(s) : Jurisdictional Wetland(s) s : Jurisdictional Linear Wetland(s) 25 ft. Trout Buffer Pond • . - Wetland and Natural Resource Consu P.O. Box 882 Canton, N.C. 2871 828-648-8801 ?'-- I I 0 900' 1800' 3600' 5400' Itants 6 1"=1800 WNR • 2-27-08 Overall Impact Map 3f11E: High Carolina Buncombe County, North Carolina ro]eu code: The Cliffs Communities TCC-1005,1009 N O FZT i i i i i' i i i l? I i i i i I I I i i r 1 e_ 1 ae: V=50' awn r WNR ae. 2-27-09 P 1 p e Map Impact Map P,pj?d Np High Carolina : Wetland and Natural Resource Consultants n P T-fi : { P.O. Box 882 Canton, N.C. 28716 V r Buncombe County, North Carolina 825-648-8801 C°e0S The Cliffs Communities aec T'L-1005,1009 \? NORTH Pet 2 rae: 1„=5U rawn v: WNR ate: 2-27-08 P I p e MaP. Impact Map Project Name: High Carolina :z -. - Wetland and Natural Resource Consultants r (? \? ;tocahont Buncombe County, North Carolina P.O. Box 882 Canton, N.C. 28716 _='- 828-648-8801 C11eo1 The Cliffs Communities OJe? TCC-1005,1009 i NORTH / I i i l? I j, eet : 3 Isle; 1"=50' I[Drawrby: WNR ate: 2-27-08 '? V v Q P i p e Map. Impact Map Project Name: High Carolina %_ ••. r wetland and Natural Resource Consultants R r d Buncombe County, North Carolina ;.?:. P.O. Box 882 Canton, N.C. 28716 828 648'8801 client: role e: The Cliffs Communities TCC-1005,1009 \ \ NOFLTH j , i eet cae: raven y: ate: 4 1"=50' WNR 2-27-08 r :1 \ Pi p e Ma Impact Map Project Name: High Carolina Wetland and Natural Resource Consultants i Location: P.O. Box 882 Canton, N.C. 28716 - Buncombe County, North Carolina 828-648-8801 Olen rojec o e: The Cliffs Communities TCC-1005,1009 ____--L?IE7RTF-1 i _- ,r-. it-- -- Sheet 5 rae: 1"=50' raven y: WNR are: 2-27-08 / _ \ \ I p e Map: Impact Map P Praj- Name: ? V i! U High Carolina .z . rr•. r Wetland and Natural Resource Consultants -, P.O. Box 882 Canton, N.C. 28716 r «atnn: Buncombe County, North Carolina •? '•`? 828-648-8801 C11e,t: The Cliffs Communities o,e? TCC-1005,1009 NORTH «». 6 1°=50' ?.., WNR .-. 2-27-08 Q Pipe Map Impact Map Project Name: 0 High Carolina Wetland and Natural Resource Consultants P rid", e Locw- {= `- Buncombe County, North Carolina P.O. Box 882 Canton, N.C. 28716 _J S : 828-648-8801 icier. The Cliffs Communities o e TCeC-1005,1009 N H / I I I eet 7 we: 1„-50 -n Y: WNR ate: 2-27-08 ? 1= P i p e MaP Impact Map 0 Project Name: Al" <- I High Carolina Y.. •;. ; Wetland and Natural Resource Consultants P.O. Box 882 Canton, N.C. 28716 ra-. Buncombe County, North Carolina Proje 828-648-8801 Client: o e: The Cliffs Communities TCC 1005,1009 Dam Safety Report -.-.-?_-.,_..,,......?- .x_vv...m r;xx>.:e:.?.ea.o: a,::..:.:d;,, ..t-••r+:.,.t.,vu:...-.x:?:xr.?.:ndLaz'.L'&c.,ur.,..esMru'a2r-,?..w,u:w;.;.:i.simxLR:rtw.:..r?r:?ueawamawrwva?»?eisn..«:,v?A.tx"?..aiS.N.ak*. rk.`iWFbbr? .??'???f?.?F.£:?.s Y? *S&ME October 18, 2007 Mr. Donald H. Nickell, Jr., P.E. The Cliffs Communities 3598 Highway 11 Travelers Rest, South Carolina 29690 Reference: REPORT OF DAM SAFETY ISSUES High Carolina Dam - The Cliffs Buncombe County, North Carolina S&ME Project No. 1356-07-014 Dear Don: S&ME, Inc. is pleased to provide this letter and attachment regarding dam safety issues for the referenced project. We have prepared this information, at your request, to fulfill certain requirements of the environmental permitting process. Ms. Jennifer Robertson of Wetland and Natural Resource Consultants, Inc. (WNR) provided direction to us regarding the stream impacts incurred by the rehabilitation of the subject dam. In this letter, we present our understanding of the existing condition of the dam. Specifically, we will focus on the deficiencies with the existing dam that must be addressed to meet current dam safety requirements mandated by North Carolina State law. PROJECT INFORMATION The existing dam is an earth structure about 400 feet long with a height from the crest to the downstream toe of about 45 feet. It has a crest width of 15 feet and a downstream embankment inclination of approximately 2 horizontal to 1 vertical and steeper. The normal pool water surface elevation of 3652.6 feet is maintained by a concrete riser approximately 4 feet by 4 feet, interior dimension. The riser directs flow into a 30-inch inner diameter concrete conduit through the embankment dam. The conduit is supported at its outfall by a concrete structure elevating the pipe about 7 feet above the stream channel. A secondary spillway channel is excavated into the north abutment through apparent residual earthen and rock materials. The normal pool surface area covers approximately 6.8 acres, with a drainage area just under 600 acres. .xtAE, iir. 4.4 Buck, _. I f'cas 28704 + 3a. ?C... .. w .:- r.... n 7i Report of Dam Safety issues SWE Project No. 1356-07-014 The Cliffs at Nigh Carolina Dam, Fairview, North Carolina October 18, 2007 From review of the NC Dam Safety inventory, this dam was constructed in 1953. Design plans are not available. It is classified as a Medium Size, Class C (High Hazard) dam. During recent site visits we have noted that the upstream embankment is covered with trees up to 12 inches in diameter, with their roots exposed in the crest. The downstream embankment is covered with grass and weeds with some small tree stumps. Some minor sloughing has been noted on the downstream embankment near the crest. Seepage near the toe and along the northern abutment contact has created a large saturated area on the right side (facing downstream) of the downstream toe. It appears that corrugated metal pipes have been installed in this area. These pipes are consistent with remediation plans in the NCDENR file for the installation of a subsurface drainage system along the toe of the dam during the late 1970's. Erosion was noted near and below the spillway pipe. The erosion and saturated toe conditions indicate that the subsurface embankment drain is not providing adequate relief of groundwater in the foundation. S&ME has performed soil test borings in the embankment and abutments with a mechanized drill rig and with a hand auger. The borings indicate that the dam is comprised of relatively homogeneous, moderately well-compacted earth fill with some organic materials intermixed. The borings also suggest that a layer of poorly compacted fill soil exists at the bottom of the embankment overlying the residual soils and rock native to the area of the dam footprint. Temporary piezometers were installed to provide measurements of groundwater elevation within the embankment. Groundwater readings indicate that a major portion of the embankment fill material is in a saturated condition. Hall Contracting of Charlotte, NC performed a video inspection of the principal spillway conduit. The inspection indicated the existing concrete spillway conduit has maintained alignment conducive to efficient water flow. However, several cracks in the conduit were documented. The cracks ran both laterally around the pipe and longitudinally along the axis of the conduit. Evidence of earthen materials being moved through the cracks by seepage water was also noted. DAM SAFETY REGULATIONS Dam Safety regulations in North Carolina include provisions for dam stability design standards. Embankments should be designed to provide an acceptable factor of safety for given conditions. The state dam safety regulations state: "Slope stability analyses should be considered by the design engineer for all embankment dams and may be required for class B and class C dams. [ ] A minimum factor of safety of 1.5 for slope stability for normal loading conditions and 1.25 for quick drawdown Report of Dam Safety issues SWE Project No. 1356-07-014 The Cliffs at High Carolina Dam, Fairview, North Carolina October 18, 2007 conditions and for construction conditions shall be required ...." (North Carolina Administrative Code, Title 15A, Subchapter 2K Section .0208 (b) S&ME, Inc. has performed preliminary slope stability analyses using data collected from our subsurface exploration. Our preliminary analyses indicate the geometry and condition of the embankment fill do not meet current Dam Safety regulations. Modification to the embankment will be required as outlined below. Geotechnical engineering for the stability of embankment dams must work within the constraints of earth fill material strength which is quantified by field observation, explorations, and laboratory classification and testing. Standard engineering practice for embankment stability involves developing a stable dam cross section and limiting the effects of saturation of embankment materials and seepage through the embankment by the impounded water. For the proposed improvements to the High Carolina Dam, we have developed preliminary recommendations that include the following: ® Install new subsurface filter drains and collections in the existing downstream toe of the embankment to collect and safely discharge seepage through the existing embankment. a Place additional fill against the downstream slope of the existing dam to an appropriate geometry such that the required factors of safety are met and to accommodate a road crossing. ® Slip-line the existing concrete conduit with high-density polyethylene pipe and seal the annular space with grout to limit the movement of embankment materials by seepage water through cracks in the concrete conduit. S&ME, Inc. has prepared the attached plan for the dam illustrating the concept of these proposed improvements. We developed this concept to limit impact to the downstream channel to Vii feet. We understand, by limiting the downstream impact to 511 feet, the rehabilitation of the dam will be covered under a general environmental permit. We measured 51feet from the outlet end of the existing spillway conduit on the topographic data provided to us. We then developed a grading plan for the proposed improvements to the dam. The resulting downstream embankment slope is approximately 2.0 horizontal to 1 vertical. We note that the proposed downstream slope is steeper than typical dam embankments. This will require additional analysis, specialized construction techniques, and/or specific construction materials to provide adequate factors of safety. Report of Dam Safety issues The Cliffs at High Carolina Dam, Fairview, North Carolina S&ME Project No. 1356-07-014 October 18, 2007 Also shown on the attached plans are a new principal spillway conduit and riser and a widened emergency spillway. These additional improvements are required to meet the dam safety requirements for spillway capacity. However, these improvements can be adjusted to meet the footprint impacts of the proposed modifications. CLOSURE The proposed conceptual improvements have been developed to meet permitting needs and goals of the project. These include limiting downstream channel impacts to 51 feet of stream channel or less and providing adequate passage for the proposed road across the dam. These concepts are based on and limited by the information received from The Cliffs and WNF, Inc., data collected by S&ME, Inc, and field observations by S&ME, Inc. Modifications and/or additions to this concept will be required prior to submittal for dam safety permits. Please contact us with questions regarding this proposed concept. Sincerely, S&M E, Inc. ? John F. Garner, P.E. roject Engineer Senior reviewed: Walker Birdsong, P.E. WB/CMUs/proposal/highcat mtrydam/07525 Carl McDonald, E.1 Project Professional Attachments: Conceptual Plan Dam Impact Map PRELIMINARY PROPOSED DAM GRADING PROPOSED SECONDARY SPILLWAY TED SPILLWAY 100' WIDTH) ?' ` I 11 5654 564 60' STREAM--" IMPACT LIMIT DELINEATED STREAM EXISTING PRIMARY SPILLWAY PROPOSED ROAD CROSSING (40' ROW - SEE *NOTE*) o p o I APPRO IMATE EXISTING DAM REST ELEV/. 3.658' I EXISTING DAM GRADES - ---367u REF: STREAM, WETLAND DELINEATIONS AND EXISTING TOPOGRAPHIC INFORMATION PROVIDED BY WETLAND AND 1 NATURAL RESOURCES CONSULTANTS. EXISTING DAM LOCATION AND ELEVATION INFORMATION GENERATED FROM GROUND L SURVEY INFORMATION PROVIDED BY THE CLIFFS COMMUNITIES. 11? 1 1 1 t PROPOSED DAM CREST ELEV. 3,664' LAKE TSUNGA I PONDEROSA WSEL = 3,652.6' r GD \ p LL. Or ?m o ? d' 3 ° O 2 ? (n ° o I z cD Q U Q O U) a ul 2 ca oc I j d F. a Z z CL . 0 QU !! z Owo APPROXIMATE IMPACTS (AS MEASURED ON PLANS): cc u z STREAM IMPACT < 60' t H = 3 WETLAND IMPACT = 1,644SF = 0.0377 AC Z co c? ?ij O w *NOTE*: PROPOSED ROAD CROSSING IS W m a - CONCEPTUAL. FINAL ROAD CROSSING DESIGN, lc INCLUDING ROADWAY SECTION AND VERTICAL AND - 4 ? HORIZONTAL CURVES SHALL BE PROVIDED BY OTHERS. GRAPHIC SCALE FIGURE NO. 40 0 20 40 BD IN F) Corps Approval Letter DUARTAIENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 151 PAT1ON AVENUE ROOM 208 ASHEVILLE, NOR CAROLINA 28801-5006 REPLY TO ATTENTION OF January 23, 2008 Regulatory Division Action ID. 200701619 The Cliffs Communities Mr. Rob Weber 3598 Highway 11 Travelers Rest, South Carolina 29690 Dear Mr. Weber: I refer to the Pre-Construction Notification (PCN) dated October 23, 2007, submitted on your behalf by Wetland and Natural- Resource Consultants, Inc. (WNR), requesting authorization to impact 149 linear feet of stream and 0.052 acre of wetland in order to enlarge 2 road crossings and upgrade/repair the existing dam on Tsuga Lake; 90 feet of stream impact has already occurred. These activities are associated with the development of a 2,100-acre tract of land in Swannanoa, Buncombe County, North Carolina. This file has been assigned number SAW 200701619. I also refer to the meeting of September 18, 2007, in which representatives of the Cliffs Communities (Mr. Don Nickell, Mr. Charlie Hughes, Mr. Jason Cangler, and you), Ms. Jennifer Robertson from WNR, and representatives from the Asheville Regulatory Field Office (Ms. Lori Beckwith and I) discussed the proposed impacts, as well as future impacts that you will propose once the master plan for the development is finalized. You explained that while you do not have a final master plan for the entire 2,100 acres, you currently need to construct a road that will allow travel from one side of the property to the other and need to upgrade/repair the existing dam; therefore, you have submitted the current request for verification with the understanding that you will propose additional, unknown impacts in the future. The Corps has determined that the work, as described in paragraph 1, is authorized by NWP number 29 conditional upon your compliance with and/or acknowledgement of the following: 1. All work must be accomplished in strict accordance with the attached General and Regional conditions, conditions 1-6 and 9-11 of the attached letter from the North Carolina Wildlife Resources Commission and your submitted plans. 