HomeMy WebLinkAbout20080502 Ver 1_More Info Letter_200805131
sr 'r,F, '.r e3
rcp
`?•'p,M;,,oa• Ala ..
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY P.O. BOX 1587, Greenville, N.C. 27835-1587 LYNDO TIPPETT
GOVERNOR SECRETARY
May 8, 2007
Ms. Sonia Gregory
North Carolina Department of Environment O ?d 5 02
And Natural Resources
401 Wetlands Unit
2321 Crabtree Boulevard
Raleigh, North Carolina 27604
Dear Ms. Gregory,
Enclosed please find information regarding a Division 2 project located in Beaufort
County. The project name is SR 1767, Monroe's Lane, Beaufort County. The WBS Element
Number is 2C.007026. The DWQ Project Number is 20080502 and dated on March 20, 2008.
Please replace pages 11 and 12 of the original PCN with the revised pages that are enclosed. Mr.
Garcy Ward will also receive the revisions. Should you have any questions regarding this
information, please contact me at 252-830-3490 ext. 254.
Sincerely,
Mike Sutton LG,PLS
Environmental Specialist
Division 2
NCDOT
DIVISION TWO • P.O. BOX 1587 • GREENVILLE, N.C. 27835
PHONE (252) 830-3490 • FAX (252) 830-3352
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://www.nceep.net/pages/inlieureplace.htm. If use of the NCEEP is proposed,
please check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (linear feet): 0.0
Amount of buffer mitigation requested (square feet): 0.0
Amount of Riparian wetland mitigation requested (acres): 0.0
Amount of Non-riparian wetland mitigation requested (acres): 0.0
Amount of Coastal wetland mitigation requested (acres): 0.0
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ?
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No ?
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ? No
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ® No ?
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 85 3 (2 for Catawba) 0
Updated 11/1/2005
Page I1 of 13
2
Total 1 599
* Zone 1 extends out 30 feet perpendicu
additional 20 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. Stormwater will be Filtered Through
Vegetated Uplands Before Entering Wetlands.
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XM. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 211.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application? Yes ? No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
514
1.5 0
0
the top of the near bank of channel; Zone 2 extends an
Updated 11/1/2005
Page 12 of 13