Loading...
HomeMy WebLinkAbout20080758 Ver 1_More Info Received_20080515Battleboro Park Earthen Embankment Dtl-modifications rl Subject: Battleboro Park _Earthen Embankment Dtl-modifications_rl From: "Richard Callahan" <rallahan@sitesolutionspa.com> Date: Thu, 15 May 2008 17:10:55 -0400 To: <joseph.gyamfi@ncmail.net> Joseph, joseph.gyamfiCncmail.net Thank you for speaking with me earlier this morning. As we discussed I am enclosing the addition Design Calculations for the Earthen Embankment Weir height. Earthen Embankment detail is located on Sheet L-6.2, detail #2. Likewise, this detail has been revised with additional Erosion Control Fabric as requested. Please contact me with any additional comments. We look forward to your Approval Letter at your earliest convenience. See enclosure for Details and Calculations. Details #1 enclosed for reference, has not been changed. Detail #2 enclosed, modified per your request. Notation # 3 addresses your comments. Calcs enclosed, weir height of Earthen Embankment. Thank you, <<Dtl#2_6-2Amendments-Cals_rl.pdf>> Richard Callahan Site Solutions 2320 W. Morehead Street Charlotte, NC. 28208 Direct 704-943-3183 Phone 704-521-9880 Fax 704_521-8955 www.sitesolutionspa.com <http://www.sitesolutionspa.com/exchange> Content-Description: Dtl#2_6-2Amendments-Cals_rl.pdf Dtl#2_6-2Amendments-Cals_r1.pdf Content-Type: application/octet-stream Content-Encoding: base64 1 of 1 5/16/2008 9:04 AM Battleboro Park Rocky Mount, North Carolina Storm Water Management Report February 8, 2008 Revised April 22, 2008 10- . r wi%v MA`f 1% 2t7015 E a??.A SOLUTIONS 2 3 2 0 W. Morehead Street Charlotte, NC 28208 Landscape Architecture Site Planning Civil Engineering www.sitesolutionspa.com Telephone-704.521-9880 Facalmile-704-521-8955 SS Project No. 23131 Battleboro Park Rocky Mount, North Carolina Design Head (weir elevation) for 1" Storm Orfflce Orifice Coefft., Co 0.60 Orifice Shape Circular Orifice Diameter, Do 6 Ins 0.50 Ft Orifice Area, Ao 0.20 Sf CoAo 0.12 2g 64.40 Invert EL 95.00 Ft Design Flow, Qo 0.56 Cfs Hea&..above centroid H 0:35: ft. Elev. Oriffice Invert 95.00 Elev. Oriffice Centroid 95.25 Min Eley Of Weir 55:60: [Ao = 3,1416*D^2/4] [h=((Qo/CoAo)^2)/2g] Page 1 of 1 OUTSIDE EDGE OF 6' PVC AT 1.00% SLOPE OUTSIDE EDGE OF SWALE EL.=96.0 TO LEVEL SPREADER. SWALE EL=96.0 TOP OFQWEIR-1 r EARTHEN WEIR 1. -- Atec A EAM EMBANCMETIT WITH - CONTROL WEIR. EMBANKMENT TO BE GRADED, COMPACTED AND SEEDED PER SPECIFICATIONS CLASS 'A' RIP RAP AT FACE OF EARTH EMBANKMENT PROPOSED GRADE, SEE GRADING PLAN PROPOSED BOTTOM OF SWALE #2 i LM SPREADER, SEE DETAIL #1 THIS SHEET. WEIR ELEVETION WEIR EL=95.5 2.5 FINVERT ELEV =93.5 ('P'), SEE DETAIL r #1 THIS SHEET. ' IT - 7 INVERT ELFI/ 95.0 _ '7 r 6' PVC 0 1% SLOPE CR055 5ECTION VIEW D ( ?? Earthen Embankment w/ ? N.r.s. 4 _ ? u Control Weir, at Swale #2 TOP OF WEIR EL.=95.6 NORTH MMERON GREEN SM FABRIC. - STAPLE WITH .11 GA, e u STAPLES AT 2' O.C. DOWN THE SLOPE AND 1.8' O.C. ACROSS THE SLOPE NO PLASM NEMNG IS A.LOMV. 4TI '' NORTH AMERICAN GREEN SC75 FABRIC. STAPLE WITH A 1 CA, 64 U STAPLES AT 2' O.C. DOWN THE SLOPE AND 1.6' O.C. ACROSS THE SLOPE. NO PLASTIC NETTING 16 ALLOWED. CLA% A 61 PVC (SEE DETAIL #2 THIS SHEET). WEIR 1W? r ? P' Ow. EL.) iricnr ?1 IT 3' LAYER OF #57 STONE FILTER FABRIC 4's PERFORATED SUBDRAIN, TO DAYLIGHT "•::" MODULAR CONCRETE UNITS 0 124x81 MIN, FIELD VERIFY WITH OWNER PROIR TO INSTALLATION. 31 LAYER OF #57 STONE 2-34 BALLAST STONE CONTROL FABRIC " "-6EO6YNTHETIC REINFORCEMENT Tt # REINFORCED BACKFILL COMPACTED 98% OF MAXIMUM STANDARD PROCTOR - DENSITY, SEE EARTHWORKS AND PAVING SPECIFICATION FOR ADDITIONAL. REQUIREMENTS GRANULAR LEVELING PAD 12" ABC (MIN.) * VERIFY TOP OF LEVEL SPREADER WILL =' -m BE AT OR SLIGHTLY ABOVE EXISTING GRADE PRIOR TO CONSTRUCTION ELEVATION CHART STRUCTURE "W" WEIR EL "P" INV. EL. LS LENGTH "BW" BASE WIDTH Level Spreader #1 95.50 93.5 25' Min. 2' D (?1 Level Spreader ( N.T.S.