2. While the current impacts are under the threshold for which the Corps typically requires compensatory mitigation, it is anticipated that future development will require additional impacts. Therefore, you have agreed to mitigate for all impacts. You shall mitigate for the 2 unavoidable impacts to 149 linear feet of stream associated with this project by payment to the NCEEP in the amount necessary to perform restoration to 59 linear feet of cold stream and 90 linear feet of cool stream in the French Broad River Basin (Cataloging Unit 06010105). Construction within jurisdictional areas on the property shall begin only after the permittee has made full payment with certified check to the NCEEP, and the NCEEP has made written confirmation to the District Engineer, that it agrees to accept responsibility for the mitigation work required, pursuant to Paragraph IV.D. of the Memorandum of Understanding between the North Carolina Department of Environment and Natural Resources and the U.S. Army Corps of Engineers, Wilmington District, dated November 4, 1998. 3.. The presence of federally listed species and historic structures/archeological sites for the entire property has been examined by your consultant. According to information submitted on May. 16, 2007, by WNR, "...there are no current or historic records of any occurrence of federally endangered or threatened species within the parcel of land being considered for development." Additionally, "...there are no records of any occurrence of archeological or culturally significant sites within the parcel of land being considered for development." According to the ArcGIS map prepared by this office, no listed species, critical habitat, or historic/archaeological resources are located in the property boundaries. While no listed species, critical habitat historic/archaeological resources were discovered, please be advised that if potential resources are identified during future permit reviews, you may be required to conduct surveys for federally listed species, in accordance with the Endangered Species Act, and/or historic and archaeological resources, in accordance with the National Historic Preservation Act. 4. The construction/presence of this access road (to which this Nationwide Permit (NWP) verification letter pertains) will not affect our review of any future proposed impacts. The presence of this road will not be an adequate justification for future impacts (e.g., additional roads must be built in jurisdictional waters of the U.S. because the location of this road necessitates the location of the other roads). We will examine any future proposal to impact jurisdiction waters of the U.S. to ensure that you have avoided, minimized, and/or mitigated for unavoidable impacts. 5. Any impacts to waters of the U.S. proposed at a later date will be combined with the current impacts and will be reviewed cumulatively. Cumulative impacts of more than 0.5 acre of wetland and/or 300 linear feet of stream will be processed under an Individual Permit. 6. A verification of the use of Nationwide Permit 29 for the currently proposed impacts does not imply that this office will necessarily approve any future proposal(s) to impact waters of the United States on this property. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification will remain valid until January 16, 2010, unless the NWP authorization is modified, suspended or revoked. If, prior to the expiration date, the NWP authorization is reissued and/or modified, this verification will remain valid until the expiration date provided it complies with all requirements of the modified NWT. If the NWP authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the NWP, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the NWP, will remain authorized provided the activity is completed within twelve months of the date of the NWP's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 of the Clean Water Act may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Lori Beckwith at 828-271-7980, extension 226. Sincerely, Tom Walker Chief, Asheville Regulatory Field Office Enclosures Copy Furnished w/o encls: Wetland and Natural Resource Consultants, Inc Ms. Jennifer Robertson Post Office Box 882 Canton, North Carolina 28716 EEP Acceptance Letters E i-4;J lneement PROGRAM November 20, 2007 Rob Weber The Cliffs Communities 3598 Highway 11 Travelers Rest, SC 29690 Expiration of Acceptance: May 20, 2008 Project: High Carolina Pipe Maintenance County: BUNCOMBE The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification/CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) as invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep.net. Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the followine table. FRENCH Stream (feet) Wetlands (acres) Buffer I Buffer II BROAD (Sq. Ft.) (Sq. Ft.) 06010105 Cold Cool Warm Riparian Non-Riparian Coastal Marsh Impacts 0 90 0 0 0 0 0 0 Credits 0 180 0 0 0 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of' Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998. If you have any questions or need additional information, please contact Kelly Williams at (919) 716-1921. Sincerely, Willi 7Gilmore, PE Director cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit Lori Beckwith, USACE-Asheville Kevin Barnett, NCDWQ-Asheville Jennifer Robertson, agent (email) File A&ft40r!;1?5 ... Egha"- Prl0t-"' 0" It-&& 6-E RR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-16521919-715-04761 www.nceep.net a E ® Lem aneement PROGRAM November 20, 2007 Rob Weber Carolina High Retreat 3698 Highway 11 Travelers Rest, SC 29690 Expiration of Acceptance. May 20, 2008 Project: High Carolina Dam Maintenance County: BUNCOMBE The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification/CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep.net. Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the :oRowin table. FRENCH Stream (feet) Wetlands (acres) Buffer 1 Buffer II BROAD (Sq. Ft.) (Sq. Ft.) 06010105 Cold Cool Warm Riparian Non-Riparian Coastal Marsh Impacts 59 0 0 0 0 0 0 0 Credits 118 0 0 0 0 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998. If you have any questions or need additional information, please contact Kelly Williams at (919) 716-1921. Sincerely, ((?? . )?? 8. A-M- WilGilmore, PE Director cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit Lori Beckwith, USACE-Asheville Kevin Barnett, NCDWQ-Asheville Jennifer Robertson, agent (email) File 'Enha"... Pro&o&i;?J our Jm& MOM North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 1919-715-0476 / www.nceep.net ®WQ Letter Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality Rob Weber The Cliffs Communities 3598 Highway 11 Travelers Rest, South Carolina 29690 January 4, 2008 Subject Property: High Carolina Subdivision Swannanoa, NC Application for Impacts Under Section 401 Dear Mr. Weber: Buncombe County The Asheville Regional Office of the North Carolina Division of Water Quality (DWQ) is aware you have submitted an application package for a 404 permit to the US Army Corps of Engineers. You are required to apply for the corresponding 401 Water Quality Certification as both, 404 and 401 permit/certification, are necessary prior to any work occurring in surface water/wetlands. In your application package you stated that you would be seeking an Individual Permit for the remainder of the project, acknowledging the fact that the project will exceed the 300 linear foot threshold for an Individual 401 Water Quality Certification for the development. In accordance with the DWQ policy you are hereby required to submit for, and obtain written concurrence through the State of North Carolina's 401 Water Quality Certification for the entire project prior to impacting any streams or wetlands on this project. If you have any questions, please telephone Kevin Barnett in the DWQ Asheville Regional Office at 828-296- 4657. Sincerely, Roger C. Edwards, Regional Supervisor Division of Water Quality Surface Water Protection Section cc: Jennifer Robertson Wetland and Natural Resource Consultants, Inc. Post Office Box 882 Canton, NC 28716 Ian McMillan, 401 Central Office USACE Asheville Regulatory Field Office DWQ Asheville Regional Office DLR Asheville Regional Office David McHenry, NC Wildlife Resources Commission File Copy Central Files Filename: TheCliffsCommunities.High Carolina. Swan nanoa NorthCarolina 11A1atura1!ry North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 2-8778 Phone (828) 296-4500 Customer Service Internet: www..ncwaterquality.org FAX (828) 299-7043 1-877-623-6748 4n Equal Opportunity/Affirmative Action Employer-50% Recyclea/10% Post Consumer Paoer Bridge Construction Drawings RME% OF siflmn I. TITLE SHEET 2. GENERAL NOTES 3. PLAN L PROF I LE 4. FOUNDATION LAYOUT 5. END BENT I PLAN L ELEVATION 6. ENO BENT 1 FOOTING DETAI LB 7. ENO BENTI STEM AND WI NO WALL DETA I LS B. ENO BENT 1 DETAILS 9. ENO BENT 1 REINFORCING STEEL SCHEDULE 10. ENO BENT 2 PLAN L ELEVATION It. END BENT 2 FDOTI NO DETAILS 12. END BENT 2 STEM. WI NO WALL BETAI LS 13. END BENT 2 DETAIL l4. END SENT E REINF 0LING STEEL SCHEDULE 6 SADDLEBROOK CONSTRUCTION INC. 16. 3'-0' x I'-9' PRE6TRES8E0 CORED SLAB BETA IL6 I6HEET I OF 41 16. 3'-0' A I'-9' PRESTRE66ED CORED SLAB BETAI L6 (SHEET 2 OF 41 17. 3'-O' x 1'-9• PRE6TRE6BED CORED SLAB DETAI LS [SHEET 3 OF 41 16. 3'-0' x 1'-9' PRE6TRE66E0 CORED SLAB DETA I L6 ISHEET 4 OF 4) X19. FASO I A BEAM DETA I L6 BUNCOMBE COUNTY, NORTH CAROLINA BRIDGE # 1 THE CLIFFS AT SWANNANOA SO'-0f9 CORED SLAB BRIDGE ON CANTILEVER ABUTMENTS WITH SPREAD FOOTINGS FINAL PLANS Revlslon Drawn B/ Dofa Descflpllon Ralelan Orwm M' Dole OcscrN+ilan Name Out, ProJeolr Tllla.• 1 REw 3/20/67 Faaclo odded. Ofwm ?': NWA 12112106 1589 MalropoENan Bivd. Shaul Na. Tallahassee, FL. 32308 THE CLIFFS AT SWANNANOA -- Desl9ned &y: NWA renvo6 B50 894-two Bridge #1 TITLE SHEET ApDfovaJ er. RCF IS/12/06 FIA Fax: 850-694-1614 Buncombe County NoM Cazdlm 1 A. SPECIFICATIONS 2. CONCRETE COVERS: F. BEARING PLACEMENT A. CONCRETE COVERS SHOWN IN PLANS DO NOT INCLUDE REINFORCEMENT 1. DESIGN: in PLACEMENT AND FABRICATION TOLERANCES UNLESS SHOWN AS SEE BEARING DETAILS FOR ADDITIONAL INFORMATION. A. AASHTO STANDARD SPECIFICATIONS 17 EDITION, W02 WITH 'MINIMUM COVER". LATEST INTERIMS. COVER DESCRIPTION G. UTILITIES SUPERSTRUCTURE - PRECAST BEAMS 2 In ALL SURFACES B• DESGN LOADINGS DATA CONCERNING TYPE AND LOCATION OF UNDERGROUND AND OTHER SUBSTRUCTURE 3 In IN GROUND CONTACT UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. 1. DEAD LOADS: 2 In ALL OTHER SURFACES THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATIONS A. UNIT WEIGHT OF REINFORCED CONCRETE.- 150 Lb/F13 AS TO THE TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES B. BARRIER, TRAFFIC RAILING.- 700 LbIlt 3. REINFORCING STEEL- AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. A. ALL REINFORCING STEEL SHALL BE AASHTO M31, GRADE 60. 2. LIVE LOADS: B. ALL REINFORCING STEEL DIMENSIONS ARE OUT-TO-OUT. H. ABBREV/ATATNS A. HS-20 AND/OR LANE LOADS PLUS IMPACT 4. PRESTRESSING STEEL, Brg. - Bsaring 3. RAILING LOADS, A. STRAND: AASHTO M203, GRADE 270, LOW RELAXATION. Batt. - Bottom A. EFFECTS IN ACCORDANCE WITH AASHTO STANDARD SPECIFICATIONS. PARAMETERS: - MODULUS OF ELASTICITYt 28,500 Ksl C.I.P. - Cast-In-Place Clr. - Clearance/Cover 9. THERMAL FORCES: - MAXIMUM JACKING STRESS: 0.75 fpu Const. Jt. - Construction Joint A. TEMPERATURES AND TEMPERATURE VARIATIONS FOR. DESIGN - MAXIMUM ANCHORING STRESS AT ANCHORAGE.• 07 Fpu E.F. - Each rove OF CONCRETE STRICTURES (DEGREES FAHRENHEIT (FO ): STRAND DfAN£TERr - 05 In Elev. - Elevation TEMPERATURE RISE (+) 35 DEGREES F Exp. J1. - Exponshn Joint TEMPERATURE MEAN 45 DEGREES F 5. ELAS BEARINGS, EN. - Equal TEMPERATURE FALL (-145 DEGREES F OMET IX/ROMETER 60 A. F.F - F Far Foos Far THERMAL COEFFICfANT 6 0x10-6 /DEGREES F FFBN - of Bock Wall . D. ALLLIWAB(E STRESSES/LOADS NF. - Near Face e Near 5. CREEP/SHRINKAGE: POL - Profile Grade Line A. EFFECTS OF CREEP AND SHRINKAGE IN ACCORDANCE WITH THE AASHTO 1. DESIGN METHOD: Spa. - Space STANDARD SPECIFICATION WITH RELATIVE HUMIDITY - 75X A. SERVICE [DAD AND STRENGTH DESIGN METHOD. S St , . mm. - Symmymmefrlca! Synan. 6. SEISMIC LOADS, 2. MATERIAL STRESSES: Typ. - Typical A NO SEISMIC DESIGN WAS COMPLETED FOR THIS SINGLE SPAN BRIDGE A. ALLOWABLE STRESSES ARE !N ACCORDANCE WITH THE AASHTO STANDARD UJNA - Unless Noted Oth.-Ise . . DESIGN SPECIFICATIONS FOR ALL MATERIALS SHOWN IN THESE PLANS. B. ALLOWABLE TENSION IN THE PRECOMPRESSED TENSILE ZONE = 3 7. WIND LOADS, A. EFFECTS OF WIND LOADS IN ACCORDANCE WITH THE AASHTO STANDARD IN THE ENDS AND ZERO TENSION AT MID-SPAN. SPECIFICATION. E. FOUNDATIONS , 8. UTILITIES: 1. FOUNDATION DESIGN CRITERIA: A. TWO UTILITY LOADS OF 500 PLF HAVE BEEN ACCOUNTED FOR IN DESIGN. THE LOADING IS APPLIED TO THE FIRST INTERIOR BEAM ON EACH SIDE. A. THE END BENTS SHALL BE SUPPORTED ON SPREAD FOOTINGS. INSERTS HAVE BEEN PROVIDED TO FACILITATE UTILITY PLACEMENT. SEE FOUNDATION LAYOUT FOR ADDITIONAL INFORMATION. B. THE ALLOWABLE BEARING CAPACITY FOR THE SPREAD FOOTING SHALL BE 5 KSF, OR 65 KSF MAXIMUM. C. MATERIALS EXCEPT AS MAY OTHERWISE BE SPECIFIED IN THE PLAINS, ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES BOOK DATED JULY, 2006. L CONCRETE. A. PROVIDED 3/4' CHAMFERS ON ALL EDGES AND CORNERS EXCEPT AS OTHERWISE NOTED. 6. MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS, PRECAST CORED SLABS f'c = 6.0 Ksl C.I.P. BARRIERS Yc = 4.0 Ksl C.I.P. END BENTS Pc = 4.0 Ksl FINAL PLANS Rwlslan Drawn 6y Dude Dnmrlpllon _ _ Rwfabn Drawn Br Late Demrlpf/on Naas Lbfe PfaJeah T717c• Dfavn By, JMH 12112/06 1599 MaSOpd'Aan 61M. ianahassee FL 32309 THE CLIFFS AT SWANNANOA Sheel llo. Das7gned LTyr MINA !P/I2/06 ! ? , 95094-1so0 Bridge #1 GENERAL NOTES loved RCF IPAP?L76 ,' ? wq Faze 95o-99F1611 BunCwN?c Caunly, NaM Carolina P i Brg.-+1 Brg. 505 i i 500 Neavy Sl oneR/prop ersl (Hy Oth 495 l 990 I I I Ground une PROFILE € Bra. - - 48 -Id/r• h (' Hrg. WP. I End Hent i i 1 i i N = 5000563 i E = l000.000 .? WP. 0 End Bent Z f Survey 1. 4 I N 5049.436 E = 1000400 --------------- Edge of Creak PLAN FINAL PLANS Rm.l. Drawn Bf lim D-rlpllo. Ral ko Drawn By Date Descrtp 1. Non. Dale Proleolr Teller Dray By: NWA l2/l2/06 tree Ma4opolilan 6hb. TdWaaaea, FL 32308 THE CLIFFS NNANOA Sn.et Na. PL Deslgnad B/: AIWA 17112/06 FA 850-eW160D dge#i B ridge flt AN AND PROFILE Approvrd Byr RCF l2/l2/06 Y nmti.ro a•N,,vrc. F=860-We 1614 Buncombe Co.*, Nosh carous. 3 C Brg. NOTES SPREAD FOOTING SHALL HAVE AN ALLOWABLE BEARING PRESSURE OF 5 KSF SUSTAINED, AND 65 KSF FOR SHORT TERN LOADING. c Survey WP.I EM BOW I I N = 5000563 E = 1000.000 a e Wl%woll c _--- - - - _ - _- _- _ -- -- END BENT I PLAN END BENT 2 g Brg. FINAL PLANS RevkW Dram B/ Date D-rlpNon Ralelon Dram &j Wt. 0-rlptlon -- Name Ooh ProJaaf+ TINe.• Drawn By! AIWA 12112106 %W wwapa6lan aw. rauanaeeaa FL 323M THE CLIFFSAT SWANNANCA sneer Na. _ Owlanad Byr AIWA !2/12/06 C¦-¦ ?/ r , . 850-04-16M ' F Bridge #1 FOUNDATION LAYOUT Approved L;r! R0F !2/12/OS um' Eno'.+ri9 an"n. Mw 0-&94--1614 ? & BUnwinbe Courtly, NoM Cwollna 9 NOTES. 1. Foundation Excavation shellbe In aaardonce with the Stallard Spoolfk tlons. 2. Boakfll/ Yateridshdl be In accordance with the Standard Spearlootlons. BackflN shollbe compacted to the Density roWlrad by the geotwMtool report. 3. No More than roof Backf/Il(nroosarod from Bottom of Fcattng)shdlbe pbcd will Cored Stabs have bean Instdld W Dowels Grouted M piece. 4. Lot aiguides may be pmd after hollow cord 81083 are 8ei° tens/and end grouted. PLAN I?--t Bridge (Symm.) I 51 l5 -d ° I 15 -d ' GPGP//QQZN X?i.& our RE7WAY /-Bre Sea Elm 504J9t i !NP Joint Filler 3 Hate ltypJ EL. 487' E(?fArrox FINAL PLANS can °la?w. oww M ssorryrrtan Nana Do. PPAPP- 1669 AAecopoeian OW. PlHtE rme.• END BENT 1 snset Na. Drown By: MWA Ivlzy05 iaeahssees, FL 32MB THE CLIFFS AT SWANNANOA PLAN & ELEVATION Designed By: AIWA !P/!P/O6 W-694-160D Bridge #1 e e?FY FeK85o-8&1-1614 B-1b. Cow*. Noah carana (SHEET I OF 5) 5 i i i Af905 (To Batt.) i ? i i 48-090f a 8' (sowed with JW) - ._ ______ -____ _____ ^b 5p-C/60Y O 8" t. d Wth J(90(f 52-JI90fe 8' (T & BottJ PLAN - FOOTING REINFORCEMENT FINAL PLANS Reihtan Grown B/ D", no-+sr/prron ReVlston bravo Br lbfe "I" M UM xOOp 0ob rolerJa 7fxN p Drawn By: ,uwA jyly06 15H91ABU0 L. 9Wd. TBIWassea. F L92308 l THE CLIFFSATSWANNANOA END BENT 1 sneerxo. FOOTING DETAILS __- _ Dell nd p Brs MWA ly/2/06 Fl?W 850-894-IOW F Bridge #1 (SHEET 2 OF 5! rovd App RCF !yly06 . dre-,. r _,e< ar: 950-894-1874 ?nnce cn.?ar. North ce<o 6 n9vz I m 8 WING WALL ELEVATION AT FRONT FACE WING WALL REINFORCING ELM ELEVATION FINAL PLANS .....% wc..p..m. awn 1' uauraxon Name nme Pro)eck Tllle: uwA /2nz/o6 '?9f0P0?" B'''d END LENT I sneerxo. Tetlehesxe, FL 32308 THE CLIFFS AT SWANNANOA Drawn By: STEM AND WING WALL DETAILS Desl4ned byL - cp? 850-994-Ieoo Bddge #1 : ! WA l2/l Folk Fe.: 850-884-1614 Bo.wo.ane County, Noes Cwoone (SHEET 3 OF 5) r STEM WALL SECT?N WING WALL SECTION FINAL PLANS RNISIon Drawn By Data D=rfpttoa Rwislon Drawn By ow. Duarlprfan Nova Da/a p P' P ProJsab rlaa Drawn Dy: AIWA 12l12/O6 ppp A 7589 Matropdilan ... Taloha FL 32300 THE CLIFFS AT SWANNANOA END BENT I Sneer No. Daa19n0d By, MWa 1y12108 A . 85 600 Bridge #1 DETAILS Pae:050-Waista a„wnroa C-y.Nmn ca,dx9 (SHEET 4 OF 51 a WEEP HOLE - FRENCH DRAIN DETAIL AIM 96 15'-B° AM ZO 2'-0 P'-0 cm BO 51-9' !D' 6'-7' MY 1'9 51-91 11-5' T'-P• Jim 15 JZ'_J• 11-5' 91'-l' jam 23 e'-Il' 21-0' fJ'-//' FINAL PLANS Rwls/m Drawn Dale Desor/plbn Rwfsbn Drawn Oafe DsscllpfPon flmns I]Me PPI-d pro/eal: Tlllef 1 WA 03/71,/07 Olnfenslon mrrecleJ. 7589 Me4apol88n BWd. Drawn Bye NWA !Z iallaliaseee, F1.32308 THE CLIFFS AT SWANNANOA Shah ep. END BENT / REINFORCING STEEL SCHEDULE Designed Hyr WA 12/lB/O6 BSe-e9A-7e00 FI " Bridge #1 (SHEET 5 OF 5) Approved RCP 12/18iD6 Fe"' 950-6" -lsta a"K°"'b° C°wH• Na'u' cera+na s REINF.STEEL SCHEDULE -END BENT ! NARK TOTpL ?-_. RElYO a b e 0 LENGTH AI60P 46 H'-0' H'-0• AI6Q3 26 6'-6" A190/ IB 34'-6' J4'-6' A190P 96 H'-0' 19'-0' AI9DJ 9 !9'-!/' AIBD1 !P D'-!!' D'-II' A7905 Po n'-6• n'-s• APPDI 29 IS'-9 f5'-9' Cl901 is 5'79' /'-0• 6 -B' G902 Z P3'-6' 2'-0' G903 9 19'-B' P'-0' CIBW 6 D'-B• P'-0" ZB 01905 !8 9'-4' 2'-0" B'-4• J160P 15 JP'-J' 1-6• JS'-J' JIA7l 104 8'-5' 21-0' Jl902 r- ' BA RS A ' BARS C I I ?0. BARS J QUANTITIES -ONE BENT /TEN IT EACH BENT Cancrets for Structures - Class A CY. fZ5 Relnforc! Steel for Sirwiures LBS. !2 n NOTES, 1. FouNdlon Exadallon shall bo In aooordaae with ft. Stddord Speafflavtlons. 2. BaMfll Materfal shall be In amrdemae with the Stadord Speofflaatlons.Ba0fllslwllbe mmpaa/ed to the Density requtrad by the geotaMlal report. J. N. More them V of Baatrl/l,measured from Bottom of Fatingl SW be paced untliCorod Stabs have bem Installed and Dowels Grouted in preoe. 4. lateraIguldess may be p/aod after honav oral slabs are set, row and grouted. PLAN CE e?rldg. -_ r- lsr-d ? rs'-d • r-s+ V• Jolnt Ffller 4Y/?tNST.Jr.w/ ( Bridge Saof KtIWAY %i" i El- _ 50J9 fhpJ T Hole fa. weep hv? EL 489' ELEVATION FINAL PLANS rtwi awn sy wre uucripnvn _ avn eg Y4 er/plpn Name 0J/e Pfe/ee/S Tin Oravn Byr INJA /2/18/06 1589 Metrapolikvi BNtl. Seeei NoPAR . rendreuee,Razaae THE CLIFFS AT SWANNANCA END BENT 2 ----- Desl9ned Byr MwA 12/18/06 aoo-asa-7soo Bridge #7 PLAN & ELEVATION a FllktJEY Fm` u° ego fs 4 BuncaMe County. NOM 011111a (SHEET / OF 5) Amrovsd Bo: RCF 121181 oe i Ajqo5 (Top att.) -C1902 m G I w m 6 e 63 48-CI901 a 8' (*=ad w/fh J1901) L O -__ __ ___ _ _ _ _ _ _ _ _ J . 50-CI6W a 8' (spaced with JNW) 52-JI901 a 8' (T0 b BaBJ PLAN - FOOTING R INFORC DENT FINAL PLANS 0fawn ?' Mle Oalvrfpllan Reiklon argrn »' D11. Oaroflyifan -- - xwo0 Uofe ProJe4r Tlxu r Drown B/r NWA 12//2/06 1589 +tetr eaa assea. FL Fl. azaoe TaOan THE CLIFFS AT SWANNANOA sneef x01. END BENT E FOOTING DETAILS Designed 6yr AfWA Ivlvo6 esae91 16010 Bridge OF 5) 9 OF 5) roved RCF Ivl2/os 4 F° c 4 F 16 4 Numn caroms e???a?a cosy. x -j" C1909 A1909 a? n 19'-3" A I I I t a` clW5 (*U. W/ .11602) .l A"i a 4 ? „ i a t? a TI ' 1TYPJ 11-6' C CORED SUB 2 - A299DOWELS - 9 SPA.o Y-O'= 27'-0" WING WALL ELEVATION AT F RONT FADE 2-AI6IX %-,'J" from tfi . w/ G600 -- 46-AI902 back lfipJ. w/ ClSOR 2-A1601 ELM A1601 A1603 L6 A1601 A1601 ---^'{ 2 "- n A1602 (front & AWE (book) ? I P I C160Rfronrl & CZ201Ibackl I G60! WINO WALL REINFOR CING €LEVATION l FINAL PLANS Revlelon Gram A' Dole DosorJpflen fi w.,, Fr--m Rf W. D l/on Name Ms Pr j t, Tltle: D. eyr 4WA 12/12/06 - '89 ? mawea. mw. 7 L szao BD'etl THE CLIFFS AT SWANNANOA END BENT 2 sneer No. Designed By: 1M'A I7J12/? F1N EV B ela9y N STEM E? OF 5 ETA/LS H roved bye 1tCF 12/12106 . an?avan. k, F 850- 8a4-16 14 u, ,a>a wh c?wa (S E !z W R 'm AM W N pu Q 6' ? y SHEAR KEY DETAIL 2M Q A7601 AM t, A1602 A/90z 21 cl. e• r?_ 2 rTMJ 8 ay" n Cl601 -- rMl CI601 - CPZO/ Filter rcyrlc seared J/90l c' Q to rxs or wott J22W S? N to flfern fjr ved J1901 COW .11902 9-A1Xl& l'-0' fT & BottJ 10-11905 a P-0' frog & Bo1tJ STEM WALL SECTION WING WALL SECTION 3' 0 Weep R.I. WEEP HOLE - FRENCH DRAIN DETAIL FINAL PLANS ftdlsf Drwvn B/ 611e Oescrlpf/on Regsfan Dravn B/ Opfe Oa¢crlp/fan Name Outs 7669 Me Prplah Tlllm ----- Dram By: MWA 1211PIOS nopelllen Bnd. END BENT 2 SneeJ No. ®Y T?laha¢see.FL32306 THECLIFFSidge NANOA Dasl9ned By. MWA 650-66a-1bao Bridge #1 #1 DETAILS AAproved Byr RCF IP/!2/06 F„ i,f F.8: &5o-9aa-i614 eunewroe Cony, uronn Cmins (SHEET 4 OF 5) u REINF. STEEL SCHEDULE - END BENT 2 MARK READ DD o D1uEN 6 SIONS c d LE'N'GTH AM 37 14'-9' /4'-9` A/602 45 131-0' W-D' A1603 !ffi 614 6'-6• A190/ 18 341-6' 34'_6• Af902 46 13'-0' 13'-0' Ar903 6 131-11• 13 -Il A1904 12 21'-8' A1905 2D 11'-6' AM 20 14'-9' 14•_9• A290/ 20 2'-0' am 71 51-9' p• 6'-7• 0501 48 5'-9' P-W C1902 2 /T-6• 21-0' C190 131-,8' 211' 01904 2Y-8' 21-01 C1905 4'-4' 2'-0' 6'-4' C220t 5'-9' 1'-5' 7 -2 F J1601 32 -3' 4'-5• 41'-r mm 32 -3 1'-6' 35'-3 J1901 8'-5* 2'-0' JI902 9'-Ir 2'-0' J28e m 9'-1 F-o- 13'-1l' a ? BARS A BARS C ?-T to BARS JJJJJJ_L QUANTITIES - ONE BENT ITEM UNIT EACH BENT Concrete for Structures - Class A C.Y. 69 Relnforel Steelfor Structures LBS. 10105 FINAL PLANS Re W.n Drawn B/ Dots DesoNOW Ralslan Drown Ry D.I. Descrlp/lar Nsaro Dote ProJeot T1Na Shaat ? 1 11WA OS/ffi/DI Di nosw mrmtoe. Drawn Bys WA t2//6/06 1569 MaUOpdiian fiHtl. END BENT 2 l .? ?? - ^^' _ ^^ Te w ascee, FL. azaoe THE CLIFFS AT SWANNANOA REINFORCING STEEL SCHEDULE Desl9nee Byr NWA rznBios 860-894-1600 Bridge FIN" No (SHEET 5 OF 5) H F :850 ax-894-4614 8uncomhe County. Nonh Cerdine 9Y-1v - rLwwp w - Barrl, Parapw Not Shaun I I I I I b 1]WK t1?? I I H e %s' B HS.T,..w se Part TwWa2ng Strand I 1, V0 Hof, I Q Brldga WP.AT Q BRG. I I I I Q I I I zvdda crypi I-----------??I-_ -------- ICI ----------- ----------- II------------+I-----------1 I ------------I,------------I----'-------I I I Sorrier Parap-l Nd Sluvn V-014 ? T . -,'/, I PLAN - 50'-0' SPAN -WP.AT fb BRG 5 9 See Wall IN Shed Nal6 Z L5'-0' (See mte l1 _ I _ 19-0' IS. We 1) I 27'-13'lCbar RwdWWJ l2'-1D' I 040' r_ a I I ?+--? Bridge I y I Slear Krysye to be Tilled wpb pplod altar flnol tenslaNng 01 gNNpN TlaaNefsB Slfanda I FG. 10 -Worlar Cored LBdDO Arab ffypl _ Slab rryN SQ' ??l g InsBlf Shat Naf9 EMartw Coed Slab -CaeNlrPlace 6ol?Jw Poro1W -Sm O ta11'A' shw Na16 Exllrl %'HS Trens'eran Ca red SW lgost TenslaNng /awl Strand 1n 2'O/aNab TYPICAL DECK SECTION Nowt k Dlm Won gluon does nw lnckrde rack vaneer. FINAL PLANS Rwfs/on Dlavn ?' -h Desallpllon Rwlslwr 0lmvn 1?' Dale Deeprlptf- NBwe Dure P.Jealr T/tlu ' ° Saeet Na l REW t 3/15id ArcA? facode added. 5y: Drmn JMH 12112/06 iauun Blvd. 589 Wmseea.see.Fta 32308 lvd THE CLIFFS AT SWANNANOA PRESTRESSED CONCRETE 50 -0 CORED S1A8 (S'-D CRE . Designed By: WA !2112106 ?? tie 14J e50-awiGDO 1 P Bridge #7 li b C N th C t (SHEET ! OF 4) 15 _ APProed 6y: RCF 121!2/06 ? F1 850-M-16 4 or aro na Buncom e oun y. BARRIER PARAPET DETAILS Ae1JNt 21"o Davnl Nde WearlM - ac. AM/D .wW_Elmrlarprlc Vr 1 I Berln9 Pad I f BearrrA? S. EM Bent far dddls. rte-' SECTION AT END BENT A ?E703. Sidd fw &M 9. P LO REMA rare 23J STRAND LAYOUT f'o • 6D W (Ar301 bars .fslew) Pd - 4.8 ks! p BOND SHAD. BE BROKEN ON THESE STRANDS FOR A DISTANCE OF 8 FT FROM THE END OF THE CORED SCAR U.Yfr O BOND SHALL BE BROKEN ON THESE STRANDS FOA A DISTANCE OF 6 FT FWM THE -N END aF THE CORED SLAB UNT I Vd s ' • 1 1 J% 03 9-JI301 see END ELEV. ' far wrangwwo r-c r-c xf ' 7%z' 7% IW . 4" r-2" r ? 7 JI301 i I r r k, I. L ... J1301 -1 LO MO, (Se fd. 1) J1301 rV3a J1303 END ELEVATION Stxedra plammafaf Lbuble SYlrrux lacdle f DaeelHdes and X303 Bars. (Stand Load Mstavn) Idvtw Slab Sadtan shaven - Ederlw Slob SWIM slmllar OXCW Sher Key 1b.01M. • HSTrm-.e Pad Teadadna Hot for Arad sledhed wIth o mrrwmly. P4. Transvarse S. See. SFelal Provlslaw 1 I I I ;: Strand Vlx 4" OWaddo I- If ,.• FIN mess B 8' B Exterlw Cared Slab wHh grad 9/i Y1 ELEVATION VIEW SECTION B-B GROUTED RECESS AT END OF POST TENSIONED STRAND DETAIL eb Fl/l rfs??rryryaaASS w1M Er Mwror C /axsl? PrW? - SShh 'e• PX" SHEAR KEY DETAIL End d Cared Sob We .O.mlt Sher xeY an W.W. Fam C d Edwlar Card SION3. PART ELEVATION AT END OF CORED SLAB SECTION C-C Y Spare 46 Spa@ r.& GROUTED RECESS AT END OF PRETENSIONED STRAND PART PLAN - EXTERIOR SECTION Note r Exterhv Sedlm sham - ldwlar Salton staftr ampl ..Np dbar (Add#1=f rdrVwcemed of show? Not", C NI pllna to be reax W Pula J. 91a01,V FINAL PLANS RM:ton Drawn Br Oo1a (ksorlpNaa Ravlslon Drown by Oat. D..r1ot1. Name Date ProJeoB iltler l AEw .3/&/07 OsfanH -.d 1. anaaf 11. Drawn (}t MH Z//2/ 0 1589 McVOpoeian (YVd. Talleheasee.FL.3aaoa LIFFSATSWANNANOA THE C RESTRESSED TIE RTE C2R 50'-0°PED SLAB fat-0"l9e1 Sheet NO. Designed By+ MWq C16 l2/ FIN" eso-e9a-t9ao Bridge #t N m C Im (SHEET 2 OF 4) 16 Pared r RCA 12//2/06 Feu: Ilso esa-1614 or .. a Baacoran. C-ty, EXTERIOR SLAB SECTION (Fw Pre*mud Strand lWwr.sae Inlerlw Slab Sed/aaa) 104J1702 (Ea. Slab utdt) 4 pars J130P (ryp.eo.ondl CI- fryN 61 to f BrL_ =11. 4B-db- *TrN A/- 2 Pdlrs JI301fTyp1 B' to C Brg. 52 pdra J1302 a l2'dlaxClra 2 !2 12 p ®Opyy +A(30/12 urea. N 2 Borsyune) fTa/ fT p Rye fa ? s I W Y Tro sa trand --- - ------------ ---? r ---- span rc - i ------izpVold IT _3'- - - III II L _ _ ____________ _ 7 L____________________J - ___________ _ _ V II I l5'-f GRADE 270 STRANDS %z' d LR. C0 ( lncfesl 0,153 fkl Sirardl 413 Apgled fraelreds (kl per 5(radl 3/O TYPICAL ELEVATION OF 50'CORED SLAB UNIT (See 50' Span (ayad Sheet f5) fo - 6D ks7 /'d-99 kal DEAD LOAD DEFLECTION AND CAMBER %o 1111 5a span n Comber to Eradlon (Slab k. In pace) f$a' Oerledlon dw to • ; AsplwH Weor? Surforo Final Caller c PLAN k ? I t ELEVATION 6 2 kolas Obwd Niles 1. SNft Jf302 stlrraps 01Y to dear Transverse S/raMa. 2. J1303 bars not shown for clarlty. TOLERANCES a - DWh b -Width -- o • L.roth d • P"Ww or Vdds -Vatled e - Padflon OF Vdds - HwIzo dd - Posfticn of Vdd Ends -(agltudnd r • S f lzodEnd. - d or wfl kd)cv deslp a akew 0 •tta lift Kr fZWOIal leveed ?ertkn aaMe of gtt h - Camber - Difforadidi bdween adlaouf unffs h - Comber - Dirferowat &A- high ad low e members of He eoee span 1-P.Man of O-WHdae -Davldlon from Ab^ posH/on M Wld1h th - soma to n(!d or ad/aceN spans fn the scan seil d e e Baalry Arm-Dev7dlan rrom pt" surface _- b / • I"smoafl s k • lfarfzatd PoM al; or Was rer Trauvs,•so Strands l • vad wl PosNlm of holes for Tranverso Strord - m m • P"111. of Strards --- SECTION a Lar4h of adj..t cued slobs arid/ rd differ In/ mare t/wn %4 IE Boar/np Pod L? I ?I 3' I x Q //4"? Haas i Baorft Pad 0 FIXED END ELASTOMERIC BEARING DETAILS •A:k-!b' t %1 :1/i per 10' t -9, tV fF -9' per Ia.Y4, M. nl• now. V4 V M. %•In d =f/4 FINAL PLANS s lbta Prolaoh. T1Ha Sheet No. Reilslon Dravn &y Dote Dasarlptlan RaVlabn Dravn Rj Dols Dascrtpllan 7-A Dr"A 12/12/06 ? '? " •°P 50 PRESTRESSED CONCRETE Brz 11O 50-89. FL FL32308 388 THE CLIFFS AT SWANNANOA CORED SLAB (3'-O' x I'-9°) a-iebo Badge #1 Des9nl ed BY+ 12 eso9 N" Fax: 850-894-1814 8-be County- NOM Carolina (SHEET 3 OF 4) FIN" n NOTES. ALL PRESTRESSING STRANDS SHALL BE ]-WIRE LOW RELAXATION GRADE 90 STRANDS AND SHALL CONFORM TO AASHTO U203 EXCEPT FOR SAMPLING REQUIREMENTS WHICH SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS. BILL OF MATERIAL FOR ONE 50' PARED SLAB UNIT NARK TOTAL 11E07D. TOTAL REdA DIMENSION LENGTH INT. EXT. o b c d AI301 4 4 25'-7' p5•-7• PIW 51 a J1301 B 8 P-9 J/302 !20 /20 2'$ P-f 51-5 J1303 9 9 P-51?y' 2'$ 6=A0' QUANTITIES ITEM UNIT INTERIOR EXTERIOR Reinforcfn0 Skel Lbs 495 930 6D ksl.CTrcrda (r.) CU.Yda 7D 70 0 Lit Sfrads No. 73 iJ D LILStronds L.F. 1148 Il4B BILL OF MATERIAL FOR ONE 50' BARRIER PARAPET MARK TOTAL 'B DIMENSION LENGT RED a b c d A601 6 49-9 49£ QUANTITIES fTEY ONfr TOTAL Rddordng Sfael for 5lrudures f(irld9d Lbs. 3Kl La ooh of Barter Parapet LF. 498T5 ALL REINFORCING STEEL CAST WITH THE CORED SLAB SECTIONS SHALL BE GRADE 60 AND SHALL BE INCLUDED IN THE UNIT PRICE BID FOR PRESTRESSED CONCRETE CORED SLABS. THE CORED SLABS MUST ALWATS BE MAINTAINED IN AN UPRIGHT POSITNM' WHEN HANDLED PICKUP PUNTS MUST BE WMIN 2'-60F THE ENDS. PROVIDE A PDEEP RECESS AT THE PICKUP POINTS THE RECESSES SHALL BE GROUTED PRIOR TO WATERPROOFING THE TOP SURFACE OF THE CORED SLABS WHEN BEING STORED. CARE MUST BE TAKEN TO ELIMINATE INTERIOR SUPPORTS. RECESSES FOR TRANSVERSE STRANDS SHALL BE GROUTED AFTER THE TENSIONING OF THE STRANDS. THE 2%z'- LOWEL HOLES AT FIXED ENDS OF SLAB SECTIONS SHALL BE FIXED WITH GROUT THE WR. - DOWEL HOLES AT EXPANSION ENDS OF SLAB SECTIONS SHAT BE FILLED WITH JOINT SEALER MATERIAL TO f/j ABOVE THE TOP OF DOWELS AND THEN FAILED WTH GROUT. THE JOINT SEALER MATERIAL SHALL CONFORM TO THE REQUIREMENTS OF TYPE SL LOW MODULUS SILICONE SEALANT. THE 0-BACKER ROD SHAD. CONFORM TO THE REQUIREMENTS OF TYPE M BOND BREAKER. SEE SECTION 1028 OF THE STANDARD SPECIFICATIONS. WHEN CORED SLABS ARE CAST A POSITIVE HOLD-DOWN SYSTEM SHALL BE EMPLOYED TO PREVENT VOIDS FROM RISING OR MOVING SIDEWAYS THIS SYSTEM SHALL BE DESIGNED TO BE LEFT IN PLACE UNTIL THE CONCRETE HAS REACHED RELEASE STRENGTH. WHEN A CONCRETE WEARING SURFACE IS DETAILED ON THE CORED SCAB BRIDGE TYPICAL SECTAW.7-HE TOP SURFACE OF THE CORD SLAB LIMITS SHALL HAVE A Yj'RAKED FINISH. THE TRANSFER OF LOAD FROM THE ANCHORAGES TO THE CORED SLAB UNIT SHALL BE DONE WHEN THE CONCRETE HAS REACHED A COMPRESSIVE STRENGTH OF NOT LESS THAN 5D KSI. VERTICAL GROOVED CONTRACTION JOINTS .%a'IN DEPTH, SHALL BE TOOLED IN ALL EXPOSED FACES OF THE BARRIER RAIL AND IN ACCORDANCE WITH ARTICLE 825-KXB10F THE STANDARD SPECIFICATIONS A VERTICAL CONTRACTION JOINT SHALL BE LOCATED AT EACH THIRD POINT BETWEEN BARRIER RAIL EXPANSION JOINTS. ONLY ONE CONTRACTION JOIN IS REOWRED AT MIDPOINT OF BARRIER RAIL SEGMENTS LESS THAN PD FEET IN LENGTH AND NO CONTRACTION JOINTS ARE REQUIRED FOR THOSE SEGMENTS LESS THAN 10 FEET IN LENGTH. BAR BENDING DIAGRAM I I BARS A i-?yj BARS J BARS P ® For dlmaWaos d P1601 bar sae bar bad. ESTIMATED SUPERSTRUCTURE DUAAR7TIES I T E M TOTAL NumW of 50' Extarlar Cored Slob Inks (49, d12- o=9 2 Tdd Laglh of SO'Erterlor Cored Stab Udte (LFJ 99.75 Number d 5O lderlor Cored Slab Unxs (49-10h- aaW 8 Tdd lawh of ST IdarMr vor d Slob UNLS U." Number of 50' Barrier Porapd Sacflans 2 Tdd RdiVardng Sfad for 50' Beale Por Sectlons (LDS) 620 Tdd Laipth of 5d Barrier Porapd Sedlm (LFJ 6975 Elmstamarlc Baorfnl (Fixed/ 20 EkWomorlc Beal (E W - Tdd RdNwdnl Stad for Struduras !Badge) Ubs) 5620 FINAL PLANS amp __ e.rcrrpr?en - n ! - pesonp 1. Name lklle PPA- Prafea/A TIN. Drawn By, JMH IZIZ2106 NteLmpofean ewd. 50'-0e PRESTRESSED CONCRETE Shut No. iatiarssaee,FL.s236e THE CLIFFS ATSWANNANOA CORED SLAB (3'-0a X P-9a) Daalgned 1Iv: MINA 12112106 es0-e5a-tsoo Bridge #1 F101A.E1/ Pan: 850-894-1614 Buncombe County, Nunn Caronaa (SHEET 4 OF 4) fs Aoarmd Be: RCF /2/12/06 smM.e?u amo. ve End not. ELEVATION ONslde face of Do 'lon RlcMarW Ekartar Cared Slab L 6,311;' x ' Alfoagqhh to '0 End gj.w J- S F-7 SW Angle Cored 5(ab- %Z ArWW BW5 ! %P!N° L 6x3r/o'x?§'Altach to End $ w/ 3- V' _ • AnClnr Bolts 1 (( P ?'q' B Askca Neod Bolts ( . End Be& 21-0, U _ C /. Plate ' M A M I zv I %' 2' a 2'-0' J L 6,_Vh'A-%'idqs Angie EM Gerd L 6x3r/e'xIj'[edga Angle %' Plata SECTION A %' 0 2'-0' e ? a QUAIL C g DETAIL 'B' Notw Provide mkh In angle to ovold confllot with bolts. Provide 2' weld wall side of notch. FINAL PLANS Revision Dram By Data DescrlAl7on RcASlon Drawn 81 Dota Dsscr7pllon Noma Dole Projwtr Tin Shah No ! REW J/20/01 Sheer added. Drawn By. REV' 3115107 1889 M1eUOpole- &ud. TaOehaesee, R 92908 THE CLIFFS AT S WANNANOA FASCIA BEAN DETAILS . Designed By: iIWA 3/!5/07 &5D-894-Two KJM V Bridge #1 9 resod Byr RCP 3/15/07 F Fax; 850-894-1614 - 13 i-, be Cauny. Nadh Ce Iwo MUK OF SHEETS 1. TITLE SHEET 2. GENERAL NOTES $. PLAN S PROF I LE 4. FOUNOAT ION LAVOUT 5. END BENT 1 PLAN & ELEVATION 5. END BENT 1 FOOTING DETAILS 7. ENO BENT 1 STENAND WING WALL DETAI L6 8. E140 BENT I DETAILS 9. ENO BENT I REINFORCING STEEL SCHEDULE 10. END BENT 2 PLANS ELEVAI ION 11. END BENT 2 FOOTING DETAI L6 12. END BENI 2 STEML WING WALL DETAI L6 yyD CONSTRUCTION ?'y 13. END BENT 2 DETAILS S?I9I)LEEI$®®? IN C. 14. ENO BENREINFORCING STEEL SCHEDULE 16. 3'-0' I!.: PRESTRESSED CORED SLAB DETAI L6 (BHEEi 1 OF 41 16. 3'-0• ¦ 1'-9• PRE6TFIE66ED CORED SLAB DETAI L6 I6HEET 2 OF 41 17. 3'-0• a 1'-9• PRE6TRE66ED CORED SLAB DETAI L6 (SHEET 3 OF 4) Is. 3'•0• x 1'-9• PRE6TRE6SED CORED SLAB DETAI L6 (SHEET 4 OF 41 ,L 10. FASCIA BEAM BETA I LS BUNCOMBE COUNTY, NORTH CAROLINA BRIDGE # 2 THE CLIFF'S AT SWAN A N®A 25'-0" CORED SLAA BRIDGE ON CANTILEVER A.BUTMENTS WITH SPREAD FOOTINGS FINAL PLANS Ralslon Drawn 5y Lbfa Oaearlptlm Ravlsbn Drawn 18' Mle Osscrfp!/cn Ymns 1)ufe ppp- P,oJmi! Tll)e? SMfI No. 1 IfEI'I 3/90/07 foscfo added. 0lawn ?V dM'A IP/E2/O6 1598 -,.. UIan BHtl. Taeanaxsea. FL aza06 TtiE CLIFFS AT SWANNANOA TITLE SHEET Dwignod &I. kWA I?l22/O6 ® 4600 bridge #2 --- -- - 'IL??? 95o-9se F- 05D-894-1614 S.-,be Co,,*. N.M Carolina I Approved EW RCP 12122/06 F=..v:v_ow?y,e? A. SPECIFICATIONS 2. CONCRETE COVERS: F. BEARING PLACEMENT A. CONCRETE COVERS SHDWN IN PLANS DO NOT INCLUDE REINFORCEMENT 1. DESIGN. th PLACEMENT AND FABRICATION TOLERANCES UNLESS SHOWN AS SEE BEARING DETAILS FOR ADDITKINAL INFORMATION. A. AASHTO STANDARD SPECIFICATIONS B EDITION, 2002 WITH "MINIMUM COVER". LATEST INTERIMS. COVER DESCRIPTION O. UTILITIES SUPERSTRUCTURE - PRECAST BEAMS 2 In ALL SURFACES B. DESIGN LOADINGS DATA CONCERNING TYPE AND LOCATION OF UNDERGROUND AND OTHER SUBSTRUCTURE 3 In IN GROUND CONTACT UTILITIES 15 NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. 1. DEAD )DADS: A UNIT WEIGHT OF REINFORCED CONCRETE 3 2 1. ALL OTHER SURFACES THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS AWN DETERMINATIONS . : l50 DN/Ff B. BARRIER, TRAFFIC RAILING: TOO CD/Ff 3. REINFORCING STEEL. AND OTHER UTILITIES AS TO THE TYPE AND LOCATION OF E 'THERETO. AS MAY BE NECESSARY TO AVOID DAMAGE AGAGE 2. LIVE LOADS: A. ALL REINFORCING STEEL SHALL BE AASHTO M34 GRADE 60. A- HS-20 AND/0.4 LANE LOADS PLUS IMPACT B. ALL REINFORCING STEEL DIMENSIONS ARE OUT-TO-OUT. H. ABBREVIATNINS 4. PRESTRESSING STEELr Bra. - B.arlrg 3. RAILING LOADS: A. STRAND: AASHTO M203, GRADE 90, LOW RELAXATION. Bolt. - Bottom A. EFFECTS IN ACCORDANCE WITH AASHTO STANDARD SPECIFICATIONS. PARAMETERS: C.IP.- Cast-In-Plot. - MODUU/S OF ELASTICITY: 28,500 Ks1 Cir. - Cleoramo/Cover 4. THERMAL AL FORCES. FORCES: - MAXIMUM JACKING STRESS: 0.75 fpu Const. Jt.- Construction Joint A_ AND TEMPERATURE VARIATIONS FOR DESIGN MAXIMUM ANCHORING STRESS AT ANCHORAGE: 0.7 fpu E.F. - Eooh Fa.e OF CONCRETE STRUCTURES (DEGREES FAHRENHEIT (F)Ar -STRAND O/AMETERr 05 In Elev. - Elevation TEMPERATURE RISE (*)35 DEGREES F Exp. Jf. - Expansion Joint TEMPERATURE MEAN 45 DEGREES F 5. ELAS U C BEARINGS: . - TEMPERATURE FALL f-145 DEGREES F RO E A. lX/RONE TER GO FF - For Faoa or THERMAL CIOEFFICIANT 6Da10-6 /DEGREES F FFBw - Front Face of Book Wall D. ALLOWABLE STRESSES/!DADS N.F. F. - Naar Faoa 5. CREEP/SHRINKAGE: PGL - Profile Grade Line A. EFFECTS OF CREEP AND SHRINKAGE IN ACCORDANCE WITH THE AASHTO 1. DESIGN NEThY1D: Spa. - space STANDARD SPECIFICATION, WITH RELATIVE HUMIDITY = 75%. A. SERVICE (DAD AND STRENGTH DESIGN METHOD. S Symm. m. - $yymm mm.irlcal 6. SEISMIC LOADS: 2. MATERIAL STRESSES: Typ.- Typical A. NO SEISMIC DESIGN WAS COMPLETED FOR THIS SINGLE SPAN BRIDGE. A. ALLOWABLE STRESSES ARE IN ACCORDANCE WITH THE AASHTO STANDARD U.N.0 - Un/= Noted Otherwise DESIGN SPECIFICATADMS FOR ALL MATERIALS SHOWN IN THESE PLANS. 7. WIND LOADS: B. ALLOWABLE TENSION IN THE PREDOMPRESSED TENSILE ZONE = 3 Jrc A. EFFECTS OF WIND LOADS IN ACCORDANCE WITH THE AASHTO STANDARD IN THE ENDS AND ZERO TENSION AT MID--SPAN. SPECIFICATION. E. f0/N0AT10AIS 8. UTILITIES: A. TWO UTILITY LOADS OF 500 PLF HAVE BEEN ACCOUNTED FOR IN DESIGN. 1. FOUNDATION DESIGN CRITERIA: THE LOADING IS APPLIED TO THE FIRST INTERIOR BEAM ON EACH SIDE. A. THE END BENTS SHALL BE SUPPORTED ON SPREAD FOOTINGS. FOOTINGS. S INSERTS HAVE BEEN PROVIDED TO FACILITATE UTILITY PLACEMENT. SEE FOUNDATION LAYOUT FOR ADDITIONAL INFORMATION. B. THE ALLOWABLE BEARING CAPACITY FOR THE SPREAD FOOTING SHALL BE 5 KSF,OR 6.5 KSF MAXIMUM. C. MATERIALS EXCEPT AS MAY OTHERWISE BE SPECIFIED IN THE PLANS, ALL MATERIAL AND WORKMANSHIP SHALL DE IN ACCORDANCE WITH THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES BOOK DATED JULY,2005. 1. CONCRETE: A. PROVIDED %' CHAMFERS ON ALL EDGES AND CORNERS EXCEPT AS OTHERWISE NOTED. 8. MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS: PRECAST CORED SLABS f'o = 5.0 Kol C.I.P. WRIER$ fc = 4.0 X.1 C.I.P. ENO BENTS f'c = 4.0 Ksl FINAL PLANS Revlalon Drown & Date D-ription R.N.A. Drown Ib Dd. 11-riptian Nome Dote Pr.Jmtr T111a• - -- -- Dfawn $y: JMH (P/22/06 1. MeaopoGlan DPid Tal4a lwssec FL 82308 THE CLIFFS AT 9WANNANOA SAaet No. it, dIWA 12/PP/O6 ?? , 65o -B9a-ieoo F eso e a Bridge #2 GENERAL NOTES Approved bY: RCf I?J22/06 ey.n..a oina,MC. mc -nna - s eurcomoa county. NaNi cardine e Ground Llne a UphillEdge? ?H Othatrs) Rlprop Ground Ltna O Cetefllne Ground One a Downhill Edge l PROFILE W.P.I End Bent I--\ N = 4988,063 E _ /000D00 k survey ---------- __ --_-. PLAN C Brg. of Creek I ?W.P.2 End Bet 2 N = 508938 FINAL PLANS RM.1.a -- Drawn By -- Date DeserlDtlon _ - Re hkn D- By gate DeserlpNan Name - Dole ProJxt: Tl11e: ---- -- Drawn By: k 12y22/D6 1589 Nelwpalilan &W. Tananasue, FL. 3=8* HE CLIFFS AT SWA14NANOA PLAN AND PROFILE SneeJ No. - Designed By: UWA /2122/06 J06 FIWLEV Bso-M4-teoo Bridge #2 3 Appfoved ey: RCF 1212 far: 850-894-1814 Buncombe Caunty, NoM Cmolina NOTES, 1. Fourdallan £awvatlnn aWibe In ocoordace with the Standard Spealf).U ns. 2• BacbfigMalerldshatibe In m rd=& with the Standard Speciflcatkns. Bockflll eAoll be compacted to the DensN required by the gmlodMakol raper). 3. No More than 10' of Baafflll fatwwred from DDHom of Footing)stdl be paced uWlhCorvd Slabs Rave been lhetalled and Cbwels Grouted In place. 4. /mare/ gulden may be paood orter tallow cored slabs ore set, tanstoned and grouled. PLAN ?+--F Brldgo (SymmJ y_gr I5'-d I ls'_y i,_y -L?rOtrst.?r. wr I /-Br)dge seat ?' Joint Flller-? 14''0• 1 3• W NuleDla•fypJ pJ I ? 4 1 N £t. 490' ELEVATION '_ FINAL PLANS Nawsfon Drawn By Date Deserlptlan Rev/sbn Drawn By We Deserlptba Nome Dote pweot: Tlae, Sheel Na. Drawn by: AMA IZIW06 )?9 Meaopon BNd. THE CLIFFS AT SWANNANOA END BENT I Tatlahaseae, FL. 32308 PLAN & ELEVATION Designed Dy.• WA /2/22/06 850-894-ISM Bridge#2 Fax: d50-80x-08 4 auacanine County, uanh C-11a (SHEET I OF 5) s - FKWUEV T - 1 - I 1 Aaoraved lm: arv m`I i?pi? I A505 (Top & BottJ ( 0190E I o I £ I I ? I L° I y i ? ? I I Si I I 46-0901 a B' (sp- with J190t1 1 1 I 1- ? ------ ----------- -_ . __ _ _-_ -_ . _ ___ - I I ~ I I sQ? 50-01601 a 8° (s pod with Jwl) 52-JI901 a B' trop) & 52-J2201 a a' (Bolt) PLAN -FOOTING REINFORCEMENT FINAL PLANS Ralskn Orarn ? Oofs D°urlplfan Ra7s7on Drarn lti DO. Oea°rlpff°n Mama O°la PraJaYr Tlae: ----- 0ravn eyr MWA 12/22/06 tM M.Unpolilan ewa. Talr hassee FL ax3oe THE CLIFFS AT SWANNANOA END BENT I Sn°°t k°- T Desloned By: thvA 12i22ia6 r ed a . . 11"osataoo BridgefF2 FOOTING DETAILS Approve,! Byr RcF 12/2vos - Fia? 85688A-1619 u?ncomce covnry, worn coy°im? (SHEET 2 OF 5) 6 m r 25'-3. -- -- ? ? x Al904 G904 q 6? n -3 -- 3 3 Q 4 ro m a a I C1905 (spa. W. J16021 ua? ' O N ? I $ . .. .. . .. ... . .. ... ... . 71 ' (TYPJ 13'-6' OMEO SL18 E - AY90/ IXA4ELS - d .PA. A 3'-0' = ET-0" - WING WAR( ELEVATJON AT FRONT FACE 46-AI602 front (Spa. w/ C160() E-AI601 46-A/9(12 back (Spa. W/ 0190() 2-AI601 ELM pp 6 A1603 AI601 A1601 A!6(N A1602 ffronL)& A1902 fback) m? m C160l ffronN & CEBW (baokl C1601 WING WALL REINFOR?C EMMATJON FINAL PLANS Rwlslpn Orarn Bf Oole Osser)pllon - Revlslan Dram 6y Dals D-r)pllon Nane Dole pp? P pro)eoft TRler -- - Drawn Wt 1h/A !2/E2/06 p A 1589 Mavop h- BIW. Ta?lahacsae, PL. 32008 END BENT I SAW 0. THE CLIFFS AT SWANNANOA STEM AND WING WALL DETAILS Das(Onec au ,WWA !2/22106 850 894-1600 Bridge #2 . !SHEET 3 OF 5) roved 6y: RCF lP122106 N Fax:65DM-1614 Buncombe County, Nosh GarWna 7 It r-6' A29& L I LT- SHEAR Kff DETAIL a6oz - a90z A1601 - gppnl fTyp.l 2' Cl. fTypJ_ Fiollf raaFabric soured CI601 - - CHW to aT .. wall - N J/90l A • - C1601 - C220! Y$7 app v o J:T h C /R flll6f /dbrlC L J N-AlWo I'-D' 'To & 80NJ C1902 JI902 rro & early STEM WAU. SECTION 12-asos o P-O' J° 0 Woap MI. WING WALL SECTJQd _ WEEP HOIZ - FRENCH DRAIN DETAIL FINAL PLANS Ralskn Ormvn By Dote Dosoflpltan _ Rwislon Drawn Date Desarlptka Nanm Dafe .J t, TRW 1583 hleuopdilan Blvd. 5nee1 qo. Drawn l3yr 1M+A 12122/06 7yunacsao. FL 32508 THE CLIFFS AT SWANNANOA END GENT 1 PPA' _____ Oesfpned Q: {hYA !2/22/06 { 1 Fak B5BP89481514 13-be Bridge C..y, NWh C..Iba (SHEE9 DETAILS OF 5) D _,._.,_..,, rdveC RCF 12/PP/06 Qa?auw eao.u=. RAW, a e c d 151-91 AX02 46 14'-0' _ - - - Z59 1 24 H'-0' am 75 51-9' !0' cm 48 51-9' I'-0' -4--74- 41'1' am 52 9'-11+ P'-0' I J. FINAL PLANS Ralslan Orewn By Gals Oaiellpl7on Revlslan Orawn ?' Lble Desarl0fbn Name Lbfe W Pralxlr Till. ! uWA 03/f6i07 OManslon cbrfaCled ! 1586 Mahapoaan Bbd. _ Drawn BY: AhyA 2122/06 Tauah-aa,FL.3230e RA THE CLIFFS ATSWANNANOA Sheol Na. END BENT 1 REINFORCING HEDU[£ - _ __ Approved $': 12/22/06 F®90I" - O 1(9 Midge #2 SHEET 5 OF S _ By: Approved M,' RCF 12/22/06 F aS 4 --n 4- r"a?+a"o amm.+? Burc bo Co umy,Nonn cawlm 9 REINF.STE£L SCHEOU[E - ENp BENT t XARK TOTAL OfXEN5fON5 (ENGTN A1603 !'b 6'-6' 6'-6° AfSCV 22 39'-6" 34'-6' A1902 % !9'-0' 14'-0° A1904 12 24'-1!' 24'-11° AP8f11 P9 l5'-9' AP901 PO CI902 2 20-6' 2'-0" CPJOJ 9 ts'-9• P'-0' I6'-B' 01909 6 24'-B' 2'-0' P6'-e+ CI905 18 4`10' 2'-0' CPBOI Pf 51-9' I1-5' 7'-2• JI601 IS 32 J. J?OP IS 32'-3' 1'-6' 35'-3• JI902 a 11'-5° P'-0' JP901 BARS a - BARS C BARS J QUANTITIES -ONE BENT lT£X UNIT Caxrele fdr Slrucfures - Cldpp a CY. ACH BENT !b Ralnfprcl Sleet for S/ltClures CBS. IP J NOTES: 1. Foundation Esaaatlon shagbe In accordance with the Standard Speatfloatlons. 2. BoatfillMatorlalshallbe In accofdanca with the Slarddrd Syealflootlaw.BaokRllsnallbe coaMded to the Denslfy required by the gootooMmol report. J. No Moro than 10' of Bacbfill !measured from Batfaa of Footirgtsballbe aood until Cored Slabs hue been fnstallrd M' D.,els Grouted In place. 4. Lateral guides may be paced aftor hollow eared slabs are set, tensioned and grouted. PLAN C Brldga---? fSymmJ %2' Jclnf Fl(ler 8rldpe Seaf, bb N ? EL 4305' ELEVATION FINAL PLANS Drawn BY+ WA 12/22/06 PPA' "sae tseuapaem, en,d. THE CLIFFS AT SWANNANOA END BENT 2 shnal"'a- Taliahesse9, FL 3a?08 1 I I I Designed By: dIWA l2/22J06 i ew-ass "soo BridgeN - PLAN ELEVATION Arun, M Q,,, r-ex: esg-b9n-isa Bwkwnhe Ccuny, Noah C.." (SHEET L OF 5) OF 51 to PLAN - FOOTING REINFO CEMENT FINAL PLANS isa0 Me6op°ri?en Ord. END BENT 2 __ Orawn By: lBUA 12/22106 PPA 7atlanassae, FL 37308 THE CLIFFS Al' SWANNANOA sneer xo. Oesrgned Q?: NWp 121221a eso-esa-1600 Bridge #2 - FOOTING DETAILS Ann nvad a?, acv rzil ezir 1 FB F 85"94A614 ikmw a cowry,Nmn Cwdm (SHEET 2 OF 5) u -- ??-J" -? c19oa a9oa ? o n I ? ? 3 QU $ 4'-O° ?O I $ o' _ T- 0/905 spa. w/ JI6021 ? m I N ? ??fp N ' fTYPJ CDR ED SLAB WIN G WALL. ELEVATION AT FRONT FAC 2 - A29p OOwfGS - 9 SPA.0 3;'-O'= 27'-0" 96-x602 front lspo. W1 0I6011 E 96-a902 dank (spo. W/ 01901) 2-a6a eLM _A1601 i a603 a x601 x601 ".' a602 (front) & x902 (dark) I ? b I ?? I pp pp l6 b 1 1 C1601ffront)& C220/fdoak) C/601 WING WALL REINFOR CING ELEVATION FINAL PLANS Rcvlslon Ormm N Mfe Ossorlpllan R.W. 0rmon 4' (late Uasorlptfon _ Name pots P Prolwtr MW Drown Byr 1M1YA l2/P2/06 P A 1589 Mdropd4an BNtl. iwianauee, rt aaaoe THE CLIFFS AT SWANNANOA Snao7 Na. END BENT 2 Desfgnad Byr Nwa l212P106 aso-M ?a 0a Bridge #2 STEM AND WING WAU aETAf1S ---- -_-- rove0 1tCF 12/22/06 0gm.eno ?w.ar - w s amca C-., Norm C=h na SHEET 3 OF 51 fY A29W W a i-F 6" - SHEAR KEY DETAIL AI602 - - A190P U Al6W A2M 2' Cl. IryPJ 0601 -- - G9W f1YPJ o Filler Fabric sauufaa J19W 3 a L 1 (a (aa9 a Wall ? ? y4? N ? U 0601 - Cfl9N a J22W i AA Slane f PPad (n fl7fef fa?r?e ' JfNI 9-A19W o I'-D' (To & BcItJ C1902 J190P 10-Al905 a P-0' (To & eon.) STEM WALL SECTION ?"0 Weop Ho/a WING WALL SECTION WEEP 110( - FRE(JM DRAIN DETAIL FINAL PLANS nmslon omen 9v mto Dsscrlpftan Ralston Drawn 9f Date D-riptim Name Ma PraJecl: TNIe: lb6D Ne4o eLi&i BNd. CLIFFS AT SWANNANOA Sheet No. -- Dravn Bpr !&YA IP/22/06 WPAP D ENO BENT 2 - -- - raoanasaaa.F(.azaoa THE __ 0asfgnod Byr 1-A !?/22/06 FB Facse?so9-a9la1sla Bwicomba?Cloudnly, N c carowa !SHE DETAILS 51 I-A u Approved By: RCF /2/22106,era om?, x. REINF.STEEL SCHEDULE - END BENT 2 NARK TOTA?C REO D p DIMEN b SIONS c d LENGTH AM 42 14'-9' H -9 AW2 46 /3'-0' A1603 26 61-6' AM 18 34'-6" 34'-6 A1902 46 13'-0 13 -0 A1903 8 AW4 f2 P4'-11 ' A1905 20 W-8- M AP20! 25 14'-9' A290/ PO 2'-0' 2' Cl601 76 5 -9' 10° 6 -7' cm 48 51-9' 11-0' CRJ02 2 2J -6 f'-0' P3 -6` CI9W 26'-B' Cl905 H 4'-4 2-0° 6 -4 CPPO7 24 5'-9' I'-5• 7'-2° J166W !9 2 -3 4'-5' 41'-Y J1602 l4 32 -3' 1'-6' JIM J2201 19 9'-ll' P'-0' l3'-1Y OARS A y BARS C I I BARS J QUANTITIES - ONE BENT ITEM UNIT EACH BENT Concrete for Structures - Class A CY. 95 Raffiforci iig Stew For Struefures CBS. 10 59 FINAL PLANS w,. a„o„ems gyp. a erm,me _ ama ?,e Till. sheet No. I uwa Os/2s/07 ear-tea dlmwlon Drawn AMA 12/22/06 1588 McBppou. 81w. Prsl + END ?' Tauahascee. FC. azsoe THE CLIFFS AT SWANNANOA BENT 2 Daslpned Dyr AAVa r?/2y06 aso-fis4-1600 Bridge 02 REINFORCING STEEL SCHEDULE Aparovsd Bv: RCF 1P/22/06 ?.re F- 850-6WI614 Swwmbo CoeNy, Nwlh Carolina (SHEET 5 OF 5) 14 a M Bartle!' Parapet Not Sluwn E!?2 ? fJps'el HIXas lfYDJ ? %z' d xS.Transvarse i I Past Ten ,dng Strand fn E'B Hale Q Qrfdpe wP.pT Q ti Jr0 Voids lfyDJ -----------------ll--__-____-_-----___J If_________________- ----------------- ------ -_____J i 5 9 l51-0' !See Me D /51-D' 1S. 1Wa fl I 8'-fJ`fClear Roadway) - ' __ P-0 l2?ID' 12'-10' r-P p--¢ Brldpa 5 briape Slew Xeys'o be flUal wild 00Sh afternnmrerurdnrlxfor Transverse SYrwds AfP1od fE' %i r- a I F.G. Surf ce ? %i Sea Datall'A' M. 16 ssm Y? Stmt No.l9 E?derlw Cored Slab Cad-hrPla Rafter Parapet S. Dololl'A' Sheaf N4.16 lmarfw Cored Slab lfypj ?'xS.Tronsvarsa Cored Slab PPaadd ro,.dwrrgg Inset/ SYrard In TWa.Hda ?? TYPICAL DECK SECTION Banter Pwopd Mxn Mots PLAN - 25'-W SPAN Arched faoado added. \-WP.AT j BRO. Pf60! o !'4 !Cast p W/bBaall aa 6 5, /- Rook face van and Y (AAAm othersac CMd.? ; Cl ?\ ma?yy,, %i Plate tedpe,fa of. _ BARRIER PARAPET DETAILS Q N." 1. Dl--Iw n prveo daces W InWudo rack ranee. FINAL PLANS 159Y Mayo Prolaatr TIAa: TalanasreeF FL, 32M308 THE CLIFFS AT SWANNANOA Z5'-0° PRESTRESSED CONCRETE shoat lro. rw 8su aei,?ra a.-.,b. C-ty NNonn Cwama CORED y? WI- OF 411'-9.1 1S Tl Do11on R1dra EXTERIOR SLAB SECTION Baan 2 Placertlnsul m uf . ?- Nt/UN SLAB (For Presrsed strand to/a.s SidforHM 9 SEGI ION 9 - ?' J7 LOW RELAXATION Interior Slab Sedlons) STRAND LAYQIIT (AUDI Mr. rnl alum) f'a • 5D ksf Pd - 4D ksf A p olf 2%i 0 D-4 HNo - SNrfa?,ro JI I I I ?lz• I 1 I 1 A/9nf0Wejs?I Eloslanwrlo T-8eor/np Pad I I I ?- 1 r-E 6wrlrg See End BeM fa dafafls. h??l SECTION AT END BENT Hoes r-l"f e 1 Vd for 4-JI-101 11 END a ran I I ` I P160! PART PLAN - EXTERIOR SECTION Nab , E41.1 Ssd/an s&- - lntuiv Sedl. awlar arpopl oaIDP1601 bars. (Addilknol rdrlacemad not sfnwN l JIM-3 M301 -\ r?• r?• rd:. 71 . 7! . ?, . N 7Y,' -: I I 7%' 1 t J/JO/ 1 JI3W J Da ; (Sae rots 1) r J/J0l N301 41303 END ELEVATION Slawlry &-d o' D"a" Sn"'or lood/M of DbvciHdes and J1303 J3ors. (strand (%'ordrd swn) howls Slab Swdlon :barn - Extsr)w slab Sedan slMlar wcv# Slxnr KW Juanilm ..qtr SHEAR KEY DETAIL Ndo,OMI Slnar ,Yet on Outside Face of E Z ar ad Stabs. Hato /a Q %p• p' NS.Transverss Post Tarulodng Strard elsdlnd wNh a norlro =M. pipe. Tra js straw Sm Spedal P-1.1 u ___i i_____•y? I - x5"x5"@ fi A I e:: S Slra?Vlsa '1" ONSide faced _ ? ? fffl rexss 8 g B ExleRa Cored Slab (e -y/V- 1141 with grad ELEVATION VIEW SECTION BB GROUTED RECESS AT END OF POST TENSIONED STRAND DETAIL 'A' r F/Il tin rcavs wRb Epoq' Mortar esprlo/N /amddad fa C 4---1 &at on wMaa Strand .r 's• C 4-1 End of Cored Slab PART ELEVATION AT END OF CORED SLAB SECTION CC GROUTED RECESS AT END OF PRETENSIONED STRAND Naas, L MAP" to bo romaad prior to grading. u _ FINAL PLANS Ralston Dear By Data ow.ripllsn ftwUkn Drawn P/ Dots Den:rlptl n _ Noma D.I. PraJeetA Tllla: ! REW J/19/nr DsarllB moved is wheel/9. D/own By: - MWA 12/Pl/n6 1fiB9 MebopoGlan Dlvd. Tananassee FLBZaoe THECLIFFSATSWANNANOA '?$•-0` PRESTRESSED CONCRETE Shael No. Dasignod By: IIWA lPJ9/06 ? ? , ' a-IwD = ' Bridge#2 CORED SLAB (3'-O`K /'-99 (SHEET 2 F a a- Ao roved RCF t2/y/D6 .y,o? a„ua,Y r. ync &9 0 B941B14 Buncombe County, NarN Caroliw O 4) I6 _ 54 J1302 (Ea, Slab UrdH 4 mfrs J/J02_ aYRea.a- ffrN to /Q Iko. t-bM' rat ra J150 2 O lzm...Clrs. - 4ifIVII I pave/ 4-Al30/l2 lbws. 2 earsiunw PQ Hoe for Trnsverse Strand II I- - - _____ ----- __________________ --------_. -'-------- -____--_________--__ --A L--------------?--Ir/I Vald 7TYpJ -r- _ J III l'? I ' 1a-ra ? ? 4 a' r urea _ ?'-9yj GRADE 270 STRANDS %z• 0 LJl Arse "- is or hsaes) 0153 mmdo sraafn td SYraMI 4<3 _ Addled Preshess (kl SfreMl J/A TYPICAL ELEVATION OF 2YCORED SLAB UNIT /Sea 25' Span L.g'an 51n9151 ksi - 4A ksi Ea g DEAD LOAD DEFLECTION AND CAMBER -- ? ? ? zs 5?n Camber at Eradton f$1ab den" In place) • Ddl.Won due to ad"fer Parapd and vs AspboN Wmrlnp Surfaa4 Flnol Camber Sri } r la r 1 4-4 --------------- PLAN r I / =- I&- 2 Pairs J1301fryR) Pao Dow Flan Not. r I. Stiff X302 s frupt os -sary fo debt Transverse Sfrards. 2 J1303 furs rd s/nwn for dairy. TOLERANCES o-aepn- •S•fo- 6 -Width a- o • "Win d -P-Ulm of Voids -AdIcW -- V '/4 4YH per l0' t-I e • PasA(on of Vofda -Harizodaf :.?• Paslllon a Vdd Ends -Laalh)dlrol-- F - S Nodal ar vertu) or d lpndcd akav :r .1 q •HalzaMalNla-alt-Lln4dlan from a sfrdpM Ilro pwall fo fir cede ffm of awmbsr jj• h • Camber - DNfaredld bhv4en addaxd u at. h - Camber - Dlfferadld bdwaen Mph and lo, awmbre of It. same span 1- Position of Dowd Holes - DaRdlm from Man Position --- Ps' w•• ' anx" j6• mox. - '!: ' - `r E e - b W/otn- Dlfferadlal at odJQ-W spans In it. soon drmfurc Dmrlra Ar-D .U. fray Mane surface J • Iacaf sff ahrsa k - HcrizaddPasnlon of no/os for TfaflsW-se Strands I - vallml Position of hole for Fro-arso Stronda m - P"Alm of Strands Yw' %q' ). la _?• SECTION g B-Inp Pad LB-I I I 3• 5 3' I Q f' f/ Hdes L eearlrg Pad ?f FIXED END ELASTOMERIC BEARING DETAILS ELEVATION • Laapth or ad)«xd cared slabs aholl nd differ Fry more flan %4 FINAL PLANS A.I.I. Dravn By Bala Oxorlptlon Revlamn Drawn ? 011a Desorrpilan -- Nana Lb/e Pro)ah T!ller __ _ ----- Drawn eye kIWA 12/2106 M9 MaAapo a ewe. Taeahassee FL 52988 THE CLIFFS AT SWANNANOA f5'-0" PRESTRESSED CONCRETE ' ' slaver "`- Desipned A NvA 12/21/06 . . 850.&44-1800 MAL" Bridge #2 DARED SLAB (3 -O" X I -9") (SHEET 3 OF 4) _ Approved By: RCF 12/21/06 o a?wo.w- F"`' 850-894-4814 Buncombe Comy, Noun Gwoww N NOTES, BILL OF MATERIAL FOR ONE 2FCORED SLAB UNIT TOTAL ' TOTAL DIMENSION (LARK RED 0. WY. REDO Er. a b c d LENGTH M301 4 4 13'-Y l3'-I' P/60/ 26 J1301 6 8 Y-9' Y-4' J4302 70 70 2'd' Y-4' 6-S J1303 4 4 r---VA' z-e OUANTITfES ITEM UNIT INTERIOR EXTERIOR Rd'ecrcRg Stool Lhs. 330 552 5D ksJ.Cmrsde 01c1 Co.Yds. 36 36 y; D LRSYrmds M. 9 9 yo' AT Lit Strads L.F. 224 224 8/L ONE L OF MATERIAL FOR 25' BARRIER PARAPET R TOTAL INMEI(S10N NA K REO'0. e D a a LENGT AISY 6 24'-6' 24Yi' U(MATITIES ITEM UNIT TOTAL Rddarary S 1 erl shUduros td9d Lb. 154 length of Battler Parapd V. 24675 ALL PRESTRESSING STRANDS SHALL BE ?-WIRE LIEN RELAXATION GRADE 270 STRANDS AND SHALL CONFORM TO AASHro M203 EXCEPT FOR SAMPLING REOU/REUENTS WHICH SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS. ALL REINFORCING STEEL CAST WITH THE CARED SLAB SECTIONS SHALL BE GRADE 60 AND SHAD. BE INCLUDED 1N IHE UNIT PRICE BID FOR PRFSFRESSED CONCRETE CORED SLABS. THE Q)RED SLABS MUST" ALWAYS BE MAINTAINED IN AN UPRIGHT POSITION WHEN HANDLED. PICKUP POINTS BE WITHIN' 2'b' OF THE ENDS PROTIDE A raEEP RECESS AT MUST THE PICKUP PDINTSTHE RECESSES SHALL BE GROUTED PRIOR TD WATERPROOFING THE TOP SURFACE OF THE CORED SIABS.WHEN BEING STOREDCARE MUST BE TAKEN TO ELIMINATE INTERIOR SUPPORTS. RECESSES FOR TRANSVERSE STRANDS SHALL BE GRUUTED AFTER THE TENSIONING OF THE STRANDS. THE LlW,'- DOWEL HOLES AT FIXED ENDS OF SLAB SECTIONS SHALL BE FILLED WITH GROUT THE 21116'- DOWEL HOLES AT EXPANSION ENDS OF SLAB SECTIONS SHALL BE FILIEO WITH JOINT SEALER MATERIAL TO Y/= ABWE THE TOP OF DOWELS AND THEN FILLED WITH GROUT. THE JOINT SEALER MATERIAL SHALL CONFORM TO THE REOVIREMENTS OF TYPE SL LOW MCOULNS SILICONE SEALAMr.THE 2-BACKER ROD SHALL. CONFORM TO THE RED)IREMENTS OF TYPE M BOND BREAKER SEE SECTION 1028 OF THE STANDARD SPECIFICATIONS. WHEN COREO SLABS ARE CAST A POSITIVE HOLDDDVN SYSTEM SHALL BE EMPLOYED TO PREVENT VOIDS FROM RISING OR MINING SIDEWAYS.THIS SYSTEM SHALL HE DESIGNED TO BE LEFT IN PLACE UNTIL THE CONCRETE HAS REACHED RELEASE STRENGTH. WHEN A CONCRETE WEARING SURFACE IS OETALLED ON THE CORED SLAB BRIDGE TYPICAL SECTION, THE TOP SURFACE OF THE CORED SLAB LIMITS SHALL HAVE A %"RAKED FINISH. THE TRANSFER OF LOAD FROM THE ANCHORAGES TO THE CORED SLAB UNIT SHALL BE DONE WHEN THE CONCRETE HAS REACHED A COMPRESSIVE STRENGTH OF NOT LESS THAN SO KSI. VERTICAL. GROOVED CONTRACTION JOLNTS,Y2"IN DEPTH SHALL BE TOOLED IN ALL EXPOSED FACES OF THE BARRIER RAIL AND IN ACCORDANCE WITH ARTICLE 825-100OF THE STAUDARO SPECIFICAT1001A VERTICAL CONTRACTION JOINT SHALL HE LOCATED AT EACH THIRD POINT BETWEEN BARRIER RAIL EXPANSION JWNTS. ONLY ONE L:ONTRACDW JOINT IS REQUIRED AT MIDPOINT OF BARRIER RAIL SEGMENTS LESS THAN 20 FEET IN LENGTH AND ND CONTRACTION MAYS ARE REOVIRED FOR THOSE SEGMFNTS LESS THAN M FEET IN LENGTH. Pr 1669 Afelropaaea BHA oJxtr . TaNahassee, FL 32306 THE CLIFFS AT SWANNANOA B,w-09a-1000 BridgeN Fax: Bsae9a-role Bunca??da cowry, Nonh Carman FINAL PLANS 25'-O" PRESTRESSED TlE,9RETE Sheet Na. CORED SLAB f3' O" x !'-9 I (SHEET 4 OF 4) a BAR BENDING DIAGRAM I I BARS A BARS J BARS P AL Far d/ma t s or P1601 bar See bar bow ESTIMATED SUPERSTRUCTURE QUANTITIES I T E M TOTAL Number If 25' ErkrhX Coed Nab Uals (24'-td,' eaW 2 Total L&Oh of PS' EAlerlor Carad Skb Uats (LFJ 4975 Number of PS" lidwkr Corod Slob Uals (2Y-Id - mcN B Taal La 4h of 25' laeHar Corot Skb Uafs RFJ 199 Number or 2v a rr/er Parapat Sedlons 2 Talal Rdffadrg S7ad for 25 Barrlsr Pora6et Sedlcas (LLsJ 306 Total LwWh OF BY Barrfar Pvrq?j Sedloas (LFJ 4975 FJostawlo Bmrl/g (Flad) 20 Elad-lo Bmrl (END awd - TdolRdlfwcl SfedfV Strudures far! (LbrJ 4052 7 Spaces 0 3'-0'-2Y?0• p-lp ' L (ix3h' 'ffypl Tap of Corad Slab rsee L>uar'?'cl %i Plole Se° Nde I I F • 20'!' L fi%4' Ldge gle ffYW ? End Budfwing .It not s/avn for c/arly( ELEVATION N&A Richmond ODtsfde face of F-7 Stnh' Angle Exlerlor Cored Inserf Slab Askav 11 _??ead Batts • I I _?ey7]' .? u i 0 DETAIL W C. End DETAIL C If E14 dgo Angle L 6x3 ' x; Attach to E d ent W/ 3-%0 AnaW Bops %' /-%Plats \-L 6x3%j x?"Ladge Arg/e SECTION A Note: Provide notch In ang/a I. avoid "nitlat with Dolts. Provide Z'Wefd each slde of Mich. FINAL PLANS Falslon Orarn BJ Date Doxrlpflan Raman Drown B/ Wfo geaoflpflon Namo lbfe PP, PreJeab Tiller I FEW 3/YO/ar Sheet added. MEW 3115107 RA 1 Monopoelar BNd. Ta569llahassee FZ azBOe THE CLIFFS AT SWANNANOA Sneat NO. ED-lgud !h A 3/16/07 FIN" , -894-i6W F 8 Bridge #2 FASCIA BEAM DETAILS 9 flCF 3/16/07 roa evywy.? ax' 50-894-1614 Bmrcomb. County, Noah Cerol{na 1 INDEX OF SKEE" 1. TITLE SHEET 2. GENERAL NOTES 3- PLAN L PROFILE 4. FOUNDATION LAYOUT 5. END BENT I PLAN: ELEVATION 6. ENO BENT I FOOT I NQ DETA I LS 7. ENO BENT I STEM AND YII NG WALL BETA I L6 6. END BE NT 1 DETAILS 9. EIID BENT I flE I NFORCI NQ STEEL SCHEDULE 16. END BENT 2 PUN S ELEVATI ON ll. END BENT 2 FOOTING DETAILS 12. END BENT 2 STEMS WING WALL DETAI L6 13. END BENT 2 DETAILS Iq. END BEN 2 REINFORCING STEEL SCHEDULE IS. 3'-0' x I'T•9' PREIT:E66ED CORED:LAB DETAI L6 ISHEET I OF 41 16. 3'-0' x 1'•9' PRESTRESSED CORED SLAB DETAILS IGHEET 2 OF 41 l7- 3'•0° x 1'-9' PRESTRESSED CORED SLAB DETAILS (SHEET 3 OF 41 IB- 3'-0' x I'-9' PRESTRESSED CORED SLAB BETA I L6 (SHEET 4 OF 41 19. FA601 A BEAM DEW LG SA DLEBR-®OK CONSTRUCTION INC. BUNCOMBE COUNTY, NORTH CAROLINA BRIDGE # 4 THE CLIFFS AT SWANNA-NOA 4W-0" CORED SLAB BRIDGE OIL CANTILEVER ABUTMENTS WITH SPREAD FOOTINGS a , ) 0 . c AP 0 FINAL PLANS Rn/sl4n OrmJn By Dbl. O.scrlpIN. Revlslbn Drown Ml. Besor/pll.n Nome 0.1. prbJeclJ TI1w _ Oravn Byr AIWA 03/21/07 1569 Me.oposWn BNd Tallahassee, FL 3za0e THE CLIFFS AT SWANNANOA TITLE SHEET Shen!No. DcslNneO Syr IfWA 03/P!/07 ®tl ?r 65"4-1600 Bddge #4 - one 111- 7- 7 F_: 850-894-1614 Bum:omb. County, W.11, Carol 7 A. SPECIFICATIONS E. CONCRETE COVERS: I. UESIGM. A. CONCRETE COVERS SHOWN IN PLANS DD NOT INCLUDE REINFORCEMENT A. AASHTO STANDARD SPECIFICATIONS Nth EDITION 2002 WITH PLACEMENT AND FABRICATION TOLERANCES UNLESS SHOWN AS " " , LATEST INTERIAIS. MINIMUM COVER . LOVER DESCRIPTK)N 8. DESIGN LOADINGS SUPERSTRUCTURE - PRECAST BEMIS 2 /n ALL SURFACES 1. DEAD LUADS, SUBSTRUCTURE 3 In IN GROUND CONTACT A. UNIT WEIGHT OF REINFORCED CONCRETE: 150 Lb/Ft3 2 In ALL OTHER SURFACES B. BARRIER, TRAFFIC RAILING. 700 Lb/Ff J. REINFORCING STEED 2. LIVE LOADS. A. ALL REINFORCING STEEL SHALL BE AASHTO LI3l, GRADE 60. A. HS-20 AND/OR LANE LOADS PLUS IMPACT B. ALL REINFORCING STEEL D/AfENS/ONS ARE OUT-TO-OUT. 4, PRES7'RE55ING STEED 3. RAILING LOADS: A. STRAND. AASHTO 11203, GRADE 270, LOW RELAXATION. A. EFFECTS IN ACCORDANCE WITH AASHTO STANDARD SPECIFICATIONS PARAMETERS. . - MODULUS OF ELASTICITY: 28,500 Ksl 4. THERMAL FORCES - MAXIMUM JACKING STRESS.- 0.75 fpu A. Tr.MPERATURES AND TEMPERATURE VARIATIONS FOR DESIGN - MAXIMUM ANCHORING STRESS AT ANCHORAGE. 0.7 tpu OF CONCRETE STRUCTURES (DEGREES FAHRENHEIT (FI).' - STRAND DIAMETER. 05 In TEMPERATURE RISE (+)35 DEGREES F 5. ELASTOMER/C BEARINGS: TEMPERATURE MEAN 45 DEGREES F A. DUROMETER 60 TEMPERATURE FALL f-) 45 DEGREES F THERMAL COEFFIC0ANT 6040-6 /DEGREES F O. ALLOWABLE STRESSESILOADS 5. CREEP/SHRINKAGEr 1. DESIGN METHOD: A. EFFECTS OF CREEP AND SHRINKAGE IN ACCORDANCE WITH THE AASHTO A. SERVICE LOAD AND STRENGTH DESIGN METHOD STANDARD SPECIFICATION, WITH RELATIVE HUMIDITY = 759. . 6. SEISMIC LOADS: 2. MATER/AL STRESSES. A. MO SEISMIC DESIGN WAS COMPLETED FOR THIS SINGLE SPAN BRIDGE A. ALLOWABLE STRESSES ARE IN ACCORDANCE WITH THE AASHTO STANDARD . DESIGN SPECIFICATIONS FOR ALL MATERIALS SHOWN IN THESE PLANS. 7. WIND LOADS, B. ALLOWABLE TENSION IN THE PRECOMPRESSEO TENSILE ZONE 3 A. EFFECTS OF WIND LOADS IN ACCORDANCE WITH THE AASHTO STANDARD IN THE ENDS AND ZERO TENSION AT MID-SPAN. spml,ICATION. E. FOUNDATIONS 8. UTILITIES, I. FOUNDATION DESIGN CRITERIA: A. TWO 07 ILITY LOADS OF 500 PLF HAVE BEEN ACCOUNTED FOR IN DESIGN. THE LOADING IS APPLIED TO THE FIRST INTERIOR BEAM ON EACH SIDE A. THE END BENTS SHALL BE SUPPORTED ON SPREAD FOOTINGS. . INSERTS HAVE BEEN PROVIDED TO FACILITATE UTILITY PLACEMENT. SEE FOUNDATION LAYOUT FOR ADDITIONAL INFORMATION. B_ THE ALLOWABLE BEARING CAPACITY FOR THE SPREAD FOOTING SHALL BE 5 KSF, OR 65 KSF MAXIMUM. THE CAPACITY C. MATERIALS SHALL BE VERIFIED BY THE GEOTECHNICAL ENGINEER WRING EXCAVATION. EXCEPT AS MAY OTHERWISE BE SPECIFIED IN THE PLANS, ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATI)NS FOR ROADS AND STRUCTURES BOOK DATED JULY,2006. 1. CONCRETE: A. PROVIDED f," CHAMFERS ON ALL EDGES AND CORNERS EXCEPT AS OTHERWISE NOTED. B. MINIMUM COMPRESSIVE STRENGTH AT 26 DAYS: PRECAST DARED SLABS Pc = 5.0 K.1 C.I.P. BARRIERS 1". = 40 Ksf C.I.P. ENO BENTS f'G = 4.0 X51 F_ BEARING PLACEMENT SEE BEARING DETAILS FOR ADDITIONAL INFORMATION. 6. UTILITIES DATA CONCERNING TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES 15 NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATIONS AS TO THE TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. H. ABBREVIATIONS Brg. - Bearing Batt.- Batton C.I.P. - Cast-In-PMce Cl, - Clmra .ICover Count. it. - Construction Joint E.F. - Each Face Elev. - Elevation Exp. Jt. - Expoaslan Joint Eq. - Equal F.F - Far Faoa FFBW - Front Face of Book Wall M.F. - Near Face PGL - Profile Grade Line spa. - Space Sta. - Station symm. - Symairloof TYP. - TYPI-I U.NA - Unlass Noted Otherwise FINAL PLANS R WOO Drmra ty Data Dascr/ptlOn RMSIOn Dram Ly Deis Daurtpl/an Nana &t. proJooL• Tllla, --- -- JMH 03130107 pp"A 1569 MclropWilw &vtl. ia6ahaasaa Ft..6z+oe THE CLIFFS AT SWANNANOA SnaeR Na. . - _ Designed Byr MWA 03/30/07 ®n ?.0 . 850-894-1600 Bridge 44 GENERAL NOTES APPrOVad BY., RCF 03/30/Of Fm: BSD-B94-16tH , N.Uh Buncombe County, Nnnh Ca:dina p 510 $ Brg. ?' OJO 505 ? ery. '1 -' 500 I _-_??_ Orf?llllEdpe Ground line 495 Q Cenrorilne Bottom of Footing Elev. 494' GrN??Ind Ong m PfWnhlll Edge 490 485 PROFILE Bottom of Footing Elev. 483' 480 fE Brg. 38'-!Brg. W,P.1 End Bent/ \ N = 4960569 E ° 1015.000 \ W.P. 2 End Bt e 9vrvw N = 4999.438 E _ l015DW \ of Crook "'--C of Creek PLAN FINAL PLANS Hevlslan Dravn 6y Out, D-rlPtlon Nalaron D,.. By D t. DascrlpNan _ Name DO, PraJah TNIo- _ Drown By: dhyA 03/16/07 15e9 tde6op01itan BNd. TalWhascea FL 3zfoe THE CLIFFS Al SWANNANOA Sneer Na. --" , D.1jined By: kWA 03/16/07 FIN" 850894-1600 Bridga#4 FIN V F PLAN AND PROFILE a :850-691-161a Gunccmbe Coune/, NoM C3?olav Approved Be. RCF 03/16/07 rrn?n.u om?,.n?. 11 3 NOTES SPREAD FOOTING SUALL HAVE AN ALLOWABLE BEARING PRESSURE OF S KSF SUSTAINED, AND 69 KSF FOR SHORT TERM LOADING. SEE SHEEIS 5 AND 10 FOR FOOTING DIMENSIONS. , \ \ I £ = f Survey-- N 4999 436 -A - _ ____ _ - _ _ __- __ _ - _ _ _._ __ _ E = 05.000 1 \ WP.I End &.I t N = 4960563 1 E 1015.000 1 2 , END BENT l END BENT 2 PLAN _ FINAL PLANS ?alslon Orpvn By Lblo Dopallpllan Ralslan Drawn dy !late D-rlpllon Noma Lbie Pro)eotr Tllle: -- Oravn By: -A 03/(6/07 1589 Metropolitan Blvd. rauat,ae,ee R. 32308 THE CLIFFS AT SWANNANOA t OeslOned By: A1Wq 03/!6/tTI I , eso esalwo 1600 Bridge #4 FOUNDATION LAYOUT H ,.?_ _ A round Byr RCF 03//6/W F Faz:850- 1a 1L,ncombe County, Nnnn Cmaina NOTES. 1. FounrMflon Eacwollan shall be In oocordamo wllh the Standard Specifications. 2. Baokffllklaferfal sball be In O rdarco with the Standard Sptlflmtlons. Backfill aWl be compacted to the DensW required by the gwlachalcal report. 3. No More Man 7' of Bockfill (m-rod from Bottom or Fwtlry) shall be pieced until Cored Slabs lave bath Installed and Dawdle Grouted rh place. 4. Lateral 9.1das o my be plooed after hole. cored slabs are set, tenstanad and grouted. r -f Bridge f4m i l'-d$is` 1'-6' V-5 4?1KST.11 . W/ I age Seat rKf?? Etev.05J9' %, Filler `P thvJ Q ? ? I 3' Ofa. weep `?, " I (tole ttyPJ?_N ? a I EL. 494' ELEVATION FINAL PLANS Drawn By. ABYA 015Tae89afwasee McSapol4an BwaTHE CLIFFS AT SWANNANOA ENO BENT l sneolxa. R.3 PLAN & ELEVATION Deal9ned By. MWA 03/PP, 850-694-16ee 2368 Bridge #4 I I 1 I I I A-1 r4 nrF nv?nrm ® v Fax: 850 894-1614 ea,combe G. ?,y,WIM G-Wo LSHEET L OF 5) 5 ,1 1 ?JS /T 0p & Bpyy+MU / d / Q - ----- - ' ------------ ------ - -------- -- _ 49-CIB010 8 (5XaW with J1901) 51-CI6010 8° (spaced with JI901) PL 56-J190/ 0 8e (Top & B.tt.) AN - FOOTING RMFORCEYENT FINAL PLANS Rcvfsfon Drove 8y Date Daaorlpffon Revlelan Drawn By Mh Ceecrrprlan Nmne Dora P P rfl/. Drawn IA 03 P A tsea ueo- HE CLIFFS ATSWANNANOA END BENT l DeslyneA &t INIa D3/v/07 ® -16 B5D-09A7000 Bridge #4 F FOOTING DETAILS Approved Byt RCF 03127107 e??oy?a a+aw.uK. F- Bso-esa-rata &-.b. C-py, NoM Ca,oena (SHEET 2 OF 5) 6 WING WALL ELEVATION AT FRONT FACE WING WALL REINFORCING FINAL PLANS -- --- _ re ea: __ _. _ DTavn t669 MetrapoYWn BIW. Snc:.! No. -- - -. - By: NWA 03/P7/Ot 7alalwssee, FI. szsoe THE CLIFFS AT SWANNANOA END SENT I Designed By. MWA o3/?/rn eso 694-i9w Bridge #4 STEM AND WING WALL DETAILS Fax: 850-694-1614 B.....Nw Cwn , North Ga,di- (SHEET 3 OF 5) T Annmva.-l A- tY T"', f wo(ISBWT°d 1* `to"ni3?'w WING WALA_ SECTION 7589 MatropoNtm BNd. 'teuew-. Fl. ,,.Me THE CLIFFS AT SWANNANOA 1:90-8941600 Bridge #4 F_: 85O-094-7814 8--,b. County, NaNi C..lh. FINAL PLANS T711e1 END BENT I snaerra. DETAILS !SHEET 4 OF 5) e WEEP HOLE - FRENCH DRAIN DAL ((o0 & Barr.) C1601 76 5' 0' los 51-10. QUANTITIES - ONE BENT FINAL PLANS Rwfslan Drawn ay Dale Oucr/plion Rw/slon Dra+'n B/ Oote OescrJpllon Nane LI M, Nla Propch TBlar - Drawn e» 03/27/D7 rase Mevopclnan BMi. Talahacsaa szaoe THE CLIFFS AT sWANNaNOw END BENT I sn.al xa. Daslpnad Byr Nwq 03/9/D7 , ®g??y,r/ eso e9a-iwo ? Bridge #4 REINFORCING STEEL SCHEDULE (SHEET 5 OF 51 9 Approved RCF 03/27/07 ynewy b Fau: a50?9a-i61a s Buncombe County, N.Wv C..Ik,a RELNF. STEEL SCHEDULE -END BENT L NARK TOTAL DIMEN SIONS REQ D o b o d LENGTH A1601 33 10'-J` 111. A1602 97 B'-6' 8'-6" AAi03 26 6'-6' 61-6' A190! 14 36'-3' A190P 47 8'-6' 8'-6 A190J 4 !3' 7' /3'-7' A1904 12 2/'-7' A1906 PO b'-3°- 101-3" A2901 PD 2'-0° CI90I 71 61-6' P F16DI b " b' p'-6' FI60P b I'-6' fi'-0• F190! l0 P'-0° 5'-0` - FBI601 b 19'- al 66 '-6' b' 21-6 221-2' FB1602 10 19'-6' Y-6' 5' 11-5' 21-0' F6f9W 9 /3'-P' 5• t'-5' 15'-2° fB190P 6 21'-P• '-0' P.3'-P• J190/ ill 5'-5• P'-0` 9'-5' JN02 3P 61-P' P'-O` ID'-P• r `-? 6LL. BARS A ? a BARS G L? rl ld BARS F -y BARS FB I BARS J ITEM UN1T EACH BENT Concrete for Structures - Cfass A CY. 65 Ralnforel Sioe(far Structures 185. RJ9? T / > /. NOTES, >'y, 1 1. FauMoflan Exaavarlon ball b. In acmrdoroe with ths-Standdrd Speolfioatlons. b M d 2. BaWflktoterfWshall s aceor axo with the Standard SWflcotlons. 8ocklll/shaft ba ' 0 c.q-td to the Dens/h/ requ/ red ty the % - geotechnlaal rmport. % 3. Na More than 10' of Backfid(measured from ?'6^ t r' Q Bottom of Fooflao shall be placed until Cared Sl b h I t ll d d D l b ` > an a s ave een ns a e owe s Grouted In place. 4. Cateratguides ma/ be placed after hollow cored ° slobs ate set, fenslaned and orout d. Q M rs%/ fs• 9, " rss, PLAN H Bridge - o (SymnJ dotnt Filler I CONST JT•w/ T Bridge Seat K/,11 ° I E1er.501J9 I I I I o -? a --- W? ep H.I. H°arp.) ? (Q•pJ ° 4 EC. 983' M ELEVATION _ _ _ FINAL PLANS Holston Orarn S/ Data Descrlptlon Oars oasertpflon ??? Noma Gore praJacl 47 7ftla.• m i ? tsmu Metro mneo EWvd Drown io- kIIgA - Utah ; " s.e THE CLIFFS AT SWANNANOA Snaet No. END BENT 2 _ , Designed &e AM'A 09/30/(7® F w9 i Bomgry I ELEVA P(SNEET 1f OFT5?N t _ - _ e 4tsi4 Ganaamna m ca,auna - -- --.- _ B5 Approved f7CF 03/30/ E w+ r?w.oK fo FINAL PLANS Prolwlz TIIIA 1589 McVOpolllen &vtl. Sneef No. Tullanassee. FL. 32386 THE CLIFFS AT SWANNANOA END BENT 2 esae94-ieo6 Bridge #4 FOOTING DETAILS Faz: 850-894-1614 Buncombe Coumy. North Cuolkw (SHEET 2 OF 5) u N / A1904 FB/902 I l ? ? l F160) v l w ° ' -4 14 Q CORED SLAB _ 2 - A29 MVEtS -19 SPA. o 3'-I%' = 29'-41 ° Lot 47-A1602 ($Pa. W/ 01601) h 2-A1601a 47-A2201 bock (Spa. W/ C2200 2-A1601a WING WALJ ELEVATION AT F RONT FACE A160/a A7 A16031a-mJ a j! A1601U AI60Ja F190 a $ QN q b b pp Za 3 ?l M .M? o O T ti 1601 tfronN& C250f (ba WING WALL REINFOR CING ELEVATION FINAL PLAN5 Rwlslon Drawn BI Dale D-r/pt/on R.I.W Dram By Data D-rlpflan r j.tr "' -A BNd -= THE CLIFFS AT SWANNANOA END BENT 2 Shoot Na. 4 Bridge #4 STEM ANO WING WALL DETAILS (SHEET 3 OF 5) 03/[7/07 Fr'pu'vip? h: Fac'85&-894-161d 6uncontEe Caunly, North Corol lna /2 AI602 ffronfl A220/ (back) & I ? I I O h 3 I b 4 1' I I /601 $ O Y 4 STEM WALL SECTION WING WALL SECTION FINAL PLANS Drawn BY: b1WA 03/77/07 ?? 4lad eh,d, sneotxa. - -- ------- rauana-aaea•FL. 3239e THE CUFFS ATSWANNANOA ENO BENT 2 --- ._--,-------- - Dastgned 8y: prp 03/„io7 ® F-S 5a 0 894-1-1614 &r¢on,ba Coupe ff4 Carolina (SHEET 4 OF w Ia a,,.?moan w.. arc H Nonh WEEP HolE - PRE CH DRAIN OETAIL 22 21-310 A900 P 13'-6" ITEM UNIT EACH BENT __ FINAL PLANS Rerlalan Orarn Br Lbia Oasarlplfon Rwlsfon Orarn B/ Dale Deserlp/lon Na., e i Protect T11/or Drwn By: AIWA /07 --- - ? 1699 Mevopolsan elva. 32368 THE CLIFFS AT SWANNANOA Tallahassee FL END BENT 2 Sbeal No. Deslo-d By, AIWA dq, , . . ea?aa t Bridge #4 REINFORCING STEEL SCHEDULE roved RCF ?07 ?o?a? Oro p e Fax; 850.894- 6 4 enncanhe romry, tk nh Cantina !SHEET 5 OF 51, H REINF.STEEL SCHEDULE -END BENT 2 MAR TOTAL O1NEN IONS K REq D o b c V LENGTH AI601a /4 /fi -9" Al6016 /4 !6'-7' vorles f6'-7 Af601o to l5'-4' to !5'-9' A/603a P6 6'-6° vorles 61-6• Al603m 1. 7'-6" M A1903 B p-B' p'-B' Aga4a s 0-8' re'-B AI504c P W-01 Afeos a p'-e ro'_B• A220! 47 _ 14'-!I" 14'-ll' AZ5Wa 2 16'-B" A250I6 !9 16'-7" varies l6'-T AP5(Mo Po l5'-4" to 151-4' A2901 2D 2'-0' C1601 7E 5'-6" to, 6'-4 C2201 51 6 !'-0' C25a /5 F/fi01 76 F/602 !6 / -6' 5 Fl901 B P'-0' 7° I'-!I' 12`-6° F190E 6 20'-6' FI9D3 E 2'-O' 3• Y-9' /9'-E• F816(N l6 p' E'-6 PP -P' FBI602 16 19'-6• I`-6° 5° l'-5' PI'-0" FB19IX 16 31-0' 11-0' 7" /'-N° 5'-0" J28C11 57 ro'- P'-0' /4'-3• JPSOP !2 Il'-P' 2'-0' l5'-2" bL?I BARS A F- p\?\ BARS C BARS F BARS Fit BARS JJ JJJJJ???111... 41/rLYTITIES - ONE BENT Conorefa for S7uctures - Closs A CY. 90 Ralnfaroi Sfael for Slrucfuras ($S. 10,600 Jq ld ' Uan h at Caed Slab U V) Barrle=Porapel NN S/avn 1 ??y,vdas r_____-----_..1, I___--______l L_________.,_ 111_____I, _ ___--_---__ I I_______-___ I r + L_______-___I 1a___________ J Bottler Par-pal Not Stew, PLAN - 90'-0° SPAN 1 1 1m? , ? ? Q Y8' 17 flS7ransverse Past TensloNrp Strand 1 In zd dale 5 9 Sae D.1.11 W Sled No. 16 !alga !e ?yp.) S. Goo J 6 Steel Nal3 Cared d Slab 15'-0'lSee role lJ W-U(See role h I 27',8'(C/ear Roudway) r? !z-Ja I lz-la r -a r-¢ Brlago g, Y a Stnor Kvry to be fitted with p!oN offer f!rollens'w'v of TransVarse Strands WA?? I F.G. !z lz Smfaao - © - © (9 ©6 © a fl - _ - ?---interior cored % Slab fry>u 'HS.Trans m Wart Pad Tensioning 57rord In 2'Ola.Hda TYPICAL DECK SECTION CastilrPlace Barrier Parapet ffypj 5. Ddfl Shoot No.l6 Ea7arla Cared Slab -/,5011 to,d rv47e BARRIER PARAPET DETAILS Nd"m I, Dllaanslon gain does rot Include rank vaneer. 2. For variable almenslans,a. Sleet If. FINAL PLANS Ra,mfun Drmvn by talc Dasarlptlan R. /on Drawn ib, Dote Desalipt/an Drawn Rya Name dAJH 03/?J/1017 Olvd Wd. rq f.- Tiller 90'-0" PRESTRESSED CONCRETE Shael No. Designed ty: 1M'A g pl fir/ osa asn-l6ag THE CLIFFS AT SWANNANOA Bridge 174 CORED SLAB W-Os x P-9") H Fax: 850-894A614 Bunn- County, NoM Carolina (S EET I OF 9) 15 ¢ Oo7lan klcfrnad F-5 j•Ola,-1 '12 Theaded Insert a 4'spudrg for Bean 2 Placs Insert on OplxaMte 40' INTERIOR SLAB SECTION EXTERIOR SLAB SECTION Side tar Beam I V1 N( LOW RELAXATION lFor Plasiresaed Strand IrynW,sea -- R lydorlor Slab SOW=) STRAND LAYOUT W301 burs rxd slxxvN ,Fr-, --5,0 ksl Pd • 4.0 *at p BOND SHALL BE BROKEM ON THESE STRANDS FOR A DISTANCE OF 6 IFT FROM THE END OF THE CORED SLAB ON?. J1303 - • " c J/301 -? 7Y, z Iil"a° •• I r-r r I i II 7?2' JI301 ??`- -- . III. '.. I.I'F ?- . (Sea note 1) ? J1301 T '001-/ N301 J/303 Has fw ¢ Yy d NS.Transverss Post Tenslom w Strand stealled with o non-wrosive plpe. Transverse Strand S. SpeWWPralslans •$? _ _ J t _ _ _ _ .Q ! L Strand Vise ® OWslde face d • •• Fill r- B g B Exterlar Cored slab wllh prow 9: ELEVATION VIEW SECTION B-B GROUTED RECESS AT END OF POST TENSIONED STRAND OEFAIL M Haas I1 Liz ?%? ? D'xvd /Iota 9 L --- Vol s ? i I 1 I A9901 Oave/s I £loslonrerfc 1 I I Beorrnp Pod 1 _ k- J Bearing Sao End Belot for detal/s. ('- SECTION AT END BENT END ELEVATION Slnwlnp plao"Idd %ble Stirrups 1anllan of LbwdHO" aad J1303 Bars. fraw fuynWnot shwN Inf-H, 515 Sadlon slnwn - Ederlar 51s0 SaWAa similar -W Steor Kw lamllan • ?4 SHEAR KEY DETAIL Nds :OMlSimr Keryy m Oulsfde face of Exlerlor C MW Slobs. Flf/ f1e ra Ey r 2 ospactany = 1P C ?t- opNlcatlau on verllml surfocar. Predress - 1 L Strand __ •e. C ®J EW of Cored Slab PART ELEVATION AT END OF CORED SLAB SECTION C-C GROUTED RECESS AT END OF PRETENSIONED STRAND tides: AiL l Plow to be r-od prior to prwft. FINAL PLANS Rurlsf°n Drawn By Pots Peserlpflon Rwlslon P,•mrn By Ibis Desorlpflan Nome W. W-A Proje hl I T1tie: Brawn By: JMH 3/2//W 1569 MaVOpo0lan elva TaOahasSee FL3z308 THE CLIFFS AT SWANNANOA 90'-0" PRESTRESSED CONCRETE sne°fR°- Oeslpned By: AfNA 31PJI07 ! , 660-6.94-1660 Bridge 44 CORED SLAB LJ'-0 X /'-9 (SHEET OF ) _ roved By: RCF /2I/0I 03 u,wwn ago. n_ eso-ese-161s Caron,. B-nbe County, W. 2 4 l6 PART PLAN - EXTERIOR SECTION Note : Ell Aar 51,11on sluvn - ."..r. ,,t;_ Sedlon slnil. exocpl . (Ald/flanl llforceawxd net stewn) _Bi JlJ02 (Ea. Slab MY) 4 pairs J1302 ?yp.a .edl -&-L (TYN Bra. _ Gavel fkiles 42 pdrs J002 a /YNax.cl- rj, 0% _ 12 1-2-' II ?Y//.,a d Gave/ 1 /da s ?YN 4-A/30112 !Ines. P Bars/L/rel 2O We fr_ Transverse 94-or- i II I - - ------ ------ ---1 r ---- - - SWIw /s ---- _ _ N ?'- - r-- /Ylk vdd fr _ _ I I r I !r-4• ?r-7/ r-4• GRADE 270 STRANDS d L.R. Area (Spume Inclcsl 0153 _ k1pY p Se trotrand) f s d! _ 1 ( ! Per strane01alcd Pfeslfass 3!D TYPICAL ELEVATION OF 41Y CORED SLAB UNIT (Sae AY Span (pouf Shed 15) Ego DEAD LOAD DEFLECTION AND CAMBER %z'ALA Strand 40' Span Camber at Eradloo (slab done /n plow) s?. } Deflection due to Barrier Paracet and Asplatt IVCar/no surface s = Flnal Comber r Ky 1 1 1 _________ PLM 1 I ..------------------------- l g... (TYPJ J1301 fryN 6'to N Br Dav Ades Notes e 1. SNft J130E dlrrups as lmcassary to tlear Transverse 9Yaodr. Z Jl303 bars red sire n for Uarlry. TOLERANCES a • DApth w b -Width -- _%• o • Length :v., per ly d • P. Nan of VNds - Vdlool L • e - Postilon of Volds - HWIZ.&a! s. • Pus)Hmn or Vdd Cods -tmgltudlnN t r f -Square Erds - nwldlon from square lfa'lzWal a r veWest)W daslgnatod skow V9 y a-N lON da?Afa ,t, Nne t oeNe ne,fmo r h -Camber -LDrfor.W.1 botWoan adja.W unl/s %i Per 10'.V mdX. h -Camber - Dlffare wat between N4h and low a ?.l danbefs of t1n same span - P06111. of &../NWes -D.W.11m from plan poslNon Yi Width - erdldar odlawN spare In He same oma s lruoh a e B4W11a Area-DevMlan from ;tare surface . f • Loral 51vdfnese %i in 0 b R • Narizoudof Palo of of Was for TrmuvWSt 5t& I • VeRlcal Podtlon lutes far Transverse Strands m - P.M. d Strands : V4. SECTION q Beorl, Pad I, 3• f%-? Holes - Bearlrg Pad m fi FIXED END ELASTOMERIC BEARING DETAILS ELEVATION c fergfb d adld-t -,d slabs sM1 red differ IW mute then %4 . FINAL P L AN$ R=W Woo -- Drawn Rf Gale --- 0-rfpilon Rnlsfon Drawn By 0bte Oascrblbn _ Drawn By: Name JNN Dufa 03/ZJ/07 1589 htebopdi BWd . ProleaN TT 40'-0" PRESTRESSED CONCRETE hear Na. '- - -- Deslaned By, VJA 3/2//07 . TeUa L -1600 08 fib 9 eso- e?taoD F 85 18 4 THE CLIFFS AT SWANNANOA Bridge #3 ORED SLAB (3'-0° x I'-9 ") (SHEET 3 OF 4) ?._?.. Approved ey: RCF 03/2//07 a 14 0-89 - ?a4==Me afl?.ur. Bo-,b. Co.*. Nana C-11- ? NOTES: ALL PRESTRESSING STRANDS SHALL BE 7-WIRE LOW RELAXATION GRAVE M STRANDS AND SHALL C016'FORM TO AASHTO NZOJ EXCEPT FOR SAUPHNG REOUIREMENTS WHICH SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS. BILL OF MATERIAL FOR ONE 40' CORED SLAB UNIT A" TOTAL RC= TOTAL REQ'D D/AIENSION E INT. . EXT. a b d L NGTH A13G 4 4 20`41 P1601 41 ® 8=2' J1301 11 8 Y-9' Ni' 9' S J1302 /00 IOD E-Li' S-5' J130J 4 4 Yi'/2' 2'-6 6-10' OUANTITIES ITEM UNIT INTERIOR EXTERlOA Rdrdwulrp Stool Lb.. 459 808 510 Asl.C=rd. (T'd Cu.Yds, 55 55 12' 0 LR.SIr w. N. Il 16 f' 0 LR:Slrands LF. 638 638 BILL OF MATERIAL FOR ONE 40' BARRIER PARAPET MARK TOTAL W OD. XD. DIMENSION a D d AI60I 6 3.7-6 39'£' OUANTTrIES IFEM UN? TOTAL RHNordtg Sled iw SlrL/cturas (Hrlagel !ES 248 Lerglh of Barrier Parapet LF. 39875 ,ILL HEINFORC116 STEEL CAST W!i"H 7HE CORED SLAB SECTIONS SHALL BE GRADE 60 AND SHALL BE INCLUDED IN THE UNIT PRICE B/D FOR PRFSTRESSED CONCRETE CORED SLABS. THE CORED SLABS MUST AUYAYS BE MAINTAINED IN AS WRIGHT POSITION WHEN HANLXFD, el-c IIUP POINTS MUST BE WHHIN 2'% OF THE FNOS PROVIDE A /'[JEEP RECESS AT THE PICKUP POINTS THE RECESSES SHALL BE GROUTED PRIOR TO WATERPROOFING THE TOP SURFACE OF THE CORED SLABS WHEN BEING STORED. CARE MUST BE TAKEN TO ELIMINATE INTERIOR SUPPORTS, RECESSE5 FOR TRANSVERSE STRANDS SHALL BE GROUTED AFTER THE TENSIONING OF THE STRANDS. THE 2%- LXANEL HOLES AT FIXED ENDS OF SLAB SECTIONS SHALL BE FILLED WITH GRUUL:THE 21/2'- DOWEL HOLES Al EXPANSION ENDS OF SLAB SECTIONS SHALL BE FELLED WWII JOINT SEALER MATERIAL TO 1Y,' ABOVE THE TOP OF DOWELS AND THEN FELLED WITH GROUT. THE JOINT SEALER MAI ERIAL SHALL CONFORM TO THE REQUIREMENTS OF TYPE SL LOAN MODULUS SILICONE SEALA17. THE Z' -BACKER ROD SHALL CONFORM TO THE REOUIREMEMrS OF TYPE M BOND BREAKER. SEE SECTION 1024 Or THE STANDARD SPECIFICATIONS. WHEN CORED SLABS ARE CAST A POSITN£ HOLD-aft SYSTEM SHALL. BE EMPLOYED TO PREVENT VOIDS FROM RISING OR MWING SIDEWAYS. THIS SYSTEM SHALL BE DESIGNED TO BE LEFT IN PLACE UNTIL THE CONCRETE HAS REACHED RELEASE STRENGTH. WHEN A CONCRETE WEAR14G SURFACE IS DETAILED Oil THE CORED SLAB BRIDGE TYPICAL SECTION THE TOP SURFACE OF THE COREO SLAB UNITS SHALL HAVE A X" RAKED FINISH. THE TRANSFER OF LOAD FROM THE ANCHORAGES TO THE CORED SLAB UNIT SHALL BE DONE WHEN THE CONCRETE HAS REACHED A COMPRESSIVE STRENSI-H OF NOT LESS THAN 411 KSI. VERTICAL GRO IVED CONTRACTION JOISTS.h"IN DEPTH.SHALL BE TOOLED IN ALL EXPOSED FACES OF THE BARRIER RAIL AND IN ACCORDANCE WITH ARTICLE 8254018I OF THE STANDARD SPECIFICATIONS A VERTICAL CONTRACTION JOINT SHALL BE LOCATED AT EACH THIRD PONT BETWEEN BARiUER RAIL EXPANSION JOINTS. ONLY ONE CONTRACTION JOINT IS REQUIRED AT MIDPOIIrr OF BARRIER RNL SEGMENTS LES$ THAN 20 FEET IN LENGTH AND NO CONTRACTION JOINTS ARE REOUlRED FOR THOSE SEGMENTS LESS THAN 10 FEET IN LENGTH. Oescrlpllon FINAL. PLANS ProJmh 1589 MatU0ldao BNd. 40'-0" PRESTRESSED CONCRETE Tallahassee, FL. 32306 THE CLIFFS AT SWANNANOA 718e: Bridge CORED SLAB (3'-0" X 1'-9") eso-e94-teob #4 Fax: 850-694 1674 B._nt be Countd, NotN Catalina (SHEET 4 OF 4) Sheaf No. d W BAR BENDING DIAGRAM I 1 BARS A 0. A At G BARS J Tv 4 _ J' BARS P ® For d/mans/ass or PI60Lbar S"e bar bend. ESTIMATED SUPERSTRUCTURE QUANTITIES ITEM TOTAL Mamba- d 40' E darlbr Cored Slab UNts 039'-die aadd 2 TNol &eVh of 4V Exterlor Coral Slob UNts (LFJ 79]5 ma.w of 40'INerlor Cored slob UNts (39'-/X/7• _.N 8 Total Len91h or 40' Iderlor cored Slab UNIS (LFJ J/9D Number of 40 Border Parapet Sodione 2 TdaL wilwdrg Steel for 40' Bonier Parapet Sedlons aw 496 Trial h td 40' Sorrier Para t Seellons UFJ 7975 Elodamrlc Sawing IFlxad) 20 Fie"l a. Bear/ (Exoonsluo) - Tdo/RelNor0a Sleelror Strudures (Bridge) (Elul 5288 L-:?A nd sinvn fw d SOUTH BATTER DETAIL BL i Lf5e6xeDefollCl 3%j A"rypJ / r-Top of Cored Slab /? Plofe See Nate A ? I j:? - - - - - - - - - - -- - - - - - R - 53'-r L 6x3%z x)k' ledge Arglo ITYN a?yl? s 6 6'-r/, rs c NORTH BATTER DETAIL ELEVATION DNslde fore of oyton Rlalxrond EMwlw Cored lob ch r L 6x7%' x' 3- q:lg /z er EM Sant w/ F7 ShcJf Angle Cwod Slob d"r &,Ih lAwt A %Plot. L 6x3A%' Adaan to End l3artl w/ 3-Y2•0 • Motor Bolls I Q a/q'B Askev (Aedd Bolls End BaN t/i' 2' et 2•-08 • , I t D _ _. L I %9 Plole ? i - I-A I I %x • P" 0 2'-0" J L 6x7%y' x?§' ledge Angle End Boll - L 6xJh'.%' ledge Angle %q' Plate SECTION A %. 2 n 2' D i exae?awr DETAIL C DETAIL °B Not. Provlde wlah In et le to avoid mnflkt with bolts. Provlde 2" weld each side of notch. FINAL PLANS Bwraton Drs+n B/ Date owcrlptton kwlslon Drawn a/ tale 0-rrpllon Name Date ProJech Tlnc: - Drawn By: REW 3/30/07 Ises Melmponlan eNa. taNahessee FL 3zia8 THE CLIFFS AT SWANNANOA sneel No. Designed By: 1AVA 3/30/07 . . 850-am F . Bridge #4 FASCIA BEAM DETAILS roved By: _LAC 3/30/07 F.rinwvva aoap.w ax 050-894-1614 Buncombe Canty. North CaroWw /9 MEN OF SWUM I- TITLE SHEET 2. GENERAL NOTES 3. PLAN & PROFILE 4. FOUNOAT ION LAYOUT 5. END BENT AND DETAILS 6. END BENT REI NFOROI NO STEEL SCHEDULE 7. 3'-0' a 1'-9' PRE:TRE9:ED CORED:LAB DETAIL6 ISHEET I OF 41 :. 3'.0' a 1"-B' PRESTRESSED GORED:LAB DETAIL6 ISHEET 2 OF 41 9. 3'-0' a V-9' PRESTRESSED CORED SLAB DETAIL6 (SHEET 3 OF 41 10. 3'-0" a 1'-9' PR16TRESSED CORED SLAB DETAI LS (SHEET 4 OF 41 11. FASCIA BEAM DETAIL6 SADDLEBIt®GK CONSTRUCTION INC. BUNCOMBE COUNTY, NORTH CAROLINA BRIDGE # 5 THE CLIFFS AT SW NNA OA 35'®099 CORED SLAB BRIDGE ON PILE CAP ABVI lTl?.'dl®1 TS PRELIMINARY ION NOT FOR CONSTRUCT .. _ ... _.. ?, ?._ _,.------ .? ....,.., .r,,,,., Drawn RELY 5/!4/07 1659 Alaaopolilan SNd. ru ao: !!a 5prol NO. TaYabassee. FL 32309 THE CLIFFS AT SWANNANOA Oesl9nad Dr. 1N/A 511,9/07 ???q? 950-994 7900 Bridge #5 TITLE SHEET T r Aoarovod BY: RCF 5/19/D7 F' Fax: 95G-694-1914 Buncombe C-*, NaM C-i- / A. SPECIFICATIONS 2. CONCRETE COVERS, F. BEARING PLACEMENT A. CONCRETE COVERS SHOWN IN PLANS DO NOT INCLUDE REINFORCEMENT 1. DESIGN, A. AASHTO STANDARD SPECIFICATIONS Oft' EDITION 2002 WITH PLACEMENT AND FABRICATION TOLERANCES UNLESS SHOWN AS ° " SEE BEARING DETAILS FOR ADDITIONAL INFORMATION. , LATEST INTERIMS. MINIMUM COVER . COVER DESCRIPTION G. UTILITIES SUPERSTRUCTURE - PRECAST BEAMS 2 In ALL SURFACES B. DESIGN LOADINGS DATA CONCERNING TYPE AND LOCATION OF UNDERGROUND AND OTHER SUBSTRUCTURE 3 In IN GROUND CONTACT UTILITIES 15 NOT GUARANTEED 70 BE ACCURATE OR ALL INCLUSIVE. 1. DEAD LOADS: P In ALL OTHER SURFACES THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATIONS A. UNIT WEIGHT OF REINFORCED CONCRETE: 150 Lb/Ff 3 AS TO THE TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES B. BARRIER. TRAFFIC RAILING, 700 Lb/Ft J. REINFORCING STEEL• AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. 2. LIVE LOADS, A. ALL REINFORCING STEEL SHALL BE AASHTO MJI, GRADE 60. A. HS-20 AND/OR LANE LOADS PLUS IMPACT B. ALL REINFORCING STEEL DIMENSIONS ARE OUT-TO-OUT. H. ABBREVIATAWS 4. PRESTRESSING STEELS Brg. - Bearing 3. RAILING LOADS: A. STRAND: AASHTO M203, GRADE 270, LON RELAXATION. Boff. - BoHo'n A. EFFECTS IN ACCORDANCE WITH AASHTO STANDARD SPECIFICATIONS. PARAVETERSt C.I.P. - Cast-In-Place - - MODULUS OF ELASTIC/TYO 28,500 Ksl C/r. - Clearance/Cover 4. THERMAL FORCES: - MAXIMUM JACKING STRESS, 075 fpU Const. JA- Coastrwthn Joint A. TEMPERATURES AND TEMPERATURE VARIATIONS FOR DESIGN - MAXIMUM ANCHORING STRESS AT ANCHORAGE: 07 fpu E.F. - Each Face OF CONCRETE STRUCTURES !DEGREES FAHRENHEIT !Fl It - STRAND DIAMETERt OS In Elev. - Elevation TEMPERATURE RISE !+) 35 DEGREES F Exp. J1. - Expansion Joint TEMPERATURE MEAN 45 DEGREES F 5. ELASTOMERIC BEARMIGSt Eq. - Equal TEMPERATURE FALL !-)45 DEGREES F - A. DUROMETER 60 S Far Face THERMAL COEFFlCIANT 6.0.10-6 /DEGREES F F of 8.4 Wall D. ALLOWABLE STRESSES/LOADS N.F. - Nwr Face 5. CREEP/SHRNKAGE, PGL - Profflo Grade Line A. EFFECTS OF CREEP AND SHRINKAGE IN ACCORDANCE WITH THE AASHTO 1. DESIGN METHOD: Spa. - Space STANDARD SPECIFfCATfpN,WlTH RELATfVE RUMIOM = T57. A. SERVICE LOAD AND STRENGTH DESIGN METHOD. Sta. - Station Sy nan. - Symmetrical 6. SEISMIC LOADS. 2. MATERIAL STRESSES. Tva. - Typical A. NO SEISMIC DESIGN WAS COMPLETED FOR THIS SINGLE SPAN BRIDGE. A. ALLOWABLE STRESSES ARE IN ACCORDANCE WITH THE AASHTO STANDARD UJIA - Unless Noted OtherWlse DESIGN SPECIFICATIONS FOR ALL MATERIALS SHOWN IN THESE PLANS. 7. WIND LOADS: B. ALLOWABLE TENSION IN THE PRECOMPRESSED TENSILE ZONE = 3 A. EFFECTS OF WIND LOADS IN ACCORDANCE WITH THE AASHTO STANDARD IN THE ENDS AND ZERO TENSION AT MIO-SPAN. SPECIFICATION. E. FOUNOATKNIS 0. UTILITIES: A. TWO UTILITY (DADS OF 500 PLF HAVE BEEN ACCOUNTED FOR IN DESIGN. 1. FOUNDATION DESIGN CRITERIA: THE LOADING 1S APPLIED D HE FIRST INTERIOR BEAM AC EACH SIDE. A. THE END BENTS SHALL BE SUPPORTED ON PILE FOOTINGS. INSERTS HAVE BEEN PROVIDED TO FACILITATE UTILITPLACEMENT. SEE FOUNDATION LAYOUT FOR ADDITIONAL INFORMATION. B. THE PILES SHALL BE DRNEN TO A MINIMUM BEARING CAPACITY OF 40 TONS. C. MATERIALS EXCEPT AS MAY OTHERWISE BE SPECIFIED IN THE PLANS, ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES BOOK DATED JULY, W06. 1. CONCRETE: A. PROVIDED -A" CHAMFERS ON ALL EDGES AND CORNERS EXCEPT AS OTHERWISE NOTED. H. NININULI COMPRESSIVE STRENGTH AT 28 DAYSt PRECAST CORED SLABS F'o = 5.0 Ksl _ C.I.P. BARRIERS f'o = 4O Ksl C./-P. END BENTS F'o = 4.0 Ksl PRELIMINARY NOT FOR CONSTRUCTION ._. .,.".,..? .... ........, .". ... .,w...w. ff", .r.,en Noma :tare Ptolaet, TIN.: Drawn By, REW 5/14/07 1588 Nleeopolilan Blvd Shear No. Taoanae?ee. FL. azsoa THE CLIFFS SWANNANOA GENERAL NOTES _ Designed By., MWA $114/07 ay eso-ee4-,sob Bridg dge#5 FIN" Y Fax: 858-894 1$14 El.-be Cou(dy. NoM CaroGnd E Approved RCF 5/19107 oory?o aam.ln; 505 f Brg•'?Y 1 ? 8rg.--? Top of Deck I Top of Deck Elev. 502.64' Elev. 502.69' 500 1 eontroctor to fill/ grade slopes to suppart proposed br ge obuMats. 995 HP 1263 Plies (Typd 490 Bro . ' I I I Brg. I I I I i I I I pror. Limns I I 1 I I I I I O Navy Stone I rf Survey I $" i I ? Rlprop I I I - - - - - I - - - - - - - - - - -- - I I - - - - - - - - - - - - - I I -WP.1 End Beat I I I I j l W.P.2 End B t,? N = 5000J44 I N = 5000J44 E I I I I E = I043J/2 I I ? Edge of Creek I I I I PRELIMINARY NOT FOR CONSTflNClION Revlel.n Dr -n We DosorlpNon Revislm Oran B/ Lbla Osscrfpl/on __ _ Nam. Dole Protect: Title: - ---- Dravn By: 25H 05114107 1589 M.WOpoelan Wd. Tallahasse FL 32WB THE CLIFFS AT SWANNANOA Sh..l N.. -- Designed By: WA 05114107 pie®y e B50-894-1600 Bridge #5 PLAN AND PROFILE Approved : RCF ID104106 TIO?E e- e.w.. Fax:85D-894-1614 OWlCwlft County, North Carolina 3 33'-AY1z° -- C BfO. & PNes ° cryP - 35 ? Br9• & Pllas B i a NOTES PILES SHALL BE DRIVEN TO A MINIMUM BEARING CAPACITY OF 40 TONS. HP 12x53 P/1" lryp.t I I THE STEEL PILING SHALL BE GRADE 50 STEEL. o h 4 4 ? $. h ? Survey I o _ _ ____ ___ _ _ -__ _ - _ __ - _ __ _ _ _ - _ - _ - _ _ _ _ .-_._ W.P. I End Bent I I N = 5000.144 , 2 End Bent a E _ !009237 q N = 50 ? h h E 1043.112 I ?931/2 I}-Il '-'? ' II I A 4 END BENT I END BENT 2 PLAN PRELIMINARY NOT FOR CONSTRUCTION Rwulon Dram BY Deto Onfo(Ipllon fl.W0 Dfewn 8y Dole OeSOfW1len N1me D.I. pp, Pio/eel: TRW Drawn Syr ZSH 5/14/07 1588 liauopofun eNn p TWlWl sec, FL 31;08 shear NO. THE CLIFFS AT SWANNANOA Designed By: MWA 5/14/07 FIN" 850- eeateoo FOUNDATION LAYOUT Bridge #5 - - - loved ly2 LL RCF _ 5/14/0 7n? k Fax: 850 &94-1614 B-b¢ County, Nonh Ceram. 3'-0" EL. 50093' ?I?I ?I ICI lil FILLER (IYPJ ?1? ?i ICI ICI ICI I? LA 7-0- A2201 EA. FACE 9 - A2201 , 7, -0? C lip Ph 51301 STIRRUPS AT 12" MAX. SPACING ?J ELEVATION W/NG WALL REINFORCING NOT SHOWN FOR CLARITY Nw1 S/3010 A2201 EA. FA o? H F/L WH APA _S EL. 99833 -1 S A HOWM UNFOL 6WT LINE. DED PARTIAL PLAN NOTES 1. Foundation ExLavatlon shall be In accordance WING WALL ELEVATION with Me Standard Specifications. 2. Baatril/Malorla/shall Do In accordance wIll? SECTION the Standard Spectfications. Backf ll shall be mmpocted to the Density required by the goetxhnloal report- 3. Piles shall b- drIven to a minimum Bearing Copaolty of 90 tons. Piles shall be HP 12x53 Grade 50 Steel. 9. End Bent 1 shown. End Bent 2 similar. 5. Lateral gulden and whq walls to be paced after hollow cored slabs are selytensioned and grouted. PRELIMINARY __ NOT FOR CONSTRUCTION Rcvlslan Drawn 8y DO, D. rlpt/on RMslan Drawn B/ Date Desorlptlon Name Dale P P Prodectr Tiller -- Drawn tyI __ ZSH _ 5/l9/07 P A 7589 Me«opoGian BNa. 7alah=ce FL 32309 THE CLIFFS AT SWANNANOA SAW No. Des/gned By: MWA 5/19/0I ? c tl ? . a5h 9sat9oo F Bridge 95 END BENT AND DETAILS - ?.?? A loved Byt RCF 5119107 u e rwp,? a ag 950-99a-767a Durwombe County. Noah Ca?ollna 5 i - 1:1 PRELIMINARY NOT FOR CONSTRUCTION Rwlsf.n oravn B/ W. Oescrlpllon R.111, Dram By D.fe Domfiyllon Nam. Dd Project Tlflu -._ _. __ Ofo vn By: ZSH 5/14/07 1589 Me.Gpoblan BNd. ® t u h FL THE CLIFFS AT SWANNANOA SneY NO. Dastgned &W WA 5/14/07 a a .ssae. . s2s9a es o eta s B l END BENT REINFORCING STEEL SCHEDULE .®. rwad By. RCF 5/19/07 B w s n FrGmbip GuD ncomhe Ru o un9y Nunn ca owe a RElNF.STEEC SCHEDULE -END BENT ! PARK BAR TOTADL DI b MENSIONS c d LEIiGTN SIZE REQ' a AIJO! 9 50 3'-Kl• 3'-N)• A2201 7 10 3t'-3' 31'_3• F1301G 4 14 S'-l/• !'-@' I'-0• l'-6• 7'-@• FI30fb 4 /4 6'-1' P'-I' 1'-E' Y-B• 8'-P' 5130! 9 30 P ' BARS A ?- I o I BARS F D? BARS 5 QUANTITIES ONE BENT TlEY UNIT EACH BENT Concrete Pof 5lruqures - Cl- A C.Y. B lnforc7 A, tor SYnx7uras 5. RE NARK PA AI301 4 50 3'-KI' AEPO/ 7 Kt FI301a q H 5'- ' 1'-6' $1" 9 30 2'-0° BARS A BARS F QUANTITIES ONE BENT 1TEY l166 INRF. STEEL SCHEDULE - END BENT 2 RETq DD a ti E StONS d l£N6TN ZE Jl'-5 ' 31'-J' lI I'-6• F130fb 4 (4 6'-I' E'-I' 1'-@• E'-0" 5• 8'-10' b F - UNIT EACHBENT Concrale far Slrueluru - 61asa A CY. B Ralntarcl Steel for Structures 185, 1166 301-0 is. nola 11 39•-xyh' (Length at cared slab vat) 8`,B' (Clear Rmdwayl S /- 9 9' r rr &rriw Par 8aarapet frYN C Sea Dd f/ A' Shed Nab Soo WOW (\ Shed No B . kedge Ng/e flyp1 lnterlw Cared Extw/or Slab rrypW - 1 'FIS.Transvwse Cored Slab ? See G9all'B' Sheaf Noll Tenslwdnngg 1-d Sfrard In 2DIaNala Wort E da for TYPICAL DECK SEMOM Coed Slab BRfi P1 r-0' (Cast W/be bean a) y. o /- Reek face veneer o >u i4ed Ey rs - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Corns! JI 0:1 Bwrlw Parapd nd darn ?t/'Plwe BARRIER PARAPET DETAILS PLAN 35W SPAN N.W.. I. Dlmenslon given does na+ lnatude rack veneer. PRELIMINARY NOT FOfl CONSTflUCTi ON Rev111. D- By Dota DvarlptW RMlalan Drawn 8/ Dole Dasarfpnw Name Dote Pro/eala TRI.: -- -- -- Drawn BY: ZSH 5/14/rn 35'-0° PRESTRESSED CONCRETE sneer xo. 32309 THE CLIFFS AT SWANNANOA Tallahassee Ft ` ' ° ' Designed By: NWA 5/H/07 . , CORED SLAB (3 -O -9 ) X 1 e5o-asatsoD Bridge #5 !SHEET I OF 91 r A roved RCF 5//9/D7 s:.oM.an amsa. rt e°°comn° County. NoM CaroMa Barr/of Porapel 7f shavn I I I I i I ? ? ? ?/;' # Davol ltwwos rTYP? %p' d NS.Transvwse I Pad TensfaNng Strand I I I In 2'9 Hofe ? Brlege I i I WP.AT B>t?. g I I I I I I i rz a vdds I I fTYPa _ n WP.AT i I I rs•-0• rsaa ndo a 15'-& rsee mla u -- - i r-a - IE'-la I tr-ar rn ? Braga ?l?o I ys to be MW with SMw K Ayrad d flrpl fe/ISfoMrg a a Trensvwso Slronds ?? IY I FG. Suttee ?? ? I?? -? ??(?M PIGOI I Y$ Y£ la rr fa a r-, -F-! ? i i I I I 2" Vdds? ?I L- J1303 a a JI302 ' , ;y W III! LUX III I Q Doylan RlclmwN F-5 X*iV. 1. EXTERIOR SLAB SECTION Bwm? P? 1 rr(rr??.sFi a 35 IATERIOR SLAB SECTION (for Praslressed Strand loJrxd.ses Slde fw Beam 9. 13 - I2' 0 Lm RELAXATION Ildwlw Slab Sedmnsl STRAND LAYOUT (AC01bar. nd 61WW /'c - 50 Lsl /'G • 4D ksl kh"O Dowel Nde •A 1 L._--- Vd s -- I I 1 I N9Dl Obwds 1 Elaslobnrfc 1 B.ullg Pad 1 I I 1 _ I E eaorlny See Em Beralw ddall. ?-J-1-r SECTION AT END BENT +JIM ses END for arran P/60/ Bar Sp Y£ Y£ ld?• 7! • 7! Ipl?. ?! • I ? I 7V' J1301 T J1301 J !date II i J1301 AW J1303 END ELEVATION Slvwln9 Namnml?w = Sflrr& laud/an o/ Dawd Noes and J1303 Bars. !Shan! Lg' 0. slnwnl Idarla Slab Sadia'! slavn - Exlwlw Slab SWIM slmllar except Slear MY laadl- .r ExW br Lured stabs. P" T.Iim SHEAR KEY DETAIL Nda OaW Shwr Kay .n Outdde Fan q Y?* Or H-5. rand s/eol b a s r pip. Hde far B Tra drse straw Ses wdPrwlsbns I I----- .•iil I x5°E I :? I I :: Steam Vfse Gh. vi 1 ?ti•:f.: 4" Wad. fam cr a B IT B Exferlor Carad Slab flf7 reasss will 9rpd %• 5%! !' ELEVATION VIEW SECTION B B GROUTED RECESS AT END OF POST TENSIONED STRAND DETAIL 'A afss w/ ? Nw1or Jh d ? /? 1 t 1 ? ? ° a et 1 s apolcdluu m verllcd L% ? solaces. ? Piesfress Sham C4-1 _- fm d" Cwed Slab PART ELEVATION AT END OF CORED SLAB SECTION DC GROUTED RECESS AT END OF PRETENSIONED STRAND Na". 1. NI prpas to to remaed PGw fa 9-MG JPREL' NOT FOR CONSTRUCTION Rw/sJan Drawn By ?fe Dasarlpllon Rwlalon Drawn B/ Ode Des°rlPflan Noma Dora P ProJoclr Tlller Drawn B -- zSH 5/14/07 P A 1689 enanoPaenv, ame. idlahassa. FL 32sba THE CLIFFS AT SWANNANOA 35'-0" PRESTRESSED CONCRETE slea/ xo. ' ° ' ° irl 5/14/ F® WLEV . 9sOaea-IBro F es Bridge #5 D !3 0 X l -9 1 4) , RCF 5/14/Or m A-. omw.rK ax: o-a9a-16N _? 4 PART PLAN - EXTER/OR SECTION Nde ,Exlerfw Sacffon slxwn - ldwlw SeGlan slmllw excy0 ondl l rdtf far. (rddN rd sslhma) cenad 72,11302 [Ea. Slab OnN) 4 pars J1302 lrypaa.eN1 RYW 6'to f era. & 2l/z' llawd Ndas r "Y/i 36 pdra ,11302 a 12'Yax.Clrs. _ 2'Q Hds /or ' I Transverse Strand - Est d Dowd 4a/30112 Unas, ITYPJ 2 Bars/Une1 ' Sgfc.. Y-0, Hda to 20 TramYafss StrmN III II I L - -____----- __ - --------- - -A _____-__ I----------------- - ' I--- ------------ - J III ? ? ? NL- la Y a -- a r ? ? ? a? 'If GRADE 270 STRANDS At. IS ro l 04-1 .- mda r A Ids 51raM) 4f3 (Mjlad PS1sa?l &0 TYPICAL ELEVATION OF 35'COREO SLAB UN? (Sae 35' Spur LW d Slag 7J f'o • SD tsl /'d - 9D ksi DEAD LOAD DEFLECTION AND CAMBER LR Y2 I . SYfoed 35'5 ?n Combos at Eredlm ISlab Drone In p bw) %q Defledlon due to Barrter Paropd and Asp'alf Wearlog Surtax Final ra.W 101 \ q PLAN a e E k -> J _ I J I b ______________.- SECTION YPJ -2 Puff. ,11301 rryo s/o aG, Bra. l0'43 Oarsl Ndas Ndes , k Slot X" stirrups as twasdry lodear Tranwxrse Strands 2,1(303 W. nd shun fur '.folly. TOLERANCES A ? h 'to-%• W - o - langlA ° : Ve' Psr 10' 0 • Paslflon of Voids - Va tfad ----- V c • Posfrlm of Vold. -Wizoraal : jj- Paslnan of Vold Ends -lm Ruined :Y f Sr. -quaEnds -Dsvlaflon tram square IhrizoUd ar vert/odl a dsslanded skmr p - Ibrtiaaal N1paoad - Lbvlallan flan a slydaM it, pardla!!o }ha wderllro of memMr ?§• Al • Camber - Dlffaenad bahvem adfacW units %y' par la.?,' max. h - Camber - Dlffer.Waf bd reed Ugh and law mxmlxra oY th dame sport .?• ppx I-P.Rlm of AavdHdxs - OMa/Im from plan puslffm V9 WIM - Dlfforxdid of adjacent spau In th dam afrualura . Beaug areo- Pwla 1. flan pane surface 1 i s / - L=j U-0/1"s /y /n (a k • Horizantd f%vllm oI hales for Trarsversx Strands I - Vartlaal Poslllm of Ids for Transyxrse Strands m - P.M. f Strands :'14' ¢ Beoring Pad R.A. Pad FIXED END ELASTONERIC BEARING DETAILS PRELIMINARY ELEVATION ^lengfh of odJamnt".d slobs'.hall nd differ A' more than i•• I NOT FOR CONSTR0CTI ON Rwlslxn Dro+n B/ W. Damrlpflm RMV. Drawn liy Wle Desorlpl/ T!l/w E 1559 kleen 61vd e FL 323 THE CLIFFS AT SWANNANOA 35'-0' PRESTRESSED CONCRETE IWa 5/w/07 , . 850-e9a-lsob F Bridge k5 CARED SLAB (3r-0° X I'-9) (SHEET 3 OF 4) - I roved 80a licF 5/f4/07 .: aeo-e94-16a eE-4 W Ba Comte cmnly, Nona cara?a y NOTES. BILL OF ERIAL FOR ONE MARK S R I TOTAL REDD TOTAL REVD DIMENSION IZ E . INT. , EAT. a b c d LENGTH M301 4 4 4 I8'-a !B'-0' Pl601 5 - 36 0 8'-Z JI301 4 B B YA Y-4' 4'-S J1302 4 as 88 2'-ff I1-4' 5'-S J1303 4 4 4 Y-51/y' WANT/TIES ITEM UNIT INlERlOR EXTERIOR Roldwalnp Sled lbs. 408 7I5 5D k.J.0-10 fPaJ C.Yds. 5D SA ' B L.R.Sfraals Na /3 13 ' Q LR. Stroa& L.F. 454 454 BILL OF MATERIAL FOR ONE 35'BARRIER PARAPET MARK BAR Z TOTAL RE 'D DIMENSION LEND! SI E -? O . - a b o d A/60/ 5 6 34'6' 3r-B WANT/TIES ITEM UNIT TOTAL RMdwdaO Sfmlfw Slruduru (Bridges lbs. 216 Lmvh d Barrier Parapet LF. 349TS ALL PRESTRESSING STRANDS SHALL BE T-W1RE Lm RELAXATION GRACE 270 STRANDS AND SHALL CONFORM TO AASHTO M203 EXCEPT FOR SAMPUNG REWIHEMENTS WHICH SHALL BE IN ACCOROAIICE WITH THE STANDARD SPECIFICATIONS. ALL REINFORCING STEEL CAST WHIZ 7HE CORED SLAB SECTIONS SMALL BE GRADE 60 AND SHALL BE INCLUDED ON THE UNIT PRICE 810 FOR PRESIRESSED COCRETE CORED SLABS. THE CORED SLABS MUST ALWAYS BE MAINTAINED IN AN UPRIGHT FDS/T/ON WHEN HANDLED. PICKUP POINTS MUST BE WIWI r-6` OF PROVIDE A f DEEP RECESS AT THE PICKUP POINTS THE RECESSES SHALL BE GROUTED PRIOR TO WATERPROOFING THE TOP SURFACE OF THE CORED SL48S.WHEN BEING STORERCARE MUST BE TAKEN TO ELIMINATE INTERIOR SUPPORTS. RECESSES FOR TRANSVERSE STRANDS SHALL BE GROUTED AFTER THE TENSIONING OF THE STRANDS. THE DOWEL HOLES AT FIXED ENDS OF SLAB SECTIONS SHALL BE FILLED WUIH GRWT.THE 21/z'- DOWEL HOLES AT EXPANSION ENDS OF SLAB SECTIONS SHALL BE FILLED WITH JOINT SEALER MATERIAL TO //z ABOVE THE TOP OF DOWELS AVD THEN FILLED WITH GROUT. THE JOINT SEALER MATERIAL SHALL CONFORM TO THE REQIIREMENTS OF TYPE" SL LOW MOWLUS SRUCOA'E SEALANT. THE Z'BACKER ROD SHALT. CONFORM TO THE REQUIREMENTS OF TYPE M BOND BREAKERSEE SECTION 1028 OF THE STANDARD SPECIFICATIONS. WHEN CORED SLABS ARE CAST.A POSITNE HOLD-DOWN SYSTEM SHALL BE EMPLOYED TO PREVENT VOIDS FROM RISING OR MOWING SIDEWAY$ THIS SYSTEM SHALL BE DESIGNED TO BE LEFT IN PLACE UNTIL THE CONCRETE HAS REACHED RELEASE STRENGTH. WHEN A CONCRETE WEARING SURFACE IS D£TA ED ON THE CORED SLAB BRIDGE TYPICAL SECTION THE TOP SURFACE OF THE CORED SLAB UNITS SHALL HAVE A 9-RAKED FINISH. THE 7RANSFER OF LOAD FROM THE ANCHORAGES TO THE CORED SLAB UNIT SHAL BE DONE WHEN THE CONCRETE HAS REACHED A COMPRESSIVE STRENGTH OF NOT LESS THAN 5D KSI. VERTICAL GALXNED CONTRACTION JOINTS,%2"lN DEPTH.SHALL BE TOOLED IN ALL EXPOSED FACES OF THE BARRIER RAIL AND IN ACCORDANCE WITH ARTICLE 825-09)OF THE STANDARD SPECIFICATIONS.A VERTICAL CONTRACTION JUNT SHALL BE LOCATED AT EACH THIRD POINT BETWEEN BARRIER RAIL EXPANSION JOINTS ONLY ONE CONTRACTION JOINT IS REQUIRED AT MIDPOINT OF BARRIER RAIL SEGMENTS LESS THAN 20 FEET IN LENGTH AND NO CONTRACTION JOINTS ARE REWIRED FOR THOSE SEGMENTS LESS THAN 10 FEET IN LENGTK D...rlpf/oe BAR BENDING DIAGRAM BARS A -Al ?IT 71 ?. BARS J BARS F AL For all-q- d P16Obar - bar beM. ESTIMATED SUPERSTRUCTURE QUANTITIES I T E M TOTAL Naidw d 35'EXlwlw Cored Slab UNIS (34=1d/p' -W 2 Tolol Length d 35' EAerlw Cored Slab Uldls (IFJ 6975 Number d 35' fNw7w Carol Slab ONfs (34'-ld/i eocW 8 Tdal LAWh d 35' INerlw Cwed Slab UNIS (LFJ 979 NL/aW of 35 'Bowler PadjW SOOMW 2 Tda/Rerldwal Sw for JS' Bawler Parapd ScdloAs (Lbsi 432 Tdd Lw&h of 35' BwHw Para Ssdlans ILF) 6975 Elaslamwla Bewlag IFlxod) 20 E/odansrfo a rw (EXpww" - TddRafnfwdng 51.dfw 5111.0 es (Bridge! (LASJ 5454 1569 McUopoldw Blvd. Tagthassea. FL. 32M8 Bri? THE CLIFFSdge #J SWANNANOA 850-894-16M Fez: SSOA94-1614 Buncombe County. Noah C.." PRELIMINARY NOi FOR CONSTRUCTION Tlf/e: 35'-0' PRESTRESSED DONCRETE sneer xo. CORED SLAB (3'-0° x (SHEET 4 OF 4) w Erosion Control Permit Approval lnscrl& Bat spoornp -994, 10 sues a 3'0-30'0 _ I ?• 71 L &3"a.A,?yp Top of Cored Slab lsee aNCI %i Plate Sea Nde 1 R -39'-0 End Befd lwlm woo L 6x3%'xjg" IWa. Arq/e l7YN not WVwn far WwiNl lf-9 3'-21 1910 ELEVATION 7q Won Rldmud 01051d. face of -L 6x31/p'xj§•A11oc1 F-7 Shelf Aro/e Slab lo' COW Cored Slab Ekww Bills 3- VY lose t - %i P/ote L 6x3f//z' xjj' Allah to M Baf w/ ,? ?• AErofar Brits I I J--6 Baskew I 1 - C Hm0 aL -l End BeN %9' U vl j Pluto %i 1 ? J L 6x31/¢•xjb'Ledgo Angle End Bent L 6x y% A%'Lodgo Angle %i PINe-? SECTION A A, 2•a 2?-0• Leope/Mgee• DETAIL c DETAIL °B Motu Pralda mich In angle to avold aaafllct with butts. Provide 2' weld each stria of notch. 1PRELIMINARY N.1 FDR CONSTRNCTION Re/ISlon Droxn 8/ Dnte _ Desorlptfun _ Rwlshln Drawn 6)' oa/e Deserfptlon Name lbta ProJsl, Till. Drawn By. ZSH 5/19/UI 75A9 NetrapWilan ELvd. Sheet Na. Tallaaaccea. FL-3230& THE CLIFFS AT SWANNANOA FASCIA BEAM DETAILS Designed BY, NWA 5/l9/O- a5D-&9aiA Bridge celotne n read RCF 5/19/07 El e6o-s09-isle suuaa,e,a County. N. Oh _ _. ...s1 . ?. ?s rL ,u?CY?LUP1t1?N7' Palley ?; Telephone Erosion and Sedimentation Control Telephone; (828)-250-4848 LETTER OF AppROVAL TCI A September 21, 2006 Mr. James B. Anthony 3598 Highway I I Travelers Rest, SC 29690 Dear Mr. Anthony: This office has reviewed the revised Erasion and Sedimentation Control Plan submitted for the Project ' the plan to be acceptable with the attached modifications and/or performance reservations and her Approval. Please be advised that Section 26-22 p J listed below. We find the job site. S requires that a copy bf the approved Soil Erosion Control Plan be ontfiie at The Buncombe County Soil Erosion and Sedimentation Control Ordinance is a performance oriented protection of the natural resources and adjoining properties. If, following commencement of this proJ?ect it is determined that the plan is inadequate, this office may require revisions to the plan and its implementation, program requiring The approval of an erosion plan is conditioned on the applicant's compliance with federal and slat regulations, and rules. A copy of the erosion control plan for any land disturbing activity that involves the utilization for the purpose of de-watering or lowering e water quality laws, b the water table must be forwarded to the director of water quality,of ditches A NPDES Permit is enclosed. Please inform this office of the construction start date. We look forward to working with you an this project. Sincerely/, Micfiael A. Brookshire Erosion Control Officer Asheville, 46 Valley NC Street 28801 Project name: CLIFrS HIGH CAROLINA Location: Patton Cove Road Date received: September 15, 2006 Date approved; September 18, 2006 Person financially responsible: James B. Anthony Cora E Creighton. - - Director/,4ssistant Courtly a?lanager 828-250-4830 828-250-6086 Conceptual Impact Table High Carolina Impact Table Phase 1 Impacts Channel Impacts Site # Length ft. 1 90 3a 59 149 Wetland Impacts Site # Size ac. 2 0.014 3b 0.038 0.052 Impact 1 = Road Impact Impact 2 = Road Impact Impact 3a = Pond Maintenance Impact 3b = Pond Maintenance Conceptual Impacts Total Wetland Impacts (ac.): 0.197 Total Channel Impacts (ft.): 5548 Road Impacts Channel Impacts Site # Length ft. 4 80 5 80 5b 60 6 80 6b 60 7 40 8 80 9 80 10 80 11 80 12 80 12b 20 13 80 13b 40 14 80 14b 80 15, 80 16 80 17 50 18 80 19 80 20 80 20b 20 21b 20 21 80 22 20 23 80 23b 80 24, 80 25 80 25b 40 25c 80 2130 Wetland Impacts Site # Size ac. 16a 0.135 0.135 Golf Impacts Channel Impacts Site # Len th ft. 26 296 27 211 28 507 29 144 30, 497 36 694 37 484 39 585 3418 Wetland Impacts Site # Size ac. 33 0.001 31 0.01 32 0.013 34 0.024 35, 0.01 38 0.004 0.062 Avoid & Minimize Channel Impacts Length ft. 40 80 41 80 42 80 43 80 44 80 45 80 46 80 47 80 48 80 49 80 50, 80 51 80 960 Conceptual Master Plans